Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
KEY PLAN
AMINE WASTE USED OIL WASTE SLUDGE WASTE
LE : 3411.397 Y=0.00 STORAGE TANK STORAGE TANK STORAGE TANK 5000
LN : 1406.288 (188-VTK-31001-03) (188-VTK-31001-01) (188-VTK-31001-02)
X=0.00
2329 1215
AMINE FILLING PUMP
946
188-VT-31001-06
SLUDGE FILLING PUMP
188-VT-31001-05
2347
3357
723
USED OIL FILLING PUMP
6000
188-VT-31001-05
2300 SEE DETAIL
A ON SHEET 2 OF 7
1517
2981
PCC
173
PLATFORM
ON SHEET 4 of 7
HEAD
STATOR
SEE DETAIL
ON SHEET 2 OF 7 B
4611
6001
STATOR
2599 2491 DIESEL FUEL TANK REV DATE DESCRIPTION DRAWN CHKD APPD
(188-VTK-31001-05)
REVISIONS
TEP-1198019-D06-0043 DETAILED FABRICATION DRAWING for STRUCTURE
1412
FDF BLOWER
1898
WATER QUENCHER
(188-VKE-31001-02)
(188-VDV-31001-01) SLAKE LIME PIT TEP-1198019-D06-0042 DETAILED FABRICATION DRAWING for PLATFORM & LADDER
(188-VZC-31001-02) REFERENCE DETAILED FABRICATION DRAWING for SLAKE LIME PIT & PUMP
TEP-1198019-D06-0017
DRAWINGS HWI
SEE NOTE 2
SEE DETAIL TEP-1198019-B01-0001 GENERAL ARRANGEMENT DRAWING for HWI
C
602
ON SHEET 2 of 7
DWG NO. TITLE
DAILY PREPARATION TANK ALL RIGHT RESERVED
SCC (188-VTK-31001-07) THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS DOCUMENT, DATA,
INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP BERAU LTD.
PLATFORM
TANGGUH EXPANSION PROJECT
2187
3881
6000
DRY SCRUBBER
(188-VDV-31001-02)
859
WATER TANK
(188-VTK-31001-04)
IDF BLOWER
(188-VKE-31001-03) 213 NEUTRALIZING TANK
SEE DETAIL PLATFORM
SEE DETAIL
ON SHEET 3 of 7 E ON SHEET 3 of 7 D 2022
SEE DETAIL
SOLUTION PREPARATION TANK G ON SHEET 3 of 7
FUTURE EQUIPMENT (188-VTK-31001-06)
(HOLD)
3373
870310-S-1198019-MEC-B04-0001