1. Design of JMF
2. Transportation of GSB mix from plant to construction site
3. Dumping of GSB mix with the help of tipper or truck
4. Laying of GSB mix with the help of mechanical paver (If machine laid)
5. Spreading of GSB mix to the desired line, level and grade
6. Checking moisture content prior to compaction with suitable apparatus
7. Rolling operation (if moisture content is found ok) otherwise re-watering
& recompaction should be done till desired degree of compaction is
achieved
8. Determination of degree of compaction
9. Checking of surface irregularity with the help of 3 m straight edge
BEFORE LAYING GSB LAYER
FINISHED SUBGRADE TOP SHOULD BE CHECKED FOR THE FOLLOWING:
Treated
as single
granular
layer
m i - infi
Se
nite ade
r
subg
CONSTRUCTION STEPS:
1.PREPARATION OF JMF
to obtain the following parameters:
(a) material proportions (40mm, 20mm, 10mm & S/D
(b) MDD & OMC
(c) CBR value (> 100%)
2.PLANT CALIBRATION
LAV = should not be greater than 40% Aggregate may satisfy requirements of
AIV = should not be greater than 30% either of the two tests
Combined F & E Indices = should not be greater than 30%
1.One loader should be made available at the plant for loading materials