TANGGUH EXPANSION – PROJECT EXECUTE

LNG EPC

CALCULATION FOR OPERATING PLATFORM-043-PLF-31004

Code Description
A Proceed - No comment
B Proceed - With comment
C Do Not Proceed - Revise & Resubmit
D Cancelled
E Received as information
Signature:

A Sutanto/ T Moritsuna T / Cicilia


B01 Issued for Information Agung T 28-Nov-2018 28-Nov-2018 28-Nov-2018
Asmoro Dwi M
Rev Reason for Issue Author Date Checker Date Approver Date

! This document is copyright and shall Document Number Contractor Doc Number
not be reproduced without the
TEP-043-CAL-ST-BP4-0020 870310-PTS-043-STR-CAL-28041
permission of BP

Document Class
© BP p.l.c.

Security Classification: 3
BP Internal
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table of Contents

1 Introduction………………………………………………………………………… 4
1.1 Project Overview………………………………………………………………… 4
1.2 Scope of Work…………………………………………………………………… 4
1.3 Reference………………………………………………………………………… 4
1.3.1 Local Codes and Standards………………………………………………………… 4
1.3.2 International Codes and Standards………………………………………………… 5
1.3.3 Project Documents………………………………………………………………… 6
1.3.4 Other References…………………………………………………………………… 7
1.4 Language and Units……………………………………………………………… 7
1.4.1 Language…………………………………………………………………………… 7
1.4.2 Units………………………………………………………………………………… 7
1.5 Quality of Material………………………………………………………………… 7
1.6 Unit Weight of Material………………………………………………………… 8
1.7 Abbreviation and Symbol………………………………………………………… 8
2 Analysis Method…………………………………………………………………… 11
2.1 Design Concept…………………………………………………………………… 11
2.2 Design Loading…………………………………………………………………… 12
2.2.1 Primary Load………………………………………………………………………… 12
2.2.2 Load Combination…………………………………………………………………… 13
2.3 Allowable Deflection……………………………………………………………… 20
2.3.1 Vertical Deflection…………………………………………………………………… 20
2.3.2 Horizontal Deflection………………………………………………………………… 20
2.3.3 Allowable Drift……………………………………………………………………… 20
3 Design Result Summary…………………………………………………………… 21
3.1 Steel Stresses Summary………………………………………………………… 21
3.2 Steel Deflection Summary……………………………………………………… 21
3.2.1 Column Deflection Summary……………………………………………………… 21
3.2.2 Beam Deflection Summary………………………………………………………… 21
4 Conclusion…………………………………………………………………………… 21

List of Appendix
Appendix 1 - Operating Platform Plan Layout & View
Appendix 2 - Structural Modelling
Appendix 3 - Design Load
Appendix 4 - Steel Strength
Appendix 5 - Steel displacement and Deflection Check
Appendix 6 - Connection Check
Appendix 7 - Calculation for Special Connection
Appendix 8 - Material Take Off
Appendix 9 - STAAD. Pro Data
Appendix 10 - Steel Strength Ratio
Appendix 11 - STAAD. Pro Output
Appendix 12 - Pipe & Equipment Loading Data
Appendix 13 - Steel Structure Drawing

TEP-043-CAL-ST-BP4-0020 2 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Revision History
Revision
Amandment Date Amandment Name Amandment
Number
28-Nov-2018 B01 Agung T Issued for Information

OMS References
Relevant Section of This
OMS Section Ref OMS Section Title
Document

Related Documents
Document Number Document Name

TEP-043-STL-ST-BP4-0027 OPERATING PLATFORM 043-PLF-31004 - FRAMING


PLAN
TEP-043-STL-ST-BP4-0028 OPERATING PLATFORM 043-PLF-31004 - ELEVATION
TEP-043-STL-ST-BP4-0029 OPERATING PLATFORM 043-PLF-31004 -DETAILS

Stakeholders
Name Date Reviewed

Sudewo Winarso, Civil & Structural Lead Engineer


Rizaluddin, Senior Civil Engineer
Hugo Galanes, Senior Geotechnical Engineer

List of Holds
Hold Description Comment

TEP-043-CAL-ST-BP4-0020 3 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1 Introduction
1.1 Project Overview
BP Berau Ltd., hereafter known as COMPANY, is the operator of Tangguh LNG, a two train natural gas
(NG) liquefaction facility in Bintuni Bay, Papua, Indonesia. The facility includes associated onshore
infrastructure, two offshore platforms, pipelines and twelve wells. These facilities are the Trains 1 and
2 developments at Tangguh.

COMPANY has initiated the Tangguh Expansion Project to commercialise the incremental resource
into high margin gas markets based on a single LNG (liquefied natural gas) train expansion (Train 3).

Tangguh Expansion Project will consist of new offshore facilities, including wellhead platforms and
pipelines, and onshore development on the existing Tangguh brownfield site. The new onshore
facilities will include one additional natural gas liquefaction train of a similar design and capacity to the
existing trains, an onshore receiving facility (ORF), new LNG and condensate loading berth, additional
boil off gas (BOG) recovery, utilities, flares and the infrastructure to support logistics and the
associated increase in the temporary and permanent workforce.
The Tangguh Expansion Project comprises of the following new facilities:
 [New] Onshore Receiving Facility (ORF)
 [New] LNG Train 3
 [New] Condensate Stabilization Train 3
 [New/Inter connection] Plant Utility Facilities
 [New] LNG Loading System
 [New] Condensate Loading System
 [Expansion] Integrated Control and Safety System (ICSS)
 [Expansion] Telecommunication System
 [New] Trestle Jetty Structure
 [Expansion] Onshore Infrastructure
 Hazardous and Non-hazardous Waste Management System

1.2 Scope of Work


This report presents calculation of structure design for Pipe Bridge 093-BRG-31002 in Tangguh LNG
Plant, located at Tanah Merah in the Bintuni Bay region, West Papua province, Indonesia.

1.3 Reference
All design shall be in accordance with, but not limited to the current revisions and latest amendments
of the following codes and standards.

1.3.1 Local Codes and Standards


Local regulation and codes about structural design shall apply to the structural and foundation work
unless otherwise specified herein or indicated on the drawings.

1. SNI 1726: 2012 Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan
Gedung dan Non Gedung (Seismic Resistance Design for Building and
Non-Building Structures)

2. SNI 1727: 2013 Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur Lain
(Minimum Design Loads for Buildings and Other Structures)

3. SNI 1729-2015 Spesifikasi untuk Bangunan Gedung Baja Struktural (Specification for
Design of Structural Steel Building)

4. SNI 2847: 2013 Persyaratan Beton Struktural untuk Bangunan Gedung (Building Code
Requirements for Structural Concrete)

TEP-043-CAL-ST-BP4-0020 4 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1.3.2 International Codes and Standards


International regulation and codes about structural design shall apply as governing standards to the
structural and foundation work unless otherwise specified herein or indicated on the drawings.

1. AISC 303-10 Code of Standard Practice for Steel Buildings and Bridges
2. AISC 325-10 Steel Construction Manual
3. AISC 326-10 Detailing for Steel Construction
nd
4. AISC 327-12A AISC Seismic Design Manual 2 Ed.
5. AISC 341-10 Seismic Provisions for Structural Steel Buildings
6. AISC 360-10 Specification for Structural Steel Buildings
7. ASCE 7-10 Minimum Design Loads for Buildings and Other Structures
8. ASCE 41088 Design of Blast-Resistant Buildings in Petrochemical Facilities
9. ASCE 41140 Guidelines for Seismic Evaluation and Design of Petrochemical
Facilities
10. ASCE 41180 Wind Loads for Petrochemical and Other Industrial Facilities
nd
11. ASCE (2010) ASCE 2 Ed. Design of Blast Resistant in Petrochemical Facilities
12. ASCE (2013) Anchorage Design for Petrochemical Facilities
13. ASCE 37-02 Design Loads on Structures during Construction
14. ASCE 59-11 Blast Protection of Buildings
15. ASTM A36/A36M Standard Specification for Carbon Structural Steel
16. ASTM A53/A53M Standard Specification for Pipe, Steel, Black and Hot-Dipped Zinc-
Coated Welded and Seamless
17. ASTM A123/A123M Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron
and Steel Products
18. ASTM A283/A283M Standard Specification for Low and Intermediate Tensile Strength
Carbon Steel Plates
19. ASTM A307 Standard Specification for Carbon Steel Bolts, Studs, and Threaded
Rod 60000 PSI Tensile Strength
Standard Specification for High Strength Structural Bolts, Steel and
20. ASTM F3125/F3125M
Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa)
Minimum Tensile Strength, Inch and Metric Dimensions
21. ASTM A572/A572M Standard Specification for High-Strength Low-Alloy Columbium-
Vanadium Structural Steel
22. ASTM A615/A615M Standard Specification for Deformed and Plain Carbon-Steel Bars for
Concrete Reinforcement
23. ASTM A1064/A1064M Carbon-Steel Wire and Welded Wire Reinforcement, Plain and
Deformed, for Concrete
24. ASTM F436/F436M Standard Specification for Hardened Steel Washers
25. ASTM F2329 Standard Specification for Zinc Coating, Hot-Dip, Requirements for
application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts,
and Special Threaded Fasteners
26. JIS G 3101 Standard for Rolled Steels for General Structure
27. JIS G 3106 Standard for Rolled steels for welded structure
28. NFPA 59A Standard for the Production, Storage, and Handling of Liquefied
Natural Gas (LNG)

29. RCSC (2009) Specification for Structural Joints Using High-Strength Bolts
30. UFC 3-340-02 Structures to Resist The Effect of Accidental Explosions

TEP-043-CAL-ST-BP4-0020 5 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1.3.3 Project Documents


The following project documents shall be applied as part of building design :
1. TEP-900-DBS-CV-BP4-0001 Onshore Civil and Structural Design Basis
2. TEP-900-SPE-CV-BP4-0001 Project Specification for Seismic Design Criteria
3. TEP-900-SPE-CV-BP4-0002 Project Specification for Wind Load Design Criteria
4. TEP-900-SPE-CV-BP4-0004 Project Specification for Piling (Fabrication, Installation &
Testing)
5. TEP-900-SPE-CV-BP4-0005 Project Specification for Reinforced Concrete & Grouting Work
& Supply
6. TEP-900-SPE-CV-BP4-0008 Project Specification for Structural Supply and Fabrication
7. TEP-900-SPE-CV-BP4-0009 Project Specification for Steel Erection
8. TEP-900-SPE-CV-BP4-0010 Project Specification for Passive Fire Protection System
9. TEP-900-SOR-HS-BP4-0001 Blast Requirement for Equipment, Piping and Structures
10. TEP-900-DBS-HS-BP4-0001 Blast Resistant Structural Design Criteria
11. TEP-093-LAY-PP-BP4-5001 Sectional Plot Plan for LNG Process Train-3
12. TEP-053-EDS-EX-BP4-0039 Data Sheet of C3 Compressor Desuperheater (053-E-31001)
13. TEP-053-EDS-EX-BP4-0041 Data Sheet of C3 Subcooler (053-E-31003)
14. TEP-053-EDS-EX-BP4-0042 Data Sheet of LP MR Compressor After Cooler (053-E-31004)
15. TEP-053-EDS-EX-BP4-0043 Data Sheet of MP MR Compressor After Cooler (053-E-31005)
16. TEP-053-EDS-EX-BP4-0044 Data Sheet of HP MR Compressor After Cooler (053-E-31006)
17. TEP-900-STD-ST-BP4-0010 Standard Drawing Column Base Plate
18. TEP-900-STD-ST-BP4-0011 Standard Drawing Beam to Column Moment Connection
19. TEP-900-STD-ST-BP4-0012 Standard Drawing Beam to Column Pin Connection
20. TEP-900-STD-ST-BP4-0013 Standard Drawing Beam to Beam Pin Connection
21. TEP-900-STD-ST-BP4-0015 Standard Drawing Vertical Bracing Connection
22. TEP-900-STD-ST-BP4-0016 Standard Drawing Horizontal Bracing Connection
23. TEP-900-CAL-ST-BP4-0004 Calculation for Column Base Plate
24. TEP-900-CAL-ST-BP4-0006 Calculation for Beam to Column Moment Connection End Plate
Type
25. TEP-900-CAL-ST-BP4-0007 Calculation for Beam to Column Moment Connection Welded
Type
26. TEP-900-CAL-ST-BP4-0008 Calculation for Beam to Column Pin Connection
27. TEP-900-CAL-ST-BP4-0009 Calculation for Beam to Beam Pin Connection
28. TEP-900-CAL-ST-BP4-0011 Calculation for Vertical Bracing Connection
29. TEP-900-CAL-ST-BP4-0012 Calculation for Horizontal Bracing Connection
30. CTR-IHM-PIPE-01122 Loading Data for Process operating Platform (043-PLF-31004)
3rd Step Issue
31. TEP-LNG-4420000942-L-0128 LOI - Blast Load Requirements for Critical Equipment and
Occupied Buildings.

1.3.4 Other References


1. Drake, Richard M. & Walter,Robert J., "Seismic design of structural steel pipe racks".
2. MacGregor, J.G. & Bartlett, F.M., "Reinforced Concrete Mechanics and Design".
3. Gunung Garuda, PT., "Catalogue of Steel Material".

TEP-043-CAL-ST-BP4-0020 6 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1.4 Language and Units


1.4.1 Language
All project calculations shall be written in the English language with some exceptions as per
Ref.1.3.3.1, Onshore Civil and Structural Design Basis.

1.4.2 Units
The units of measurement to be used in all calculations are generally based on the International
System of Units (SI). Nominal pipe size may be in inches.

1.5 Quality of Material


Table 1 - Quality of Material
Parameter Strength unit
Concrete
- Structural Concrete f'c = 32.00 MPa
- Leveling Concrete f'c = 15.00 MPa
- Prestressed Concrete Pile f'c = 50.00 MPa
Reinforcing Bar
- Deformed Bar, SNI 07-2052-2002 grade BJTS 40 fy = 390.00 MPa
- Plain Bar, SNI 07-2052-2002 BJTP 24 fy = 235.00 MPa
- Welded Wire, SNI 07-0663-1995 fy = 490.00 MPa
Steel
- Standard Profile, JIS 3101 Gr SS 400 fus = 400.00 MPa
for thickness ≤ 16 mm fys = 245.00 MPa
for thickness >16 mm and ≤ 40 mm fys = 235.00 * MPa
- High Grade Profile, ASTM A572 Gr.50 fus = 450.00 * MPa
fys = 345.00 MPa
Connection
- High Strength Bolt, ASTM F3125/F3125M grade A325M
Nominal Tensile Strength ft = 620.00 MPa
Nominal Shear Strength fv = 372.00 MPa
- Mild Steel Bolt, ASTM A307
- Anchor Bolt for general use, ASTM A307 Grade B
Specified Tensile Stress of Bolt fu = 414.00 MPa
Specified Yield Strength of Bolt fy = 248.00 MPa
Nominal Tensile Stress of Bolt fnt = 310.00 MPa
Nominal Shear Stress of Bolt fnv = 165.00 MPa
* For simplify analysis, Fy taken for all member size is 235 Mpa (for standard steel)

TEP-043-CAL-ST-BP4-0020 7 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1.6 Unit Weight of Material


Table 2 - Unit Weight of Material
Parameter Unit Weight unit
3
Reinforced concrete s = 24.53 kN/m
3
Plain concrete pc = 23.54 kN/m
3
Structural steel s = 77.01 kN/m
3
Earth fill so = 17.66 kN/m
3
Water L = 9.81 kN/m
3
Cement mortar g = 21.58 kN/m
3
Fireproofing 22.56 kN/m

1.7 Abbreviation and Symbol


Abbreviations
ACI American Concrete Institute
AISC American Institute of Steel Construction
API American Petroleum Institute
ASCE American Society of Civil Engineers
ASTM American Society for Testing and Materials
FEED Front End Engineering and Design
ICC/IBC International Code Council/ International Building Code
JIS Japanese Industrial Standard
LNG Liquefied Natural Gas
LPG Liquefied Petroleum Gas
LRFD Load Resistance Factor Design
MSL Mean Sea Level
N North
NFPA National Fire Protection Association
PIP Process Industry Practice
RC Reinforced Concrete
SFRS Seismic Force Resisting System
SNI Indonesian National Standards
TEP Tangguh Expansion Project
UFC Unified Facilities Criteria

Symbol
Af Projected Area Wind Direction
AG Anchor/ Guide Support Load
As Area of Non-prestressed Longitudinal Tension Reinforcement
Av Area of Shear Reinforcement
b Width of Structural Member
CD Crane Dead Load
Cf Force Coefficient
CL Crane Lifting/ Impact Load
Cs Seismic Response Coefficient

TEP-043-CAL-ST-BP4-0020 8 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Csx Seismic Response Coefficient X-Direction


Csz Seismic Response Coefficient Z-Direction
Cu Coefficient for Upper Limit on Calculated Period
D Diameter
d, d' Distance from Extreme Compression Fiber to Centroid of Longitudinal Compression
Reinforcement
dbar Rebar Diameter
DL Dead Load
E Earthquake Load
Ec Modulus of elasticity for concrete
Es Modulus of elasticity for steel
Ex Earthquake Load X-Direction
Ey Earthquake Load Y-Direction
Ez Earthquake Load Z-Direction
f’c Specified Compressive Strength of Concrete at 28 Days
Fi Lateral Seismic Force
Fw Wind Force
fy Specified Minimum Yield Stress of Steel
G Gust Effect Factor
h Depth of Structural Member
hi The Height from the Base to Level i
Ie Importance Factor in Seismic
Kd Wind Directional Factor
Kz Velocity Pressure Coefficient
Kzt Topographic Factor
L Live Load
Mu Factored Moment at Section
P Piping Load
p Wind Pressure
PE Piping Load Empty Condition
PO Piping Load Operating Condition
PT Piping Load Test Condition
Q Equipment Load
QE Equipment Load Empty Condition
QO Equipment Load Operating Condition
QT Equipment Load Test Condition
qz Velocity Pressure
Rx Response Modification Coefficient X-Direction
Rz Response Modification Coefficient Z-Direction
s,s1,s2,s3 Spacing between Shear Reinforcement
Sa Design Spectral Response Acceleration
Sax Design Spectral Response Acceleration X-Direction
Saz Design Spectral Response Acceleration Z-Direction
SD1 Design, 5% damped, Spectral Response Acceleration at Period of 1
SDS Design, 5% damped, Spectral Response Acceleration at Short Period

TEP-043-CAL-ST-BP4-0020 9 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

SL Surge Load
T Fundamental Period of Structure
Ta Approximate Building Period
TB Bundle Tube Load
TF Thermal Friction Load
TL Long-Period Transition Period
To 0.2 SD1 / SDS
Ts SD1 / SDS
Tx Period of Structure in X-Direction
Tz Period of Structure in Z-Direction
v Wind Speed
Vc Shear Capacity of Concrete Section
VL Vibration/ Dynamic Load
Vs Shear Capacity of Reinforcement Rebar
Vu Factored Shear at Section
Vx Seismic Base Shear Force X-Direction
Vz Seismic Base Shear Force Z-Direction
W Wind Load
Wi The Portion of the total Effective Seismic Weight Assigned to Level i
Wt The Effective Seismic Weight
WX Wind Load X-Direction
WZ Wind Load Z-Direction
z Height Above Ground Level
zg Nominal Height of the Atmospheric Standard
l Factor Related to Concrete Type
a 3-sec Gust-Speed Power Law Exponent
b1 Factor Relating Depth of Equivalent Rectangular Compressive Stress Block to Neutral Axis
Depth

Ø Shear Reduction Factor, 0.75


r Ratio of Rebar Reinforcement and Concrete Area
π phi value, 3.14
Φ Flexural Reduction Factor, 0.9
c Density of Reinforced Concrete
g Density of Cement Mortar
L Density of Water
pc Density of Plain Concrete
s Density of Structural Steel
so Density of Earth Fill

TEP-043-CAL-ST-BP4-0020 10 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

2 Analysis Method
2.1 Design Concept
1. The loads to be considered in calculation consist of self-gravity loads, super imposed dead loads,
live loads, pipe loads, equipment loads and environmental loads.
2. Steel member shall be designed conforming to AISC LRFD (Load and Resistance Factor Design)
Method.
3. Seismic force resisting system of structure was designed refer to Table 15.4-1 for Non Building
Structures Similar to Building of ASCE 7-10 as :
a. Moment resisting frames system in transversal direction with Steel Ordinary Moment
Frames (OMF).
b. Steel ordinary concentrically braced frames in longitudinal direction with Steel Ordinary
Concentrically Braced Frames (OCBF).
4. The types of support in transversal direction are assigned as ‘fixed but’ type with rotational
spring stiffness calculated refer to Doc.No. TEP-900-CAL-ST-BP4-0004 (Calculation for Column
Base Plate) and as pinned in longitudinal directions.

5. Operating Platform 043-PLF-31004 is classified as structure category C-2 as per SARI


specification Doc.No.TEP-900-SOR-HS-BP4-0001 No Blast Requirement for Equipment, Piping
and Structures

6. Sesimic Force was calculated by static equivalent lateral force analysis


7. The structure will be analyzed with STAAD.Pro V8i structural analysis computer programming
with linear elastic analysis and as space frame.

TEP-043-CAL-ST-BP4-0020 11 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

2.2 Design Loading


2.2.1 Primary Load
The following loads and forces are considered in the design of structure :
2.2.1.1 Dead Load (D)
Self-weight of steel structure including fireproofing.
Self-weight of concrete structure including reinforcement. Self-
weight of grating, hand rail, stair, lighting and accessories.
2.2.1.2 Live Load (L)
Any load which is not permanently fixed to the structure e.g. loading caused by personnel, tools during
maintenance.

2.2.1.3 Equipment Load (Q)


The weight of equipment or machinery including its appurtenances is classified as an empty/ erection
load QE, an operating load Q O or a testing load Q T.
2.2.1.4 Piping Load (P)
The weight of pipe including its appurtenances is classified as an empty/ erection load PE, an operating
load P O, or a testing load PT.
2.2.1.5 Wind Load (W)
Based on reference “TEP-900-SPE-CV-BP4-0002, Project Specification for Wind Load Design Criteria”,
the wind load shall be calculated in accordance refer to Ref.1.3.2.7

2.2.1.6 Earthquake Load (E)


Based on reference “TEP-900-SPE-CV-BP4-0001, Project Specification for Seismic Design Criteria”,
the earthquake load shall be calculated in accordance refer to Ref.1.3.2.7

2.2.1.7 Thermal Friction Load (TF)


In the design of pipe supports, horizontal friction forces due to thermal expansion or contraction
produced by process temperature change shall be applied at the defined anchor points.
2.2.1.8 Anchor / Guide Support Load (AG)
The anchor and guide force shall be deemed as a permanent thermal load when the temperature
corresponds to the normal operating condition. This force shall be assumed to act in both direction
parallel to and perpendicular to the piping run.

TEP-043-CAL-ST-BP4-0020 12 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

2.2.2 Load Combination


General Design Loads Combinations for Reinforced Concrete & Steel Structure Design
Table 3 - Factored Load Combinations

TEP-043-CAL-ST-BP4-0020 13 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 3 (continued) - Factored Load Combinations

TEP-043-CAL-ST-BP4-0020 14 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 3 (continued) - Factored Load Combinations

TEP-043-CAL-ST-BP4-0020 15 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 3 (continued) - Factored Load Combinations

TEP-043-CAL-ST-BP4-0020 16 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

TEP-043-CAL-ST-BP4-0020 17 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

General Design Loads Combinations for Soil Bearing Pressure and Serviceability & Stability Check
Table 4 - Unfactored Load Combinations

TEP-043-CAL-ST-BP4-0020 18 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 4 (continued) - Unfactored Load Combinations

TEP-043-CAL-ST-BP4-0020 19 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

2.3 Allowable Deflection


2.3.1 Vertical Deflection
Refer to Ref.1.3.3.1 Table 18, Onshore Civil and Structural Design Basis, the serviceability limit vertical
deflection for structural members shall be as specified below :

Table 5 - Allowable Vertical Deflection


Member Type Deflection Limit
Beams supporting floors - general "Span" / 240 or 25 mm, whichever is less
Beams supporting brittle wall / finishing "Span" /360 under permanent load
"Span" / 360 or 25 mm, whichever is less,
Beams supporting pipes
under permanent load

Beams supporting equipment "Span" / 360 under permanent load


Grating / checker plate "Span" / 240 or 5 mm, whichever is less

2.3.2 Horizontal Deflection


Refer to Ref.1.3.3.1 Table 18, Onshore Civil and Structural Design Basis, the serviceability limit
horizontal deflection for structural members shall be as specified below :

Table 6 - Allowable Horizontal Deflection


Member Type Deflection Limit
Columns - General "Height" / 200
Columns - First Order Analysis "Height" / 500 under permanent load
Columns - Second Order Analysis "Height" / 300 under permanent load
Columns supporting crane / monorail "Height" / 400

2.3.3 Allowable Drift


The design story drift due to seismic shall not exceed the allowable story drift, as obtained refer to
Ref.1.3.2.7 Table 12.12-1” for any story.

The design story drift of Main Pipe Rack, risk category III type of structure, shall be less than 0.015*h,
where “h” is the story height for each level. The displacement of the Main Pipe Rack and the potential
for interaction pounding effect of mechanical equipment system shall be considered as following :

(Ref.1.3.2.7 Eq.15.5-1)
Cd * δxe
δx =
Ie
Where, δx = Design story drift due to seismic
Cd = Deflection amplification factor (Ref.1.3.2.7 Table 15.4-1)
δxe = Deflection using prescribed seismic design force
Ie = Importance factor (Ref.1.3.2.7 Table 15.4-1)

In general piping confirmed if structure displacement limit under seismic load with maximum
displacement 0.015H has met piping requirement.

TEP-043-CAL-ST-BP4-0020 20 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3 Design Result Summary


3.1 Steel Stresses Summary
All steel member stress ratio is within the allowable criteria, Detail report refer to appendix 4.

3.2 Steel Deflection Summary


3.2.1 Column Deflection Summary
All column member horizontal deflection is below the allowable criteria, Detail report refer to appendix
5. Horizontal displacement of column member are within the allowable criteria.

3.2.2 Beam Deflection Summary


All Beam member vertical deflection is below the allowable criteria, Detail report refer to appendix 5.
Deflection of all beam member are within the allowable criteria.

4 Conclusion
Based on given condition in the structural analysis, the design of 043-PLF-31004 is considered
adequate in meeting the design criteria.

TEP-043-CAL-ST-BP4-0020 21 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 1 - Operating Platform Plan Layout & View


1.1 Operating Platform (043-PLF-31004) Plan
Refer to Ref.1.3.3.12, drawing Sectional Plot Plan for LNG Process Train-3 .
Figure 1 - Operating Platform (043-PLF-31004) Plan View

1.2 Operating Platform (043-PLF-31004) Layout


Refer to Ref.1.3.3.12, drawing Sectional Plot Plan for LNG Process Train-3 .
Figure 2 - Operating Platform (043-PLF-31004) Layout View

TEP-043-CAL-ST-BP4-0020 22 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 2 - Structural Modelling


2.1 STAAD. Pro - Model for Modul-1
Figure 3 - Operating Platform (043-PLF-31004) 3D View

Y
X
Z
1

2
A

Figure 4 - Operating Platform (043-PLF-31004) Line 1

R4 R4
R1

TOS +27.000
R2
R1

TOS +24.250
R2
R1

TOS +21.500
R2
R1

5400
A B

TEP-043-CAL-ST-BP4-0020 23 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 5 - Operating Platform (043-PLF-31004) Line 2

R2 R2

R1
TOS +27.000
R2

R1
R2

R1
R2

R1
5400
A B

Figure 6 - Operating Platform (043-PLF-31004) Line A

TOS +29.300
R2 R2 R3
R1

R1

TOS +27.000
R2 R2 R3
R1

R1

TOS +24.250
R2 R2 R3
R1

R1

TOS +21.500
R2 R2 R3
R1

R1

4600
A B

TEP-043-CAL-ST-BP4-0020 24 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 7 - Operating Platform (043-PLF-31004) Line B

R2 R2 R3

R1
R2 R2 R3

R2 R2 R3

R2 R2 R3

4600

A B

Figure 8 - Operating Platform (043-PLF-31004) Elevation +21.500,

R3 R3
R3

R6

R6

R3
1
R2
R2

R6

R2

R3 R3 R3
R6
R6

R6 R6
R6

4600
R6

R3 R3 R3
R2
R6
R2

Load 22
2

5400

A B

TEP-043-CAL-ST-BP4-0020 25 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 9 - Operating Platform (043-PLF-31004) Elevation +24.250,

R3 R3 R3

R3

R6

R6

R3
R3 R3
1
R2

R3

4600
R2

R3 R3

R2
R3
R2

R3
R3 R3

R5

R5

R3 R3

R5 R5

A
2
R2

Figure 10 -

R3 R3 R3

1
R2
R2
Load 22

5400
R3

R6

R6

Operating Platform (043-PLF-31004) Elevation +27.000,


R2

R3

R6

R3

R3

R6 R6 R6 R6
R2
R3

R3

4600

R3 R3 R3 R3
R2

R6

R2

Loa d 22
2
R2

5400

A B

TEP-043-CAL-ST-BP4-0020 26 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 11 - Operating Platform (043-PLF-31004) Elevation +29.300,

R3 R3 R3

R3

R6

R6

R3
R4 R4 1

R2

R6

R6

R6

R2
R4 R4 R4 R4

R4

R4

4600
R4

R4

R4
R4 R4 R4 R4 R4

R6

R4
R2

R4

R2
R6

R6

R4
Load 22
R2 2
R2
5400

A B

TEP-043-CAL-ST-BP4-0020 27 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

2.2 STAAD. Pro - Member Properties


The following table explains the preliminary member property in figures in sub-chapter 2.1.
Table 1 Member Properties for Operating Platform (043-PLF-31004)
Name Profile Material Remark
COLUMN
R1 WH-200 Steel Column
EL. +21.500
R2 SH-300 Steel Primary Beam
R3 SH-250 Steel Secondary Beam
R6 C-150 Steel Secondary Beam
R8 L-75 Steel Horizontal Brace
EL. +24.250
R2 SH-300 Steel Primary Beam
R3 SH-250 Steel Secondary Beam
R5 WH-125 Steel Secondary Beam
R6 C-150 Steel Secondary Beam
R8 L-75 Steel Horizontal Brace
EL. +27.000
R2 SH-300 Steel Primary Beam
R3 SH-250 Steel Secondary Beam
R6 C-150 Steel Secondary Beam
R8 L-75 Steel Horizontal Brace
EL. +29.300
R2 SH-300 Steel Primary Beam
R3 SH-250 Steel Secondary Beam
R4 WH-150 Steel Secondary Beam
R6 C-150 Steel Secondary Beam
R8 L-75 Steel Horizontal Brace
Vertical Bracing
R7 PIPE 4" Steel Vertical Brace

TEP-043-CAL-ST-BP4-0020 28 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 3 - Design Load


3.1 Dead Load
3.1.1 Self Weight

Refer to Design Basis Sec 6.2.2, Onshore Civil and Structural Design Basis, Dead Load of steel
structure will be calculated by software (STAAD.Oro) with command ''Selfweight Y -1.12'' .

Figure 8 - Selfweight of Structure

3.1.2 Dead Load of Grating, Handrail and Ladder


Figure 9 - Dead Load of Cable and Service Tray Support

TEP-043-CAL-ST-BP4-0020 29 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.2 Live Load


Figure 10 - Live Load

TEP-043-CAL-ST-BP4-0020 30 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.3 Piping Load


Piping Load is applied as per civil information and loading data refer to Appendix 5
3.3.1 Piping Loading data
Piping Load is applied as per Civil information refer to Appendix 5
Refer to Piping Loading Data & Procedure (CSTS Internal Document )
Fyw1 : Piping weight including insulation (exclude fluid weight)
Fyw2 : Piping weight including insulation including fluid weight
Fyo / Fxo / Fzo : Vertical/Horizontal force during operation due to thermal
Fys / Fxs / Fzs : Vertical/Horizontal force due to short therm condition
FyT : Piping weight during hydrostatic pressure test
FxR / FzR : Horizontal force due to PSV discharge

Note :
1. PO-vertical (in Operating Condition) = F YW2 + FYO
2. Seismic Load due to Piping is calculated by CVST
- Consider only F Yw2 for seismic design due to piping
- Fyo / Fxo / Fzo is additional force due to thermal force therefore it is not considered for
seismic calculation

Figure 11 - Empty Piping Load

TEP-043-CAL-ST-BP4-0020 31 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 12 - Operating Piping Load

TEP-043-CAL-ST-BP4-0020 32 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.4 Thermal Friction Load


The friction force shall be taken as the operating load times the applicable friction coefficient.
Only half of the total pipe operating weight will be included in thermal load calculation, as not
all pipes will be simultaneously causing the same effect.

TF = Pipe gravity load * Friction coefficient ( 0.3 for steel to steel ).


Thermal Friction Load were calculated based on the following basis :
- For beam with 3 pipes or less were taken as 30% of total (both for local and global check).
- For beam with over 3 pipes were taken as 15% of total load for global check, and 30% of total load
for local check.
- For case item no.3 of section 6.9.3 ( Ref 1.3.3.1 ), Piping inform that thermal loads are calculated
based on “Design Temperature”, Not Normal Operating Temperature” to make conservative
assumption. Therefore, there is less possibility to act simultaneously.

- All horizontal thermal friction (X,Z) will be input in positive direction. Effect of its reverse direction
will be considered in Load Combination (Refer to Table 3)

Figure 13 - Thermal Friction Load

X-DIRECTION Z-DIRECTION

TEP-043-CAL-ST-BP4-0020 33 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.5 Anchor/Guide Load


Anchor/guide Load is applied as per Civil information refer to Appendix 5
Figure 14 -a Guide Load

Figure 14 -b Anchor Load

TEP-043-CAL-ST-BP4-0020 34 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.6 Wind Load


RC = Risk category = III (Ref.1.3.3.3 Table 2)
V = Basic wind speed = 43.40 m/s (Ref.1.3.3.3 Sec. 8.3.2)
E Exposure category = C (Ref.1.3.3.3 Sec. 8.1)
Kd = Wind directionality factor = 0.85 (Ref.1.3.3.3 Table 3)
Kzt = Topographic factor = 1.00 (Ref.1.3.3.3 Sec. 8.3.6 )
z = Height of pipe rack = 11.30 m
zg = = 274.32 m (Ref.1.3.2.7 Table 26.9-1)
α = = 9.50 (Ref.1.3.2.7 Table 26.9-1)
Kz = Velocity pressure coef. = 1.03 (Ref.1.3.2.7 Table 29.3-1)
(2/α)
= 2.01 * (z/z ) for 4.50 m ≤ z ≤ zg
g
(2/α)
= 2.01 * (4.5/z ) g
for < 4.5
2
qz = Velocity pressure = 1.01 kN/m (Ref.1.3.3.3 Sec. 8.3)
2
= 0.613 * Kd * Kzt * Kz * V

Table 2 - Load Distribution at Various Height


Limit State Design; Risk Category III & IV
Height z (m) Kz v = 43.40 m/s ; K d = 0.85
qz (kPa)
0.3 0.84605 0.830340035
3.5 0.84605 0.830340035
6.25 0.90663 0.889797625
9 0.97898 0.960794955
11.3 1.02702 1.007948352

3.6.1 Wind Load due to Structure


G = Gust effect factor = 0.85 (Ref.1.3.3.3 Sec. 8.6)
Cf = Force coefficient = 1.80 (Ref.1.3.3.3 Sec. 8.11)
FwS = Wind load due to structure = 1.54 * Af (Ref.1.3.3.3 Sec. 8.11)
= qz * G * Cf * Af
Table -
Wind load due to structure
Elevation z (m) F ws = qz * G * Cf * Af Height (z)
(kPa)
18.3 1.27042 * Af 0.3
21.5 1.27042 * Af 3.5
24.25 1.36139 * Af 6.25
27 1.47002 * Af 9
29.3 1.54216 * Af 11.3

TEP-043-CAL-ST-BP4-0020 35 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 15 - Wind Load


Due to structure
X direction Z direction

TEP-043-CAL-ST-BP4-0020 36 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

3.7 Seismic Load


3.7.1 Static Seismic Force - Equivalent Lateral Force
RC = Risk category = 3 (Ref.1.3.3.2 App. 2)
SC = Seismic design category = D (Ref.1.3.3.2 App. 2)
Rx = Response modification coeff. = 3.500 (Ref.1.3.3.2 App. 2)
Longitudinal Steel Ordinary Moment - Resisting Frame
Rz = Response modification coeff. = 3.250 (Ref.1.3.3.2 App. 2)
Transverse Steel Ordinary Concentrically Braced Frame
TL = Long-period transition period = 10 (Ref.16. Page 9)

2/3 MCER Case


Ie = Importance factor = 1.250 (Ref.1.3.3.2 App. 2)
OBE Case
Ie = Importance factor = 1.500 (Ref..18 App. 2)

2/3 MCER Case


SDS = Design spectral response = 0.745 (Ref.1.3.3.2 App. 5)
acceleration in the short
periode
Design spectral response
SD1 = = 0.522 (Ref.1.3.3.2 App.5)
acceleration at a period of 1.0
s
2/3 MCER Case

T0 = 0.2 SD1/SDS = 0.140 (Ref.1.3.2.7 Eq.11.4-7)

Ts = SD1/SDS = 0.701 (Ref.1.3.2.7 Eq.11.4-7)

(Longitudinal Direction)
Frequency for Load Case 91 empty = 0.972 (Staad Pro Output)
Frequency for Load Case 93 Operating = 1.925 (Staad Pro Output)

Upper Limit on Calculated Period


Type = Structure type = Steel moment - resisting frame
Cu = Response modification coeff. = 1.40 (Ref.1.3.3.2 Table 4)
Ct = = 0.072 (Ref.1.3.3.2 Table 3)
x = = 0.800 (Ref.1.3.3.2 Table 3)
hn = Structural height = 10.500 m
1
Tx = = 1.029 sec empty
Freq
1
Tx = = 0.519 sec operating
Freq

TEP-043-CAL-ST-BP4-0020 37 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

check :
Tx - max ≤ Cu * Ct * hn x (Ref.1.3.2.7 Eq.12.8-7)
= 1.4 * 0.0724 * (10.5 ^ 0.8) = 0.665 sec Use this

Tx - max < 3.5 Ts (Ref.1.3.2.7 Table 12.6-1)


= 3.5 * 0.701 = 2.452 sec OK!
Tx - used = Min(Tx-max , Tx) = 0.665 sec empty
Tx - used = Min(Tx-max , Tx) = 0.519 sec operating
2/3 MCER Case
Csx = Seismic response coeff. (Ref.1.2.1 Eq.12.8-2)
= SDS / (Rx / Ie) = 0.266
2/3 MCER Case
Refer to Ref. 1.3.3.2 Appendix 5
for Tx = 0.665 s,  Sax-E = 0.630 empty
for Tx = 0.519 s,  Sax-O = 0.690 operating
(Ref.1.3.3.2 Appendix 5)
Sa
Csx - max = = 0.225 empty
(Rx / Ie) (Ref.1.3.2.7 Eq.12.8-3)
Sa
Csx - max = = 0.246 operating
(Rx / Ie)
Cs - min = 0.044 SDS Ie ≥ 0.01 = 0.041 OK!
(Ref.1.3.2.7 Eq.12.8-5)
Csx- used = 0.225 empty
Csx- used = 0.246 Operating
Redundant factor = 1.300
Vx = Seismic base shear = 0.293 * ΣWt
= Csx * ΣWt empty condition
Vx = Seismic base shear = 0.320 * ΣWt
= Csx * ΣWt operating condition
(Ref.1.3.2.7 Eq.12.8-1)
(Transversal Direction)
Frequency for Load Case 92 empty = 6.714 (Staad Pro Output)
Frequency for Load Case 94 Operating = 6.493
Upper Limit on Calculated Period
Type = Structure type = All other structural systems

Cu = Response modification coeff. = 1.400 (Ref.1.3.3.2 Table 3)


Ct = = 0.049 (Ref.1.3.3.2 Table 3)
x = = 0.750 (Ref.1.3.3.2 Table 3)
hn = Structural height = 11.300 m
1
Tz = = 0.149 sec empty
Freq

TEP-043-CAL-ST-BP4-0020 38 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

1
Tz = = 0.154 sec operating
Freq
Check :
Tz - max ≤ Cu * Ct * hn x (Ref.1.3.2.7 Eq.12.8-7)
= 1.4 * 0.0488 * (11.3 ^ 0.75) = 0.421 sec OK!

Tz - max < 3.5 Ts (Ref.1.3.2.7 Table 12.6-1)


= 3.5 * 0.701 = 2.452 sec OK!

Tz - used = Min(Tz-max , TStaad) = 0.149 sec empty


Tz - used = Min(Tz-max , TStaad) = 0.154 sec operating

2/3 MCER Case


Csz = Seismic response coeff. = 0.287 (Ref.1.3.2.7 Eq.12.8-2)
= SDS / (Rz / Ie)

2/3 MCER Case


Refer to Ref. 1.3.3.2 Appendix 5
for Tz = 0.149 s,  Saz-E = 0.670 (Ref.1.3.3.2 Appendix 5)
for Tz = 0.154 s,  Saz-O = 0.690
Sa (Ref.1.3.2.7 Eq.12.8-3)
Csz - max = = 0.258 empty
(Rz / Ie)
Sa
Csz - max = = 0.265 operating
(Rz / Ie)

Cs- min = 0.044 SDS Ie ≥ 0.01 = 0.041 OK!


(Ref.1.3.2.7 Eq.12.8-5)
Csz- used = 0.258 empty
Csz- used = 0.265 operating
With redundance factor (  ) = 1.3
Vz = Seismic base shear = 0.335 * ΣWt
= Csz * ΣWt empty condition
Vz = Seismic base shear = 0.345 * ΣWt
= Csz * ΣWt operating condition

The total of seismic base shear (Vx or Vz) shall be distributed prorate as point load at each of
column in accordance with the following formula :
Fi = Wi * hi * Vx or Vz
Σ(Wi * hi)

TEP-043-CAL-ST-BP4-0020 39 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 1 - Lateral Forces as an input to STAAD. Pro for Empty Condition


2/3 MCER Case
X direction for grid 1
Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 2.43 4.11 9.04 2.81

B 2.47 6.41 3.92 5.58

Z direction for grid 1


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 2.78 4.70 10.35 3.22

B 2.82 7.34 4.49 6.40

X direction for grid 2


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 1.06 3.53 7.52 2.13

B 1.07 5.65 2.21 4.35

Z direction for grid 2


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 1.21 4.04 8.61 2.44

B 1.23 6.47 2.53 4.99

TEP-043-CAL-ST-BP4-0020 40 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 2 - Lateral Forces as an input to STAAD. Pro for Operating Condition


2/3 MCER Case
X direction for grid 1
Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 2.84 4.65 10.65 3.04

B 2.88 7.33 4.81 6.14

Z direction for grid 1


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 3.05 5.01 11.47 3.27

B 3.10 7.89 5.18 6.61

X direction for grid 2


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 1.26 4.04 8.63 2.97

B 1.27 6.47 2.42 4.86

Z direction for grid 2


Elevation (m)
ROW

F1 F2 F3 F4
21.50 24.25 21.50 24.25

A 1.36 4.35 9.30 3.20

B 1.37 6.97 2.60 5.23

TEP-043-CAL-ST-BP4-0020 41 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 16 - Seismic Empty Condition - X direction

Figure 17 - Seismic Empty Condition - Z direction

TEP-043-CAL-ST-BP4-0020 42 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Figure 18 - Seismic Operating Condition - X direction

Figure 19 - Seismic Operating Condition - Z direction

3.7.2 Vertical Seismic Load Effect


⅔MCER Condition
Ev = Vertical seismic force (Ref.1.3.2.7 Eq.12.14-6)
= 0.2 * SDS * D = 0.149 * D

TEP-043-CAL-ST-BP4-0020 43 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 4 - Steel Strength


4.1 Steel Stresses Ratio
Summary of check result of steel members shown as follows :
Table 3 - Maximum Utilization Ratio of permanen load
Permanent
Name Profile Remark
Ratio L/C
COLUMN
R1 WH-200 0.603 1214 Column
EL. +21.500
R2 SH-300 0.562 1214 Primary Beam
R3 SH-250 0.801 1211 Secondary Beam
R6 C-150 0.179 1211 Secondary Beam
R8 L-75 0.256 1113 Horizontal Brace
EL. +24.250
R2 SH-300 0.618 1212 Primary Beam
R3 SH-250 0.708 1211 Secondary Beam
R5 WH-125 0.255 1212 Secondary Beam
R6 C-150 0.027 1211 Secondary Beam
R8 L-75 0.079 1112 Horizontal Brace
EL. +27.000
R2 SH-300 0.496 1212 Primary Beam
R3 SH-250 0.675 1212 Secondary Beam
R6 C-150 0.106 1213 Secondary Beam
R8 L-75 0.048 1114 Horizontal Brace
EL. +29.300
R2 SH-300 0.219 1212 Primary Beam
R3 SH-250 0.164 1212 Secondary Beam
R4 WH-150 0.456 1211 Secondary Beam
R6 C-150 0.041 1211 Secondary Beam
R8 L-75 0.025 1212 Horizontal Brace
Vertical Bracing
R7 PIPE 4" 0.500 1213 Vertical Brace

TEP-043-CAL-ST-BP4-0020 44 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 3 (continued) - Maximum Utilization Ratio of temporary wind and seismic


Temporary (Wind & Seismic)
Name Profile Remark
Ratio L/C
COLUMN
R1 WH-200 0.649 3112 Column
EL. +21.500
R2 SH-300 0.785 3113 Primary Beam
R3 SH-250 0.722 3111 Secondary Beam
R6 C-150 0.196 2111 Secondary Beam
R8 L-75 0.247 2113 Horizontal Brace
EL. +24.250
R2 SH-300 0.536 3112 Primary Beam
R3 SH-250 0.519 3116 Secondary Beam
R5 WH-125 0.178 3116 Secondary Beam
R6 C-150 0.019 2125 Secondary Beam
R8 L-75 0.079 2120 Horizontal Brace
EL. +27.000
R2 SH-300 0.426 3112 Primary Beam
R3 SH-250 0.462 3116 Secondary Beam
R6 C-150 0.074 2123 Secondary Beam
R8 L-75 0.084 2116 Horizontal Brace
EL. +29.300
R2 SH-300 0.192 3114 Primary Beam
R3 SH-250 0.123 3114 Secondary Beam
R4 WH-150 0.350 3114 Secondary Beam
R6 C-150 0.031 3114 Secondary Beam
R8 L-75 0.045 2120 Horizontal Brace
Vertical Bracing
R7 PIPE 4" 0.193 3116 Vertical Brace

For Permanent Condition


Maximum Ratio = 0.801 < 1.000 OK!

For Temporary Condition (Seismic and Wind)


Maximum Ratio = 0.785 < 1.000 OK!

TEP-043-CAL-ST-BP4-0020 45 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 5 - Steel displacement and Deflection Check


5.1 Column Deflection
5.1.1 Permanent Operating Condition
The deflection d x :
x/z = Drift due to permanent operating load - output from STAAD. Pro

The allowable deflection :


Da = hs / 200

Table 4 - Allowable Horizontal Displacement Due to Permanent Operating Condition - x


Direction (Load Comb 111 to 114, 121 to 124, 131 to 134)
Max Hor Allow. Hor
Story Elev.
Node LC Discplacement (  x) Deflection (Da) Remark
(m)
(mm) (mm)
3.50 7 123 3.44 17.50 OK
6.50 11 123 4.80 32.50 OK
9.00 13 123 5.30 45.00 OK
11.30 17 124 5.47 56.50 OK

Table 5 - Allowable Horizontal Displacement Due to Permanent Operating Condition - z


Direction (Load Comb 111 to 114, 121 to 124, 131 to 134)
Max Hor Allow. Hor
Story Elev.
Node LC Discplacement ( z) Deflection (Da) Remark
(m)
(mm) (mm)
3.50 5 123 1.42 17.50 OK
6.25 10 123 1.72 31.25 OK
9.00 14 123 2.01 45.00 OK
11.30 17 123 2.22 56.50 OK

5.1.2 Temporary Wind Condition


The deflection d x :
xw/zw = Drift due to Temporary (wind) Condition - output from STAAD. Pro

The allowable deflection :


Da = hs / 200

Table 6 - Allowable Drift Due to Temporary (wind) Condition - x Direction (Load Comb 211 to
226, 231 to 242, 251 to 254, 261 to 264 )

Allow. Hor
Story Elev. Max Hor Deflection
Node LC Deflection (Da) Remark
(m) xw
( ) (mm)
(mm)
3.50 7 233 6.34 17.50 OK
6.25 11 233 10.67 31.25 OK
9.00 16 235 13.79 45.00 OK
11.30 20 235 16.06 56.50 OK

TEP-043-CAL-ST-BP4-0020 46 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 7 - Allowable Drift Due to Temporary (wind) Condition - z Direction (Load Comb 211 to
226, 231 to 242, 251 to 254, 261 to 264 )
Allow. Hor
Story Elev. Max Hor Deflection
Node LC Deflection (Da) Remark
(m) ( zw ) (mm)
(mm)
3.50 5 225 1.44 17.50 OK
6.25 10 225 1.76 31.25 OK
9.00 14 225 2.04 45.00 OK
11.30 17 225 2.25 56.50 OK

5.1.3 Temporary Seismic Condition 2/3 MCER

Table 8 - Horizontal Displacement Due to Seismic Condition (Load Comb 311 to 318 321 to 328
331 to 338)
x Direction z Direction
Story Elev. (m)
Node LC Hor Defl (mm) Node LC Hor Defl (mm)
3.50 7 321 7.366 5 317 1.893
6.25 11 321 14.890 10 317 2.404
9.00 13 321 20.665 14 317 2.856
11.30 19 321 24.762 17 317 3.165

x = The deflection = (Cd * xe) / Ie (Ref.1.3.2.7 Eq.15.4-1)


Cdx = Deflection amplification factor x-dir = 3.00 (Ref.1.3.2.7 Table 15.4-1)
Cdz = Deflection amplification factor z-dir = 3.25 (Ref.1.3.2.7 Table 15.4-1)
xe = Drift due to seismic load - output from STAAD. Pro
Ie = Importance factor = 1.25 (Ref.1.3.2.7 Table 1.5-2)
Risk category = 3
Type of structure = All other structures
a = The allowable deflection = 0.015 * hs (Ref.1.3.2.7 Table 12.12-1)

2/3MCER Condition
Table 9 - Allowable Horizontal Displacement Due to Temporary Seismic Condition - x Direction

Displ (d xe ) Max Hor Displ ( xe ) Allow. Hor Displ


Story Elev. (m) Remark
mm (mm) (D a ) (mm)
3.50 7.366 17.678 52.50 OK
6.25 14.890 35.736 93.75 OK
9.00 20.665 49.596 135.00 OK
11.30 24.762 59.429 169.50 OK

TEP-043-CAL-ST-BP4-0020 47 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 10 - Allowable Horizontal Displacement Due to Temporary Seismic Condition - z Direction

Displ (dz e) Max Hor Displ ( ze ) Allow. Hor Displ


Story Elev. (m) Remark
mm (mm) (D a ) (mm)
3.50 1.893 4.922 52.50 OK
6.25 2.404 6.250 93.75 OK
9.00 2.856 7.426 135.00 OK
11.30 3.165 8.229 169.50 OK

5.1.4 Temporary Seismic Condition OBE

Table 11 - Horizontal Displacement Due to Seismic Condition (Load Comb 341 to 348 351 to 358
361 to 368)
x Direction z Direction
Story Elev. (m)
Node LC Hor Defl (mm) Node LC Hor Defl (mm)
3.50 7 343 2.276 5 343 1.129
6.25 11 343 2.722 10 343 1.342
9.00 13 343 2.681 14 343 1.549
11.30 17 344 2.570 17 343 1.707

x = The deflection = (Cd * xe) / Ie (Ref.1.3.2.7 Eq.15.4-1)


Cdx = Deflection amplification factor x-dir = 3.00 (Ref.1.3.2.7 Table 15.4-1)
Cdz = Deflection amplification factor z-dir = 3.25 (Ref.1.3.2.7 Table 15.4-1)
xe = Drift due to seismic load - output from STAAD. Pro
Ie = Importance factor = 1.25 (Ref.1.3.2.7 Table 1.5-2)
Risk category = 3
Type of structure = All other structures
a = The allowable deflection = 0.015 * hs (Ref.1.3.2.7 Table 12.12-1)

OBE Condition
Table 12 - Allowable Horizontal Displacement Due to Temporary Seismic Condition - x Direction

Displ (d xe ) Max Hor Displ ( xe ) Allow. Hor Displ


Story Elev. (m) Remark
mm (mm) (D a ) (mm)
3.50 2.276 5.462 52.50 OK
6.25 2.722 6.533 93.75 OK
9.00 2.681 6.434 135.00 OK
11.30 2.570 6.168 169.50 OK

TEP-043-CAL-ST-BP4-0020 48 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Table 13 - Allowable Horizontal Displacement Due to Temporary Seismic Condition - z Direction

Displ (dz e) Max Hor Displ ( ze ) Allow. Hor Displ


Story Elev. (m) Remark
mm (mm) (D a ) (mm)
3.50 1.129 2.935 52.50 OK
6.25 1.342 3.489 93.75 OK
9.00 1.549 4.027 135.00 OK
11.30 1.707 4.438 169.50 OK

TEP-043-CAL-ST-BP4-0020 49 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

5.2 Beam Deflection


Allowable vertical deflection for structure design is as follows:
(a) For Beam that support Pipe or Equipment L / 360
Vertical deflection check for critical members shown in the following table :
Table 14 - Summary of Beam Deflection for Permanent Condition
Actual
Beam No. Profile L/C Clause Status
Ratio
EL. +21.500
R2 SH-300 123 0.207 DEFLECTION OK
R3 SH-250 122 0.819 DEFLECTION OK
R6 C-150 113 0.073 DEFLECTION OK
EL. +24.250
R2 SH-300 122 0.521 DEFLECTION OK
R3 SH-250 124 0.844 DEFLECTION OK
R5 WH-125 121 0.293 DEFLECTION OK
R6 C-150 122 0.010 DEFLECTION OK
EL. +27.000
R2 SH-300 121 0.376 DEFLECTION OK
R3 SH-250 121 0.841 DEFLECTION OK
R6 C-150 123 0.061 DEFLECTION OK
EL. +29.300
R2 SH-300 122 0.192 DEFLECTION OK
R3 SH-250 124 0.176 DEFLECTION OK
R4 WH-150 122 1.005 DEFLECTION NG
R6 C-150 124 0.029 DEFLECTION OK

Table 15 - Summary of Beam Deflection for Temporary Condition


Actual
Beam No. Profile L/C Ratio Clause Status
EL. +21.500
R2 SH-300 312 0.198 DEFLECTION OK
R3 SH-250 316 0.775 DEFLECTION OK
R6 C-150 211 0.050 DEFLECTION OK
EL. +24.250
R2 SH-300 316 0.445 DEFLECTION OK
R3 SH-250 312 0.722 DEFLECTION OK
R5 WH-125 316 0.240 DEFLECTION OK
R6 C-150 214 0.008 DEFLECTION OK
EL. +27.000
R2 SH-400 316 0.306 DEFLECTION OK
R3 SH-250 311 0.683 DEFLECTION OK
R6 C-150 312 0.050 DEFLECTION OK
EL. +29.300
R2 SH-400 314 0.170 DEFLECTION OK
R3 SH-250 315 0.151 DEFLECTION OK
R4 WH-150 316 0.879 DEFLECTION OK
R6 C-150 313 0.025 DEFLECTION OK

TEP-043-CAL-ST-BP4-0020 50 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Appendix 6 - Connection Check


6.1 Typical Connection
Connection detail calculation shall refer to the following document:
1. TEP-900-STD-ST-BP4-0011 Standard Drawing Beam to Column Moment Connection
2. TEP-900-STD-ST-BP4-0012 Standard Drawing Beam to Column Pinned Connection
3. TEP-900-STD-ST-BP4-0013 Standard Drawing Beam to Beam Pinned Connection
4. TEP-900-STD-ST-BP4-0015 Standard Drawing Vertical Bracing Connection
5. TEP-900-STD-ST-BP4-0016 Standard Drawing Horizontal Bracing Connection
6. TEP-900-STD-ST-BP4-0010 Standard Drawing Column Base Plate

6.2 Beam to Column Moment Connection


Member connection capacity will be checked by interaction diagram according to calculation for beam to column moment
connection as per document TEP-900-CAL-ST-BP4-0006, within service area of the diagram.
Table 16 - Staad Pro Output for Beam SH-300 to Column WH-200 Moment Connection SP-1

Beam/Column
Beam Details Moment Check Shear Check
Details
Critical Critical
Beam Co FX FY MZ FX FY MZ
Section Section Load Load
No l (kN) (kN) (kN.m) (kN) (kN) (kN.m)
Case Case
No
29 H300X150 1 H200X200 7414 -7.6655 66.4243 144.666 7413 5.0614 66.4929 144.857
31 H300X150 9 H200X200 7411 -4.7541 -37.992 -108.529 7414 -1.8315 45.471 116.814
60 H300X150 3 H200X200 7414 -1.5376 56.3333 117.439 7413 -1.3817 56.3963 117.652
63 H300X150 10 H200X200 7414 -2.7405 52.9294 109.815 7413 -2.7232 52.9296 109.816
98 H300X150 5 H200X200 7414 2.0799 49.2063 88.4369 7413 2.0444 49.2552 88.5607
100 H300X150 11 H200X200 7414 3.0852 43.219 88.4165 7414 3.0852 43.219 88.4165
51 H300X150 21 H200X200 7411 4.7541 44.79 -114.783 7411 4.7541 44.79 -114.783
86 H300X150 15 H200X200 7412 1.3843 55.6629 -118.618 7412 1.3843 55.6629 -118.618
89 H300X150 22 H200X200 7412 3.2887 52.4603 -108.526 7412 3.2887 52.4603 -108.526
119 H300X150 23 H200X200 7412 -5.3374 42.8537 -87.4379 7411 -5.2922 42.8931 -87.5441
678 H300X150 13 H200X200 7412 10.778 66.9352 -146.888 7412 10.778 66.9352 -146.888
693 H300X150 17 H200X200 7412 -3.5765 49.5644 -89.6596 7412 -3.5765 49.5644 -89.6596

Figure 31 - Diagram Interaction (service Area) of Axial Force (Pr) - Moment Force (Mr) for
Main Beam SH-300 to Column WH-200 SP1
service area for required moment from
analysis structure with R=1

2000

1500

1000

500

0
0.00 100.00 200.00 300.00 400.00 500.00
‐500

‐1000

TEP-043-CAL-ST-BP4-0020 51 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Figure 32 - Diagram Interaction (service Area) of Flange Force (Ffr) - Shear Force (Vr) for
Main Beam SH-300 to Column WH-200 SP1

service area for required shear


from analysis structure with R=1

2000

1500

1000

500

0
0 100 200 300 400 500 600

‐500

‐1000

6.3 Beam to Column Pinned Connection


For Capacity member connection will be check by STAAD pro feature (struclink) :
location Start beam :
Figure 33 - Start of Beam to Column Pinned Connection

SS Connection DS Connection

TEP-043-CAL-ST-BP4-0020 52 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

location End beam :


Figure 34 - End of Beam to Column Pinned Connection

SS Connection DS Connection
To accommodate the combination of tension force and shear, the inner force of the member shall conform
the formula below :
- Combination of tension and shear
V A With : V = Shear force
+ ≤ 1
Vall Aall T = Tension force
Vall = Allowable shear capacity
Aall = Allowable Axial capacity
check by output STAAD pro with Load Comb (1111-5111)
Table 35 - Staad Pro Output for Beam to Column Pinned Connection
Connection
Beam/Column Tag Details
Beam Details Details Shear Check
Capacity

Beam Col Critical Int.


FX.Cap FZ.Cap FX FY
Load
Section Section Name Location (kN) (kN) (kN) (kN) Remarks
No No Case Ratio V

26 H300X150 1 H200X200 SS START 262.08 120.13 7113 13.73102 10.6762 0.1413 PASS

27 H300X150 9 H200X200 SS START 262.08 120.13 7118 1.318111 3.93962 0.0378 PASS

53 H300X150 13 H200X200 SS START 262.08 120.13 7115 16.09709 14.3177 0.1806 PASS

121 H300X150 17 H200X200 SS START 262.08 120.13 7118 -14.47322 2.76049 0.0782 PASS

124 H300X150 7 H200X200 SS START 262.08 120.13 7117 -10.62789 4.49961 0.078 PASS

126 H300X150 12 H200X200 SS START 262.08 120.13 7116 -8.539196 1.44328 0.0446 PASS

654 H300X150 21 H200X200 SS END 262.08 120.13 7115 1.469998 3.68447 0.0363 PASS

683 H300X150 23 H200X200 SS END 262.08 120.13 7118 -4.908057 8.81089 0.0921 PASS

Connection
Beam/Column Tag Details
Beam Details Details Shear Check
Capacity

Beam Col Critical Int.


FX.Cap FZ.Cap FX FY
Load
Section Section Name Location (kN) (kN) (kN) (kN) Remarks
No No Case Ratio V

56 H300X150 3 H200X200 DS START 262.08 120.13 3118 38.78216 11.2026 0.2412 PASS

91 H300X150 15 H200X200 DS START 262.08 120.13 1214 -12.38987 47.9285 0.4463 PASS

95 H300X150 5 H200X200 DS START 262.08 120.13 1211 16.45348 31.6773 0.3265 PASS

96 H300X150 11 H200X200 DS START 262.08 120.13 1212 16.53016 39.571 0.3925 PASS

160 H300X150 19 H200X200 DS START 262.08 120.13 1213 0.879136 18.2366 0.1552 PASS

700 H300X150 24 H200X200 DS END 262.08 120.13 1213 -0.961464 13.8379 0.1189 PASS

718 H300X150 10 H200X200 DS END 262.08 120.13 2124 -16.56611 9.14618 0.1393 PASS

719 H300X150 22 H200X200 DS END 262.08 120.13 1213 12.66481 44.674 0.4202 PASS

TEP-043-CAL-ST-BP4-0020 53 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

6.4 Beam to Beam Pinned Connection


For Capacity member connection will be check by STAAD pro feature (struclink) :
location Start beam :
Figure 35 - Start of Beam to Beam Pinned Connection

location End beam :


Figure 36 - End of Beam to Beam Pinned Connection

To accommodate the combination of tension force and shear, the inner force of the member shall conform
the formula below :
- Combination of tension and shear
V A With : V = Shear force
+ ≤ 1
Vall Aall T = Tension force
Vall = Allowable shear capacity
Aall = Allowable Axial capacity

check by output STAAD pro with Load Comb (1111-5111)

TEP-043-CAL-ST-BP4-0020 54 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 36 - Staad Pro Output for Beam to Beam Pinned Connection


Beam/Column Connection
Beam Details Tag Details Shear Check
Details Capacity

Critical
Beam Col FX.Cap FZ.Cap FX FY Int.
Section Section Name Location Load Remarks
No No (kN) (kN) (kN) (kN) Ratio V
Case
28 H250X125 25 H250X125 SS START 147.52 65.64 1212 -6.055733 25.0713 0.423 PASS

30 C150X75X 40 H250X125 SS START 88.3 11.07 2125 1.660097 0.20808 0.0376 PASS

34 C150X75X 39 H250X125 SS START 88.3 11.07 1114 -2.043895 1.77769 0.1837 PASS

59 H250X125 55 H250X125 SS START 147.52 65.64 1212 0.331082 15.6727 0.241 PASS

61 H125X125 57 H300X150 SS START 88.3 14.63 1212 0.385888 6.7866 0.4683 PASS

64 C150X75X 60 H300X150 SS START 88.3 9.86 1212 -0.238084 1.2004 0.1244 PASS

68 H250X125 75 H250X125 SS START 147.52 65.64 1213 -0.126429 5.92594 0.0911 PASS

71 H125X125 713 H300X150 SS START 88.3 14.63 1211 0.286239 9.92965 0.682 PASS

76 H250X125 73 H250X125 SS START 147.52 65.64 1211 0.711325 15.9053 0.2471 PASS

80 H250X125 65 H300X150 SS START 182.52 59.38 1213 -0.263585 4.39465 0.0755 PASS

81 H250X125 712 H250X125 SS START 147.52 65.64 1213 -0.147528 9.60247 0.1473 PASS

84 H125X125 71 H125X125 SS START 73.23 15.92 1212 -0.340902 9.92965 0.6284 PASS

87 H125X125 81 H250X125 SS START 73.76 15.92 1214 -1.120375 8.99419 0.5802 PASS

97 H250X125 94 H250X125 SS START 147.52 65.64 1213 -0.219731 14.8988 0.2285 PASS

99 C150X75X 667 H300X150 SS START 88.3 9.86 1213 -0.039095 2.19415 0.223 PASS

101 C150X75X 98 H300X150 SS START 88.3 9.86 1213 0.09933 2.0964 0.2137 PASS

109 C150X75X 104 H250X125 SS START 88.3 11.07 1213 0.485484 3.48632 0.3204 PASS

118 C150X75X 110 H250X125 SS START 88.3 11.07 1213 -0.013898 5.541 0.5007 PASS

127 H250X125 123 H250X125 SS START 147.52 65.64 1212 0.000973 5.52522 0.0842 PASS

129 H150X150 126 H300X150 SS START 95.1 14.63 1213 -0.736291 13.7237 0.9458 PASS

130 H150X150 129 H150X150 SS START 95.1 14.63 1114 -0.873503 1.67428 0.1236 PASS

132 C150X75X 127 H250X125 SS START 88.3 11.07 1213 0.016599 0.75991 0.0688 PASS

133 C150X75X 128 H150X150 SS START 88.3 9.86 1212 -0.050465 1.5964 0.1625 PASS

134 H150X150 142 H150X150 SS START 95.1 14.63 1213 1.00843 4.86981 0.3435 PASS

143 C150X75X 139 H150X150 SS START 88.3 9.86 1213 0.140096 1.86848 0.1911 PASS

147 C150X75X 143 C150X75X SS START 88.3 14.63 1213 0.004095 1.76273 0.1205 PASS

149 C150X75X 138 H250X125 SS START 88.3 11.07 1213 -0.028337 0.75991 0.069 PASS

150 C150X75X 141 H150X150 SS START 88.3 9.86 1213 -0.121152 1.5964 0.1633 PASS

151 H150X150 698 H150X150 SS START 95.1 14.63 1213 -1.038569 4.87117 0.3439 PASS

657 C150X75X 42 H300X150 SS START 88.3 9.86 1213 7.833197 2.2784 0.3198 PASS

660 C150X75X 29 H300X150 SS START 88.3 9.86 1211 5.75349 2.50551 0.3193 PASS

662 C150X75X 664 C150X75X SS START 88.3 14.63 1213 -1.10876 3.95776 0.2831 PASS

666 H250X125 26 H300X150 SS START 182.52 59.38 1213 2.288525 21.5583 0.3756 PASS

668 C150X75X 117 H300X150 SS START 88.3 9.86 1212 0.44258 2.2784 0.2361 PASS

669 H250X125 56 H300X150 SS START 182.52 59.38 1214 -0.55943 23.1021 0.3921 PASS

671 C150X75X 65 H300X150 SS START 88.3 9.86 1213 -0.118063 2.2784 0.2324 PASS

673 H250X125 27 H300X150 SS START 182.52 59.38 1113 -1.2831 5.47843 0.0993 PASS

680 C150X75X 42 H300X150 SS START 88.3 9.86 1213 -4.468933 2.26018 0.2798 PASS

682 H250X125 96 H300X150 SS START 182.52 59.38 1211 -1.046222 33.6826 0.573 PASS

687 C150X75X 95 H300X150 SS START 88.3 9.86 1113 0.833539 0.26346 0.0362 PASS

688 C150X75X 113 H250X125 SS START 88.3 11.07 3113 -0.399152 0.21687 0.0241 PASS

692 H250X125 102 H300X150 SS START 182.52 59.38 1212 0.493333 13.1683 0.2245 PASS

694 H250X125 117 H300X150 SS START 182.52 59.38 1212 0.325477 12.3911 0.2105 PASS

697 H150X150 124 H300X150 SS START 95.1 14.63 1213 1.052459 12.5704 0.8703 PASS

703 C150X75X 141 H150X150 SS START 88.3 9.86 2121 -0.402205 0.1224 0.017 PASS

708 H150X150 134 H150X150 SS START 95.1 14.63 1212 0.006334 5.13041 0.3507 PASS
714 H250X125 713 H300X150 SS START 182.52 59.38 1211 -0.600965 29.6722 0.503 PASS
30 C150X75X 31 H300X150 SS END 88.3 9.86 2125 -1.660097 0.20808 0.0399 PASS

TEP-043-CAL-ST-BP4-0020 55 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 36 (continued) - Staad Pro Output for Beam to Beam Pinned Connection

Beam/Column Connection
Beam Details Tag Details Shear Check
Details Capacity

Critical
Beam Col FX.Cap FZ.Cap FX FY Int.
Section Section Name Location Load Remarks
No No (kN) (kN) (kN) (kN) Ratio V
Case
657 C150X75X 28 H250X125 SS END 88.3 11.07 1213 -7.833197 2.2784 0.2945 PASS
659 H250X125 53 H300X150 SS END 182.52 59.38 1213 1.190162 22.0649 0.3781 PASS
660 C150X75X 39 H250X125 SS END 88.3 11.07 1211 -5.75349 2.50551 0.2915 PASS
662 C150X75X 652 H300X150 SS END 88.3 9.86 1213 1.10876 3.95776 0.414 PASS
668 C150X75X 107 H250X125 SS END 88.3 11.07 1212 -0.44258 2.2784 0.2108 PASS
671 C150X75X 66 H250X125 SS END 88.3 11.07 1213 0.118063 2.2784 0.2072 PASS
679 H250X125 52 H250X125 SS END 147.52 65.64 1211 -6.320366 26.0585 0.4398 PASS
680 C150X75X 48 H250X125 SS END 88.3 11.07 1213 4.468933 2.26018 0.2548 PASS
684 H250X125 683 H300X150 SS END 182.52 59.38 1214 -0.258218 33.3654 0.5633 PASS
687 C150X75X 104 H250X125 SS END 88.3 11.07 1113 -0.833539 0.26346 0.0332 PASS
688 C150X75X 121 H300X150 SS END 88.3 9.86 3113 0.399152 0.21687 0.0265 PASS
689 C150X75X 113 H250X125 SS END 88.3 11.07 1213 -0.485484 3.45504 0.3176 PASS
698 H150X150 160 H300X150 SS END 95.1 14.63 1213 0.991088 13.9122 0.9614 PASS
703 C150X75X 142 H150X150 SS END 88.3 9.86 2121 0.402205 0.1224 0.017 PASS
706 H150X150 139 H150X150 SS END 95.1 14.63 1213 -1.00843 6.30387 0.4415 PASS
708 H150X150 151 H150X150 SS END 95.1 14.63 1212 -0.006334 5.13041 0.3507 PASS
709 H250X125 654 H300X150 SS END 182.52 59.38 1113 -1.470601 4.84992 0.0897 PASS
712 H250X125 91 H300X150 SS END 182.52 59.38 1213 -0.751359 16.0547 0.2745 PASS
716 H250X125 92 H300X150 SS END 182.52 59.38 1212 -0.517315 30.4175 0.5151 PASS
717 H250X125 63 H300X150 SS END 182.52 59.38 1212 -0.017469 15.5115 0.2613 PASS

TEP-043-CAL-ST-BP4-0020 56 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

6.5 Vertical Bracing Connection


Vertical bracing connection will be checked as below:
Where : T = actual force
T
≤ 1
Tall Tall = allowable axial (tension/compression) force

Table 37 - Capacity of Vertical Bracing Connection


Available
Available Tension
Member Size Compression
kN kN
L-60 75.134 93.150
L-65 140.849 138.240
L-70 199.957 198.000
L-80 216.357 220.500
L-90 300.454 291.060
L-100 316.583 317.520
L-120 381.982 370.440
L-150 498.948 498.948
ø 4" PIPE 270.244 306.000
ø 5" PIPE 394.122 475.200

Table 38 - Vertical Bracing Connection Check


No. Member Beam L/C Max Axial Ratio Condition Remarks
R7 ø 4" PIPE 166 7118 120.30 0.445 Max Compression OK
166 7215 -109.06 0.356 Max Tension OK

6.6 Horizontal Bracing Connection


Horizontal bracing connection will be check as following:
Where : T = actual force
T
≤ 1
Tall Tall = allowable axial (tension/compression) force

Table 39 - Capacity of Horizontal Bracing Connection


Available
Available Tension
Member Size Compression
kN kN
L - 50 94.73 67.88
L - 60 146.17 133.92
L - 65 120.47 133.92
L - 75 149.19 142.92
L-100 270.09 299.17
L-120 284.02 312.74
L-150 467.99 444.15

Table 40 - Horizontal Bracing Connection Check


No. Member Beam L/C Max Axial Ratio Condition Remarks
R3 L - 75 178 7112 10.28 0.069 Max Compression OK
178 7113 -12.77 0.089 Max Tension OK

TEP-043-CAL-ST-BP4-0020 57 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

6.7 Column Base Plate


Calculation of Base Plate connection capacity refer to Appendix 7.
Base plate connection check presented as follow,

Figure 37 - Service Area Baseplate for P vs M and T vs M

Service Area for Axial Tension vs Moment Capacity WH200


4000

3000

2000
Pr (kN)

1000

0
0 100 200 300 400

-1000
Mr (kN.m)
Small and Large Moment Limitation
Service Area of Large Moment for Tension Interface
Service Area for Moment and Tension Force Combination

TEP-043-CAL-ST-BP4-0020 58 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

6.7.1 Base Plate Connection Check with Combination capacity of P vs M and T Vs M


From Staad Pro result, summary of support reaction for are shown below:
Table 41 - Axial Force vs Moment Staad Output Support Reaction
Fy Mz Fy Mz
Node

Fy Mz
L/C L/C L/C
kN kNm kN kNm kN kNm
1 7111 (1.2+ 124.80 97.55 2 7111 (1.2+ 54.80 78.20 3 7111 (1.2+ 299.79 102.04
1 7112 (1.2+ 188.33 97.47 2 7112 (1.2+ -8.78 77.98 3 7112 (1.2+ 361.54 102.27
1 7113 (1.2+ 274.01 -99.94 2 7113 (1.2+ 271.59 -80.14 3 7113 (1.2+ 135.98 -95.51
1 7114 (1.2+ 337.53 -100.01 2 7114 (1.2+ 208.01 -80.37 3 7114 (1.2+ 197.73 -95.28
1 7115 (1.2+ 111.19 34.35 2 7115 (1.2+ 196.51 24.06 3 7115 (1.2+ 176.13 38.83
1 7116 (1.2+ 163.13 -19.56 2 7116 (1.2+ 253.66 -22.29 3 7116 (1.2+ 132.55 -14.78
1 7117 (1.2+ 299.21 17.09 2 7117 (1.2+ 9.15 20.12 3 7117 (1.2+ 364.97 21.55
1 7118 (1.2+ 351.14 -36.82 2 7118 (1.2+ 66.29 -26.22 3 7118 (1.2+ 321.39 -32.07
1 7211 (0.9- -52.40 96.51 2 7211 (0.9- -40.66 78.39 3 7211 (0.9- 107.10 97.16
1 7212 (0.9- 10.13 96.45 2 7212 (0.9- -103.25 78.20 3 7212 (0.9- 167.76 97.34
1 7213 (0.9- 99.65 -96.66 2 7213 (0.9- 173.08 -79.07 3 7213 (0.9- -55.91 -96.07
1 7214 (0.9- 162.18 -96.72 2 7214 (0.9- 110.50 -79.26 3 7214 (0.9- 4.75 -95.90
1 7215 (0.9- -66.01 33.31 2 7215 (0.9- 101.06 24.25 3 7215 (0.9- -16.56 33.95
1 7216 (0.9- -15.07 -20.58 2 7216 (0.9- 159.19 -22.07 3 7216 (0.9- -61.24 -19.72
1 7217 (0.9- 124.85 20.37 2 7217 (0.9- -89.35 21.20 3 7217 (0.9- 173.09 20.99
1 7218 (0.9- 175.79 -33.52 2 7218 (0.9- -31.22 -25.12 3 7218 (0.9- 128.41 -32.68
1 7311 (0.9- -51.34 81.35 2 7311 (0.9- -31.96 70.61 3 7311 (0.9- 98.27 82.10
1 7312 (0.9- 4.39 81.32 2 7312 (0.9- -87.73 70.52 3 7312 (0.9- 153.78 82.08
1 7313 (0.9- 96.58 -81.56 2 7313 (0.9- 153.94 -71.37 3 7313 (0.9- -49.65 -80.84
1 7314 (0.9- 152.31 -81.58 2 7314 (0.9- 98.16 -71.46 3 7314 (0.9- 5.86 -80.87
1 7315 (0.9- -64.90 24.25 2 7315 (0.9- 98.70 20.94 3 7315 (0.9- -18.77 25.00
1 7316 (0.9- -20.71 -24.41 2 7316 (0.9- 154.23 -21.48 3 7316 (0.9- -62.95 -23.68
1 7317 (0.9- 121.68 24.17 2 7317 (0.9- -88.02 20.63 3 7317 (0.9- 167.08 24.91
1 7318 (0.9- 165.86 -24.49 2 7318 (0.9- -32.49 -21.78 3 7318 (0.9- 122.89 -23.76
1 7611 (1.2+ 233.42 7.44 2 7611 (1.2+ 126.36 0.74 3 7611 (1.2+ 246.69 11.89
1 7612 (1.2+ 237.38 7.36 2 7612 (1.2+ 122.39 0.64 3 7612 (1.2+ 251.07 12.12
1 7613 (1.2+ 222.03 -9.83 2 7613 (1.2+ 138.56 -2.79 3 7613 (1.2+ 243.47 -5.40
1 7614 (1.2+ 225.99 -9.90 2 7614 (1.2+ 134.58 -2.88 3 7614 (1.2+ 247.85 -5.16
1 7615 (1.2+ 233.42 7.44 2 7615 (1.2+ 126.36 0.74 3 7615 (1.2+ 246.69 11.89
1 7616 (1.2+ 237.38 7.36 2 7616 (1.2+ 122.39 0.64 3 7616 (1.2+ 251.07 12.12
1 7617 (1.2+ 222.03 -9.83 2 7617 (1.2+ 138.56 -2.79 3 7617 (1.2+ 243.47 -5.40
1 7618 (1.2+ 225.99 -9.90 2 7618 (1.2+ 134.58 -2.88 3 7618 (1.2+ 247.85 -5.16
1 7711 (0.9- 59.36 6.40 2 7711 (0.9- 32.91 0.91 3 7711 (0.9- 57.20 7.05
1 7712 (0.9- 62.33 6.34 2 7712 (0.9- 29.93 0.84 3 7712 (0.9- 60.49 7.22
1 7713 (0.9- 50.82 -6.55 2 7713 (0.9- 42.05 -1.73 3 7713 (0.9- 54.79 -5.92
1 7714 (0.9- 53.79 -6.61 2 7714 (0.9- 39.07 -1.81 3 7714 (0.9- 58.08 -5.74
1 7715 (0.9- 59.36 6.40 2 7715 (0.9- 32.91 0.91 3 7715 (0.9- 57.20 7.05
1 7716 (0.9- 62.33 6.34 2 7716 (0.9- 29.93 0.84 3 7716 (0.9- 60.49 7.22
1 7717 (0.9- 50.82 -6.55 2 7717 (0.9- 42.05 -1.73 3 7717 (0.9- 54.79 -5.92
1 7718 (0.9- 53.79 -6.61 2 7718 (0.9- 39.07 -1.81 3 7718 (0.9- 58.08 -5.74
1 7811 (0.9- 52.03 -0.12 2 7811 (0.9- 34.12 -0.44 3 7811 (0.9- 53.66 0.64
1 7812 (0.9- 52.03 -0.12 2 7812 (0.9- 34.12 -0.44 3 7812 (0.9- 53.66 0.64
1 7813 (0.9- 52.03 -0.12 2 7813 (0.9- 34.12 -0.44 3 7813 (0.9- 53.66 0.64
1 7814 (0.9- 52.03 -0.12 2 7814 (0.9- 34.12 -0.44 3 7814 (0.9- 53.66 0.64
1 7815 (0.9- 52.03 -0.12 2 7815 (0.9- 34.12 -0.44 3 7815 (0.9- 53.66 0.64
1 7816 (0.9- 52.03 -0.12 2 7816 (0.9- 34.12 -0.44 3 7816 (0.9- 53.66 0.64
1 7817 (0.9- 52.03 -0.12 2 7817 (0.9- 34.12 -0.44 3 7817 (0.9- 53.66 0.64
1 7818 (0.9- 52.03 -0.12 2 7818 (0.9- 34.12 -0.44 3 7818 (0.9- 53.66 0.64

TEP-043-CAL-ST-BP4-0020 59 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 41 (continued) - Axial Force vs Moment Staad Output Support Reaction


Node Fy Mz
L/C
kN kNm
4 7111 (1.2+ 261.96 78.26
4 7112 (1.2+ 200.26 78.04
4 7113 (1.2+ 47.78 -80.14
4 7114 (1.2+ -13.92 -80.36
4 7115 (1.2+ 257.51 24.11
4 7116 (1.2+ 192.02 -22.25
4 7117 (1.2+ 56.02 20.15
4 7118 (1.2+ -9.47 -26.21
4 7211 (0.9- 167.54 78.76
4 7212 (0.9- 106.93 78.56
4 7213 (0.9- -44.25 -78.76
4 7214 (0.9- -104.85 -78.96
4 7215 (0.9- 163.09 24.60
4 7216 (0.9- 98.69 -21.73
4 7217 (0.9- -36.01 21.53
4 7218 (0.9- -100.40 -24.80
4 7311 (0.9- 151.60 70.97
4 7312 (0.9- 96.13 70.88
4 7313 (0.9- -34.30 -71.04
4 7314 (0.9- -89.77 -71.13
4 7315 (0.9- 151.53 21.29
4 7316 (0.9- 96.00 -21.13
4 7317 (0.9- -34.17 20.98
4 7318 (0.9- -89.70 -21.44
4 7611 (1.2+ 130.17 0.77
4 7612 (1.2+ 125.79 0.67
4 7613 (1.2+ 120.58 -2.77
4 7614 (1.2+ 116.21 -2.87
4 7615 (1.2+ 130.17 0.77
4 7616 (1.2+ 125.79 0.67
4 7617 (1.2+ 120.58 -2.77
4 7618 (1.2+ 116.21 -2.87
4 7711 (0.9- 37.54 1.26
4 7712 (0.9- 34.26 1.19
4 7713 (0.9- 30.35 -1.40
4 7714 (0.9- 27.07 -1.47
4 7715 (0.9- 37.54 1.26
4 7716 (0.9- 34.26 1.19
4 7717 (0.9- 30.35 -1.40
4 7718 (0.9- 27.07 -1.47
4 7811 (0.9- 31.86 -0.08
4 7812 (0.9- 31.86 -0.08
4 7813 (0.9- 31.86 -0.08
4 7814 (0.9- 31.86 -0.08
4 7815 (0.9- 31.86 -0.08
4 7816 (0.9- 31.86 -0.08
4 7817 (0.9- 31.86 -0.08
4 7818 (0.9- 31.86 -0.08

TEP-043-CAL-ST-BP4-0020 60 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Figure 38 - Base Plate Connection Check for P vs M and T vs M with Staad Output Support Reaction

Service Area for Axial Tension vs Moment Capacity


4000

3000

2000
Pr (kN)

1000

0
0 100 200 300 400

-1000
Mr (kN.m)
"ACTUAL"
Small and Large Moment Limitation
Service Area of Large Moment for Tension Interface
Service Area for Moment and Tension Force Combination

6.7.2 Base Plate Connection Check with Available Shear Capacity


Below are summarize service area for Available shear capacity on system due to combine friction and anchor bolt for
Column member WH-200.
Figure 39 - Service Area for Shear Forces for Baseplate

Service Area for Shear Key Forces (Base Plate WH-200)


4500
4000
3500
3000
2500
Vz (kN)

2000
1500
1000
500
0
-500 0 250 500 750 1000 1250 1500 1750

-1000
Shear Base Plate Vx (kN)
Shear Base Plate Combine with Shear Key
Limit Max Shear Pedestal
Shear Key

T
Distance of center of anchor bolt to mid point of compression area
M d2 = 480.28 mm

Due to Tension

Axial Force
Pu = ½Fy + Mz/d2
Due to Moment

Y Resultant of required shear


d d2 Y/2 Vur = √(Fx² + Fz²)

TEP-043-CAL-ST-BP4-0020 61 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 42 - Axial Force vs Resultant Shear Force


N Staad Output Support Reaction Axial Resultant
o Axial Moment Force Shear
L/C Shear Fx Shear Fz Pu Vur
d Fy Mz
e
kN kN kN kN.m kN kN
1 7111 (1.2+ 124.80 -49.72 -2.61 97.55 124.80 49.79
1 7112 (1.2+ 188.33 -49.71 -2.41 97.47 188.33 49.76
1 7113 (1.2+ 274.01 53.60 -1.81 -99.94 274.01 53.63
1 7114 (1.2+ 337.53 53.62 -1.62 -100.01 337.53 53.64
1 7115 (1.2+ 111.19 -17.00 -2.76 34.35 111.19 17.22
1 7116 (1.2+ 163.13 10.89 -2.69 -19.56 163.13 11.22
1 7117 (1.2+ 299.21 -7.00 -1.53 17.09 299.21 7.17
1 7118 (1.2+ 351.14 20.89 -1.46 -36.82 351.14 20.95
1 7211 (0.9- -52.40 -50.14 -0.98 96.51 -26.00 50.15
1 7212 (0.9- 10.13 -50.13 -0.80 96.45 10.13 50.14
1 7213 (0.9- 99.65 50.66 -0.36 -96.66 99.65 50.66
1 7214 (0.9- 162.18 50.66 -0.18 -96.72 162.18 50.66
1 7215 (0.9- -66.01 -17.42 -1.13 33.31 -32.94 17.45
1 7216 (0.9- -15.07 10.47 -1.08 -20.58 -7.58 10.52
1 7217 (0.9- 124.85 -9.94 -0.09 20.37 124.85 9.94
1 7218 (0.9- 175.79 17.94 -0.03 -33.52 175.79 17.94
1 7311 (0.9- -51.34 -41.85 -0.62 81.35 -25.50 41.85
1 7312 (0.9- 4.39 -41.86 -0.48 81.32 4.39 41.86
1 7313 (0.9- 96.58 42.40 -0.54 -81.56 96.58 42.40
1 7314 (0.9- 152.31 42.39 -0.40 -81.58 152.31 42.39
1 7315 (0.9- -64.90 -12.29 -0.76 24.25 -32.40 12.31
1 7316 (0.9- -20.71 12.88 -0.74 -24.41 -10.41 12.90
1 7317 (0.9- 121.68 -12.34 -0.28 24.17 121.68 12.34
1 7318 (0.9- 165.86 12.83 -0.26 -24.49 165.86 12.83
1 7611 (1.2+ 233.42 -3.14 -2.48 7.44 233.42 4.00
1 7612 (1.2+ 237.38 -3.09 -2.43 7.36 237.38 3.93
1 7613 (1.2+ 222.03 6.97 -1.76 -9.83 222.03 7.19
1 7614 (1.2+ 225.99 7.02 -1.72 -9.90 225.99 7.23
1 7615 (1.2+ 233.42 -3.14 -2.48 7.44 233.42 4.00
1 7616 (1.2+ 237.38 -3.09 -2.43 7.36 237.38 3.93
1 7617 (1.2+ 222.03 6.97 -1.76 -9.83 222.03 7.19
1 7618 (1.2+ 225.99 7.02 -1.72 -9.90 225.99 7.23
1 7711 (0.9- 59.36 -3.54 -0.88 6.40 59.36 3.65
1 7712 (0.9- 62.33 -3.50 -0.85 6.34 62.33 3.61
1 7713 (0.9- 50.82 4.04 -0.35 -6.55 50.82 4.06
1 7714 (0.9- 53.79 4.08 -0.31 -6.61 53.79 4.09
1 7715 (0.9- 59.36 -3.54 -0.88 6.40 59.36 3.65
1 7716 (0.9- 62.33 -3.50 -0.85 6.34 62.33 3.61
1 7717 (0.9- 50.82 4.04 -0.35 -6.55 50.82 4.06
1 7718 (0.9- 53.79 4.08 -0.31 -6.61 53.79 4.09
1 7811 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7812 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7813 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7814 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7815 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7816 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7817 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59
1 7818 (0.9- 52.03 0.28 -0.53 -0.12 52.03 0.59

TEP-043-CAL-ST-BP4-0020 62 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 42 (continued) - Axial Force vs Resultant Shear Force


N Staad Output Support Reaction Axial Resultant
o Axial Moment Force Shear
L/C Shear Fx Shear Fz
d Fy Mz Pu Vur
e kN kN kN kN.m kN kN
2 7111 (1.2+ 54.80 -40.14 -7.51 78.20 54.80 40.83
2 7112 (1.2+ -8.78 -40.05 33.68 77.98 -4.23 52.33
2 7113 (1.2+ 271.59 41.20 -31.41 -80.14 271.59 51.81
2 7114 (1.2+ 208.01 41.28 9.77 -80.37 208.01 42.42
2 7115 (1.2+ 196.51 -12.31 -54.76 24.06 196.51 56.13
2 7116 (1.2+ 253.66 11.48 -53.83 -22.29 253.66 55.04
2 7117 (1.2+ 9.15 -10.33 56.10 20.12 9.15 57.04
2 7118 (1.2+ 66.29 13.46 57.03 -26.22 66.29 58.59
2 7211 (0.9- -40.66 -40.15 -8.65 78.39 -20.17 41.07
2 7212 (0.9- -103.25 -40.07 31.14 78.20 -51.46 50.75
2 7213 (0.9- 173.08 40.72 -30.46 -79.07 173.08 50.85
2 7214 (0.9- 110.50 40.79 9.33 -79.26 110.50 41.84
2 7215 (0.9- 101.06 -12.32 -55.90 24.25 101.06 57.25
2 7216 (0.9- 159.19 11.45 -56.37 -22.07 159.19 57.52
2 7217 (0.9- -89.35 -10.81 57.04 21.20 -44.63 58.06
2 7218 (0.9- -31.22 12.97 56.58 -25.12 -15.66 58.05
2 7311 (0.9- -31.96 -36.12 -9.72 70.61 -15.83 37.40
2 7312 (0.9- -87.73 -36.10 23.56 70.52 -43.72 43.11
2 7313 (0.9- 153.94 36.74 -23.00 -71.37 153.94 43.34
2 7314 (0.9- 98.16 36.76 10.29 -71.46 98.16 38.17
2 7315 (0.9- 98.70 -10.59 -53.44 20.94 98.70 54.48
2 7316 (0.9- 154.23 11.17 -57.41 -21.48 154.23 58.49
2 7317 (0.9- -88.02 -10.53 57.97 20.63 -43.97 58.92
2 7318 (0.9- -32.49 11.23 54.01 -21.78 -16.29 55.16
2 7611 (1.2+ 126.36 -0.40 2.51 0.74 126.36 2.54
2 7612 (1.2+ 122.39 -0.35 8.09 0.64 122.39 8.09
2 7613 (1.2+ 138.56 1.48 -5.84 -2.79 138.56 6.02
2 7614 (1.2+ 134.58 1.53 -0.26 -2.88 134.58 1.55
2 7615 (1.2+ 126.36 -0.40 2.51 0.74 126.36 2.54
2 7616 (1.2+ 122.39 -0.35 8.09 0.64 122.39 8.09
2 7617 (1.2+ 138.56 1.48 -5.84 -2.79 138.56 6.02
2 7618 (1.2+ 134.58 1.53 -0.26 -2.88 134.58 1.55
2 7711 (0.9- 32.91 -0.39 1.39 0.91 32.91 1.44
2 7712 (0.9- 29.93 -0.35 5.57 0.84 29.93 5.58
2 7713 (0.9- 42.05 1.02 -4.87 -1.73 42.05 4.98
2 7714 (0.9- 39.07 1.06 -0.69 -1.81 39.07 1.26
2 7715 (0.9- 32.91 -0.39 1.39 0.91 32.91 1.44
2 7716 (0.9- 29.93 -0.35 5.57 0.84 29.93 5.58
2 7717 (0.9- 42.05 1.02 -4.87 -1.73 42.05 4.98
2 7718 (0.9- 39.07 1.06 -0.69 -1.81 39.07 1.26
2 7811 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7812 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7813 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7814 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7815 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7816 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7817 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44
2 7818 (0.9- 34.12 0.33 0.29 -0.44 34.12 0.44

TEP-043-CAL-ST-BP4-0020 63 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 42 (continued) - Axial Force vs Resultant Shear Force


N Staad Output Support Reaction Axial Resultant
o Axial Moment Force Shear
L/C Shear Fx Shear Fz
d Fy Mz Pu Vur
e
kN kN kN kN.m kN kN
3 7111 (1.2+ 299.79 -54.68 -30.57 102.04 299.79 62.65
3 7112 (1.2+ 361.54 -54.87 10.18 102.27 361.54 55.81
3 7113 (1.2+ 135.98 48.69 -7.73 -95.51 135.98 49.30
3 7114 (1.2+ 197.73 48.50 33.01 -95.28 197.73 58.67
3 7115 (1.2+ 176.13 -21.95 -65.61 38.83 176.13 69.19
3 7116 (1.2+ 132.55 5.75 -54.72 -14.78 132.55 55.02
3 7117 (1.2+ 364.97 -11.93 57.16 21.55 364.97 58.39
3 7118 (1.2+ 321.39 15.76 68.05 -32.07 321.39 69.86
3 7211 (0.9- 107.10 -50.89 -29.75 97.16 107.10 58.95
3 7212 (0.9- 167.76 -51.04 9.41 97.34 167.76 51.90
3 7213 (0.9- -55.91 49.95 -8.81 -96.07 -28.15 50.72
3 7214 (0.9- 4.75 49.80 30.35 -95.90 4.75 58.32
3 7215 (0.9- -16.56 -18.15 -64.80 33.95 -8.21 67.29
3 7216 (0.9- -61.24 9.58 -55.48 -19.72 -30.66 56.30
3 7217 (0.9- 173.09 -10.67 56.08 20.99 173.09 57.08
3 7218 (0.9- 128.41 17.06 65.39 -32.68 128.41 67.58
3 7311 (0.9- 98.27 -42.67 -22.77 82.10 98.27 48.36
3 7312 (0.9- 153.78 -42.68 10.33 82.08 153.78 43.91
3 7313 (0.9- -49.65 41.61 -9.78 -80.84 -25.00 42.74
3 7314 (0.9- 5.86 41.60 23.33 -80.87 5.86 47.69
3 7315 (0.9- -18.77 -13.10 -57.08 25.00 -9.33 58.56
3 7316 (0.9- -62.95 12.08 -53.20 -23.68 -31.53 54.55
3 7317 (0.9- 167.08 -13.15 53.75 24.91 167.08 55.34
3 7318 (0.9- 122.89 12.02 57.64 -23.76 122.89 58.88
3 7611 (1.2+ 246.69 -8.06 -5.75 11.89 246.69 9.90
3 7612 (1.2+ 251.07 -8.22 0.59 12.12 251.07 8.24
3 7613 (1.2+ 243.47 2.06 1.84 -5.40 243.47 2.76
3 7614 (1.2+ 247.85 1.90 8.18 -5.16 247.85 8.39
3 7615 (1.2+ 246.69 -8.06 -5.75 11.89 246.69 9.90
3 7616 (1.2+ 251.07 -8.22 0.59 12.12 251.07 8.24
3 7617 (1.2+ 243.47 2.06 1.84 -5.40 243.47 2.76
3 7618 (1.2+ 247.85 1.90 8.18 -5.16 247.85 8.39
3 7711 (0.9- 57.20 -4.30 -4.92 7.05 57.20 6.53
3 7712 (0.9- 60.49 -4.42 -0.16 7.22 60.49 4.42
3 7713 (0.9- 54.79 3.30 0.77 -5.92 54.79 3.38
3 7714 (0.9- 58.08 3.18 5.53 -5.74 58.08 6.38
3 7715 (0.9- 57.20 -4.30 -4.92 7.05 57.20 6.53
3 7716 (0.9- 60.49 -4.42 -0.16 7.22 60.49 4.42
3 7717 (0.9- 54.79 3.30 0.77 -5.92 54.79 3.38
3 7718 (0.9- 58.08 3.18 5.53 -5.74 58.08 6.38
3 7811 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7812 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7813 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7814 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7815 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7816 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7817 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62
3 7818 (0.9- 53.66 -0.55 0.29 0.64 53.66 0.62

TEP-043-CAL-ST-BP4-0020 64 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Table 42 (continued) - Axial Force vs Resultant Shear Force

N Staad Output Support Reaction Axial Resultant


o Axial Moment Force Shear
L/C Shear Fx Shear Fz Pu Vur
d Fy Mz
e
kN kN kN kN.m kN kN
4 7111 (1.2+ 261.96 -40.15 -0.47 78.26 261.96 40.16
4 7112 (1.2+ 200.26 -40.07 -0.28 78.04 200.26 40.07
4 7113 (1.2+ 47.78 41.21 -0.20 -80.14 47.78 41.21
4 7114 (1.2+ -13.92 41.30 -0.02 -80.36 -7.13 41.30
4 7115 (1.2+ 257.51 -12.32 -0.55 24.11 257.51 12.34
4 7116 (1.2+ 192.02 11.47 -0.45 -22.25 192.02 11.48
4 7117 (1.2+ 56.02 -10.32 -0.04 20.15 56.02 10.32
4 7118 (1.2+ -9.47 13.47 0.07 -26.21 -4.79 13.47
4 7211 (0.9- 167.54 -40.52 -0.27 78.76 167.54 40.52
4 7212 (0.9- 106.93 -40.45 -0.10 78.56 106.93 40.45
4 7213 (0.9- -44.25 40.37 -0.02 -78.76 -22.29 40.37
4 7214 (0.9- -104.85 40.45 0.16 -78.96 -52.59 40.45
4 7215 (0.9- 163.09 -12.69 -0.36 24.60 163.09 12.70
4 7216 (0.9- 98.69 11.09 -0.26 -21.73 98.69 11.09
4 7217 (0.9- -36.01 -11.17 0.15 21.53 -17.96 11.17
4 7218 (0.9- -100.40 12.62 0.24 -24.80 -50.25 12.62
4 7311 (0.9- 151.60 -36.50 -0.22 70.97 151.60 36.50
4 7312 (0.9- 96.13 -36.48 -0.08 70.88 96.13 36.48
4 7313 (0.9- -34.30 36.37 -0.02 -71.04 -17.30 36.37
4 7314 (0.9- -89.77 36.39 0.11 -71.13 -45.03 36.39
4 7315 (0.9- 151.53 -10.97 -0.31 21.29 151.53 10.97
4 7316 (0.9- 96.00 10.80 -0.25 -21.13 96.00 10.80
4 7317 (0.9- -34.17 -10.91 0.14 20.98 -17.04 10.91
4 7318 (0.9- -89.70 10.86 0.20 -21.44 -44.89 10.86
4 7611 (1.2+ 130.17 -0.40 -0.29 0.77 130.17 0.49
4 7612 (1.2+ 125.79 -0.34 -0.24 0.67 125.79 0.42
4 7613 (1.2+ 120.58 1.49 -0.24 -2.77 120.58 1.51
4 7614 (1.2+ 116.21 1.55 -0.20 -2.87 116.21 1.56
4 7615 (1.2+ 130.17 -0.40 -0.29 0.77 130.17 0.49
4 7616 (1.2+ 125.79 -0.34 -0.24 0.67 125.79 0.42
4 7617 (1.2+ 120.58 1.49 -0.24 -2.77 120.58 1.51
4 7618 (1.2+ 116.21 1.55 -0.20 -2.87 116.21 1.56
4 7711 (0.9- 37.54 -0.77 -0.09 1.26 37.54 0.77
4 7712 (0.9- 34.26 -0.73 -0.06 1.19 34.26 0.73
4 7713 (0.9- 30.35 0.65 -0.06 -1.40 30.35 0.65
4 7714 (0.9- 27.07 0.69 -0.03 -1.47 27.07 0.69
4 7715 (0.9- 37.54 -0.77 -0.09 1.26 37.54 0.77
4 7716 (0.9- 34.26 -0.73 -0.06 1.19 34.26 0.73
4 7717 (0.9- 30.35 0.65 -0.06 -1.40 30.35 0.65
4 7718 (0.9- 27.07 0.69 -0.03 -1.47 27.07 0.69
4 7811 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7812 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7813 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7814 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7815 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7816 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7817 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08
4 7818 (0.9- 31.86 -0.06 -0.05 -0.08 31.86 0.08

TEP-043-CAL-ST-BP4-0020 65 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platfor - 043-PLF-31004

Figure 41 - Service Area for Shear Forces

Service Area for Shear Key Forces (Base Plate WH-200)


4500
4000
3500
3000
2500
P (kN)

2000
1500
1000
500
0
0 250 500 750 1000 1250 1500 1750
-500
-1000
Shear Base Plate V (kN)
Shear Base Plate Combine with Shear Key
Limit Max Shear Pedestal
Shear Key
"ACTUAL"

TEP-043-CAL-ST-BP4-0020 66 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Appendix 7
7.1.1. Design Capacity Calculation Special Endplate Connection EM-SP1

A Design Basic and Reference


Limit states that shall be considered in the design of beam-to-column flush end-plate moment connections are :

Table A1.1 - Subject to be Checked as per AISC Design Guide 4 Section 2.3
Subject to be Checked AISC DG 4 Force Direction
Connection Part Flange Side
Description Section 2.3 Vy Mz ± P
Bolt Shear Rupture Point 5 V compr zone
Bolt
Bolt Tension Rupture Point 4 V tension zone
Bearing Bolt Holes Point 6 V compr zone
End Plate
Flexural yielding Point 1 V tension zone
Shear yielding of weld Point 8 V -
Beam Web
Shear yielding of beam web Point 8 V -
Beam Flange Flange rupture of weld Point 7 V tension zone
Bearing Bolt Holes Point 6 V compr zone
Column Flange
Flange Flexural Yielding Point 12 V tension zone
Web Panel Zone in shear Point 14 V both
Web Local yielding Point 9 V compr zone
Column Web
Web Local Buckling Point 11 V compr zone
Web Crippling Point 10 V compr zone

transverse shear yielding of weld Point 13 V both


stiffener shear yielding of plate Point 13 V both

Detailed references for the design capacity calculation are as provided below.

Table A1.2 - Detail of References


DESCRIPTION REFERENCE

A Seismic Provisions for Moment Connections


1 Required Flexural Strenght and Required Shear Strength AISC 341-10 Chapter E1. 6b

B Design Capacity Calculation of Bolt Group


1 High Strength Bolt (HSB) ASTM ASTM F3125: Grade A325, AISC Spec. 360-10: Part J3:1,2,3

2 Configuration Criteria for Bolt Group AISC Spec. 360-10: Part J3:3,4,5, AISC DG 4 : 2.1 Point 3

3 Bolt Group Subject to Shear AISC Design Guide 4 : Eq (3.17)

4 Bolt Group Subject to Tension (without prying effect) AISC Design Guide 4 : Eq (3.7), (3.8), (3.9)

5 Bolt Group Subject to Tension (with prying effect) AISC Design Guide 16 : Table 4-1, Table 4-2

C Design Capacity Calculation of Stiffener


1 Endplate Stiffener Design Criteria AISC Design Guide 4 : Eq (3.15)

2 Column Stiffener Design Criteria AISC Design Guide 13 : Eq (4.3-3), (4.3-1), AISC DG 4 : Eq (3.32)

D Design Capacity Welded Connection


1 Available strenght of weld AISC Spec. 360-10: Eq (J2-3), (J2-4), (J2-5)

E Design Capacity Calculation of End Plate


1 Plate Subject to Bearing at Bolt Holes AISC Design Guide 4 : Eq (3.17)

2 Plate Flexural Yielding AISC Design Guide 16 : Table (3-3)

F Design Capacity Column


1 Plate Subject to Bearing at Bolt Holes AISC Design Guide 4 : Eq (3.17)

2 Web Panel Zone in shear AISC Design Guide 13 : Eq (2.2-1)

3 Web Local yielding AISC Design Guide 4 : Eq (3.24)

4 Web Local Buckling AISC Design Guide 4 : Eq (3.26)

5 Web Local Crippling AISC Design Guide 4 : Eq (3.29)

6 Flange Flexural Yielding AISC Design Guide 16 : Table (3-3)

TEP-043-CAL-ST-BP4-0020 67 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004
B Configuration Criteria
B.1 Shear Strength and Tensile Strength of Bolt (HSB)

Available Tensile and Shear Strength of Bolts, R n :


ϕR n = ϕ x Fn x Ab AISC Spec. 360-10: Eq. (J3-1)

Where:
ϕ = 0.75
Fn = nominal tensile stress, F nt , or shear stress, F nv , from AISC Spec. 360-10: Table J3.2, MPa
Group A (ASTM F3125/F3125M Grade A325), when threads are not excluded from shear planes
F nv = nominal shear strength of bolt = 372.00 MPa
F nt = nominal tensile strength of bolt = 620.00 MPa
2
Ab = nominal unthreaded body area of bolt or threaded part, mm

Table B1.1 - HSB Properties


HSB F nt
Ab dh F nv R nv R nt
db sb Note 1
Size (mm2) (mm)
(mm) (mm) (MPa) (MPa) (kN) (kN)

M16 16.00 2.50 201.06 18.00 372.00 620.00 56.09 93.49


M20 20.00 2.50 314.16 22.00 372.00 620.00 87.65 146.08
M22 22.00 2.50 380.13 24.00 372.00 620.00 106.05 176.76
M24 24.00 3.00 452.39 27.00 372.00 620.00 126.21 210.36
M27 27.00 3.00 572.56 30.00 372.00 620.00 159.74 266.23
M30 30.00 3.50 706.86 33.00 372.00 620.00 197.21 328.68

B.2 Configuration for HSB

Bolt group configuration is in accordance with AISC 360-10: Part J3: 3, 4, 5; which provide minimum and maximum limitations
for spacing and edge distance.
- s b is taken pursuant to AISC 360-10: Part J3: 3, 5; where the minimum and maximum spacing should be:
1. s b is not less than 2.67d b . Leh g
2. s b recommended is 3d b .
- P f is taken pursuant to AISC Design Guide 4 Chapter 2: 2.1 point 3
Pf
3. P f is not less than d b +0.5 inch for d b ≤ 1 inch
Sb
4. P f is not less than d b +3/4 inch for d b > 1 inch
5. P f recomended 2 ~ 2.5 inch for all bolt diameter
- L eh and L ev , is taken pursuant to AISC 360-10 J3: 4, 5, where the minimum and maximum edge distance should be:
1. For standard hole, minimum as provided by Table J3.4M; and check of Plate Bearing Strength (see Section C.3)
must be satisfied.
2. From bolt hole center to edge not more than 12 x[t w or t p ], but should not exceed 150mm.
Table B2.1 - HSB Configuration Criteria
HSB s b (mm) L eh and L ev (mm)

db Min Recom Min


Size Max Max
(mm) (2.67 d b ) (3 d b ) (note 2)

M16 16.00 42.67 48.00 22.00


M20 20.00 53.33 60.00 26.00
M22 22.00 58.67 66.00 28.00
note (1) note (3)
M24 24.00 64.00 72.00 30.00
M27 27.00 72.00 81.00 34.00
M30 30.00 80.00 90.00 38.00
Note:
(1) [max s b ] - 0.5 xd h < 12x[t f or t p ] ; which equal to [max s b ] < 0.5xd h + 12x[t f or t p ]
(2) AISC Spec. 360-10: Tables J3.4M, Check of Plate Bearing Strength must be satisfied.
(3) [max (L eh , L ev )] < min [12 x [t f or t p ], 150mm]

TEP-043-CAL-ST-BP4-0020 68 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Member Connection
Beam = H 300 x 150 x 6.5 x 9

Hb = 300 mm
B fb = 150 mm
Hh = 300 mm Hb
t fb = 9 mm

t wb = 6.5 mm
Hh
F yb = 235 mm
Column = H 200 x 200 x 8 x 12

Hc = 200 mm = 7.87 inch

B fc = 200 mm = 7.87 inch

t fc = 12 mm = 0.47 inch

t wc = 8 mm = 0.31 inch
rc = 13 mm
F yc = 235 MPa = 34.08 ksi
Fu = 400 MPa
d eff = 0.591 m

Bolt HSB
QTY of Bolt = 8 mm
db = 20 mm = 0.79 inch
Pf
dh = 22 mm Sb
Pf = 50 mm = 1.97 inch
h0
g = 95 mm
h1 = 536.5 mm = 21.12 inch h1
P
A Pff

h0 = 645.5 mm = 25.41 inch


L ev =P ext - P f = 40 mm = 1.57 inch Sb
Pf
Ft = 620.00 MPa = 89.92 ksi Pf
Ps = 48.5 mm
Bp
End Plate
tp = 22 mm = 0.87 inch
Bp = 185 mm = 7.28 inch
A = 620 mm = 24.41 inch
F yp = 235 MPa
Fu2 = 400 MPa

Stiffener

t st = 12 mm

F yst = 235 mm

TEP-043-CAL-ST-BP4-0020 69 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Bolt Pitch Distance Check


the recommended minimum pitch dimension is d b +1/2 inch for bolts up to 1 inch diameter and d b +3/4 inch
for larger bolt diameter (AISC Design Guide 4: Section 2.1 Point 3)
P f minimum (d b ≤ 1 in ) = 12.7 + d b AISC Design Guide 4: Section 2.1-3
= 32.70 mm
P f maximum = 2 1/2 inch AISC Design Guide 4: Section 2.1-3
= 63.5 mm
P f selected = 50 mm ≥ 32.7,OK , ≤ 63.5,OK

Bolt Spacing Check


S b preffered = 3 x db AISC Spec. 360-10: Part J3, 3
= 60.00 mm
S b minimum = 8/3 x d b AISC Spec. 360-10: Part J3, 3
= 53.34 mm
S b maximum = 1/2 xd h + 12 x min (t p or t fc ) AISC Spec. 360-10: Part J3, 5
= 119 mm
S b taken = 60 mm ≥ 53.34,OK , ≤ 119,OK

Bolt Edge Check


L eh or L ev min = 26 mm AISC Spec. 360-10: Tables J3.4M
L eh or L ev max = smallest value between 150 mm or 12 x min(t p or t fc )
= min [ 150 or 12 x 9] AISC Spec. 360-10: Part J3, 5
= 108 mm

L ev taken = 40 mm ≥ 26,OK , ≤ 108,OK


L eh taken = 45 mm ≥ 26,OK , ≤ 108,OK

C Available Flexural Strength (M n )


C.1 Capacity of Connection due to Flexural Yielding of Endplate (M n4 )
and Column Flange (M n5 )
Column Flange to be assume with stiffener

¢Mn2 = tp 2¢b FypYp ¢M = t 2¢ F Y AISC Design Guide 4 : Eq (3.21)


n3 fc b yc c

Where
b = 0.90
F yp = end plate material yield strength
F yc = column flange material yield strength
Yp = end plate yield line mechanism parameter
Yc = column flange yield line mechanism parameter

Endplate side Column Flange side

TEP-043-CAL-ST-BP4-0020 70 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Calculate Yield Line Parameter of stiffened Column Flange and Stiffened End Plate

bp 1 1 1 1
+ 1/ Bfc . g
Yp = h p p
- + h1 fi s S fc = 2
2 2 O fo 2 p

+ g h1 pfi + sp = 0.5 x SQRT (200 x 95)


= 68.92
bfc 1 1 1 1
Yc-stiff = + + h1 + 1/ Bp . g
h sfc pso psi sfc
sp = 2
22 O
+ g hO sfc + pso + h1 psi + sfc
= 0.5 x SQRT (185 x 95)

= 66.29

AISC Design Guide 16 : Table (3-3)

Yield line parameter of stiffened flange

Y c-stiff = (200/2)x((645.5/48.5+645.5/68.92)+(536.5/48.5+536.5/68.92))
+(2/95)x(((645.5*(48.5+68.92)))+((536.5x(48.5+68.92)))

= 7074.05 mm

Yp = (185/2)x((536.5/50+536.5/66.29)+(645.5/50-0.5))
+(2/95)x((536.5x(50+66.29))

= 4202.54 mm

Calculate Availeble Moment Strength due to Yield strength of End Plate

¢Mn2 = tp 2¢b FypYp AISC Design Guide 4 : Eq (3.21)


= 22 x 22 x 0.9 x 235 x 4202.54
= 430197048
= 430.20 kNm

Calculate Availeble Moment Strength due to Yield strength of Column Flange

¢Mn3 = tf 2¢b Fyc Yc AISC Design Guide 4 : Eq (3.21)


= 12 x 12 x 0.9 x 235 x 7074.05
= 215447246 Nmm
= 215.45 kNm

If the end plate and/or the column flange are exhibiting thin plate behavior (M n-pl < 1.1r M n-bolt orM n-fc < 1.1r M n-bolt ), then
procedures for determining the tensile strength of bolt with prying action are refer to AISC/MBMA Design Guide 16 Flush and
Extended Multiple-Row Moment End-Plate Connections (Murray and Shoemaker, 2002).

C.2 Capacity of Connection due to Tension of Bolt (M n1 )

assume using thick plate procedure (no prying effect)

¢Mn = ¢ nh Pt (hO + h1 ) AISC Design Guide 4 : Eq (3.8)

2
Pt = F t (0.25 π d ) AISC Design Guide 4 : Eq (3.9)
= 620x(0.25x3.14x20x20)
b
= 194778.74 N
= 194.78 kN = 43.79 kips

TEP-043-CAL-ST-BP4-0020 71 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Assume without prying effect


M n = ¢ nh Pt (hO + h1 ) AISC Design Guide 4 : Eq (3.8)
= 0.75 x 2 x 194.78 x (536.5 + 645.5 )
= 345342.71 kNmm
= 345.34 kNm

requirement to be sastisfied for thick plate behavior (no prying action)


M n-plate > 1.1r M n-bolt AISC Design Guide 16 : Eq (2-7)
M n4 > 1.1r M n1
430.20 < 379.88 OK, assumption for no prying action is correct

requirement to be sastisfied for thick plate behavior (no prying action)


M n-flange > 1.1r M n-bolt AISC Design Guide 16 : Eq (2-7)
M n5 > 1.1r M n1
215.45 < 379.88 then, tensile strength of bolt shall be calculate with prying effect

Refer to Section C.1 Above, tension of bolt shall be calculated with consideration of prying effect

Prying effect is additional force as a result of plate deflection to achieve limit of bolt rupture. If the end plate and/or the
column flange are exhibiting thin plate behavior (M n-pl < 1.1 rM n-bolt orM n-fc < 1.1rM n-bolt ), then procedures for
determining the tensile strength of bolt with prying action are refer to AISC/MBMA Design Guide 16 Flush and Extended
Multiple-Row Moment End-Plate Connections (Murray and Shoemaker, 2002). For sample calculation of thin plate
procedure with praying action is represented in this appendix

yield line
prying force, tfc tp tfc tp tfc tp
Qmax

tp
prying force thick end-plate, thin end-plate, thin end-plate,
mechanism thin column flange thick column flange thin column flange

Calculate prying force effect


bp
w' = - db + 1/16 AISC Design Guide 16 Table 4-1
2
= 7.28/2-(0.79+1/16)
= 2.79 inch

tp 3
ai = 3.682 - 0.085 AISC Design Guide 16 Table 4-1
db
= 3.682x((0.47/0.79)^3)-0.085
= 0.71 inch
3
bp F
rrdb t
Fi tp 2 Fpy + 0.80w′ +
= 0.85 2 8 AISC Design Guide 16 Table 4-1
4Pf
= (0.47^2)x(50.04)x((0.85x7.28/2)+(0.8x2.79))+(3.14x(0.79^3)x89.92/8)
4x1.97

TEP-043-CAL-ST-BP4-0020 72 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004
= 9.75 kips

3
tp
3.682 - 0.085
ao = db AISC Design Guide 16 Table 4-1
Pext - Pf
min
= MIN ( 0.71 or 1.57 )
= 0.71 inch

Fo = Fi = 9.75 kips

2
Q max,i = w′tp 2 Fi I AISC Design Guide 16 Table 4-1
Fpy 2 - 3
4ai w′tp
= 2.79x(0.47^2)x(SQRT((34.08^2)-3x((9.75/(2.79x0.47))^2)))/(4x0.71)
= 6.93 kips

Fo I 2
Q max,o = w′tp 2 F 2
-3 AISC Design Guide 16 Table 4-1
py w′tp
4ao
= 2.79x(0.47^2)x(SQRT((34.08^2)-3x((9.75/(2.79x0.47))^2)))/(4x0.71)
= 6.93 kips

Calculate moment capacity due to bolt rupture with prying action


AISC Design Guide 16 Table 4-2
¢ 2 Pt - Qmax,o ho + 2 Pt - Qmax,i h1
¢ 2 Pt - Qmax,o ho + 2 Tb h1
¢Mn1 =
¢ 2 Pt - Qmax,i h1 + 2 Tb ho
max
[2 Tb h1 + ho ]

= 0.75x((2x(43.79-6.93)x(25.41))+(2x(43.79-6.93)x(21.12))) = 2572.64
0.75x((2x(43.79-6.93)x(25.41))+(2x(0.7x43.79)x21.12)) = 2375.96
max 0.75x((2x(43.79-6.93)x(21.12))+(2x(0.7x43.79)x25.41)) = 2336.01
0.75x(2x(0.7x43.79)x(25.41+21.12)) = 2139.33
= 2572.64 ksi
= 290.67 kNm

C.3 Shear Yielding of Unstiffened Endplate (M n2 )

this section is to check shear yielding of extended portion unstiffened endplate (type 4E). The checking is not considered
for extended endplate with stiffener
b1

b2 Section to
be checked
Hb

b3
b4

TEP-043-CAL-ST-BP4-0020 73 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Ffu
< ¢Rn = ¢0.6Fypbp tp AISC Design Guide 4 : Eq (3.12)
2
Ffu < 2¢Rn = 2¢0.6Fyp bp tp

= 2 x 0.9 x 0.6 x 235 x 185 x 22


= 1032966.00 N
= 1032.97 kN

¢Mn2 = 2¢Rn deff

= 1032.966x (300 + 300 - 9 )


= 610482.91 kNmm
= 610.48 kNm

C.4 Shear Rupture of Unstiffened Endplate (M n3 )


this section is to check shear rupture of extended portion unstiffened endplate

b1
Section to
b2 be checked

Hb

b3
b4

Ffu
< ¢Rn = ¢0.6Fup (bp -2 (db +1/8)) tp
2 AISC Design Guide 4 : Eq (3.13)

Ffu < 2¢Rn = 2¢0.6Fup (bp -2 (db +1/8)) tp

= 2 x 0.75 x 0.6 x 400 x (185-2x(20+25.4 x 1/8)) x22


= 1098108.00 N
= 1098.11 kN

¢Mn3 = 2¢Rn deff


= 1098.108x (300 + 300 - 9 )
= 648981.83 kNmm
= 648.98 kNm

C.5 Capacity of Connection due to Beam Flange Weld Rupture (M n6 


Effective length tp
lw1 = B fb
= 150.00 mm a1
twb tfb
lw2 = (B fb - t wb ) Bfb
a2
= 150 - 6.5)
= 143.50 mm a2
weld size a1
a1 = 9.00 mm
a2 = 9.00 mm

the applied load is perpendicular to the weld length; therefore available strength of the weld is multiplying by following
l.5 l.5
expression 1 + 0.50sin θ = 1 + 0.50sin 90 = 1.5

TEP-043-CAL-ST-BP4-0020 74 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

R n-weld = 1.5 F nw A we AISC Spec. 360-10 : Eq (J2-4), (J2-5)


= 1.5 0.6 F EXX [0.707(a1 l w1 + a2 l w2 )]
= 1.5 x 0.75 x 0.6 x 480 x ( 0.707 x (9 x 150+9 x 143.5)
= 605083.12 N
= 605.08 kN
M n4a controlled by flange weld = R n-weld d eff
= 605.08 x 0.591
= 357.60 kNm

Checking strenght of transverse stiffener/continuity plate


Required Strength of the stiffener is calculated as flange force design at tension zone
R r -st = min(M n1 , M n2 , M n3, M n4 )/deff
= 335.02 kN

Tension Yielding of stiffener plate

AISC Design Guide 13 : Eq (4.3-1)

R n-st = F yst x A st
= 0.9x235x12x(200-8-2x25-10)
= 335016.00 N
= 335.02 kN

M n4b controlled by stiffener plate = 335.02 x 0.591


= 197.99 kNm
tfc
Effective length of double side fillet weld
l w1 = l w2 = (B fc - t w - 2 r scal - 2x5) rscal=25
5
= (200 - 8- 2x25 - 2x5)
bs a1
= 132.00 mm Bfb tst
leg size a2
a1 = 9.00 mm a2
a2 = 9.00 mm a1

the applied load is perpendicular to the weld length; therefore available strength of the weld is multiplying by following
l.5 l.5
expression 1 + 0.50sin θ = 1 + 0.50sin 90 = 1.5

Shear Strength of weld


R n-weld = 1.5 F nw A we AISC Spec. 360-10 : Eq (J2-4), (J2-5)
= 1.5  0.6 F EXX (0.707a1 l w1 +a2 l w2 )
= 1.5 x 0.75 x 0.6 x 480 x ( 0.707 x (9 x 132 + 9 x 132))
= 544265.57 N
= 544.27 kN
M n4c controlled by stiffener weld = 544.27 x 0.591
= 321.66 kNm

C.6 Capacity of Connection due to Column Web Stiffness (M n7, M n8, M n9 )
The stength of connection is designed lower than strenght of column
M n1 = 345.34 kNm Factored Beam Flange Force (Ffb) is taken from smallest value of
M n2 = 430.20 kNm among available moment M n1 , M n2 , M n3 , M n4
M n3 = 215.45 kNm
M n4 = 357.60 kNm min(¢Mn1~4 ) 215.45
Pfb = =
Hb + Hh - tfb 0.591
min (M n1~4 ) = 215.45 kNm = 364.55 kN

TEP-043-CAL-ST-BP4-0020 75 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

a) Column Web Yielding check

N = t fb mm
= 9 mm = 0.354 inch

kc = t fc +r c
= 25 mm

R nw1 = C t (6 k c + N + 2t p ) F yc t wc AISC Design Guide 4 : Eq (3.24)


= 1 x 1 x ((6 x 25) + 9 + (2 x 22)) x 235 x 8
= 381640 N
= 381.64 N ≥ 364.55 unstiffened column is sufficient

b) Column Web Buckling check

h = H c -2t fc -2r c
= 200- (2 x 12) - (2 x 13)
= 150 mm = 5.906 inch

AISC Design Guide 4 : Eq (3.26)

R nw2 = 0.9 x 24 x( 0.31 ^ 3) x (SQRT(29000 x 34.08 ))/5.91


= 113.62 ksi
= 505.39 kN ≥ 364.55 unstiffened column is sufficient

c) Column Web Crippling check

AISC Design Guide 4 : Eq (3.29)

R nw3 = 0.75 x 0.8 x (0.31^2) x (1 + 3 x (0.35 / 7.87 ) x (( 0.31 /0.47 )^ 1.5 ))xSQRT( 29000x(34.08)x0.47 /0.31 )
= 77.80 kips
= 346.07 kN < 364.55 assumption to provide column stiffener is correct

Stiffener Column Design


ts = 12 mm (initial assumption)
F ys = 235 MPa

TEP-043-CAL-ST-BP4-0020 76 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004
AISC Design Guide 13 : Eq (4.3-3)

t smin = t wb (assume for two-sided connection) AISC 341-10 : E3.6f.(2)

t st-min = 12/2 ≥ (3.58xSQRT(32.9)/95)x25.4 ≥ 9


= 6 mm ≥ 5.49 mm ≥ 9 mm
= MAX(6 or 5.49 or 9 )
= 9 mm

t st selected = 12 mm ≥ t st-min OK, can be used

Shear Yielding of Transverse Stiffener Plate

R n-plate =  F yst x t s x (l s - 2xr scal ) AISC Design Guide 13 : Eq (4.3-4)

= 0.9x 0.6 x 235 x 2 x 12x (176 - 2 x 25)


= 383745.60 N
= 383.75 kN

a2 rscal=25
Effective length of weld (2 stiffener plate double side fillet weld) a1
l w1 +l w2 = 2 (H c - 2 t fc - 2 r scal )
= 2 x (200 - 2 x 12- 2 x 25) Bfb
= 252.00 mm
leg size of weld
lw
a1 = 8.00 mm
l
s
a2 = 8.00 mm

the applied load is parallel to the weld length; therefore available strength of the weld is multiplying by following
l.5 l.5
expression 1 + 0.50sin θ = 1 + 0.50sin 0 = 1.0

Shear strength of weld


R n-weld = 1.0 F nw A we AISC Spec. 360-10 : Eq (J2-4), (J2-5)

= 1.0  0.6 F EXX 0.707 (a1 l w1 +a2 l w2 )


= 1 x 0.75 x 0.6 x 480 x ( 0.707 x (8 x 252 + 8 x 252 )) twc
= 615734.78 N
= 615.73 kN a1
tst
R n-weld > R n-plate , weld size is suficient to transmitt whole capacity of connection part a2
(transverse stiffener/continuity plate) with design strength as follows :
R nst = MIN ( R n-plate or R n-weld )
= MIN (383.75 or 615.73)
= 383.75 kN

Eqivalent Factored Beam Force


F fn = Stiffener Design Strength + Column Web Resistence
= R nst + R nw AISC Design Guide 13: Eq (4.2-1)

¢Mn7 = (¢Rnst +¢Rnw1 ) . deff = (383.75+381.64)x 0.591 = 452.34 kNm

¢Mn8 = (¢Rnst +¢Rnw2 ) . deff = (383.75+505.39)x 0.591 = 525.48 kNm

¢Mn9 = (¢Rnst +¢Rnw3) . deff = (383.75+346.07)x 0.591 = 431.32 kNm

TEP-043-CAL-ST-BP4-0020 77 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

C.7 Capacity of Connection due to Column Web Panel Zone in Shear (M n10 )

Column web panel zone shear is a phenomenon that occurs when double-concentrated forces are applied to a member.
A moment connection's beam flange forces creates these double concentrated forces.

¢Rn = ¢0.6Fyc Hc twc AISC Design Guide 13 : Eq (2.2-1)

Where:
 = 0.90
F yc = yield stress of column, MPa
Hc = depth of column member, mm
t wc = web thickniess of column, mm

¢Rn = ¢0.6Fyc Hc twc AISC Design Guide 13 : Eq (2.2-1)

with additional plat on web column,

tp = 6

wp = 130 PL 6 x 130
¢Rn = 0.9 x 0.6 x 235 x (200 x 8 + 6 x 130 )
= 272327.4 N
= 272.3274 kN

¢Mn8 = ¢Rn . deff Double Concentrated forces in Moment


connection flange force terminology.
= 272.3274 x 0.591
(AISC Design Guide 13 Figure 2‐4 a)
= 160.95 kNm

D Capacity of Connection to Restrain Shear Force (V n )

End-plate connections is designed as bearing connection. All of the shear force at a connection is assumed to be resisted by the
compression side bolts. If the both side is in tension, side with less tension is cosidered with reduction capacity. Shear yielding of
beam web and haunch to end plate weld or of beam web and haunch base metal is also veriefied as consideration of capacity of
connection to restrain shear force.

D.1 Capacity of Connection due to Shear Rupture Bolt (V n1 )

in Negative in Positive bolts that restrain


shear force, Vu
moment force moment force

Mr - Vr Mr + Vr

bolts that restrain


shear force, Vu

AISC Design Guide 4: Eq (3.17)

TEP-043-CAL-ST-BP4-0020 78 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004
Where:
ϕ = 0.75
nb = quantity of bolt in compression area or less tension, ea
R nv = Nominal shear strength of single bolt, N
= ϕ x F nv x A b AISC Spec. 360-10: Eq. (J3-1)

n compres = 4 mm
R nv = 87.65 kN ( see Table B1.1)

V n1 = n x  R nv
= 4 x 87.65
= 350.60 kN

D.2 Capacity of Connection due to Bearing of Bolt Holes (V n2 , V n3 )

V y2 = ϕ x R n x n comp AISC Design Guide 4: Eq (3.17)

Where:
ϕ = 0.75
Rn = Nominal Plate Bearing Strength in direction of load, N
= smallest value between
1.2 x l c x MIN (t p or t f ) x F u or 2.4 x d b x MIN(t p or t f ) x F u AISC Design Guide 4: Eq (3.19)
n comp = Number of Bolt(s) in compression zone
lc = clear distance, in the direction of the force, between the edge of the hole and
the edge of the adjacent hole or edge of the material, mm
tp = thickness of end plate, mm
tf = thickness of flange member, mm
Fu = specified minimum tensile strength of the material, MPa
db = nominal bolt diameter, mm

Lc = 18 mm
n = 4 ea (compression zone)

R n flange = 2.4 x d b x t fc x F u
= 2.4 x 20 x 12 x 400
= 230400 N
= 230.4 kN

R n endplate = 1.2 x l c x t p x F u ≤ 2.4 x d b x t p x F u


= 1.2 x 18 x 22 x 400 ≤ 2.4 x 20 x 22 x 400
= 190080 N 422400 N
≤ 422.40 kN
= 190.08 kN

= MIN [190.08 or 422.4]
= 190.08 kN

Flange End Plate


V n2 = ( ϕ x R n-flange x n comp ) V n3 = ( ϕ x R n-endplate x n comp )
= ( 0.75 x 230.4 x 4) = ( 0.75 x 422.4 x 4)
= 691.2 kN = 570.24 kN

TEP-043-CAL-ST-BP4-0020 79 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

D.3 Capacity of Connection due to shear yielding of weld (V n4 ) and beam web (V n5 )
Effective length of double side fillet weld tp
lw = 2 (H b + H h - 3 t fb ) a twb
= 2x (300 + 300 - 3 x 9)

= 1146.00 mm l =H +H ‐3t
Hb w b h fb
leg size of weld
deff
a = MIN (t wb or t p ) tp
= MIN (6.5 or 22) Hh
30o
= 6.50 mm

Lp
the applied load is parallel to the weld length; therefore available strength of the weld is multiplying by following
l.5 l.5
expression 1 + 0.50sin θ = 1 + 0.50sin 0 = 1.0

V n4 = 1.0 F nw A we V n5 = F y A g
= 1.0 0.6 F EXX 0.707 al w = F y t wb (H b +H h -2t fb )
= 1.0 x 0.75 x 0.6 x 480 x ( 0.707 x 6.5 x 1146 ) = 1 x 0.6 x 235 x 6.5 x (300 + 300 - 3 x 9)
= 1137551.69 N = 525154.5 N
= 1137.55 kN = 525.15 kN

V n4 > V n5 OK, weld size suficient to transmitt whole capacity of connection part (beam web)

E Summary of Endplate Moment Connection Capacity


E.1 Individual Design Capacity

Table E.1.2 below is summaries design capacity calculations of the samples Beam H 300 x 150 x 6.5 x 9 with haunch
connected to column H 200 x 200 x 8 x 12 d eff = (H b + H h - t fb ) = 0.591 m

Table E.1.2 - Index of Available Moment


Moment Capacity
Subject to be cecked Element Moment Capacity
M n (kNm) M n (kNm)
Tension Zone
M n1 Tension of Bolt Bolt 290.67
M n2 Shear Yielding of Weld Flange Weld 610.48
M n3 Shear Yielding of Weld Flange Weld 648.98
197.99
M n4 Flexural Yielding of Endplate End Plate 430.20
M n5 Flexural Yielding of Flange Column Flange 215.45
160.94 kNm
M n6 Shear Yielding of Weld Flange Weld 197.99
Compression Zone
from Column Shear Yielding
M n5 Column Web Yielding+Stiffener Column Web 452.34
M n6 Column Web Buckling+Stiffener Column Web 525.48 431.32
M n7 Column Web Crippling+Stiffener Column Web 431.32
Panel Zone
M n8 Column Shear Yielding Column Web 160.95 160.95

Table E.1.3 - Index of Available Shears


Shear Shear
Subject to be cecked Element
V n (kN) Capacity
V n1 Bolt Group Shear Bolt 350.60
V n2 Bearing Bolt holes Flange 691.20
350.6 kN
V n3 Bearing Bolt holes Endplate 570.24
V n4 Shear yielding of weld Weld 1137.55 from Bolt Group Shear

V n5 Shear yielding of beam web Beam Web 525.15

TEP-043-CAL-ST-BP4-0020 80 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

E.2 Capacity of Connection in Combination Moment and Axial

Available interaction moment and axial will be provided in chart (M vs P ) to make easier engineer check the connection of the structure.
below is explanation in develop the graph. The axial and moment force is converted into a Required Flange Force (P rf ). When an axial force
is added to a moment connection, it is assumed that this axial force is carried entirely by the flanges. Flange force from the axial will reduce
moment capacity into reduced moment strength, M n-red as formula below :

Mr Pr
P = ±
rf
deff 2
Pr AISC Design Guide 13: Eq (2.1-1)
Mr = Prf deff ± deff
2
Pr
c/Mn -red = c/Mn ± ( deff )
2
Where
P rf = flange force of beam, tensile or compressive, kN
M n = correspondence flexural strength (refer to tension side for axial tension, refer to compression zone for axial
compresson), kNm
d eff = moment arm between flange forces
= (H b + H h - t fb )
Pr = Required beam axial force (negative for tension, positive for compression), kN

Compression Side
P r (kN) M n-red (kNm)
Beam: H 300 x 150 x 6.5 x 9
0.00 Pu 431.32
1500 Compression zone Column: H 200 x 200 x 8 x 12
c/M - ( d ) Pu
limit
2000.00 n eff -159.68 (kN)
2
1459.63 0.00
1000 Panel Zone
Strength
Tension Side
P r (kN) M n-red (kNm) 500 service area for
required moment
-670.03 0.00 from analysis
-2000.00 Pu -393.01 structure with R=1
c/Mn + ( d ) Mn (kNm)
0.00 2 eff 197.99 0
0 100 200 300 400
12000.00 3743.99

Tension Zone
‐500
Panel Zone Strength limit
P r (kN) M r (kNm)
2000.00 160.95
see section C.7 ‐1000
-2000.00 160.95

E.3 Cappacity of Connection in Combination Shear and Tension

Available interaction shear and axial will be provided in graph (V vs P ) to make easier engineer check the connection of the
structure. below is explanation in develop the graph.
in particular case, all bolt will be in tension. Shear of bolt controlled by side which less of tension, shear of capacity of bolt is
reduced by tension stress as formula below :

Ffr Vr
cjJTn + cjJVn =1 Shear strength and corresponding tension strenght
V n = 350.60 kN (Table E.1.3 )
Vr Ffr
= 1-
c/Vn c/Tn T n = n .R nt
Ffr
V = c/V = (1 - )c/V = 4 x 266.23
r n-red
cjJTn
n
= 1064.92 kN

TEP-043-CAL-ST-BP4-0020 81 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004
F fr ≥ 0, full capacity, V n
< 0, with reduction, (1 - F fr / T n ) V n
where :
F fr = M r /d eff +P r /2

Flange Force ar Capacity


F fr (kN) Remark kN
1500.00 Compress full capacity,V n 350.60
0.00 netral full capacity,V n 350.60
-1064.92 tension w/ reduction,(1-F fr / T n ).V n 0.00
-2000.00 tension w/ reduction,(1-F fr / T n ).V n -307.85
-3000.00 tension w/ reduction,(1-F fr / T n ).V n -637.08
-4000.00 tension w/ reduction,(1-F fr / T n ).V n -966.31
-2129.84 tension w/ reduction,(1-F fr / T n ).V n -350.60

Ffr Beam: H 300 x 150 x 6.5 x 9


(kN) Column: H 200 x 200 x 8 x 12
2000
service area for required
1000 shear from analysis
structure with R=1
0
0 50 100 150 200 250 300 350 400
‐1000 Vr (kNm)

‐2000

‐3000

‐4000

‐5000

TEP-043-CAL-ST-BP4-0020 82 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project – LNG EPC
Calculation for Operating Platform 043-PLF-31004

Appendix 7.2
7.2. Summary Design Capacity of Special End Plate Moment Connection EM-SP1

Profile Material ( beam & column) Plate Material ( endplate, stiffeners High Strength Bolt Moment Capacity
Shear Capacity
Mn1 : Tension of Bolt Mn6 : Beam Flange Weld Rupture
Material ASTM A572 JIS G3101 Material ASTM A572 JIS G3101 Material F3125M
Mn2 : Shear Yielding of Endplate Mn7 : Column Web Yielding+Stiffener Vn1 : Bolt Group Shear
Tensile Stress Fu 450 MPa 400 MPa Tensile Fu 450 MPa 400 MPa Nominal Shear Stress F nv 372 MPa Mn3 : Shear Rupture of Endplate Mn8 : Column Web Buckling+Stiffener Vn2 : Bearing Bolt holes flange
Yield Stress Fy 345 MPa 235 MPa Yield St Fy 345 MPa 245 MPa Nominal Tensile Stres F nt 620 MPa Mn4 : Flexural Yielding of Endplate Mn9 : Column Web Crippling+Stiffener Vn3 : Bearing Bolt holes endplate
Expected Yield Stress Ry 1.1 1.5 Yield St Fy 345 MPa 235 MPa
Mn5 : Flexural Yielding of Column Flange Mn10 : Column Panel Zone Vn4 : Shear yielding of weld
Vn5 : Shear yielding of beam web

BOLT DIMENSION BOLT ARRANGEMENT END PLATE Weld HA UNC H Expected Mom ent C ap acity ( Mr ) Vr Moment Capacity (Mn ) Shear Capacity (Vn )
Stiff/
No BEAM CO LUMN Type NOS dia Hole L eh g L ev Pf Sb A B tp S2 S3 w1 w2 w3 w4 Hh 1.1R y R n d eff 1.1R y F y Z +V r L p 2(1.1R y F y Z)/L c f M n1 M n2 M n3 M n4 M n5 M n6 M n7 M n8 M n9 M n10 M n-tens M n-comp M n-pz V n1 V n2 V n3 V n4 V n5 V n
Unstiff
ea mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm kNm kNm kN kNm remark kNm kNm kNm kNm kNm kNm kNm kNm kNm kNm kNm kNm kN kN kN kN kN kN
1 H 300 x 150 x 6.5 x 9 H 200 x 200 x 8 x 12 6 Bolt Stiff 8 20 22 50 95 40 50 60 195 620 22 12 10 11 7 0 11 300 190.37 154.12+ Vr 519.62 308.24/(L‐1.283) 382.11 prying 643.48 695.79 500.82 194.70 197.99 452.34 525.48 431.32 160.95 194.70 431.32 160.95 525.90 751.68 1378.08 1225.06 525.15 525.15

2000 SH‐300 to WH‐200 2000 SH‐300 to WH‐200


P (kN) Ff (kN)

1500 1500
Service Area
combination
1000 1000 shear+Flange Force
Service Area
combination
500 500
moment + Axial
V (kN)
M (kNm)
0 0
0.00 100.00 200.00 300.00 400.00 500.00 0 200 400 600

‐500 ‐500

‐1000 ‐1000

TEP-043-CAL-ST-BP4-0020 83 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 8 - Material Take Off


The MTO below is for whole structure

7.1 Upper Structure MTO


Table 2 - Upper Structure MTO
Length Weight
Profile
m kN Ton

H200X200X8X12 44.00 21.47 2.19


H250X125X6X9 68.05 19.33 1.97
H300X150X6.5X9 74.60 26.81 2.73
C150X75X6.5 29.96 5.46 0.56
H125X125X6.5X9 9.13 2.10 0.21
H150X150X7X10 26.10 7.95 0.81
PIP E 49.57 10.56 1.08
L75X75X6 38.95 2.61 0.27

Total 96.29 9.82

TEP-043-CAL-ST-BP4-0020 84 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
Appendix 9 - STAAD. Pro Data 39 33 147; 40 36 146; 42 39 127; 48 38 128; 51 45 8; 52 7 46; 53 7 112;
9.1 STAAD. Pro Input 55 9 48; 56 9 121; 57 49 158; 59 48 51; 60 9 52; 61 49 55; 63 10 62; 64 52 51;
65 52 126; 66 51 59; 68 54 55; 69 55 57; 71 152 151; 73 57 61; 75 54 154;
76 61 151; 78 61 67; 80 126 154; 81 64 65; 82 65 67; 84 151 153; 85 59 69;
STAAD SPACE OPERATING PLATFORM 043-PLF-31004
86 126 11; 87 65 70; 89 62 12; 90 11 69; 91 11 148; 92 70 150; 94 13 72;
SET NL 500 95 13 131; 96 14 129; 97 72 74; 98 13 75; 99 135 133; 100 14 123; 101 75 74;
START JOB INFORMATION 102 75 136; 104 77 79; 107 74 81; 109 77 133; 110 79 134; 113 83 85; 116 81 87;
ENGINEER NAME IKHSAN 117 120 137; 118 134 123; 119 123 16; 120 15 87; 121 15 132; 123 17 89;
CHECKER NAME TRIASMORO 124 17 138; 126 18 140; 127 89 92; 128 17 93; 129 140 142; 130 142 98;
APPROVED NAME Sutanto
131 18 98; 132 92 93; 133 93 94; 134 94 144; 138 92 103; 139 96 100;
ENGINEER DATE 10 MAR 18 140 98 102; 141 104 125; 142 94 143; 143 100 101; 144 101 102; 146 100 107;
JOB CLIENT BP 147 101 108; 148 102 109; 149 103 104; 150 104 105; 151 105 145; 153 107 108;
END JOB INFORMATION 154 108 109; 155 103 110; 156 104 19; 157 107 141; 158 109 20; 159 19 110;
INPUT WIDTH 79 160 19 139; 162 2 157; 163 11 155; 164 11 156; 165 19 156; 166 3 155;
UNIT METER KN 167 155 12; 168 156 12; 169 156 20; 170 157 10; 171 157 9; 172 13 158;
JOINT COORDINATES 173 13 159; 176 158 14; 177 159 14; 178 5 147; 182 147 7; 183 146 8; 185 10 61;
1 0 18.3 -4.6; 2 0 18.3 0; 3 5.4 18.3 -4.6; 4 5.4 18.3 0; 5 0 21.5 -4.6; 186 52 59; 187 59 11; 189 61 12; 191 14 134; 192 75 81; 193 81 15; 195 134 16;
6 0 21.5 0; 7 5.4 21.5 -4.6; 8 5.4 21.5 0; 9 0 24.25 -4.6; 10 0 24.25 0; 196 17 94; 197 18 142; 200 105 19; 201 107 20; 652 112 118; 654 113 8;
11 5.4 24.25 -4.6; 12 5.4 24.25 0; 13 0 27 -4.6; 14 0 27 0; 15 5.4 27 -4.6; 657 39 38; 659 116 161; 660 124 147; 661 118 155; 662 117 160; 664 117 116;
16 5.4 27 0; 17 0 29.3 -4.6; 18 0 29.3 0; 19 5.4 29.3 -4.6; 20 5.4 29.3 0; 665 119 157; 666 119 33; 667 120 135; 668 120 81; 669 121 54; 670 121 49;
29 0 21.5 -5.6; 33 1.7 21.5 -3.55; 34 1.7 21.5 -2.7; 36 1.7 21.5 -1.7; 671 126 59; 673 122 36; 675 124 39; 676 125 93; 678 127 7; 679 128 46;
38 2.83 21.5 -5.6; 39 2.83 21.5 -4.6; 45 3.535 21.5 0; 46 5.4 21.5 -5.6; 680 127 128; 682 129 79; 683 130 16; 684 85 130; 685 131 129; 686 132 156;
48 0 24.25 -5.6; 49 0 24.25 -2.7; 51 0.8 24.25 -5.6; 52 0.8 24.25 -4.6; 687 131 77; 688 83 132; 689 133 83; 690 134 85; 691 136 135; 692 136 77;
54 1.865 24.25 -3.535; 55 1.865 24.25 -2.7; 57 1.865 24.25 -1.865; 693 137 15; 694 137 83; 695 138 159; 696 139 141; 697 138 94; 698 105 139;
59 2.7 24.25 -5.6; 61 2.7 24.25 -1.865; 62 2.7 24.25 0; 64 3.535 24.25 -3.535; 700 141 20; 701 142 96; 702 143 105; 703 125 143; 704 94 125; 705 125 105;
65 3.535 24.25 -3.1; 67 3.535 24.25 -1.865; 69 5.4 24.25 -5.6; 706 144 96; 707 145 107; 708 144 145; 709 146 162; 710 147 116; 711 148 70;
70 5.4 24.25 -3.1; 72 0 27 -5.6; 74 1 27 -5.6; 75 1 27 -4.6; 712 64 148; 713 149 152; 714 149 57; 715 150 153; 716 67 150; 717 151 62;
77 1.845 27 -3.615; 79 1.845 27 -1.575; 81 3.2 27 -5.6; 83 3.825 27 -3.615; 718 152 10; 719 153 12; 720 154 64; 721 155 113; 722 156 130; 723 157 122;
85 3.825 27 -1.575; 87 5.4 27 -5.6; 89 0 29.3 -5.165; 92 1.5 29.3 -5.165; 724 158 149; 725 159 140; 726 160 118; 727 161 112; 728 162 160; 729 162 113;
93 1.5 29.3 -4.6; 94 1.5 29.3 -3.6; 96 1.5 29.3 -1.8; 98 1 29.3 0; 730 160 161;
100 3.125 29.3 -1.8; 101 3.125 29.3 -0.7; 102 3.125 29.3 0; START GROUP DEFINITION
103 4.2 29.3 -5.165; 104 4.2 29.3 -4.6; 105 4.2 29.3 -3.6; 107 4.2 29.3 -1.8; MEMBER
108 4.2 29.3 -0.7; 109 4.2 29.3 0; 110 5.4 29.3 -5.165; 112 5.4 21.5 -3.55; _COLUMN 1 3 5 7 9 TO 13 15 17 19 21 TO 24
113 5.4 21.5 -1.7; 116 3.3 21.5 -3.55; 117 3.3 21.5 -3.1; 118 5.4 21.5 -3.1; _BEAM 25 TO 31 34 35 39 40 42 48 51 TO 53 55 TO 57 59 TO 61 63 TO 66 68 69 -
119 0 21.5 -3.55; 120 3.2 27 -4.6; 121 5.96046e-008 24.25 -3.535; 71 73 75 76 78 80 TO 82 84 TO 87 89 TO 92 94 TO 102 104 107 109 110 113 116 -
122 0 21.5 -1.7; 123 2.7 27 0; 124 2.4 21.5 -4.6; 125 2.7 29.3 -4.6; 117 TO 121 123 124 126 TO 134 138 TO 144 146 TO 151 153 TO 160 652 654 657 -
126 2.7 24.25 -4.6; 127 4.53 21.5 -4.6; 128 4.53 21.5 -5.6; 129 0 27 -1.575; 659 TO 662 664 TO 671 673 675 676 678 TO 680 682 TO 698 700 TO 703 -
130 5.4 27 -1.575; 131 0 27 -3.615; 132 5.4 27 -3.615; 133 2.7 27 -3.615; 706 TO 730
134 2.7 27 -1.575; 135 2.7 27 -4.6; 136 1.845 27 -4.6; 137 3.825 27 -4.6; _HBRACE 178 182 183 185 TO 187 189 191 TO 193 195 TO 197 200 201 704 705
138 0 29.3 -3.6; 139 5.4 29.3 -3.6; 140 0 29.3 -1.8; 141 5.4 29.3 -1.8; _VBRACE 162 TO 173 176 177
142 1 29.3 -1.8; 143 2.7 29.3 -3.6; 144 1.5 29.3 -2.4; 145 4.2 29.3 -2.4; _BRACE 162 TO 173 176 TO 178 182 183 185 TO 187 189 191 TO 193 195 TO 197 -
146 3.535 21.5 -1.7; 147 2.4 21.5 -3.55; 148 5.4 24.25 -3.535; 200 201 704 705
149 0 24.25 -1.865; 150 5.4 24.25 -1.865; 151 2.7 24.25 -0.9325; _B 56 95 96 718
152 0 24.25 -0.9325; 153 5.4 24.25 -0.9325; 154 2.7 24.25 -3.535; JOINT
155 5.4 21.5 -2.3; 156 5.4 27 -2.3; 157 0 21.5 -2.3; 158 0 24.25 -2.3; FLOOR
159 0 29.3 -2.3; 160 3.7 21.5 -3.1; 161 3.7 21.5 -3.55; 162 3.7 21.5 -1.7; _PNL1 25 26 28 29 39 42 48 52 53 652 657 659 660 662 664 666 675 678 TO 680 -
MEMBER INCIDENCES 710 726 TO 728 730
1 1 5; 3 5 9; 5 9 13; 7 13 17; 9 2 6; 10 6 10; 11 10 14; 12 14 18; 13 3 7; _PNL2A 56 60 61 64 TO 66 68 75 80 81 85 TO 87 90 91 669 TO 671 711 720
15 7 11; 17 11 15; 19 15 19; 21 4 8; 22 8 12; 23 12 16; 24 16 20; 25 5 29; _PNL2B 57 61 63 69 71 73 76 78 82 84 87 89 92 713 TO 719 724
26 5 119; 27 6 122; 28 29 38; 29 5 124; 30 146 45; 31 6 45; 34 33 34; 35 34 36; _PNL3A 95 98 99 101 102 104 107 109 113 116 117 120 121 667 668 682 -

684 TO 686 689 691 TO 694 722 30 35 61 64 69 71 80 82 84 85 87 99 101 104 113 116 118 130 132 133 144 147 -
_PNL3B 96 100 110 118 119 682 TO 684 690 149 150 154 155 157 654 657 660 668 671 679 680 683 684 687 TO 689 698 700 -
_PNL4 132 TO 134 138 139 141 TO 143 146 147 149 TO 151 153 676 702 706 TO 708 703 706 708 712 716 TO 719 726 727 729 END MY MZ
END GROUP DEFINITION 128 START MY MZ
DEFINE MATERIAL START 156 END MY MZ
ISOTROPIC STEEL 158 END MY MZ
E 2.05e+008 131 START MY MZ
POISSON 0.3 707 END MY MZ
DENSITY 76.8195 153 START MY MZ
ALPHA 1.2e-005 728 START MY MZ
DAMP 0.03 730 END MY MZ
TYPE STEEL 662 END MY MZ
STRENGTH FY 235000 FU 407800 RY 1.5 RT 1.2 726 START MY MZ
END DEFINE MATERIAL MEMBER TRUSS
MEMBER PROPERTY JAPANESE 162 TO 173 176 TO 178 182 183 185 TO 187 189 191 TO 193 195 TO 197 200 201 -
** Pipe 8" 704 705
**16 17 22 23 TABLE ST PIPE OD 0.2191 ID 0.20274 MEMBER FIREPROOFING
***Pipe 6" 1 3 9 10 13 15 21 22 26 27 29 31 34 35 39 40 42 51 53 56 57 60 61 63 65 68 -
*70 71 373 374 TABLE ST PIPE OD 0.168 ID 0.154 69 71 73 76 78 81 82 84 86 87 89 91 92 162 TO 173 176 177 652 654 659 661 -
****Pipe 5" 665 666 670 673 675 678 709 TO 711 713 715 717 TO 719 721 723 724 727 -
*5 6 65 68 82 85 87 88 90 368 371 385 388 390 391 - 729 FIRE CFP THICK 0.03 DENSITY 11.38
*393 TABLE ST PIPE OD 0.141 ID 0.1282 MEMBER OFFSET
**Pipe 4" **163 166 174 175 START LOCAL 0.3 0 0
1 3 5 7 9 TO 13 15 17 19 21 TO 24 TABLE ST H200X200X8X12 **162 167 170 171 END LOCAL -0.3 0 0
26 27 29 31 42 51 53 56 57 60 63 65 86 89 91 92 95 96 98 100 102 117 119 121 - 182 185 189 191 195 START LOCAL 0.3 0 0
124 126 131 140 148 158 160 652 654 661 665 667 670 675 678 683 685 686 691 - 182 185 189 191 195 END LOCAL -0.3 0 0
693 695 696 700 711 713 715 718 719 721 TO 725 TABLE ST H300X150X6.5X9 DEFINE MEMBER ATTRIBUTE
25 28 39 40 48 52 55 59 66 68 69 73 75 76 78 80 TO 82 85 90 94 97 104 107 - CONTAG "START:SHEAR:SS" LIST 28 30 34 59 61 64 68 71 76 80 81 84 87 97 99 -
110 113 116 120 123 127 138 155 159 659 666 669 673 679 682 684 690 692 694 - 101 109 118 127 129 130 132 TO 134 143 147 149 TO 151 657 660 662 666 668 -
709 710 712 714 716 717 720 727 729 TABLE ST H250X125X6X9 669 671 673 680 682 687 688 692 694 697 703 708 714 726
128 TO 130 134 139 141 142 146 151 153 154 156 157 676 697 698 701 702 706 - CONTAG "END:SHEAR:SS" LIST 30 35 61 64 69 71 80 82 84 85 87 99 101 104 113 -
707 TO 708 TABLE ST H150X150X7X10 116 118 130 132 133 144 147 149 150 154 155 157 657 659 660 662 668 671 679 -
61 71 84 87 TABLE ST H125X125X6.5X9 680 684 687 TO 689 698 703 706 708 709 712 716 717 726 727 729
30 34 35 64 99 101 109 118 132 133 143 144 147 149 150 657 660 662 664 668 - *"CONTAG" "START:SHEAR:SS" LIST 26 124 27 126 121 53
671 680 687 TO 689 703 726 728 730 TABLE ST C150X75X6.5 *"CONTAG" "END:SHEAR:SS" LIST 683 654
162 TO 173 176 177 TABLE ST PIPE OD 0.1413 ID 0.1282 *"CONTAG" "START:SHEAR:DS" LIST 56 95 96 160 91
178 182 183 185 TO 187 189 191 TO 193 195 TO 197 200 201 704 - *"CONTAG" "END:SHEAR:DS" LIST 718 700 719
705 TABLE ST L75X75X6 *"CONTAG" "START:MOMENT:EM" LIST 29 31 60 63 98 100
*Pipe 3" *"CONTAG" "END:MOMENT:EM" LIST 51 86 89 119 678 693
*263 496 546 548 550 552 554 556 TABLE ST PIPE OD 0.0889 ID 0.07792 END DEFINE
CONSTANTS DEFINE REFERENCE LOADS
*BETA 90 MEMB 1 3 5 7 9 TO 13 15 17 19 21 TO 24 *====================================================================
MATERIAL STEEL ALL *******************DEAD LOAD**********************
SUPPORTS LOAD R1 LOADTYPE Dead TITLE REF LOAD CASE 1 DEAD
1 TO 4 FIXED BUT MX KMZ 884.35 *================================================*
*1 TO 4 5 TO 20 PINNED * Selfweight All Members *
MEMBER RELEASE *================================================*
26 TO 28 30 34 53 56 59 61 64 68 71 76 80 81 84 87 91 95 TO 97 99 101 109 - * Selfweight All Members
118 121 124 126 127 129 130 132 TO 134 143 147 149 TO 151 160 657 660 662 - SELFW EIGHT Y -1.12
666 668 669 671 673 680 682 687 688 692 694 697 703 708 714 START MY MZ MEMBER LOAD

TEP-043-CAL-ST-BP4-0020 85 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
*HANDRAIL 126 CON GY -1 0.7
25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GY -0.16 *====================================================================
56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GY -0.16 **************PIping Operating LOAD***************
95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GY -0.16 LOAD R4 LOADTYPE None TITLE REF LOAD CASE 4 P(O)
132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GY -0.16 *================================================*
FLOOR LOAD JOINT LOAD
_PNL1 FLOAD -0.52 GY 38 FY -10
_PNL2A FLOAD -0.52 GY 34 FY -2
_PNL2B FLOAD -0.52 GY 81 FY -4
_PNL3A FLOAD -0.52 GY MEMBER LOAD
_PNL3B FLOAD -0.52 GY 40 CON GY -2 0.835
_PNL4 FLOAD -0.52 GY 61 CON GY -2 1.15
MEMBER LOAD 76 CON GY -2 0.765
*ladder 87 CON GY -2 0.765
29 98 CON GY -0.36 0.5 *685 CON GY -4 1.125
60 CON GY -0.702 130 CON GY -2 1
110 CON GY -0.312 0.85 31 CON GY -2 2.7
139 CON GY -0.312 1.2 126 CON GY -2 0.7
*==================================================================== *
*******************LIVE LOAD********************** *====================================================================
LOAD R2 LOADTYPE Live REDUCIBLE TITLE REF LOAD CASE 2 LIVE LOAD ****************PIping Test LOAD*****************
FLOOR LOAD LOAD R5 LOADTYPE None TITLE REF LOAD CASE 5 P(T)
_PNL1 FLOAD -5 GY *================================================*
_PNL2A FLOAD -5 GY *====================================================================
_PNL2B FLOAD -5 GY **************Equipment Empty LOAD****************
_PNL3A FLOAD -5 GY LOAD R6 LOADTYPE None TITLE REF LOAD CASE 6 E(E)
_PNL3B FLOAD -5 GY *================================================*
_PNL4 FLOAD -2.5 GY *====================================================================
MEMBER LOAD ************Equipment Operating LOAD**************
*HANDRAIL LOAD R7 LOADTYPE None TITLE REF LOAD CASE 7 E(O)
25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GY -1 *================================================*
56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GY -1 *====================================================================
95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GY -1 **************Equipment Test LOAD****************
132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GY -1 LOAD R8 LOADTYPE None TITLE REF LOAD CASE 8 E(T)
*==================================================================== *================================================*
***************PIping Empty LOAD***************** *====================================================================
LOAD R3 LOADTYPE None TITLE REF LOAD CASE 3 P(E) *****************Bundle LOAD*********************
*================================================* LOAD R9 LOADTYPE None TITLE REF LOAD CASE 9 BUNDLE LOAD (TB)
JOINT LOAD *================================================*
38 FY -8 * ........................................ *
34 FY -1 *================================================*
81 FY -2 *====================================================================
MEMBER LOAD *******************Cable Tray LOAD****************
40 CON GY -1 0.835 LOAD R10 LOADTYPE None TITLE REF LOAD CASE 10 CABLE TRAY (CT)
61 CON GY -1 1.15 *================================================*
76 CON GY -1 0.765 *============================================================*
87 CON GY -1 0.765 * Dead Load of Cable, Service Tray & Lighting Work (1 kN/m2) *
*685 CON GY -2 1.125 *============================================================*
130 CON GY -1 1 *====================================================================
31 CON GY -1 2.7 **************Equipment Wind X dir LOAD***********

LOAD R11 LOADTYPE None TITLE REF LOAD CASE 11 EQUIPMENT WIND X DIR 61 CON GZ -0.6 1.15
*================================================* 76 CON GZ -0.6 0.765
* Wind to Equipment * 87 CON GZ -0.6 0.765
*================================================* *685 CON GZ -1.2 1.125
*==================================================================== 130 CON GZ -0.6 1
**************Equipment Wind Z dir LOAD*********** 31 CON GZ -0.6 2.7
LOAD R12 LOADTYPE None TITLE REF LOAD CASE 12 EQUIPMENT WIND Z DIR 126 CON GZ -0.6 0.7
*================================================* *====================================================================
* Wind to Equipment * * Friction Load of Pipe ((Empty + Operating Load) z Friction Coef.)
*================================================* *====================================================================
*==================================================================== *====================================================================
**************Piping Wind X dir LOAD************** *******************Anchor LOAD******************
LOAD R13 LOADTYPE None TITLE REF LOAD CASE 13 PIPE WIND X DIR LOAD R17 LOADTYPE None TITLE REF LOAD CASE 17 ANCHOR(LONG) LOAD
*==================================================================== *=============================================================*
**************Piping Wind Z dir LOAD************** JOINT LOAD
LOAD R14 LOADTYPE None TITLE REF LOAD CASE 14 PIPE WIND Z DIR 38 FX -10
*==================================================================== 38 FY -5
*******************Friction LOAD****************** ******
LOAD R15 LOADTYPE None TITLE REF LOAD CASE 15 FRICTION LONGX LOAD *====================================================================
*--- *******************Guide LOAD******************
JOINT LOAD LOAD R18 LOADTYPE None TITLE REF LOAD CASE 18 GUIDE(TRANSV) LOAD
34 FX -0.6 *=============================================================*
59 81 FX -1.2 ** Anchor & Guide Load of Pipe (Point Load)
MEMBER LOAD JOINT LOAD
40 CON GX -0.6 0.835 38 FZ -5
61 CON GX -0.6 1.15 *=============================================================*
76 CON GX -0.6 0.765 *====================================================================
87 CON GX -0.6 0.765 *******************Seismic Empty LOAD X Dir******************
*685 CON GX -1.2 1.125 LOAD R19 LOADTYPE Seismic TITLE REF LOAD CASE 19 STATIC EQUIV EMPTY EQ(E) XDIR
130 CON GX -0.6 1 **************************
31 CON GX -0.6 2.7 *********2/3MCER CASE*****
126 CON GX -0.6 0.7 ****taken from LC 1000****
*==================================================================== **
* depend on longitudinal X-direction of pipe * JOINT LOAD
* Friction Load of Pipe ((50% of Empty + Operating Load) x Friction Coef.) 5 FX 2.43
*==================================================================== 6 FX 1.06
*==================================================================== 7 FX 2.47
* Friction Load of Pipe ((Empty + Operating Load) x Friction Coef.) 8 FX 1.07
*================================================= =====* 9 FX 4.11
*******************Friction LOAD****************** 10 FX 3.53
LOAD R16 LOADTYPE None TITLE REF LOAD CASE 16 FRICTION LONGZ LOAD 11 FX 6.41
*==================================================================== 12 FX 5.65
* depend on longitudinal Z- direction of pipe 13 FX 9.04
* Friction Load of Pipe ((50% of Empty + Operating Load) x Friction Coef.) 14 FX 7.52
*==================================================================== 15 FX 3.92
JOINT LOAD 16 FX 2.21
34 FZ -0.6 17 FX 2.81
59 81 FZ -1.2 18 FX 2.13
MEMBER LOAD 19 FX 5.58
40 CON GZ -0.6 0.835 20 FX 4.35

TEP-043-CAL-ST-BP4-0020 86 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
*==================================================================== **************************
*******************Seismic Empty LOAD Z Dir****************** *********2/3 MCER*********
LOAD R20 LOADTYPE Seismic TITLE REF LOAD CASE 20 STATIC EQUIV EMPTY EQ(E) ZDIR **************************
************************** JOINT LOAD
*********2/3 MCER********* 5 FZ 3.05
************************** 6 FZ 1.36
** 7 FZ 3.1
JOINT LOAD 8 FZ 1.37
5 FZ 2.78 9 FZ 5.01
6 FZ 1.21 10 FZ 4.35
7 FZ 2.82 11 FZ 7.89
8 FZ 1.23 12 FZ 6.97
9 FZ 4.7 13 FZ 11.47
10 FZ 4.04 14 FZ 9.3
11 FZ 7.34 15 FZ 5.18
12 FZ 6.47 16 FZ 2.6
13 FZ 10.35 17 FZ 3.27
14 FZ 8.61 18 FZ 3.2
15 FZ 4.49 19 FZ 6.61
16 FZ 2.53 20 FZ 5.23
17 FZ 3.22 *==================================================================== LOAD R23
18 FZ 2.44 LOADTYPE Dead TITLE REF LOAD CASE 23 CRANE DEAD LOAD (CD)
19 FZ 6.4 *================================================*
20 FZ 4.99 * CRANE Dead Load (CD) + Trolley *
*==================================================================== *================================================*
*****************Seismic Operating LOAD X Dir**************** *---
LOAD R21 LOADTYPE Seismic TITLE REF LOAD CASE 21 STATIC EQUIV OPRT EQ(O) XDIR LOAD R24 LOADTYPE Dead TITLE REF LOAD CASE 24 CRANE LIFTING LOAD (CVS)
************************** *================================================*
*********2/3 MCER********* * CVS = CD + Rated load Capacity (LIFTING LOAD) *
****taken from LC 1001**** *================================================*
JOINT LOAD *LOAD R25 LOADTYPE Live TITLE REF LOAD CASE 25 CRANE TRANS IMPACT LOAD
5 FX 2.84 *LOAD R26 LOADTYPE Live TITLE REF LOAD CASE 25 LAMA CRANE LONG IMPACT LOAD
6 FX 1.26 *LOAD R27 LOADTYPE Live TITLE REF LOAD CASE 27 CRANE VERT IMPACT LOAD Y DIR
7 FX 2.88 *====================================================================
8 FX 1.27 *****************Blast LOAD X Dir****************
9 FX 4.65 LOAD R26 LOADTYPE None TITLE REF LOAD CASE 26 BLAST LOAD X DIR
10 FX 4.04 ***blast Load to Structure use WInd-TYPE-2 directly in wind load case
11 FX 7.33 ***Blast Load due to Piping (SLB)***
12 FX 6.47 LOAD R27 LOADTYPE None TITLE REF LOAD CASE 27 BLAST LOAD Z DIR
13 FX 10.65 ***blast Load to Structure use WInd-TYPE-3 directly in wind load case
14 FX 8.63 ***Blast Load due to Piping (SLB)***
15 FX 4.81 *
16 FX 2.42 LOAD R28 LOADTYPE None TITLE REF LOAD CASE 28 BLAST (DLB) LOAD X DIR
17 FX 3.04 *
18 FX 2.97 ***Transversal***
19 FX 6.14 ***blast Load to Structure use WInd-TYPE-4 directly in wind load case
20 FX 4.86 ***Blast Load due to Piping (DLB)***
*==================================================================== *****************Blast LOAD Z Dir****************
*****************Seismic Operating LOAD Z Dir**************** LOAD R29 LOADTYPE None TITLE REF LOAD CASE 29 BLAST (DLB) LOAD Z DIR
LOAD R22 LOADTYPE Seismic TITLE REF LOAD CASE 22 STATIC EQUIV OPRT EQ(O) ZDIR ***blast Load to Structure use WInd-TYPE-4 directly in wind load case

***Blast Load due to Piping (DLB)*** 132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GZ 0.16
* FLOOR LOAD
*****************Seismic Weight**************** _PNL1 FLOAD 0.52 GZ
LOAD R30 LOADTYPE None TITLE REF LOAD CASE 30 STR RAYLEIGH EMPTY-X _PNL2A FLOAD 0.52 GZ
*================================================* _PNL2B FLOAD 0.52 GZ
SELFW EIGHT X 1.12 _PNL3A FLOAD 0.52 GZ
MEMBER LOAD _PNL3B FLOAD 0.52 GZ
*HANDRAIL _PNL4 FLOAD 0.52 GZ
25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GX 0.16 *
56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GX 0.16 MEMBER LOAD
95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GX 0.16 *ladder
132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GX 0.16 29 98 CON GZ 0.36 0.5
FLOOR LOAD 60 CON GZ 0.702
_PNL1 FLOAD 0.52 GX 110 CON GZ 0.312 0.85
_PNL2A FLOAD 0.52 GX 139 CON GZ 0.312 1.2
_PNL2B FLOAD 0.52 GX **LOAD R3 LOADTYPE None TITLE REF LOAD CASE 3 P(E)
_PNL3A FLOAD 0.52 GX *================================================*
_PNL3B FLOAD 0.52 GX JOINT LOAD
_PNL4 FLOAD 0.52 GX 38 FZ 8
* 34 FZ 1
MEMBER LOAD 81 FZ 2
*ladder MEMBER LOAD
29 98 CON GX 0.36 0.5 40 CON GZ 1 0.835
60 CON GX 0.702 61 CON GZ 1 1.15
110 CON GX 0.312 0.85 76 CON GZ 1 0.765
139 CON GX 0.312 1.2 87 CON GZ 1 0.765
**LOAD R3 LOADTYPE None TITLE REF LOAD CASE 3 P(E) *685 CON GZ 2 1.125
*================================================* 130 CON GZ 1 1
JOINT LOAD 31 CON GZ 1 2.7
38 FX 8 126 CON GZ 1 0.7
34 FX 1 *==================================================================== LOAD R32
81 FX 2 LOADTYPE None TITLE REF LOAD CASE 32 STR RAYLEIGH OPERATING-X
MEMBER LOAD *================================================*
40 CON GX 1 0.835 SELFW EIGHT X 1.12
61 CON GX 1 1.15 MEMBER LOAD
76 CON GX 1 0.765 *HANDRAIL
87 CON GX 1 0.765 25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GX 0.16
*685 CON GX 2 1.125 56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GX 0.16
130 CON GX 1 1 95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GX 0.16
31 CON GX 1 2.7 132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GX 0.16
126 CON GX 1 0.7 FLOOR LOAD
*==================================================================== LOAD R31 _PNL1 FLOAD 0.52 GX
LOADTYPE None TITLE REF LOAD CASE 31 STR RAYLEIGH EMPTY-Z _PNL2A FLOAD 0.52 GX
*================================================* _PNL2B FLOAD 0.52 GX
SELFW EIGHT Z 1.12 _PNL3A FLOAD 0.52 GX
MEMBER LOAD _PNL3B FLOAD 0.52 GX
*HANDRAIL _PNL4 FLOAD 0.52 GX
25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GZ 0.16 *
56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GZ 0.16 MEMBER LOAD
95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GZ 0.16 *ladder

TEP-043-CAL-ST-BP4-0020 87 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
29 98 CON GX 0.36 0.5 40 CON GZ 2 0.835
60 CON GX 0.702 61 CON GZ 2 1.15
110 CON GX 0.312 0.85 76 CON GZ 2 0.765
139 CON GX 0.312 1.2 87 CON GZ 2 0.765
**LOAD R4 LOADTXPE None TITLE REF LOAD CASE 4 P(O) *685 CON GZ 4 1.125
*================================================* 130 CON GZ 2 1
JOINT LOAD 31 CON GZ 2 2.7
38 FX 10 126 CON GZ 2 0.7
34 FX 2 *==================================================================== LOAD R34
81 FX 4 LOADTYPE Seismic TITLE REF LOAD CASE 34 STATIC EQUIV EMPTY OBE X
MEMBER LOAD **************************************************************************
40 CON GX 2 0.835 *********OBE CASE*****
61 CON GX 2 1.15 ****taken from LC 1000****
76 CON GX 2 0.765 ************************************************************************** LOAD R35
87 CON GX 2 0.765 LOADTYPE Seismic TITLE REF LOAD CASE 35 STATIC EQUIV EMPTY OBE Z
*685 CON GX 4 1.125 **************************************************************************
130 CON GX 2 1 *********OBE CASE*****
31 CON GX 2 2.7 ****taken from LC 1000****
126 CON GX 2 0.7 ************************************************************************** LOAD R36
*==================================================================== LOAD R33 LOADTYPE Seismic TITLE REF LOAD CASE 36 STATIC EQUIV OPRT OBE X
LOADTYPE None TITLE REF LOAD CASE 33 STR RAYLEIGH OPERATING-Z **************************************************************************
*================================================* *********OBE CASE*****
SELFW EIGHT Z 1.12 ****taken from LC 1001****
MEMBER LOAD ************************************************************************** LOAD R37
*HANDRAIL LOADTYPE Seismic TITLE REF LOAD CASE 37 STATIC EQUIV OPRT OBE Z
25 26 28 39 48 52 53 652 662 664 666 679 710 726 728 730 UNI GZ 0.16 **************************************************************************
56 57 60 63 66 85 89 TO 92 670 711 713 715 718 719 724 UNI GZ 0.16 *********OBE CASE*****
95 96 98 100 101 107 116 119 TO 121 683 685 686 722 UNI GZ 0.16 ****taken from LC 1001****
132 TO 134 138 139 147 149 TO 151 153 706 707 UNI GZ 0.16 ************************************************************************** LOAD R40
FLOOR LOAD LOADTYPE None TITLE REF LOAD CASE 40 PIPE SHORT TERM LOAD Y DIR
_PNL1 FLOAD 0.52 GZ *==================================================================== LOAD R41
_PNL2A FLOAD 0.52 GZ LOADTYPE None TITLE REF LOAD CASE 41 PIPE SHORT TERM LOAD X DIR
_PNL2B FLOAD 0.52 GZ *==================================================================== LOAD R42
_PNL3A FLOAD 0.52 GZ LOADTYPE None TITLE REF LOAD CASE 42 PIPE SHORT TERM LOAD Z DIR
_PNL3B FLOAD 0.52 GZ *====================================================================
_PNL4 FLOAD 0.52 GZ *-
* *==================================================================== END
MEMBER LOAD DEFINE REFERENCE LOADS
*ladder **************************************************************
29 98 CON GZ 0.36 0.5 * DEFINE WIND LOAD *
60 CON GZ 0.702 ************************************************************** DEFINE
110 CON GZ 0.312 0.85 WIND LOAD
139 CON GZ 0.312 1.2 TYPE 1 WIND
**LOAD R4 LOADTZPE None TITLE REF LOAD CASE 4 P(O) INT 1.27042 1.27042 1.36139 1.47002 1.54216 HEIG 18.3 21.5 24.25 27 29.5
*================================================* *EXP 1 JOINT 1 TO 21 23 27 28 32 34 TO 40 43 45 46 48 TO 52 57 60 TO 64 68 -
JOINT LOAD *69 TO 76 79 83 TO 87 91 TO 99 101 104 TO 109 113 114 116 TO 118 120 TO 122 -
38 FZ 10 *125 127 TO 130 132 TO 137 139 140 143 145 147
34 FZ 2 TYPE 2 BLAST-X (SLB)
81 FZ 4 INT 1.9788 1.9788 HEIG 18.3 29.5
MEMBER LOAD *EXP 1 JOINT 1 TO 21 23 27 28 32 34 TO 40 43 45 46 48 TO 52 57 60 TO 64 68 -

*69 TO 76 79 83 TO 87 91 TO 99 101 104 TO 109 113 114 116 TO 118 120 TO 122 - REFERENCE LOAD
*125 127 TO 130 132 TO 137 139 140 143 145 147 R35 1.0
TYPE 3 BLAST-Z (SLB) *
INT 3.3922 3.3922 HEIG 18.3 29.5 *********************************************************** LOAD
*EXP 1 JOINT 1 TO 21 23 27 28 32 34 TO 40 43 45 46 48 TO 52 57 60 TO 64 68 - 91 LOADTYPE Mass TITLE RAYLEIGH EMPTY X DIR
*69 TO 76 79 83 TO 87 91 TO 99 101 104 TO 109 113 114 116 TO 118 120 TO 122 - ***********************************************************
*125 127 TO 130 132 TO 137 139 140 143 145 147 REFERENCE LOAD
************************************************************** R30 1.0
* DEFINE SEISMIC LOAD * CALCULATE RAYLEIGH FREQUENCY
************************************************************** *
*------------------------------------------------------------* *********************************************************** LOAD
************************************************************** 92 LOADTYPE Mass TITLE RAYLEIGH EMPTY Z DIR
* LOADING DATA * ***********************************************************
************************************************************** LOAD 31 REFERENCE LOAD
LOADTYPE Seismic TITLE SEISMIC STATIC +EQXO (EXO) R31 1.0
*IBC LOAD X 1 CALCULATE RAYLEIGH FREQUENCY
REFERENCE LOAD *
R21 1.0 *********************************************************** LOAD
LOAD 32 LOADTYPE Seismic TITLE SEISMIC STATIC +EQZO (EZO) 93 LOADTYPE Mass TITLE RAYLEIGH OPERATING X DIR
*IBC LOAD Z 1 ***********************************************************
REFERENCE LOAD REFERENCE LOAD
R22 1.0 R32 1.0
LOAD 34 LOADTYPE Seismic TITLE SEISMIC STATIC +EQXE (EXE) CALCULATE RAYLEIGH FREQUENCY
REFERENCE LOAD *
R19 1.0 *********************************************************** LOAD
LOAD 35 LOADTYPE Seismic TITLE SEISMIC STATIC +EQZE (EZE) 94 LOADTYPE Mass TITLE RAYLEIGH OPERATING Z DIR
REFERENCE LOAD ***********************************************************
R20 1.0 REFERENCE LOAD
* R33 1.0
************************************************************** LOAD 36 CALCULATE RAYLEIGH FREQUENCY
LOADTYPE Seismic TITLE SEISMIC STATIC OPRT OBE (EXO) *
************************************************************** LOAD 1 LOADTYPE Dead TITLE DEAD LOAD (D)
REFERENCE LOAD REFERENCE LOAD
R36 1.0 R1 1.0
* LOAD 2 LOADTYPE Live TITLE LIVE LOAD (L)
************************************************************** LOAD 37 REFERENCE LOAD
LOADTYPE Seismic TITLE SEISMIC STATIC OPRT OBE (EZO) R2 1.0
************************************************************** LOAD 4 LOADTYPE None TITLE PIPE EMPTY LOAD (PE)
REFERENCE LOAD REFERENCE LOAD
R37 1.0 R3 1.0
* LOAD 5 LOADTYPE None TITLE PIPE OPERATING LOAD (PO)
************************************************************** LOAD 38 REFERENCE LOAD
LOADTYPE Seismic TITLE SEISMIC STATIC EMPTY OBE (EXE) R4 1.0
************************************************************** LOAD 6 LOADTYPE None TITLE PIPE TEST LOAD (PT)
REFERENCE LOAD REFERENCE LOAD
R34 1.0 R5 1.0
* LOAD 7 LOADTYPE None TITLE EQUIP EMPTY LOAD (QE)
************************************************************** LOAD 39 REFERENCE LOAD
LOADTYPE Seismic TITLE SEISMIC STATIC EMPTY OBE (EZE) R6 1.0
************************************************************** LOAD 8 LOADTYPE None TITLE EQUIP OPERATING LOAD (QO)

TEP-043-CAL-ST-BP4-0020 88 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
REFERENCE LOAD ** Longitudinal Impact = 10 % CVS *
R7 1.0 **================================================*
LOAD 9 LOADTYPE None TITLE EQUIP TEST LOAD (QT) *REFERENCE LOAD
REFERENCE LOAD *R24 0.1
R8 1.0 LOAD 55 LOADTYPE Live TITLE CRANE VERT IMPACT (CI)
LOAD 10 LOADTYPE None TITLE BUNDLE LOAD (TB) **================================================*
REFERENCE LOAD ** Longitudinal Impact = 25 % CVS *
R9 1.0 **================================================*
LOAD 11 LOADTYPE None TITLE CABLE TRAY LOAD (CT) *REFERENCE LOAD
REFERENCE LOAD *R24 0.25
R10 1.0 LOAD 41 LOADTYPE None TITLE FRICTION LOAD LONG-X DIR
LOAD 21 LOADTYPE Wind TITLE +W X REFERENCE LOAD
*===============================* R15 1.0
* DUE TO MEMBER PROPERTY * LOAD 42 LOADTYPE None TITLE FRICTION LOAD LONG-Z DIR
*===============================* REFERENCE LOAD
WIND LOAD X 1 TYPE 1 XR -0.5 0.5 YR 0 50 ZR -50 50 OPEN R16 1.0
WIND LOAD X 2 TYPE 1 XR 5.3 5.5 YR 0 50 ZR -50 50 OPEN LOAD 43 LOADTYPE None TITLE ANCHOR LOAD (AGX)
*===============================* REFERENCE LOAD
* DUE TO EQUIPMENT & PIPE * R17 1.0
*===============================* LOAD 44 LOADTYPE None TITLE GUIDE LOAD (AGZ)
REFERENCE LOAD REFERENCE LOAD
R11 1.0 R13 1.0 R18 1.0
*===============================* LOAD 45 LOADTYPE None TITLE PIPE SHORT TERM LOAD Y DIR
LOAD 22 LOADTYPE Wind TITLE +WZ *REFERENCE LOAD
*===============================* *R40 1.0
* DUE TO MEMBER PROPERTY * LOAD 46 LOADTYPE None TITLE PIPE SHORT TERM LOAD X DIR
*===============================* *REFERENCE LOAD
WIND LOAD Z 1 TYPE 1 XR -50 50 YR 0 50 ZR -4.7 -4.5 OPEN *R41 1.0
WIND LOAD Z 2 TYPE 1 XR -50 50 YR 0 50 ZR -0.5 0.5 OPEN LOAD 47 LOADTYPE None TITLE PIPE SHORT TERM LOAD Z DIR
* *REFERENCE LOAD
*===============================* *R42 1.0
* DUE TO EQUIPMENT & PIPE * LOAD 61 LOADTYPE None TITLE BLAST (SLB) LOAD X DIR (BLX)
*===============================* REFERENCE LOAD
REFERENCE LOAD R26 1.0
R12 1.0 R14 1.0 LOAD 62 LOADTYPE None TITLE BLAST (SLB) LOAD Z DIR (BLZ)
*===============================* REFERENCE LOAD
LOAD 51 LOADTYPE Dead TITLE CRANE DEAD LOAD (CD) R27 1.0
*REFERENCE LOAD LOAD 63 LOADTYPE None TITLE BLAST (DLB) LOAD X DIR (BLX)
*R23 1.0 REFERENCE LOAD
LOAD 52 LOADTYPE Dead TITLE CRANE DEAD LOAD (CVS) R28 1.0
*REFERENCE LOAD LOAD 64 LOADTYPE None TITLE BLAST (DLB) LOAD Z DIR (BLZ)
*R24 1.0 REFERENCE LOAD
LOAD 53 LOADTYPE Live TITLE CRANE SIDE IMPACT (CSS) R29 1.0
*================================================* **===================================================================
* Transverse Impact = 20 % CVS * ** Steel Imperfection 0.3% of Gravity Loads by 1st Order (perform) Analysis *
*================================================* **===================================================================
*REFERENCE LOAD **-----------Empty Load-----------
*R24 0.2 LOAD 71 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(E)
LOAD 54 LOADTYPE Live TITLE CRANE LONG IMPACT (CLS) *NOTIONAL LOAD
**================================================* *R1 X 0.003 R2 X 0.003 R3 X 0.003 R7 X 0.003

LOAD 72 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(E) *==================================================================== LOAD


*NOTIONAL LOAD 1001 LOADTYPE Dead TITLE 1.0 (D+PO+QO)
*R1 Z 0.003 R2 Z 0.003 R3 Z 0.003 R7 Z 0.003 REPEAT LOAD
*---------Operating Load--------- 1 1.0 5 1.0 8 1.0 11 1.0
LOAD 73 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(O) *====================================================================
*NOTIONAL LOAD * STRENGTH DESIGN - LRFD *
*R1 X 0.003 R2 X 0.003 R4 X 0.003 R7 X 0.003 * LC 1111 TO 5111 *
LOAD 74 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(O) * PERFORM ANALYSIS - WITH NOTIONAL LOAD, STATIC EQV *
*NOTIONAL LOAD *====================================================================
*R1 Z 0.003 R2 Z 0.003 R4 Z 0.003 R7 Z 0.003 *====================================================================
*---------Test Load--------- * PERMANENT CONDITION *
LOAD 75 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(T) *====================================================================
*NOTIONAL LOAD **PERMANENT -> EMPTY CONDITION
*R1 X 0.003 R2 X 0.003 R5 X 0.003 R7 X 0.003 **-------
LOAD 76 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(T) **PERMANENT -> OPERATING CONDITION
*NOTIONAL LOAD *-----------------------------------------Permanent Operating Friction + Anchor
*R1 Z 0.003 R2 Z 0.003 R5 Z 0.003 R7 Z 0.003 LOAD 1111 1.4D+ 1.4(PO+QO) + 1.4CT + 1.4(TFX+TFZ) + 1.4(AGX+AGZ) + 1.4CD + ...
*LOAD 81 LOADTYPE None TITLE LOAD CASE 81 SELFW EIGHT FDN * + NX(O) + NZ(O)
*LOAD 82 LOADTYPE None TITLE LOAD CASE 82 SELFW EIGHT STR REPEAT LOAD
*SELFW EIGHT Y -1.12 1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 1.4 43 1.4 44 1.4 51 1.4 73 1.0 74 1.0
*LOAD 91 LOADTYPE None TITLE RAYLEIGH_EMPTY-X LOAD 1112 1.4D + 1.4(PO+QO) + 1.4CT + 1.4(TFX-TFZ) + 1.4(AGX-AGZ) + 1.4CD + ...
*SELFW EIGHT X 1.12 * + NX(O) + NZ(O)
*REFERENCE LOAD REPEAT LOAD
*R29 1.0 1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 -1.4 43 1.4 44 -1.4 51 1.4 73 1.0 74 1.0
*CALCULATE RAYLEIGH FREQUENCY LOAD 1113 1.4D + 1.4(PO+QO) 1.4CT + 1.4(-TFX+TFZ) + 1.4(-AGX+AGZ) + 1.4CD + ...
*LOAD 92 LOADTYPE None TITLE RAYLEIGH EMPTY-Z * + NX(O) + NZ(O)
*SELFW EIGHT Z 1.12 REPEAT LOAD
*REFERENCE LOAD 1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 1.4 43 -1.4 44 1.4 51 1.4 73 1.0 74 1.0
*R30 1.0 LOAD 1114 1.4D + 1.4(PO+QO) + 1.4CT + 1.4(-TFX-TFZ) + 1.4(-AGX-AGZ) + 1.4CD +..
*CALCULATE RAYLEIGH FREQUENCY * + NX(O) + NZ(O)
*LOAD 93 LOADTYPE None TITLE RAYLEIGH OPR-X REPEAT LOAD
*SELFW EIGHT X 1.12 1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 -1.4 43 -1.4 44 -1.4 51 1.4 73 1.0 -
*REFERENCE LOAD 74 1.0
*R31 1.0 *---------------------------------Permanent Operating Friction + Anchor + Surge
*CALCULATE RAYLEIGH FREQUENCY LOAD 1115 1.2D + 1.2(PO+QO) + 1.2CT + 1.2(TFX+TFZ) + 1.2(AGX+AGZ) + 1.2CD + ...
*LOAD 94 LOADTYPE None TITLE RAYLEIGH OPR-Z * + 1.2 (Fys + Fxs + Fzs)
*SELFW EIGHT Z 1.12 REPEAT LOAD
*REFERENCE LOAD 1 1.2 5 1.2 8 1.2 11 1.2 41 1.2 42 1.2 43 1.2 44 1.2 51 1.2 45 1.2 46 1.2 -
*R32 1.0 47 1.2
*CALCULATE RAYLEIGH FREQUENCY LOAD 1116 1.2D + 1.2(PO+QO) + 1.2CT + 1.2(TFX-TFZ) + 1.2(AGX-AGZ) + 1.2CD + ...
*==================================================================== * + 1.2 (Fys + Fxs - Fzs)
* CHECK EMPTY BASE SHEAR STATIC * REPEAT LOAD
* DL incl.CT+CraneEmpty, Pe+Ee * 1 1.2 5 1.2 8 1.2 11 1.2 41 1.2 42 -1.2 43 1.2 44 -1.2 51 1.2 45 1.2 46 1.2 -
*==================================================================== LOAD
47 1.2
1000 LOADTYPE Dead TITLE 1.0 (D+PE+QE)
LOAD 1117 1.2D + 1.2(PO+QO) + 1.2CT + 1.2(-TFX+TFZ) + 1.2(-AGX+AGZ) + 1.2CD +..
REPEAT LOAD * + 1.2 (Fys - Fxs + Fzs)
1 1.0 4 1.0 7 1.0 11 1.0 REPEAT LOAD
*==================================================================== 1 1.2 5 1.2 8 1.2 11 1.2 41 -1.2 42 1.2 43 -1.2 44 1.2 51 1.2 45 1.2 46 -1.2 -
* CHECK OPERATING BASE SHEAR STATIC * 47 1.2
* DL incl.CT+CraneEmpty, Po+Eo *
LOAD 1118 1.2D + 1.2(PO+QO) + 1.2CT + 1.2(-TFX-TFZ) + 1.2(-AGX-AGZ) + 1.2CD +..

TEP-043-CAL-ST-BP4-0020 89 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
* + 1.2 (Fys - Fxs - Fzs) 1 1.2 6 1.2 51 1.4 75 1.0 76 1.0
REPEAT LOAD LOAD 1312 1.2(D+QT) + 1.4CD + NX(T) + NZ(T)
1 1.2 5 1.2 8 1.2 11 1.2 41 -1.2 42 -1.2 43 -1.2 44 -1.2 51 1.2 45 1.2 - REPEAT LOAD
46 -1.2 47 -1.2 1 1.2 9 1.2 51 1.4 75 1.0 76 1.0
*----------------------------------Permanent Operating Live + Friction + Anchor LOAD 1313 1.4(D+PT) + 1.4CT + 1.4CD + NX(T) + NZ(T)
LOAD 1211 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(TFX+TFZ) + 1.2(AGX+AGZ) + ... REPEAT LOAD
*1.2CVS + 1.6(CSS+CLS+CI) 1 1.4 6 1.4 11 1.4 51 1.4 75 1.0 76 1.0
REPEAT LOAD LOAD 1314 1.4(D+QT) + 1.4CT + 1.4CD + NX(T) + NZ(T)
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 1.2 42 1.2 43 1.2 44 1.2 52 1.2 53 1.6 - REPEAT LOAD
54 1.6 55 1.6 1 1.4 9 1.4 11 1.4 51 1.4 75 1.0 76 1.0
LOAD 1212 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(TFX-TFZ) + 1.2(AGX-AGZ) + ... *====================================================================
*1.2CVS + 1.6(-CSS+CLS+CI) * TEMPORARY(WIND) CONDITION *
REPEAT LOAD *====================================================================
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 1.2 42 -1.2 43 1.2 44 -1.2 52 1.2 53 -1.6 - **TEMPORARY -> OPERATING CONDITION
54 1.6 55 1.6 *-----------------------------------Temporary Operating + Anchor+ Wind
LOAD 1213 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(-TFX+TFZ) + 1.2(-AGX+AGZ) + .. LOAD 2111 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WX + ...
*1.2CVS + 1.6(CSS-CLS+CI) *1.2(AGX+AGZ) + 1.2CVS + 1.0CI + NX(O) + NZ(O)
REPEAT LOAD REPEAT LOAD
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 -1.2 42 1.2 43 -1.2 44 1.2 52 1.2 53 1.6 - 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 1.0 43 1.2 44 1.2 52 1.2 55 1.0 73 1.0 -
54 -1.6 55 1.6 74 1.0
LOAD 1214 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(-TFX-TFZ) + 1.2(-AGX-AGZ) + .. LOAD 2112 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WX + ...
*1.2CVS + 1.6(-CSS-CLS+CI) *1.2(AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O)
REPEAT LOAD REPEAT LOAD
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 -1.2 42 -1.2 43 -1.2 44 -1.2 52 1.2 - 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 1.0 43 1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 -
53 -1.6 54 -1.6 55 1.6 74 -1.0
*--------------------------Permanent Operating Live + Friction + Anchor + Surge LOAD 2113 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WX + ...
LOAD 1215 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(TFX+TFZ) + 1.2(AGX+AGZ) + ... *1.2(-AGX+AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O)
* + 1.2 (Fys + Fxs + Fzs) REPEAT LOAD
REPEAT LOAD 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 1.0 43 -1.2 44 1.2 52 1.2 55 1.0 73 -1.0 -
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 1.2 42 1.2 43 1.2 44 1.2 45 1.2 46 1.2 - 74 -1.0
47 1.2 LOAD 2114 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WX + ...
LOAD 1216 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(TFX-TFZ) + 1.2(AGX-AGZ) + ... *1.2(-AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O)
* + 1.2 (Fys + Fxs - Fzs) REPEAT LOAD
REPEAT LOAD 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 1.0 43 -1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 -
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 1.2 42 -1.2 43 1.2 44 -1.2 45 1.2 46 1.2 - 74 -1.0
47 -1.2 LOAD 2115 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WX + ...
LOAD 1217 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(-TFX+TFZ) + 1.2(-AGX+AGZ) + .. *1.2(AGX+AGZ) + 1.2CVS + 1.0CI + NX(O) + NZ(O)
* + 1.2 (Fys - Fxs + Fzs) REPEAT LOAD
REPEAT LOAD 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 -1.0 43 1.2 44 1.2 52 1.2 55 1.0 73 1.0 -
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 -1.2 42 1.2 43 -1.2 44 1.2 45 1.2 46 -1.2 - 74 1.0
47 1.2 LOAD 2116 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WX + ...
LOAD 1218 1.2D + 1.2(PO+QO) + 1.2CT + 1.6L + 1.2(-TFX-TFZ) + 1.2(-AGX-AGZ) + .. *1.2(AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O)
* + 1.6 (Fys - Fxs - Fzs) REPEAT LOAD
REPEAT LOAD 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 -1.0 43 1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 -
1 1.2 5 1.2 8 1.2 11 1.2 2 1.6 41 -1.2 42 -1.2 43 -1.2 44 -1.2 45 1.2 - 74 -1.0
46 -1.2 47 -1.2 LOAD 2117 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WX + ...
**PERMANENT -> TEST CONDITION *1.2(-AGX+AGZ) + 1.2CVS + 1.0CI + NX(O) + NZ(O)
*------------------------------------------------Permanent Test Dead + Pt or Qt REPEAT LOAD
LOAD 1311 1.2(D+PT) + 1.4CD + NX(T) + NZ(T) 1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 -1.0 43 -1.2 44 1.2 52 1.2 55 1.0 73 1.0 -
REPEAT LOAD 74 1.0

LOAD 2118 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WX + ... LOAD 2212 0.9D + 0.9(PE+QE) - 0.9CT + 0.9CD - W X - NX(E) - NZ(E)
*1.2(-AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.9 4 0.9 7 0.9 11 0.9 51 0.9 21 -1.0 71 -1.0 72 -1.0
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 21 -1.0 43 -1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 - LOAD 2213 0.9D + 0.9(PE+QE) + 0.9CT + 0.9CD + WZ + NX(E) + NZ(E)
74 -1.0 REPEAT LOAD
LOAD 2119 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WZ + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 0.9 22 1.0 71 1.0 72 1.0
*1.2(AGX+AGZ) + + 1.2CVS + 1.0CI + NX(O) + NZ(O) LOAD 2214 0.9D + 0.9(PE+QE) - 0.9CT + 0.9CD - W Z - NX(E) - NZ(E)
REPEAT LOAD REPEAT LOAD
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 1.0 43 1.2 44 1.2 52 1.2 55 1.0 73 1.0 - 1 0.9 4 0.9 7 0.9 11 0.9 51 0.9 22 -1.0 71 -1.0 72 -1.0
74 1.0 **TEMPORARY -> TEST CONDITION
LOAD 2120 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WZ + ... *-------------------------------------------------Temporary Test + Partial Wind
*1.2(AGX-AGZ) + + 1.2CVS + 1.0CI - NX(O) - NZ(O) LOAD 2311 1.2D + 1.2(PT+QT) + 1.2CT + 1.2CD + 0.6WX + NX(T) + NZ(T)
REPEAT LOAD REPEAT LOAD
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 1.0 43 1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 - 1 1.2 6 1.2 9 1.2 11 1.2 51 1.2 21 0.6 75 1.0 76 1.0
74 -1.0 LOAD 2312 1.2D + 1.2(PT+QT) + 1.2CT + 1.2CD - 0.6W X - NX(T) - NZ(T)
LOAD 2121 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WZ + ... REPEAT LOAD
*1.2(-AGX+AGZ) + + 1.2CVS + 1.0CI + NX(O) + NZ(O) 1 1.2 6 1.2 9 1.2 11 1.2 51 1.2 21 -0.6 75 -1.0 76 -1.0
REPEAT LOAD LOAD 2313 1.2D + 1.2(PT+QT) + 1.2CT + 1.2CD + 0.6WZ + NX(T) + NZ(T)
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 1.0 43 -1.2 44 1.2 52 1.2 55 1.0 73 1.0 - REPEAT LOAD
74 1.0 1 1.2 6 1.2 9 1.2 11 1.2 51 1.2 22 0.6 75 1.0 76 1.0
LOAD 2122 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT + WZ + ... LOAD 2314 1.2D + 1.2(PT+QT) + 1.2CT + 1.2CD - 0.6W Z - NX(T) - NZ(T)
*1.2(-AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.2 6 1.2 9 1.2 11 1.2 51 1.2 22 -0.6 75 -1.0 76 -1.0
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 1.0 43 -1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 - *====================================================================
74 -1.0 * TEMPORARY(SEISMIC) CONDITION *
LOAD 2123 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WZ + ... * load factor for dead load = 1.2 + 0.2*SDS = 1.2 + 0.149 = 1.35 *
*1.2(AGX+AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) * 0.9 - 0.2*SDS = 0.9 - 0.149 = 0.751 *
REPEAT LOAD *====================================================================
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 -1.0 43 1.2 44 1.2 52 1.2 55 1.0 73 -1.0 - *--------------------------------------------Temporary Operating+Anchor+seismic
74 -1.0 LOAD 3111 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...
LOAD 2124 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WZ + ... *(EOX + 0.3EOZ) + 1.2(AGX+AGZ) + NX(O) + NZ(O)
*1.2(AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 1.0 32 0.3 43 1.2 44 1.2 73 1.0 -
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 -1.0 43 1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 - 74 1.0
74 -1.0 LOAD 3112 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...
LOAD 2125 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WZ + ... *(EOX - 0.3EOZ) + 1.2(AGX-AGZ) - NX(O) - NZ(O)
*1.2(-AGX+AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 1.0 32 -0.3 43 1.2 44 -1.2 -
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 -1.0 43 -1.2 44 1.2 52 1.2 55 1.0 73 -1.0 - 73 -1.0 74 -1.0
74 -1.0 LOAD 3113 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...
LOAD 2126 1.2D + 1.0L + 1.2(PO+QO) + 1.2CT - WZ + ... *(-EOX + 0.3EOZ) + 1.2(-AGX+AGZ) - NX(O) - NZ(O)
*1.2(-AGX-AGZ) + 1.2CVS + 1.0CI - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 -1.0 32 0.3 43 -1.2 44 1.2 -
1 1.2 2 1.0 5 1.2 8 1.2 11 1.2 22 -1.0 43 -1.2 44 -1.2 52 1.2 55 1.0 73 -1.0 - 73 -1.0 74 -1.0
74 -1.0 LOAD 3114 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...
**TEMPORARY -> EMPTY CONDITION *-(EOX + 0.3EOZ) - 1.2(AGX+AGZ) - NX(O) - NZ(O)
*-----------------------------------------------Temporary Empty + Wind (uplift) REPEAT LOAD
LOAD 2211 0.9D + 0.9(PE+QE) + 0.9CT + 0.9CD + WX + NX(E) + NZ(E) 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 -1.0 32 -0.3 43 -1.2 44 -1.2 -
REPEAT LOAD 73 -1.0 74 -1.0
1 0.9 4 0.9 7 0.9 11 0.9 51 0.9 21 1.0 71 1.0 72 1.0 LOAD 3115 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...

TEP-043-CAL-ST-BP4-0020 90 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
*(0.3EOX + EOZ) + 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 3217 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(0.3EOX-EOZ) + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 0.3 32 1.0 43 1.2 44 1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 0.3 32 -1.0 43 -0.9 44 0.9 -
LOAD 3116 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(-0.3EOX + EOZ) + 1.2(AGX-AGZ) - NX(O) - NZ(O) LOAD 3218 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *-(0.3EOX+EOZ) - 0.9(AGX+AGZ) - NX(O) - NZ(O)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 -0.3 32 1.0 43 1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -0.3 32 -1.0 43 -0.9 44 -0.9 -
LOAD 3117 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(0.3EOX - EOZ) + 1.2(-AGX+AGZ) - NX(O) - NZ(O) *-----------------------------------------------Temporary Empty+seismic(UPLIFT)
REPEAT LOAD LOAD 3311 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 0.3 32 -1.0 43 -1.2 44 1.2 - *(EEX + 0.3EEZ) + NX(E) + NZ(E)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 3118 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 1.0 35 0.3 71 1.0 72 1.0
*-(0.3EOX + EOZ) - 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 3312 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(EEX - 0.3EEZ) + NX(E) + NZ(E)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 0.9 31 -0.3 32 -1.0 43 -1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 1.0 35 -0.3 71 1.0 72 1.0
*------------------------------------Temporary Operating+Anchor+seismic(UPLIFT) LOAD 3313 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
LOAD 3211 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... *(-EEX + 0.3EEZ) - NX(E) - NZ(E)
*(EOX+0.3EOZ) + 0.9(AGX+AGZ) - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -1.0 35 0.3 71 -1.0 72 -1.0
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 1.0 32 0.3 43 0.9 44 0.9 73 -1.0 - LOAD 3314 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
74 -1.0 *-(EEX + 0.3EEZ) - NX(E) - NZ(E)
LOAD 3212 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... REPEAT LOAD
*(EOX-0.3EOZ) + 0.9(AGX-AGZ) - NX(O) - NZ(O) 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -1.0 35 -0.3 71 -1.0 72 -1.0
REPEAT LOAD LOAD 3315 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 1.0 32 -0.3 43 0.9 44 -0.9 - *(0.3EEX + EEZ) + NX(E) + NZ(E)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 3213 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 0.3 35 1.0 71 1.0 72 1.0
*(-EOX+0.3EOZ) + 0.9(-AGX+AGZ) - NX(O) - NZ(O) LOAD 3316 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(-0.3EEX + EEZ) + NX(E) + NZ(E)
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -1.0 32 0.3 43 -0.9 44 0.9 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -0.3 35 1.0 71 1.0 72 1.0
LOAD 3214 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... LOAD 3317 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
*-(EOX+0.3EOZ) - 0.9(AGX+AGZ) - NX(O) - NZ(O) *(0.3EEX - EEZ) - NX(E) - NZ(E)
REPEAT LOAD REPEAT LOAD
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -1.0 32 -0.3 43 -0.9 44 -0.9 - 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 0.3 35 -1.0 71 -1.0 72 -1.0
73 -1.0 74 -1.0 LOAD 3318 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
LOAD 3215 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... *-(0.3EEX + EEZ) - NX(O) - NZ(O)
*(0.3EOX+EOZ) + 0.9(AGX+AGZ) - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -0.3 35 -1.0 71 -1.0 72 -1.0
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 0.3 32 1.0 43 0.9 44 0.9 73 -1.0 - *====================================================================
74 -1.0 * TEMPORARY(SEISMIC) CONDITION - OBE CASE *
LOAD 3216 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... * load factor for dead load = 1.2 + 0.2*SDS = 1.2 + 0.126 = 1.33 *
*(-0.3EOX+EOZ) + 0.9(AGX-AGZ) - NX(O) - NZ(O) * 0.9 - 0.2*SDS = 0.9 - 0.126 = 0.774 *
REPEAT LOAD *====================================================================
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -0.3 32 1.0 43 0.9 44 -0.9 - *--------------------------------------------Temporary Operating+Anchor+seismic
73 -1.0 74 -1.0 LOAD 3411 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +...

*(EOX + 0.3EOZ) + 1.2(AGX+AGZ) + NX(O) + NZ(O) LOAD 3513 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(-EOX+0.3EOZ) + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 1.0 37 0.3 43 1.2 44 1.2 73 1.0 - REPEAT LOAD
74 1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -1.0 37 0.3 43 -0.9 44 0.9 -
LOAD 3412 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(EOX - 0.3EOZ) + 1.2(AGX-AGZ) - NX(O) - NZ(O) LOAD 3514 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *-(EOX+0.3EOZ) - 0.9(AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 1.0 37 -0.3 43 1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -1.0 37 -0.3 43 -0.9 44 -0.9 -
LOAD 3413 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(-EOX + 0.3EOZ) + 1.2(-AGX+AGZ) - NX(O) - NZ(O) LOAD 3515 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(0.3EOX+EOZ) + 0.9(AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 -1.0 37 0.3 43 -1.2 44 1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 0.3 37 1.0 43 0.9 44 0.9 73 -1.0 -
LOAD 3414 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 74 -1.0
*-(EOX + 0.3EOZ) - 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 3516 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(-0.3EOX+EOZ) + 0.9(AGX-AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 -1.0 37 -0.3 43 -1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -0.3 37 1.0 43 0.9 44 -0.9 -
LOAD 3415 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(0.3EOX + EOZ) + 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 3517 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(0.3EOX-EOZ) + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 0.3 37 1.0 43 1.2 44 1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 0.3 37 -1.0 43 -0.9 44 0.9 -
LOAD 3416 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(-0.3EOX + EOZ) + 1.2(AGX-AGZ) - NX(O) - NZ(O) LOAD 3518 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *-(0.3EOX+EOZ) - 0.9(AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 -0.3 37 1.0 43 1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -0.3 37 -1.0 43 -0.9 44 -0.9 -
LOAD 3417 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 73 -1.0 74 -1.0
*(0.3EOX - EOZ) + 1.2(-AGX+AGZ) - NX(O) - NZ(O) *-----------------------------------------------Temporary Empty+seismic(UPLIFT)
REPEAT LOAD LOAD 3611 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 0.3 37 -1.0 43 -1.2 44 1.2 - *(EEX + 0.3EEZ) + NX(E) + NZ(E)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 3418 (1.2+0.2SDS)D + L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + 0.9CD +... 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 1.0 39 0.3 71 1.0 72 1.0
*-(0.3EOX + EOZ) - 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 3612 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
REPEAT LOAD *(EEX - 0.3EEZ) + NX(E) + NZ(E)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 0.9 36 -0.3 37 -1.0 43 -1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 1.0 39 -0.3 71 1.0 72 1.0
*------------------------------------Temporary Operating+Anchor+seismic(UPLIFT) LOAD 3613 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
LOAD 3511 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... *(-EEX + 0.3EEZ) - NX(E) - NZ(E)
*(EOX+0.3EOZ) + 0.9(AGX+AGZ) - NX(O) - NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -1.0 39 0.3 71 -1.0 72 -1.0
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 1.0 37 0.3 43 0.9 44 0.9 73 -1.0 - LOAD 3614 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
74 -1.0 *-(EEX + 0.3EEZ) - NX(E) - NZ(E)
LOAD 3512 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD +... REPEAT LOAD
*(EOX-0.3EOZ) + 0.9(AGX-AGZ) - NX(O) - NZ(O) 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -1.0 39 -0.3 71 -1.0 72 -1.0
REPEAT LOAD LOAD 3615 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +...
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 1.0 37 -0.3 43 0.9 44 -0.9 - *(0.3EEX + EEZ) + NX(E) + NZ(E)
73 -1.0 74 -1.0 REPEAT LOAD

TEP-043-CAL-ST-BP4-0020 91 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 0.3 39 1.0 71 1.0 72 1.0 *1 0.9 2 0.25 5 1.2 8 1.2 43 -0.9 44 0.9 61 1.0
LOAD 3616 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +... *LOAD 4122 0.9D + 0.25L + 1.2(PO+QO) - 0.9(AGX+AGZ) + BLX
*(-0.3EEX + EEZ) + NX(E) + NZ(E) *REPEAT LOAD
REPEAT LOAD *1 0.9 2 0.25 5 1.2 8 1.2 43 -0.9 44 -0.9 61 1.0
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -0.3 39 1.0 71 1.0 72 1.0 *LOAD 4123 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX+AGZ) + BLZ
LOAD 3617 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +... *REPEAT LOAD
*(0.3EEX - EEZ) - NX(E) - NZ(E) *1 0.9 2 0.25 5 1.2 8 1.2 43 0.9 44 0.9 62 1.0
REPEAT LOAD *LOAD 4124 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX-AGZ) + BLZ
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 0.3 39 -1.0 71 -1.0 72 -1.0 *REPEAT LOAD
LOAD 3618 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD +... *1 0.9 2 0.25 5 1.2 8 1.2 43 0.9 44 -0.9 62 1.0
*-(0.3EEX + EEZ) - NX(O) - NZ(O) *LOAD 4125 0.9D + 0.25L + 1.2(PO+QO) + 0.9(-AGX+AGZ) + BLZ
REPEAT LOAD *REPEAT LOAD
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -0.3 39 -1.0 71 -1.0 72 -1.0 *1 0.9 2 0.25 5 1.2 8 1.2 43 -0.9 44 0.9 62 1.0
*==================================================================== *LOAD 4126 0.9D + 0.25L + 1.2(PO+QO) - 0.9(AGX+AGZ) + BLZ
* TEMPORARY(BLAST) SLB CONDITION * *REPEAT LOAD
*==================================================================== *1 0.9 2 0.25 5 1.2 8 1.2 43 -0.9 44 -0.9 62 1.0
*----------------------------------------------Temporary Operating+Anchor+Blast *====================================================================
LOAD 4111 D + 0.25L + (PO+QO) + (AGX+AGZ) + BLX * TEMPORARY(BLAST) DLB CONDITION *
REPEAT LOAD *====================================================================
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 61 1.0 *----------------------------------------------Temporary Operating+Anchor+Blast
LOAD 4112 D + 0.25L + (PO+QO) + (AGX-AGZ) + BLX LOAD 4211 D + 0.25L + (PO+QO) + (AGX+AGZ) + BLX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 61 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 63 1.0
LOAD 4113 D + 0.25L + (PO+QO) + (-AGX+AGZ) + BLX LOAD 4212 D + 0.25L + (PO+QO) + (AGX-AGZ) + BLX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 61 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 63 1.0
LOAD 4114 D + 0.25L + (PO+QO) - (AGX+AGZ) + BLX LOAD 4213 D + 0.25L + (PO+QO) + (-AGX+AGZ) + BLX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 61 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 63 1.0
LOAD 4115 D + 0.25L + (PO+QO) + (AGX+AGZ) + BLZ LOAD 4214 D + 0.25L + (PO+QO) - (AGX+AGZ) + BLX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 62 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 63 1.0
LOAD 4116 D + 0.25L + (PO+QO) + (AGX-AGZ) + BLZ LOAD 4215 D + 0.25L + (PO+QO) + (AGX+AGZ) + BLZ
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 62 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 64 1.0
LOAD 4117 D + 0.25L + (PO+QO) + (-AGX+AGZ) + BLZ LOAD 4216 D + 0.25L + (PO+QO) + (AGX-AGZ) + BLZ
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 62 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 64 1.0
LOAD 4118 D + 0.25L + (PO+QO) - (AGX+AGZ) + BLZ LOAD 4217 D + 0.25L + (PO+QO) + (-AGX+AGZ) + BLZ
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 62 1.0 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 64 1.0
****------------------------------------------------------ LOAD 4218 D + 0.25L + (PO+QO) - (AGX+AGZ) + BLZ
*LOAD 4119 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX+AGZ) + BLX REPEAT LOAD
*REPEAT LOAD 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 64 1.0
*1 0.9 2 0.25 5 1.2 8 1.2 43 0.9 44 0.9 61 1.0 **--------------------------------------------
*LOAD 4120 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX-AGZ) + BLX *LOAD 4219 0.9D + 0.4L + 1.2(PO+QO) + 0.9(AGX+AGZ) + BLX
*REPEAT LOAD *REPEAT LOAD
*1 0.9 2 0.25 5 1.2 8 1.2 43 0.9 44 -0.9 61 1.0 *1 0.9 2 0.4 5 1.2 8 1.2 43 0.9 44 0.9 63 1.0
*LOAD 4121 0.9D + 0.25L + 1.2(PO+QO) + 0.9(-AGX+AGZ) + BLX *LOAD 4220 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX-AGZ) + BLX
*REPEAT LOAD *REPEAT LOAD

*1 0.9 2 0.4 5 1.2 8 1.2 43 0.9 44 -0.9 63 1.0 54 1.6 55 1.6 73 1.0 74 1.0
*LOAD 4221 0.9D + 0.25L + 1.2(PO+QO) + 0.9(-AGX+AGZ) + BLX LOAD 6212 1.2D + 1.6L + 1.2(PO+QO) + 1.2CT + 2.4(-TFX+TFZ) + 1.2(AGX-AGZ) + ...
*REPEAT LOAD *1.2CVS + 1.6(-CSS+CLS+CI) + NX(O) - NZ(O)
*1 0.9 2 0.4 5 1.2 8 1.2 43 -0.9 44 0.9 63 1.0 REPEAT LOAD
*LOAD 4222 0.9D + 0.25L + 1.2(PO+QO) - 0.9(AGX+AGZ) + BLX 1 1.2 2 1.6 5 1.2 8 1.2 11 1.2 41 -2.4 42 2.4 43 1.2 44 -1.2 52 1.2 53 -1.6 -
*REPEAT LOAD 54 1.6 55 1.6 73 -1.0 74 -1.0
*1 0.9 2 0.4 5 1.2 8 1.2 43 -0.9 44 -0.9 63 1.0 LOAD 6213 1.2D + 1.6L + 1.2(PO+QO) + 1.2CT + 2.4(TFX-TFZ) + 1.2(-AGX+AGZ) + ...
*LOAD 4223 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX+AGZ) + BLZ *1.2CVS + 1.6(CSS-CLS+CI) + NX(O) + NZ(O)
*REPEAT LOAD REPEAT LOAD
*1 0.9 2 0.4 5 1.2 8 1.2 43 0.9 44 0.9 64 1.0 1 1.2 2 1.6 5 1.2 8 1.2 11 1.2 41 2.4 42 -2.4 43 -1.2 44 1.2 52 1.2 53 1.6 -
*LOAD 4224 0.9D + 0.25L + 1.2(PO+QO) + 0.9(AGX-AGZ) + BLZ 54 -1.6 55 1.6 73 -1.0 74 -1.0
*REPEAT LOAD LOAD 6214 1.2D + 1.6L + 1.2(PO+QO) + 1.2CT - 2.4(TFX+TFZ) - 1.2(AGX+AGZ) - ...
*1 0.9 2 0.4 5 1.2 8 1.2 43 0.9 44 -0.9 64 1.0 *1.2CVS + 1.6(-CSS-CLS+CI) - NX(O) - NZ(O)
*LOAD 4225 0.9D + 0.25L + 1.2(PO+QO) + 0.9(-AGX+AGZ) + BLZ REPEAT LOAD
*REPEAT LOAD 1 1.2 2 1.6 5 1.2 8 1.2 11 1.2 41 -2.4 42 -2.4 43 -1.2 44 -1.2 52 1.2 -
*1 0.9 2 0.4 5 1.2 8 1.2 43 -0.9 44 0.9 64 1.0 53 -1.6 54 -1.6 55 1.6 73 -1.0 74 -1.0
*LOAD 4226 0.9D + 0.25L + 1.2(PO+QO) - 0.9(AGX+AGZ) + BLZ *====================================================================
*REPEAT LOAD * CONNECTION CHECK *
*1 0.9 2 0.4 5 1.2 8 1.2 43 -0.9 44 -0.9 64 1.0 * for Moment COnnection w/ End Plate *
*==================================================================== *====================================================================
* TEMPORARY(MAINTENANCE) CONDITION * *============================================================*
*==================================================================== * ro:1.3,overstrength factor:3 ===> factor load: 3/1.3=2.31 *
LOAD 5111 0.9D + 0.9(PE+QE) + 1.6TB + 0.9CT + NX(E) + NZ(E) * 0.3*2.31=0.69 *
REPEAT LOAD * ro:1.3,overstrength factor:2 ===> factor load: 2/1.3=1.54 *
1 0.9 4 0.9 7 0.9 11 0.9 71 1.0 72 1.0 * 0.3*1.54=0.46 *
*==================================================================== * factore load : 1.2 + 0.2*SDS = 1.2 + 0.149 = 1.35 *
* LOCAL BEAM CHECK * * 0.9 - 0.2*SDS = 0.9 - 0.149 = 0.751 *
*==================================================================== * 0.1 - 0.2*SDS = 0.1 - 0.149 = -0.05 *
*------------------------------------Local Beam Check,Operating+Friction+Anchor *============================================================*
LOAD 6111 1.4D + 1.4PO + 1.4CT + 2.8(TFX+TFZ) + 1.4(AGX+AGZ) + 1.4CD +... *-------------------------------------------Conn.Check Operating+Anchor+Seismic
*NX(O) + NZ(O) LOAD 7111 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
REPEAT LOAD *1.2CD + 2.31EOX + 0.46EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O)
1 1.4 5 1.4 11 1.4 41 2.8 42 2.8 43 1.4 44 1.4 51 1.4 73 1.0 74 1.0 REPEAT LOAD
LOAD 6112 1.4D + 1.4PO + 1.4CT + 2.8(-TFX+TFZ) + 1.4(AGX-AGZ) + 1.4CD +... 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 2.31 32 0.46 43 1.2 44 1.2 -
*- NX(O) - NZ(O) 73 1.0 74 1.0
REPEAT LOAD LOAD 7112 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
1 1.4 5 1.4 11 1.4 41 -2.8 42 2.8 43 1.4 44 -1.4 51 1.4 73 -1.0 74 -1.0 *1.2CD + 2.31EOX - 0.46EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O)
LOAD 6113 1.4D + 1.4PO + 1.4CT + 2.8(TFX-TFZ) + 1.4(-AGX+AGZ) + 1.4CD +... REPEAT LOAD
*+ NX(O) + NZ(O) 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 2.31 32 -0.46 43 1.2 44 -1.2 -
REPEAT LOAD 73 1.0 74 1.0
1 1.4 5 1.4 11 1.4 41 2.8 42 -2.8 43 -1.4 44 1.4 51 1.4 73 1.0 74 1.0 LOAD 7113 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
LOAD 6114 1.4D + 1.4PO + 1.4CT - 2.8(TFX+TFZ) - 1.4(AGX+AGZ) + 1.4CD +... *1.2CD - 2.31EOX + 0.46EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O)
*+ NX(O) + NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -2.31 32 0.46 43 -1.2 44 1.2 -
1 1.4 5 1.4 11 1.4 41 -2.8 42 -2.8 43 -1.4 44 -1.4 51 1.4 73 1.0 74 1.0 73 -1.0 74 -1.0
*-------------------------------Local Beam Check,Operating+Friction+Anchor+Live LOAD 7114 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
LOAD 6211 1.2D + 1.6L + 1.2(PO+QO) + 1.2CT + 2.4(TFX+TFZ) + 1.2(AGX+AGZ) + ... *1.2CD - 2.31EOX - 0.46EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O)
*1.2CVS + 1.6(CSS+CLS+CI) + NX(O) + NZ(O) REPEAT LOAD
REPEAT LOAD 1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -2.31 32 -0.46 43 -1.2 44 -1.2 -
1 1.2 2 1.6 5 1.2 8 1.2 11 1.2 41 2.4 42 2.4 43 1.2 44 1.2 52 1.2 53 1.6 - 73 -1.0 74 -1.0

TEP-043-CAL-ST-BP4-0020 92 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
LOAD 7115 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 73 1.0 74 1.0
*1.2CD + 0.69EOX + 1.54EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O) LOAD 7217 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...
REPEAT LOAD *0.69EOX - 1.54EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 0.69 32 1.54 43 1.2 44 1.2 - REPEAT LOAD
73 1.0 74 1.0 1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 0.69 32 -1.54 43 -0.9 44 0.9 -
LOAD 7116 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 73 -1.0 74 -1.0
*1.2CD - 0.69EOX + 1.54EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O) LOAD 7218 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...
REPEAT LOAD *-0.69EOX - 1.54EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -0.69 32 1.54 43 1.2 44 -1.2 - REPEAT LOAD
73 1.0 74 1.0 1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -0.69 32 -1.54 43 -0.9 44 -0.9 -
LOAD 7117 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 73 -1.0 74 -1.0
*1.2CD + 0.69EOX - 1.54EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O) *----------------------------------------------Conn.Check EMPTY+Seismic(UPLIFT)
REPEAT LOAD LOAD 7311 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 0.69 32 -1.54 43 -1.2 44 1.2 - *2.31EEX + 0.46EEZ + NX(E) + NZ(E)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 7118 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 2.31 35 0.46 71 1.0 72 1.0
*1.2CD - 0.69EOX - 1.54EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O) LOAD 7312 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
REPEAT LOAD *2.31EEX - 0.46EEZ + NX(E) + NZ(E)
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -0.69 32 -1.54 43 -1.2 44 -1.2 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 2.31 35 -0.46 71 1.0 72 1.0
*-----------------------------------Conn.Check Operating+Anchor+Seismic(UPLIFT) LOAD 7313 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
LOAD 7211 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... *-2.31EEX + 0.46EEZ - NX(E) - NZ(E)
*2.31EOX + 0.46EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -2.31 35 0.46 71 -1.0 72 -1.0
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 2.31 32 0.46 43 0.9 44 0.9 73 1.0 - LOAD 7314 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
74 1.0 *-2.31EEX - 0.46EEZ - NX(E) - NZ(E)
LOAD 7212 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... REPEAT LOAD
*2.31EOX - 0.46EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O) 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -2.31 35 -0.46 71 -1.0 72 -1.0
REPEAT LOAD LOAD 7315 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 2.31 32 -0.46 43 0.9 44 -0.9 - *0.69EEX + 1.54EEZ + NX(E) + NZ(E)
73 1.0 74 1.0 REPEAT LOAD
LOAD 7213 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 0.69 35 1.54 71 1.0 72 1.0
*- 2.31EOX + 0.46EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O) LOAD 7316 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
REPEAT LOAD *-0.69EEX + 1.54EEZ + NX(E) + NZ(E)
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -2.31 32 0.46 43 -0.9 44 0.9 - REPEAT LOAD
73 -1.0 74 -1.0 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -0.69 35 1.54 71 1.0 72 1.0
LOAD 7214 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... LOAD 7317 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
*-2.31EOX - 0.46EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O) *0.69EEX - 1.54EEZ - NX(E) - NZ(E)
REPEAT LOAD REPEAT LOAD
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -2.31 32 -0.46 43 -0.9 44 -0.9 - 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 0.69 35 -1.54 71 -1.0 72 -1.0
73 -1.0 74 -1.0 LOAD 7318 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
LOAD 7215 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... *- 0.69EEX - 1.54EEZ - NX(E) - NZ(E)
*0.69EOX + 1.54EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.751 4 0.751 7 0.751 11 0.751 51 0.9 34 -0.69 35 -1.54 71 -1.0 72 -1.0
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 0.69 32 1.54 43 0.9 44 0.9 73 1.0 - *============================================================*
74 1.0 * ro:1.3,R:3.5(transv) ===> factor load: 3.5/1.3 =2.69 *
LOAD 7216 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... * 0.3*2.69=0.81 *
*-0.69EOX + 1.54EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O) * ro:1.3,R:3.25(long) ===> factor load: 3.25/1.3=2.5 *
REPEAT LOAD * 0.3*1.54=0.75 *
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -0.69 32 1.54 43 0.9 44 -0.9 - *============================================================*

*------------------------------------Moment Conn.Check Operating+Anchor+Seismic REPEAT LOAD


LOAD 7411 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 2.31 37 -0.46 43 1.2 44 -1.2 -
*1.2CD + 2.69EOX + 0.75EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O) 73 1.0 74 1.0
REPEAT LOAD LOAD 7613 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 2.69 32 0.75 43 1.2 44 1.2 - *1.2CD - 2.31EOX + 0.46EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O)
73 1.0 74 1.0 REPEAT LOAD
LOAD 7412 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -2.31 37 0.46 43 -1.2 44 1.2 -
*1.2CD + 2.69EOX - 0.75EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O) 73 -1.0 74 -1.0
REPEAT LOAD LOAD 7614 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 2.69 32 -0.75 43 1.2 44 -1.2 - *1.2CD - 2.31EOX - 0.46EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O)
73 1.0 74 1.0 REPEAT LOAD
LOAD 7413 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -2.31 37 -0.46 43 -1.2 44 -1.2 -
*1.2CD - 2.69EOX + 0.75EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O) 73 -1.0 74 -1.0
REPEAT LOAD LOAD 7615 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -2.69 32 0.75 43 -1.2 44 1.2 - *1.2CD + 0.69EOX + 1.54EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 7414 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 0.69 37 1.54 43 1.2 44 1.2 -
*1.2CD - 2.69EOX - 0.75EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O) 73 1.0 74 1.0
REPEAT LOAD LOAD 7616 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
1 1.35 2 1.0 5 1.35 8 1.35 11 1.35 51 1.2 31 -2.69 32 -0.75 43 -1.2 44 -1.2 - *1.2CD - 0.69EOX + 1.54EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O)
73 -1.0 74 -1.0 REPEAT LOAD
*----------------------------Moment Conn.Check Operating+Anchor+Seismic(UPLIFT) 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -0.69 37 1.54 43 1.2 44 -1.2 -
LOAD 7511 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ... 73 1.0 74 1.0
*0.9CD + 2.69EOX + 0.75EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O) LOAD 7617 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
REPEAT LOAD *1.2CD + 0.69EOX - 1.54EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O)
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 2.69 32 0.75 43 0.9 44 0.9 73 1.0 - REPEAT LOAD
74 1.0 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 0.69 37 -1.54 43 -1.2 44 1.2 -
LOAD 7512 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ... 73 -1.0 74 -1.0
*0.9CD + 2.69EOX - 0.75EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O) LOAD 7618 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
REPEAT LOAD *1.2CD - 0.69EOX - 1.54EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O)
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 2.69 32 -0.75 43 0.9 44 -0.9 - REPEAT LOAD
73 1.0 74 1.0 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -0.69 37 -1.54 43 -1.2 44 -1.2 -
LOAD 7513 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT - ... 73 -1.0 74 -1.0
*0.9CD + 2.69EOX + 0.75EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O) *-----------------------------------Conn.Check Operating+Anchor+Seismic(UPLIFT)
REPEAT LOAD LOAD 7711 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -2.69 32 0.75 43 -0.9 44 0.9 - *2.31EOX + 0.46EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O)
73 -1.0 74 -1.0 REPEAT LOAD
LOAD 7514 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ... 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 2.31 37 0.46 43 0.9 44 0.9 73 1.0 -
*0.9CD - 2.69EOX - 0.75EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O) 74 1.0
REPEAT LOAD LOAD 7712 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...
1 0.751 5 0.751 8 0.751 11 0.751 51 0.9 31 -2.69 32 -0.75 43 -0.9 44 -0.9 - *2.31EOX - 0.46EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O)
73 -1.0 74 -1.0 REPEAT LOAD
*------------------------------CONNECTION CHECK FOR OBE CASE 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 2.31 37 -0.46 43 0.9 44 -0.9 -
LOAD 7611 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 73 1.0 74 1.0
*1.2CD + 2.31EOX + 0.46EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O) LOAD 7713 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...
REPEAT LOAD *- 2.31EOX + 0.46EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 2.31 37 0.46 43 1.2 44 1.2 - REPEAT LOAD
73 1.0 74 1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -2.31 37 0.46 43 -0.9 44 0.9 -
LOAD 7612 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ... 73 -1.0 74 -1.0
*1.2CD + 2.31EOX - 0.46EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O) LOAD 7714 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ...

TEP-043-CAL-ST-BP4-0020 93 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
*-2.31EOX - 0.46EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O) *0.69EEX - 1.54EEZ - NX(E) - NZ(E)
REPEAT LOAD REPEAT LOAD
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -2.31 37 -0.46 43 -0.9 44 -0.9 - 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 0.69 39 -1.54 71 -1.0 72 -1.0
73 -1.0 74 -1.0 LOAD 7818 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ...
LOAD 7715 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... *- 0.69EEX - 1.54EEZ - NX(E) - NZ(E)
*0.69EOX + 1.54EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O) REPEAT LOAD
REPEAT LOAD 1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -0.69 39 -1.54 71 -1.0 72 -1.0
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 0.69 37 1.54 43 0.9 44 0.9 73 1.0 - *============================================================*
74 1.0 * ro:1.3,R:3.5(transv) ===> factor load: 3.5/1.3 =2.69 *
LOAD 7716 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... * 0.3*2.69=0.81 *
*-0.69EOX + 1.54EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O) * ro:1.3,R:3.25(long) ===> factor load: 3.25/1.3=2.5 *
REPEAT LOAD * 0.3*1.54=0.75 *
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -0.69 37 1.54 43 0.9 44 -0.9 - *============================================================*
73 1.0 74 1.0 *------------------------------------Moment Conn.Check Operating+Anchor+Seismic
LOAD 7717 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... LOAD 7911 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
*0.69EOX - 1.54EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O) *1.2CD + 2.69EOX + 0.75EOZ + 1.2(AGX+AGZ) + NX(O) + NZ(O)
REPEAT LOAD REPEAT LOAD
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 0.69 37 -1.54 43 -0.9 44 0.9 - 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 2.69 37 0.75 43 1.2 44 1.2 -
73 -1.0 74 -1.0 73 1.0 74 1.0
LOAD 7718 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + 0.9CD + ... LOAD 7912 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
*-0.69EOX - 1.54EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O) *1.2CD + 2.69EOX - 0.75EOZ + 1.2(AGX-AGZ) + NX(O) + NZ(O)
REPEAT LOAD REPEAT LOAD
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -0.69 37 -1.54 43 -0.9 44 -0.9 - 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 2.69 37 -0.75 43 1.2 44 -1.2 -
73 -1.0 74 -1.0 73 1.0 74 1.0
*----------------------------------------------Conn.Check EMPTY+Seismic(UPLIFT) LOAD 7913 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
LOAD 7811 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... *1.2CD - 2.69EOX + 0.75EOZ + 1.2(-AGX+AGZ) - NX(O) - NZ(O)
*2.31EEX + 0.46EEZ + NX(E) + NZ(E) REPEAT LOAD
REPEAT LOAD 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -2.69 37 0.75 43 -1.2 44 1.2 -
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 2.31 39 0.46 71 1.0 72 1.0 73 -1.0 74 -1.0
LOAD 7812 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... LOAD 7914 (1.2+0.2SDS)D + 1.0L + (1.2+0.2SDS)(PO+QO) + (1.2+0.2SDS)CT + ...
*2.31EEX - 0.46EEZ + NX(E) + NZ(E) *1.2CD - 2.69EOX - 0.75EOZ - 1.2(AGX+AGZ) - NX(O) - NZ(O)
REPEAT LOAD REPEAT LOAD
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 2.31 39 -0.46 71 1.0 72 1.0 1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 51 1.2 36 -2.69 37 -0.75 43 -1.2 44 -1.2 -
LOAD 7813 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... 73 -1.0 74 -1.0
*-2.31EEX + 0.46EEZ - NX(E) - NZ(E) *----------------------------Moment Conn.Check Operating+Anchor+Seismic(UPLIFT)
REPEAT LOAD LOAD 7915 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ...
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -2.31 39 0.46 71 -1.0 72 -1.0 *0.9CD + 2.69EOX + 0.75EOZ + 0.9(AGX+AGZ) + NX(O) + NZ(O)
LOAD 7814 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... REPEAT LOAD
*-2.31EEX - 0.46EEZ - NX(E) - NZ(E) 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 2.69 37 0.75 43 0.9 44 0.9 73 1.0 -
REPEAT LOAD 74 1.0
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -2.31 39 -0.46 71 -1.0 72 -1.0 LOAD 7916 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ...
LOAD 7815 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... *0.9CD + 2.69EOX - 0.75EOZ + 0.9(AGX-AGZ) + NX(O) + NZ(O)
*0.69EEX + 1.54EEZ + NX(E) + NZ(E) REPEAT LOAD
REPEAT LOAD 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 2.69 37 -0.75 43 0.9 44 -0.9 -
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 0.69 39 1.54 71 1.0 72 1.0 73 1.0 74 1.0
LOAD 7816 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... LOAD 7917 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT - ...
*-0.69EEX + 1.54EEZ + NX(E) + NZ(E) *0.9CD + 2.69EOX + 0.75EOZ + 0.9(-AGX+AGZ) - NX(O) - NZ(O)
REPEAT LOAD REPEAT LOAD
1 0.774 4 0.774 7 0.774 11 0.774 51 0.9 38 -0.69 39 1.54 71 1.0 72 1.0 1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -2.69 37 0.75 43 -0.9 44 0.9 -
LOAD 7817 (0.9-0.2SDS)D + (0.9-0.2SDS)(PE+QE) + (0.9-0.2SDS)CT + 0.9CD + ... 73 -1.0 74 -1.0

LOAD 7918 (0.9-0.2SDS)D + (0.9-0.2SDS)(PO+QO) + (0.9-0.2SDS)CT + ... * *


*0.9CD - 2.69EOX - 0.75EOZ - 0.9(AGX+AGZ) - NX(O) - NZ(O) *====================================================================
REPEAT LOAD *====================================================================
1 0.774 5 0.774 8 0.774 11 0.774 51 0.9 36 -2.69 37 -0.75 43 -0.9 44 -0.9 - * PERMANENT CONDITION *
73 -1.0 74 -1.0 *====================================================================
*==================================================================== **PERMANENT -> EMPTY CONDITION
* TEMPORARY (ACHE ERECTION) * **-------
*==================================================================== **PERMANENT -> OPERATING CONDITION
*---------------------------------------------------------ACHE Erection *-----------------------------------------Permanent Operating Friction + Anchor
LOAD 8111 1.2D + 1.2(PE+QE) + 1.2CVS + 1.6(CSS+CLS+CI) + NX(E) + NZ(E) LOAD 111 D + (PO+QO) + CT + CD + (TFX+TFZ) + (AGX+AGZ)
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 52 1.2 53 1.6 54 1.6 55 1.6 71 1.0 72 1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 1.0 42 1.0 43 1.0 44 1.0
LOAD 8112 1.2D + 1.2(PE+QE) + 1.2CVS + 1.6(-CSS+CLS+CI) + NX(E) + NZ(E) LOAD 112 D + (PO+QO) + CT + CD + (TFX-TFZ) + (AGX-AGZ)
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 52 1.2 53 -1.6 54 1.6 55 1.6 71 1.0 72 1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 1.0 42 -1.0 43 1.0 44 -1.0
LOAD 8113 1.2D + 1.2(PE+QE) + 1.2CVS + 1.6(CSS-CLS+CI) - NX(E) - NZ(E) LOAD 113 D + (PO+QO) + CT + CD + (-TFX+TFZ) + (-AGX+AGZ)
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 52 1.2 53 1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 -1.0 42 1.0 43 -1.0 44 1.0
LOAD 8114 1.2D + 1.2(PE+QE) + 1.2CVS + 1.6(-CSS-CLS+CI) - NX(E) - NZ(E) LOAD 114 D + (PO+QO) + CT + CD + (-TFX-TFZ) + (-AGX-AGZ)
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 52 1.2 53 -1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 -1.0 42 -1.0 43 -1.0 44 -1.0
*----------------------------------------------------ACHE Erection+Wind *--------------------Permanent Operating Live + Friction + Anchor + Surge Load
LOAD 8211 1.2D + 1.2(PE+QE) + WX + 1.2CVS + 1.6(CSS+CLS+CI) + NX(E) + NZ(E) LOAD 115 D + (PO+QO) + CT + CD + (TFX+TFZ) + (AGX+AGZ) + FYS + FXS + FZS
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 21 1.0 52 1.2 53 1.6 54 1.6 55 1.6 71 1.0 72 1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 -
LOAD 8212 1.2D + 1.2(PE+QE) + WX + 1.2CVS + 1.6(-CSS+CLS+CI) + NX(E) + NZ(E) 47 1.0
REPEAT LOAD LOAD 116 D + (PO+QO) + CT + CD + (TFX-TFZ) + (AGX-AGZ) + FYS + FXS - FZS
1 1.2 4 1.2 7 1.2 21 1.0 52 1.2 53 -1.6 54 1.6 55 1.6 71 1.0 72 1.0 REPEAT LOAD
LOAD 8213 1.2D + 1.2(PE+QE) - WX + 1.2CVS + 1.6(CSS-CLS+CI) - NX(E) - NZ(E) 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 1.0 42 -1.0 43 1.0 44 -1.0 45 1.0 46 1.0 -
REPEAT LOAD 47 -1.0
1 1.2 4 1.2 7 1.2 21 -1.0 52 1.2 53 1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 LOAD 117 D + (PO+QO) + CT + CD + (-TFX+TFZ) + (-AGX+AGZ) + FYS - FXS + FZS
LOAD 8214 1.2D + 1.2(PE+QE) - W X + 1.2CVS + 1.6(-CSS-CLS+CI) - NX(E) - NZ(E) REPEAT LOAD
REPEAT LOAD 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 -1.0 42 1.0 43 -1.0 44 1.0 45 1.0 46 -1.0 -
1 1.2 4 1.2 7 1.2 21 -1.0 52 1.2 53 -1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 47 1.0
LOAD 8215 1.2D + 1.2(PE+QE) + WZ + 1.2CVS + 1.6(CSS+CLS+CI) + NX(E) + NZ(E) LOAD 118 D + (PO+QO) + CT + CD + (-TFX-TFZ) + (-AGX-AGZ) + FYS - FXS - FZS
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 22 1.0 52 1.2 53 1.6 54 1.6 55 1.6 71 1.0 72 1.0 1 1.0 5 1.0 8 1.0 11 1.0 51 1.0 41 -1.0 42 -1.0 43 -1.0 44 -1.0 45 1.0 -
LOAD 8216 1.2D + 1.2(PE+QE) + WZ + 1.2CVS + 1.6(-CSS+CLS+CI) + NX(E) + NZ(E) 46 -1.0 47 -1.0
REPEAT LOAD *----------------------------------Permanent Operating Live + Friction + Anchor
1 1.2 4 1.2 7 1.2 22 1.0 52 1.2 53 -1.6 54 1.6 55 1.6 71 1.0 72 1.0 LOAD 121 D + (PO+QO) + CT + L + (TFX+TFZ) + (AGX+AGZ) + CVS + (CSS+CLS+CI)
LOAD 8217 1.2D + 1.2(PE+QE) - WZ + 1.2CVS + 1.6(CSS-CLS+CI) - NX(E) - NZ(E) REPEAT LOAD
REPEAT LOAD 1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 1.0 42 1.0 43 1.0 44 1.0 52 1.0 53 1.0 -
1 1.2 4 1.2 7 1.2 22 -1.0 52 1.2 53 1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 54 1.0 55 1.0
LOAD 8218 1.2D + 1.2(PE+QE) - WZ + 1.2CVS + 1.6(-CSS-CLS+CI) - NX(E) - NZ(E) LOAD 122 D + (PO+QO) + CT + L + (TFX-TFZ) + (AGX-AGZ) + CVS + (-CSS+CLS+CI)
REPEAT LOAD REPEAT LOAD
1 1.2 4 1.2 7 1.2 22 -1.0 52 1.2 53 -1.6 54 -1.6 55 1.6 71 -1.0 72 -1.0 1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 1.0 42 -1.0 43 1.0 44 -1.0 52 1.0 53 -1.0 -
PERFORM ANALYSIS 54 1.0 55 1.0
CHANGE LOAD 123 D + (PO+QO) + CT + L + (-TFX+TFZ) + (-AGX+AGZ) + CVS + (CSS-CLS+CI)
*==================================================================== REPEAT LOAD
* LOAD COMBINATION FOR FOUNDATION STABILITY & DISPLACEMENT * 1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 -1.0 42 1.0 43 -1.0 44 1.0 52 1.0 53 1.0 -

TEP-043-CAL-ST-BP4-0020 94 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
54 -1.0 55 1.0 LOAD 213 D + 0.75L + (PO+QO) + CT + 0.45WX + (-AGX+AGZ) + CVS + CI
LOAD 124 D + (PO+QO) + CT + L + (-TFX-TFZ) + (-AGX-AGZ) + CVS + (-CSS-CLS+CI) REPEAT LOAD
REPEAT LOAD 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 -1.0 44 1.0 52 1.0 55 1.0
1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 -1.0 42 -1.0 43 -1.0 44 -1.0 52 1.0 - LOAD 214 D + 0.75L + (PO+QO) + CT + 0.45WX + (-AGX-AGZ) + CVS + CI
53 -1.0 54 -1.0 55 1.0 REPEAT LOAD

*--------------------------OPERATING ( LIVE + FRICTION + ANCHOR + SURGE LOAD) 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 -1.0 44 -1.0 52 1.0 55 1.0
LOAD 125 D + (PO+QO) + CT + L + (TFX+TFZ) + (AGX+AGZ) + CVS + (CSS+CLS+CI) +.. LOAD 215 D + 0.75L + (PO+QO) + CT - 0.45WX + (AGX+AGZ) + CVS + CI
* Fys + Fxs + Fzs REPEAT LOAD

REPEAT LOAD 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 1.0 44 1.0 52 1.0 55 1.0
1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 1.0 42 1.0 43 1.0 44 1.0 52 1.0 53 1.0 - LOAD 216 D + 0.75L + (PO+QO) + CT - 0.45WX + (AGX-AGZ) + CVS + CI
REPEAT LOAD
45 1.0 46 1.0 47 1.0
LOAD 126 D + (PO+QO) + CT + L + (TFX-TFZ) + (AGX-AGZ) + CVS + (-CSS+CLS+CI) +.. 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 1.0 44 -1.0 52 1.0 55 1.0
* Fys + Fxs - Fzs LOAD 217 D + 0.75L + (PO+QO) + CT - 0.45WX + (-AGX+AGZ) + CVS + CI
REPEAT LOAD
REPEAT LOAD
1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 1.0 42 -1.0 43 1.0 44 -1.0 52 1.0 53 -1.0 - 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 -1.0 44 1.0 52 1.0 55 1.0
LOAD 218 D + 0.75L + (PO+QO) + CT - 0.45WX + (-AGX-AGZ) + CVS + CI
45 1.0 46 1.0 47 -1.0
REPEAT LOAD
LOAD 127 D + (PO+QO) + CT + L + (-TFX+TFZ) + (-AGX+AGZ) + CVS + (CSS-CLS+CI) +
* Fys - Fxs + Fzs 1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 -1.0 44 -1.0 52 1.0 55 1.0
*Wind-Z
REPEAT LOAD
LOAD 219 D + 0.75L + (PO+QO) + CT + 0.45WZ + (AGX+AGZ) + CVS + CI
1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 -1.0 42 1.0 43 -1.0 44 1.0 52 1.0 53 1.0 -
REPEAT LOAD
45 1.0 46 -1.0 47 1.0
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 1.0 44 1.0 52 1.0 55 1.0
LOAD 128 D + (PO+QO) + CT + L + (-TFX-TFZ) + (-AGX-AGZ) + CVS + (-CSS-CLS+CI) +
LOAD 220 D + 0.75L + (PO+QO) + CT + 0.45WZ + (AGX-AGZ) + CVS + CI
* Fys - Fxs - Fzs
REPEAT LOAD
REPEAT LOAD
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 1.0 44 -1.0 52 1.0 55 1.0
1 1.0 5 1.0 8 1.0 11 1.0 2 1.0 41 -1.0 42 -1.0 43 -1.0 44 -1.0 52 1.0 -
LOAD 221 D + 0.75L + (PO+QO) + CT + 0.45WZ + (-AGX+AGZ) + CVS + CI
53 -1.0 45 1.0 46 -1.0 47 -1.0 REPEAT LOAD
**PERMANENT -> TEST CONDITION
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 -1.0 44 1.0 52 1.0 55 1.0
*------------------------------------------------Permanent Test Dead + Pt or Qt
LOAD 222 D + 0.75L + (PO+QO) + CT + 0.45WZ + (-AGX-AGZ) + CVS + CI
LOAD 131 (D+PT) + CD REPEAT LOAD
REPEAT LOAD
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 -1.0 44 -1.0 52 1.0 55 1.0
1 1.0 6 1.0 51 1.0
LOAD 223 D + 0.75L + (PO+QO) + CT - 0.45WZ + (AGX+AGZ) + CVS + CI
LOAD 132 (D+QT) + CD REPEAT LOAD
REPEAT LOAD
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 1.0 44 1.0 52 1.0 55 1.0
1 1.0 9 1.0 51 1.0 LOAD 224 D + 0.75L + (PO+QO) + CT - 0.45WZ + (AGX-AGZ) + CVS + CI
LOAD 133 (D+PT) + CT + CD REPEAT LOAD
REPEAT LOAD
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 1.0 44 -1.0 52 1.0 55 1.0
1 1.0 6 1.0 11 1.0 51 1.0 LOAD 225 D + 0.75L + (PO+QO) + 1.2CT - 0.45WZ + (-AGX+AGZ) + CVS + CI
LOAD 134 (D+QT) + CT + CD REPEAT LOAD
REPEAT LOAD
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 -1.0 44 1.0 52 1.0 55 1.0
1 1.0 9 1.0 11 1.0 51 1.0 LOAD 226 D + 0.75L + (PO+QO) + CT - 0.45WZ + (-AGX-AGZ) + CVS + CI
*==================================================================== REPEAT LOAD
* TEMPORARY(W IND) CONDITION *
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 -1.0 44 -1.0 52 1.0 55 1.0
*====================================================================
**--------------------------------------------Temporary operating+Anchor+Wind
**TEMPORARY -> OPERATING CONDITION
*wind-X
*-----------------------------------Temporary Operating+Live+Anchor+ Wind
LOAD 231 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WX + 0.6(AGX+AGZ) + CVS + CI
*Wind-X
REPEAT LOAD
LOAD 211 D + 0.75L + (PO+QO) + CT + 0.45WX + (AGX+AGZ) + CVS + CI
REPEAT LOAD 1 0.6 4 0.6 7 0.6 11 0.6 21 0.6 43 0.6 44 0.6 52 1.0 55 1.0
LOAD 232 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WX + 0.6(AGX-AGZ) + CVS + CI
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 1.0 44 1.0 52 1.0 55 1.0
REPEAT LOAD
LOAD 212 D + 0.75L + (PO+QO) + CT + 0.45WX + (AGX-AGZ) + CVS + CI
REPEAT LOAD 1 0.6 4 0.6 7 0.6 11 0.6 21 0.6 43 0.6 44 -0.6 52 1.0 55 1.0
LOAD 233 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WX + 0.6(-AGX+AGZ) + CVS + CI
1 1.0 2 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 1.0 44 -1.0 52 1.0 55 1.0
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 21 0.6 43 -0.6 44 0.6 52 1.0 55 1.0
LOAD 234 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WX + 0.6(-AGX-AGZ) + CVS + CI
REPEAT LOAD

LOAD 261 D + (PT+QT) + CT + CD + 0.36WX


1 0.6 4 0.6 7 0.6 11 0.6 21 0.6 43 -0.6 44 -0.6 52 1.0 55 1.0
REPEAT LOAD
LOAD 235 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WX + 0.6(AGX+AGZ) + CVS + CI
1 1.0 6 1.0 9 1.0 11 1.0 51 1.0 21 0.36
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 21 -0.6 43 0.6 44 0.6 52 1.0 55 1.0
LOAD 236 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WX + 0.6(AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 21 -0.6 43 0.6 44 -0.6 52 1.0 55 1.0
LOAD 237 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WX + 0.6(-AGX+AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 21 -0.6 43 -0.6 44 0.6 52 1.0 55 1.0
LOAD 238 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WX + 0.6(-AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 21 -0.6 43 -0.6 44 -0.6 52 1.0 55 1.0
*wind-Z
LOAD 239 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WZ + 0.6(AGX+AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 0.6 43 0.6 44 0.6 52 1.0 55 1.0
LOAD 240 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WZ + 0.6(AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 0.6 43 0.6 44 -0.6 52 1.0 55 1.0
LOAD 241 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WZ + 0.6(-AGX+AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 0.6 43 -0.6 44 0.6 52 1.0 55 1.0
LOAD 242 0.6D + 0.6(PO+QO) + 0.6CT + 0.6WZ + 0.6(-AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 0.6 43 -0.6 44 -0.6 52 1.0 55 1.0
LOAD 243 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WZ + 0.6(AGX+AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 -0.6 43 0.6 44 0.6 52 1.0 55 1.0
LOAD 244 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WZ + 0.6(AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 -0.6 43 0.6 44 -0.6 52 1.0 55 1.0
LOAD 245 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WZ + 0.6(-AGX+AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 -0.6 43 -0.6 44 0.6 52 1.0 55 1.0
LOAD 246 0.6D + 0.6(PO+QO) + 0.6CT - 0.6WZ + 0.6(-AGX-AGZ) + CVS + CI
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 22 -0.6 43 -0.6 44 -0.6 52 1.0 55 1.0
***TEMPORARY -> TEST CONDITION
*-------------------------------------------------Temporary Empty + Wind
LOAD 251 0.6D + 0.6(PE+QE) + 0.6CT + CD + 0.6WX
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 51 1.0 21 0.6
LOAD 252 0.6D + 0.6(PE+QE) + 0.6CT + CD - 0.6W X
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 51 1.0 21 -0.6
LOAD 253 0.6D + 0.6(PE+QE) + 0.6CT + CD + 0.6WZ
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 51 1.0 22 0.6
LOAD 254 0.6D + 0.6(PE+QE) + 0.6CT + CD - 0.6W Z
REPEAT LOAD
1 0.6 4 0.6 7 0.6 11 0.6 51 1.0 22 -0.6
*-------------------------------------------------Temporary Test + Partial Wind
44 -1.0
LOAD 262 D + (PT+QT) LOAD 313 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
+ CT + CD - 0.36WX *CD + (-525EOX + 0.158EOZ) + 1.0(-AGX+AGZ)
REPEAT LOAD REPEAT LOAD
1 1.0 6 1.0 9 1.0 11 1.0 51 1.0 21 -0.36 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 -0.525 32 0.158 43 -1.0 -
LOAD 263 D + (PT+QT) 44 1.0
+ CT + CD + 0.36WZ LOAD 314 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT - ...
REPEAT LOAD *CD + (0.525EOX + 0.158EOZ) - (AGX+AGZ)
1 1.0 6 1.0 9 1.0 11 1.0 51 1.0 22 0.36 REPEAT LOAD
LOAD 264 D + (PT+QT) 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 -0.525 32 -0.158 43 -1.0 -
+ CT + CD - 0.36WZ 44 -1.0
REPEAT LOAD LOAD 315 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
1 1.0 6 1.0 9 1.0 11 1.0 51 1.0 22 -0.36 *CD + (0.158EOX + 0.525EOZ) + (AGX+AGZ)
*=================================================== REPEAT LOAD
================= 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 0.158 32 0.525 43 1.0 -
* TEMPORARY(SEISMIC) CONDITION * 44 1.0
* SDS = 0.745 LOAD 316 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
* load factor for dead load = 1.0 + 0.7*0.2*SDS = 1.104 * *CD + (-0.158EOX + 0.525EOZ) + (AGX-AGZ)
* 0.6 - 0.7*0.2*SDS = 0.496 * REPEAT LOAD
*===================================================
================= 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 -0.158 32 0.525 43 1.0 -
*--------------------------------------------Temporary Operating+Anchor+seismic 44 -1.0
LOAD 311 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + LOAD 317 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
(1.0+0.14SDS)CT + ... *CD + (0.158EOX - 0.525EOZ) + (-AGX+AGZ)
*CD + (0.525EOX + REPEAT LOAD
0.158EOZ) + 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 0.158 32 -0.525 43 -1.0 -
1.0(AGX+AGZ) REPEAT 44 1.0
LOAD LOAD 318 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT - ...
1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 0.525 32 0.158 43 1.0 - *CD + (0.158EOX + 0.525EOZ) - (AGX+AGZ)
44 1.0 REPEAT LOAD
LOAD 312 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + 1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 -0.158 32 -0.525 43 -1.0 -
(1.0+0.14SDS)CT + ...
44 -1.0
*CD + (0.525EOX -
0.158EOZ) + 1.0(AGX-
AGZ) REPEAT LOAD
1 1.104 2 0.75 5 1.104 8 1.104 11 1.104 51 1.0 31 0.525 32 -0.158 43 1.0 -

TEP-043-CAL-ST-BP4-0020 95 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004
*------------------------------------Temporary Operating+Anchor+seismic LOAD 336 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
LOAD 321 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... *(-0.21EEX + 0.7EEZ)
*CD + (0.7EOX+0.21EOZ) + 0.6(AGX+AGZ) REPEAT LOAD
REPEAT LOAD 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 -0.21 35 0.7
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 0.7 32 0.21 43 0.6 44 0.6 LOAD 337 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
LOAD 322 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... *(0.21EEX - 0.7EEZ)
*CD + (0.7EOX-0.21EOZ) + 0.6(AGX-AGZ) REPEAT LOAD
REPEAT LOAD 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 0.21 35 -0.7
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 0.7 32 -0.21 43 0.9 44 -0.9 LOAD 338 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
LOAD 323 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... *-(0.21EEX + 0.7EEZ)
*CD + (-0.7EOX+0.21EOZ) + 0.6(-AGX+AGZ) REPEAT LOAD
REPEAT LOAD 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 -0.21 35 -0.7
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 -0.7 32 0.21 43 -0.9 44 0.9 *====================================================================
LOAD 324 (0.9)D + (0.9)(PO+QO) + (0.9)CT - ... * TEMPORARY(SEISMIC) CONDITION - OBE Case *
*CD + (0.7EOX+0.21EOZ) - 0.6(AGX+AGZ) * SDS = 0.630
REPEAT LOAD * load factor for dead load = 1.0 + 0.7*0.2*SDS = 1.088 *
* 0.6 - 0.7*0.2*SDS = 0.512 *
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 -0.7 32 -0.21 43 -0.9 44 -0.9
*====================================================================
LOAD 325 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ...
*--------------------------------------------Temporary Operating+Anchor+seismic
*CD + (0.21EOX+0.7EOZ) + 0.6(AGX+AGZ)
LOAD 341 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
REPEAT LOAD
*CD + (0.525EOX + 0.158EOZ) + 1.0(AGX+AGZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 0.21 32 0.7 43 0.9 44 0.9 REPEAT LOAD
LOAD 326 (0.9)D + (0.9)(PO+QO) + (0.9-0.14SDS)CT + ...
1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 0.525 37 0.158 43 1.0 -
*CD + (-0.21EOX+0.7EOZ) + 0.6(AGX-AGZ)
44 1.0
REPEAT LOAD
LOAD 342 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 -0.21 32 0.7 43 0.9 44 -0.9 *CD + (0.525EOX - 0.158EOZ) + 1.0(AGX-AGZ)
LOAD 327 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ...
REPEAT LOAD
*CD + (0.21EOX-0.7EOZ) + 0.6(-AGX+AGZ)
REPEAT LOAD 1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 0.525 37 -0.158 43 1.0 -

1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 0.21 32 -0.7 43 -0.9 44 0.9 44 -1.0
LOAD 328 (0.9)D + (0.9)(PO+QO) + (0.9)CT - ... LOAD 343 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
*CD + (0.21EOX+0.7EOZ) - 0.6(AGX+AGZ)
*CD + (-0.525EOX + 0.158EOZ) + 1.0(-AGX+AGZ)
REPEAT LOAD
REPEAT LOAD
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 31 -0.21 32 -0.7 43 -0.9 44 -0.9
*-----------------------------------------------Temporary Empty+seismic 1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 -0.525 37 0.158 43 -1.0 -
*=====================================* 44 1.0
*=====================================*
LOAD 344 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT - ...
LOAD 331 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
*CD + (0.525EOX + 0.158EOZ) - (AGX+AGZ)
*(0.7EEX + 0.21EEZ)
REPEAT LOAD REPEAT LOAD

1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 0.7 35 0.21 1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 -0.525 37 -0.158 43 -1.0 -
LOAD 332 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ... 44 -1.0
*(0.7EEX - 0.21EEZ)
LOAD 345 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
REPEAT LOAD
*CD + (0.158EOX + 0.525EOZ) + (AGX+AGZ)
1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 0.7 35 -0.21
LOAD 333 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ... REPEAT LOAD
*(-0.7EEX + 0.21EEZ) 1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 0.158 37 0.525 43 1.0 -
REPEAT LOAD
44 1.0
1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 -0.7 35 0.21
LOAD 334 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ... LOAD 346 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ...
*-(0.7EEX + 0.21EEZ) *CD + (-0.158EOX + 0.525EOZ) + (AGX-AGZ)
REPEAT LOAD REPEAT LOAD
1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 -0.7 35 -0.21 1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 -0.158 37 0.525 43 1.0 -
LOAD 335 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
*(0.21EEX + 0.7EEZ)
REPEAT LOAD
1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 34 0.21 35 0.7

44 -1.0 REPEAT LOAD


LOAD 347 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT + ... 1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 -0.21 37 -0.7 43 -0.9 44 -0.9
*CD + (0.158EOX - 0.525EOZ) + (-AGX+AGZ) *-----------------------------------------------Temporary Empty+seismic
REPEAT LOAD *=====================================*
1 1.088 2 0.75 5 1.088 8 1.088 11 1.088 51 1.0 36 0.158 37 -0.525 43 -1.0 - *=====================================*
44 1.0 LOAD 361 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
LOAD 348 (1.0+0.14SDS)D + 0.75L + (1.0+0.14SDS)(PO+QO) + (1.0+0.14SDS)CT - ... *(0.7EEX + 0.21EEZ)
*CD - (0.158EOX + 0.525EOZ) - (AGX+AGZ) REPEAT LOAD
REPEAT LOAD 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 0.7 39 0.21
1 1.088 2 0.4 5 1.088 8 1.088 11 1.088 51 1.0 36 -0.158 37 -0.525 43 -1.0 - LOAD 362 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
44 -1.0 *(0.7EEX - 0.21EEZ)
*------------------------------------Temporary Operating+Anchor+seismic REPEAT LOAD
LOAD 351 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 0.7 39 -0.21
*CD + (0.7EOX+0.21EOZ) + 0.6(AGX+AGZ) LOAD 363 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *(-0.7EEX + 0.21EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 0.7 37 0.21 43 0.6 44 0.6 REPEAT LOAD
LOAD 352 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 -0.7 39 0.21
*CD + (0.7EOX-0.21EOZ) + 0.6(AGX-AGZ) LOAD 364 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *-(0.7EEX + 0.21EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 0.7 37 -0.21 43 0.9 44 -0.9 REPEAT LOAD
LOAD 353 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 -0.7 39 -0.21
*CD + (-0.7EOX+0.21EOZ) + 0.6(-AGX+AGZ) LOAD 365 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *(0.21EEX + 0.7EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 -0.7 37 0.21 43 -0.9 44 0.9 REPEAT LOAD
LOAD 354 (0.9)D + (0.9)(PO+QO) + (0.9)CT - ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 0.21 39 0.7
*CD + (0.7EOX+0.21EOZ) - 0.6(AGX+AGZ) LOAD 366 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *(-0.21EEX + 0.7EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 -0.7 37 -0.21 43 -0.9 44 -0.9 REPEAT LOAD
LOAD 355 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 -0.21 39 0.7
*CD + (0.21EOX+0.7EOZ) + 0.6(AGX+AGZ) LOAD 367 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *(0.21EEX - 0.7EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 0.21 37 0.7 43 0.9 44 0.9 REPEAT LOAD
LOAD 356 (0.9)D + (0.9)(PO+QO) + (0.9-0.14SDS)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 0.21 39 -0.7
*CD + (-0.21EOX+0.7EOZ) + 0.6(AGX-AGZ) LOAD 368 (0.9)D + (0.9)(PE+QE) + (0.9)CT + CD + ...
REPEAT LOAD *-(0.21EEX + 0.7EEZ)
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 -0.21 37 0.7 43 0.9 44 -0.9 REPEAT LOAD
LOAD 357 (0.9)D + (0.9)(PO+QO) + (0.9)CT + ... 1 0.9 4 0.9 7 0.9 11 0.9 51 1.0 38 -0.21 39 -0.7
*CD + (0.21EOX-0.7EOZ) + 0.6(-AGX+AGZ) *====================================================================
REPEAT LOAD * TEMPORARY(BLAST) SLB CONDITION *
1 0.9 5 0.9 8 0.9 11 0.9 51 1.0 36 0.21 37 -0.7 43 -0.9 44 0.9 *====================================================================
LOAD 358 (0.9)D + (0.9)(PO+QO) + (0.9)CT - ... *----------------------------------------------Temporary Operating+Anchor+Blast
*CD + (0.21EOX+0.7EOZ) - 0.6(AGX+AGZ) LOAD 411 D + 0.25L + (PO+QO) + (AGX+AGZ) + 0.7BLX

TEP-043-CAL-ST-BP4-0020
© BP p.l.c.
96 of 107 Rev. B01
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

REPEAT LOAD LOAD 427 D + 0.25L + (PO+QO) + (-AGX+AGZ) + 0.7BLZ


1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 61 0.7 REPEAT LOAD
LOAD 412 D + 0.25L + (PO+QO) + (AGX-AGZ) + 0.7BLX 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 64 0.7
REPEAT LOAD LOAD 428 D + 0.25L + (PO+QO) - (AGX+AGZ) + 0.7BLZ
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 61 0.7 REPEAT LOAD
LOAD 413 D + 0.25L + (PO+QO) + (-AGX+AGZ) + 0.7BLX 1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 64 0.7
REPEAT LOAD *====================================================================
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 61 0.7 * TEMPORARY(MAINTENANCE) CONDITION *
LOAD 414 D + 0.25L + (PO+QO) - (AGX+AGZ) + 0.7BLX *====================================================================
REPEAT LOAD LOAD 511 D + (PE+QE) + TB + 0.1CT
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 61 0.7 REPEAT LOAD
LOAD 415 D + 0.25L + (PO+QO) + (AGX+AGZ) + 0.7BLZ 1 1.0 4 1.0 7 1.0 11 0.1
REPEAT LOAD *====================================================================
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 62 0.7 * TEMPORARY ERECTION *
LOAD 416 D + 0.25L + (PO+QO) + (AGX-AGZ) + 0.7BLZ *====================================================================
REPEAT LOAD *---------------------------------------------------------ACHE Erection
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 62 0.7 LOAD 811 D + (PE + QE) + CVS + (CSS+CLS+CI)
LOAD 417 D + 0.25L + (PO+QO) + (-AGX+AGZ) + 0.7BLZ REPEAT LOAD
REPEAT LOAD 1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 1.0 55 1.0
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 62 0.7 LOAD 812 D + (PE + QE) + CVS + (-CSS+CLS+CI)
LOAD 418 D + 0.25L + (PO+QO) - (AGX+AGZ) + 0.7BLZ REPEAT LOAD
REPEAT LOAD 1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 1.0 55 1.0
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 62 0.7 LOAD 813 D + (PE + QE) + CVS + (CSS-CLS+CI)
*-------------------------------------------------- REPEAT LOAD
LOAD 421 D + 0.25L + (PO+QO) + (AGX+AGZ) + 0.7BLX 1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 -1.0 55 1.0
REPEAT LOAD LOAD 814 D + (PE + QE) + CVS + (-CSS-CLS+CI)
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 63 0.7 REPEAT LOAD
LOAD 422 D + 0.25L + (PO+QO) + (AGX-AGZ) + 0.7BLX 1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0
REPEAT LOAD *----------------------------------------------------ACHE Erection+wIND
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 63 0.7 *-----------wx
LOAD 423 D + 0.25L + (PO+QO) + (-AGX+AGZ) + 0.7BLX LOAD 821 D + (PE + QE) + CVS + (CSS+CLS+CI) + WX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 1.0 63 0.7 1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 1.0 55 1.0 21 0.6
LOAD 424 D + 0.25L + (PO+QO) - (AGX+AGZ) + 0.7BLX LOAD 822 D + (PE + QE) + CVS + (-CSS+CLS+CI) + WX
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 -1.0 44 -1.0 63 0.7 1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 1.0 55 1.0 21 0.6
LOAD 425 D + 0.25L + (PO+QO) + (AGX+AGZ) + 0.7BLZ LOAD 823 D + (PE + QE) + CVS + (CSS-CLS+CI) - W X
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 1.0 64 0.7 1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 -1.0 55 1.0 21 -0.6
LOAD 426 D + 0.25L + (PO+QO) + (AGX-AGZ) + 0.7BLZ LOAD 824 D + (PE + QE) + CVS + (-CSS-CLS+CI) - W X
REPEAT LOAD REPEAT LOAD
1 1.0 2 0.25 5 1.0 8 1.0 43 1.0 44 -1.0 64 0.7 1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0 21 -0.6

*------------wz **===================================================================
LOAD 825 D + (PE + QE) + CVS + (CSS+CLS+CI) + WZ *5.STRENGTH (LOCAL BEAM CHECK)
REPEAT LOAD *6111 TO 6114 6211 TO 6214 ENVELOPE 5 TYPE STRENGTH
1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 1.0 55 1.0 22 0.6 *6.CONNECTION CHECK (Moment Connection w/ End Plate)
LOAD 826 D + (PE + QE) + CVS + (-CSS+CLS+CI) + WZ *1115 TO 1118 1215 TO 1218 7111 TO 7118 7211 TO 7218 7311 TO 7318 7411 TO 7414 -
REPEAT LOAD *7511 TO 7514 7611 TO 7618 7711 TO 7718 7811 TO 7818 7911 TO 7917 -
1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 1.0 55 1.0 22 0.6 *7918 ENVELOPE 6 TYPE CONNECTION
LOAD 827 D + (PE + QE) + CVS + (CSS-CLS+CI) - WZ *7.SERVICEABILITY (ERECTION)
REPEAT LOAD *811 TO 814 821 TO 828 ENVELOPE 7 TYPE SERVICEABILITY
1 1.0 4 1.0 7 1.0 52 1.0 53 1.0 54 -1.0 55 1.0 22 -0.6 **10.STRENGTH (PERMANENT & TEMPORARY)
LOAD 828 D + (PE + QE) + CVS + (-CSS-CLS+CI) - W Z *1111 TO 1118 1211 TO 1218 1311 TO 1314 2111 TO 2126 2211 TO 2214 2311 TO 2314 -
REPEAT LOAD *3111 TO 3118 3211 TO 3218 3311 TO 3318 3411 TO 3418 3511 TO 3518 -
1 1.0 4 1.0 7 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0 22 -0.6 *3611 TO 3618 4111 TO 4118 4211 TO 4218 5111 ENVELOPE 10 TYPE STRENGTH
*---------------------------------------------------------------------- ****PILING CHECK

PERFORM ANALYSIS *111 TO 118 121 TO 128 131 TO 134 ENVELOPE 11 TYPE SERVICEABILITY

CHANGE *211 TO 226 231 TO 246 251 TO 254 261 TO 264 ENVELOPE 12 TYPE SERVICEABILITY

**=================================================================== *311 TO 318 321 TO 328 331 TO 338 ENVELOPE 13 TYPE SERVICEABILITY

DEFINE ENVELOPE *341 TO 348 351 TO 358 361 TO 368 ENVELOPE 14 TYPE SERVICEABILITY
*1.STRENGTH (PERMANENT) *411 TO 418 ENVELOPE 15 TYPE SERVICEABILITY

1111 TO 1118 1211 TO 1218 1311 TO 1314 ENVELOPE 1 TYPE STRENGTH *421 TO 428 ENVELOPE 16 TYPE SERVICEABILITY

**2.STRENGTH (TEMPORARY) 111 TO 114 121 TO 124 131 TO 134 ENVELOPE 4 TYPE SERVICEABILITY

2111 TO 2126 2211 TO 2214 2311 TO 2314 3111 TO 3118 3211 TO 3218 3311 TO 3318 - ***4.SERVICEABILITY (TEMPORARY)

3411 TO 3418 3511 TO 3518 3611 TO 3618 4111 TO 4118 4211 TO 4218 - 211 TO 226 231 TO 246 251 TO 254 261 TO 264 ENVELOPE 5 TYPE SERVICEABILITY

5111 ENVELOPE 2 TYPE STRENGTH 311 TO 318 321 TO 328 331 TO 338 ENVELOPE 6 TYPE SERVICEABILITY

**=================================================================== 341 TO 348 351 TO 358 361 TO 368 ENVELOPE 7 TYPE SERVICEABILITY

*3.SERVICEABILITY (PERMANENT) END DEFINE ENVELOPE

111 TO 118 121 TO 128 131 TO 134 ENVELOPE 3 TYPE SERVICEABILITY ************************************************************************

**4.SERVICEABILITY (TEMPORARY) * STEEL CHECK *


*211 TO 226 231 TO 246 251 TO 254 261 TO 264 311 TO 318 321 TO 328 331 TO 338 - ************************************************************************ LOAD
*341 TO 348 351 TO 358 361 TO 368 411 TO 418 421 TO 428 511 811 TO 814 821 - LIST ENV 2

*822 TO 828 ENVELOPE 4 TYPE SERVICEABILITY PARAMETER 1


***100.SERVICEABILITY (WITHOUT SEISMIC) CODE AISC UNIFIED 2010
*111 TO 118 121 TO 128 131 TO 134 211 TO 226 231 TO 246 251 TO 254 261 TO 264 - METHOD LRFD
*411 TO 418 421 TO 428 911 TO 918 921 TO 928 931 TO 938 941 TO 947 - FU 400000 ALL
*948 ENVELOPE 100 TYPE SERVICEABILITY FYLD 235000 ALL
***101.SERVICEABILITY (SEISMIC) * BRACING DESIGN
*311 TO 318 321 TO 328 331 TO 338 341 TO 348 351 TO 358 361 TO 367 - MAIN 116.7 MEMB _VBRACE
*368 ENVELOPE 101 TYPE SERVICEABILITY MAIN 200 MEMB _HBRACE
*411 TO 418 421 TO 428 - TMAIN 0 MEMB _BRACE
*211 TO 226 231 TO 246 251 TO 254 261 TO 264 ENVELOPE 4 TYPE SERVICEABILITY RATIO 1 ALL
*411 TO 418 421 TO 427 - TRACK 1 ALL
*428 *--------------------LYLZ beam-------------

TEP-043-CAL-ST-BP4-0020 97 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

*-------------------------------------------EL. 21.5 METE *--------------------LYLZ column-------------


LZ 5.4 MEMB 28 48 679 LY 2.3 MEMB 7 12 19 24
LZ 5.4 MEMB 29 42 675 678 LZ 2.3 MEMB 7 12 19 24
LZ 5.4 MEMB 39 659 666 710 727 LZ 2.75 MEMB 5 11 17 23
LZ 5.4 MEMB 40 673 709 729 LY 2.75 MEMB 5 11 17 23
LZ 5.4 MEMB 31 51 LY 2.75 MEMB 3 10 15 22
LZ 4.6 MEMB 26 27 665 723 LZ 2.75 MEMB 3 10 15 22
LZ 1.85 MEMB 34 35 728 730 LY 3.2 MEMB 1 9 13 21
LY 1.85 MEMB 34 35 LZ 3.2 MEMB 1 9 13 21
UNB 1.85 MEMB 34 35 KZ 1.51 MEMB 1 9 13 21
UNT 1.85 MEMB 34 35 KZ 1.73 MEMB 3 10 15 22
LZ 4.6 MEMB 53 652 654 661 721 KZ 1.78 MEMB 5 11 17 23
*-------------------------------------------EL. 24.25 METE KZ 2.12 MEMB 7 12 19 24
LZ 5.4 MEMB 59 66 85 *
LZ 5.4 MEMB 60 65 86 ******************************************************************************
LZ 5.4 MEMB 75 669 712 720 *
LZ 5.4 MEMB 73 78 714 716 CHECK CODE ALL
LZ 5.4 MEMB 63 89 STEEL TAKE OFF LIST ALL
LZ 1.67 MEMB 68 69 FINISH
LZ 1.865 MEMB 76 717 *==========================*
LZ 1.67 MEMB 81 82 ** COLUMN DESIGN **
LZ 4.6 MEMB 56 57 91 92 670 711 713 715 718 719 724 *==========================*
*-------------------------------------------EL. 27 METE *LOAD LIST ENV 3
LZ 5.4 MEMB 97 107 116 *PARAMETER 2
LZ 5.4 MEMB 98 102 117 667 691 693 *CODE AISC UNIFIED 2010
LZ 1.98 MEMB 109 689 *METHOD LRFD
LZ 5.4 MEMB 110 682 684 690 *CAN 1 MEMB _COLUMN
LZ 5.4 MEMB 100 119 *DFF 200 MEMB _COLUMN
LZ 4.6 MEMB 95 96 685 **TRACK 2 MEMB _COLUMN
LZ 3.025 MEMB 104 692 *PRINT STORY DRIFT
LZ 3.025 MEMB 113 694 *CHECK CODE MEMB _COLUMN
LZ 4.6 MEMB 121 683 686 722 *==========================*
*-------------------------------------------EL. 29.3 METE ** BEAM DESIGN **
LZ 5.4 MEMB 127 138 155 *==========================*
LZ 5.4 MEMB 128 141 156 676 LOAD LIST ENV 4
LZ 5.4 MEMB 129 139 142 146 157 697 698 701 702 PARAMETER 3
LZ 5.4 MEMB 131 140 148 158 CODE AISC UNIFIED 2010
LZ 4.6 MEMB 124 126 695 725 METHOD LRFD
LZ 1.8 MEMB 134 151 706 707 *CAN 0 MEMB _BEAM
LZ 1.8 MEMB 143 144 DFF 360 MEMB _BEAM
LZ 1.8 MEMB 153 154 *DFF 600 MEMB _HOISTBEAM
LZ 4.6 MEMB 160 696 700 TRACK 0 MEMB _BEAM

RATIO 1 MEMB _BEAM DJ2 87 MEMB 97 107 116


*--------BEAM PARAMETER FOR DEFLECTION CHECK---- DJ1 13 MEMB 98 102 117 667 691 693
*-------------------------------------------EL. 21.5 METE DJ2 15 MEMB 98 102 117 667 691 693
DJ1 29 MEMB 28 48 679 DJ1 77 MEMB 109 689
DJ2 46 MEMB 28 48 679 DJ2 83 MEMB 109 689
DJ1 5 MEMB 29 42 675 678 DJ1 129 MEMB 110 682 684 690
DJ2 7 MEMB 29 42 675 678 DJ2 130 MEMB 110 682 684 690
DJ1 119 MEMB 39 659 666 710 727 DJ1 14 MEMB 100 119
DJ2 112 MEMB 39 659 666 710 727 DJ2 16 MEMB 100 119
DJ1 122 MEMB 40 673 709 729 DJ1 13 MEMB 95 96 685
DJ2 113 MEMB 40 673 709 729 DJ2 14 MEMB 95 96 685
DJ1 6 MEMB 31 51 DJ1 136 MEMB 104 692
DJ2 8 MEMB 31 51 DJ2 79 MEMB 104 692
DJ1 5 MEMB 26 27 665 723 DJ1 137 MEMB 113 694
DJ2 6 MEMB 26 27 665 723 DJ2 85 MEMB 113 694
DJ1 33 MEMB 34 35 DJ1 15 MEMB 121 683 686 722
DJ2 36 MEMB 34 35 DJ2 16 MEMB 121 683 686 722
DJ1 7 MEMB 53 652 654 661 721 *-------------------------------------------EL. 29.3 METE
DJ2 8 MEMB 53 652 654 661 721 DJ1 89 MEMB 127 138 155
*-------------------------------------------EL. 24.25 METE DJ2 110 MEMB 127 138 155
DJ1 48 MEMB 59 66 85 DJ1 17 MEMB 128 141 156 676
DJ2 69 MEMB 59 66 85 DJ2 19 MEMB 128 141 156 676
DJ1 9 MEMB 60 65 86 DJ1 138 MEMB 142 697 698 702
DJ2 11 MEMB 60 65 86 DJ2 139 MEMB 142 697 698 702
DJ1 121 MEMB 75 669 712 720 DJ1 140 MEMB 129 139 146 157 701
DJ2 148 MEMB 75 669 712 720 DJ2 141 MEMB 129 139 146 157 701
DJ1 149 MEMB 73 78 714 716 DJ1 18 MEMB 131 140 148 158
DJ2 150 MEMB 73 78 714 716 DJ2 20 MEMB 131 140 148 158
DJ1 10 MEMB 63 89 DJ1 17 MEMB 124 126 695 725
DJ2 12 MEMB 63 89 DJ2 18 MEMB 124 126 695 725
DJ1 54 MEMB 68 69 DJ1 94 MEMB 134 706
DJ2 57 MEMB 68 69 DJ2 96 MEMB 134 706
DJ1 61 MEMB 76 717 DJ1 100 MEMB 143 144
DJ2 62 MEMB 76 717 DJ2 102 MEMB 143 144
DJ1 64 MEMB 81 82 DJ1 105 MEMB 151 707
DJ2 67 MEMB 81 82 DJ2 107 MEMB 151 707
DJ1 11 MEMB 91 92 711 715 719 DJ1 107 MEMB 153 154
DJ2 12 MEMB 91 92 711 715 719 DJ2 109 MEMB 153 154
DJ2 10 MEMB 56 57 670 713 718 724 DJ1 19 MEMB 160 696 700
DJ1 9 MEMB 56 57 670 713 718 724 DJ2 20 MEMB 160 696 700
*-------------------------------------------EL. 27 METE CHECK CODE MEMB _BEAM
DJ1 72 MEMB 97 107 116 FINISH

TEP-043-CAL-ST-BP4-0020 98 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 10 - Steel Strength Ratio


10.1 Steel Strength Ratio for Permanent Load
(Load Comb 1111 to 1314)

10.2 Steel Strength Ratio for Temporary Load


(Load Comb 2111 to 3618)

Green = < 0.7


Blue = 0.7 - 0.9
Red = 0.9 - < 1

© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 11 - STAAD. Pro Output


11.1 STAAD. Pro Output
Example Staad Pro Output for selection member no.3

TEP-043-CAL-ST-BP4-0020 100 of 107 Rev. B01


© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 12 - Pipe & Equipment Loading Data


11.1 Piping Loads
Piping loading applied to Operating Platform Train Area (043-PLF-31004) is refer to Ref.1.3.3.30,
Loading Data for Process operating Platform (043-PLF-31004) 3rd Step Issue.

11.1.1 Piping Loads


11.1.2 Thermal Loads
The horizontal friction force, due to the thermal expansion or contraction of pipe, shall be applied at the
support bearing surfaces. The friction shall be taken as the operating load of pipes times the applicable
friction coefficient. Only half of the total pipe operating weight will be included in thermal load
calculation, as not all pipes will be simultaneously causing the same effect.

Refer to Ref.1.3.3.1 Table 11, Onshore Civil and Structural Design Basis, The friction coefficient is
given in the following table :
Table 3 - Surface Friction Coefficients
Material Friction Coefficient
Steel to Steel 0.30
Steel to Concrete 0.60
Concrete to Concrete 0.80
PTFE to PTFE 0.10

11.1.3 Anchor/Guide Forces


The anchor and guide force shall be deemed as a permanent thermal load when the temperature
corresponds to the normal operatinng condition. This force shall be assumed to act in both direction
parallel to and perpendicular to the piping run.

TEP-043-CAL-ST-BP4-0020 101 of 107 Rev. B01


© BP p.l.c.
A B C D E F G H J K

1 1

2 2

3 3

4 4

3J[BM .VMZBOB

5 B02 RE-ISSUED FOR INFORMATION RZM T.G T.I 5


B01 ISSUED FOR INFORMATION K.A.S T.G T.I

REV DATE DESCRIPTION DRAWN CHKD APPD


REVISIONS

REFERENCE
DRAWINGS /
DOCUMENTS
-

DOC. / DWG NO. TITLE

TANGGUH EXPANSION PROJECT


6 6

LOADING DATA FOR PROCESS OPERATING STAGE 043-


PLF-31004

7 CONTRACT NO. © CSTS DOC. CLASS SCALE


7
4420001030 SECURITY CLASSIFICATION:
INTERNAL 3 NTS
COMPANY DRAWING NO. X CORE SIZE REV.
- A3 B02
NON CORE
CONTRACTOR'S C-NUMBER CONTRACTOR'S S-NUMBER
- 870310-PTS-093-PIP-DWG-60600.001

A B C D E F G H J K

TEP-043-CAL-ST-BP4-0020 104 of 107 Rev. B01


© BP p.l.c.
A B C D E F G H J K

1 1

2 2

NO. DOCUMENT NUMBER SUB TITLE REV. DESCRIPTION


1. 870310-PTS-093-PIP-DWG-60600.001 LOADING DATA FOR PROCESS OPERATING STAGE 043-PLF-31004 B02 3RD STEP ( PLATFORM INFORMATION)
3 3
2. 870310-PTS-093-PIP-DWG-60600.002 DRAWING LIST TABLE B02 3RD STEP ( PLATFORM INFORMATION)

3. 870310-PTS-093-PIP-DWG-60600.003 LOADING DATA FOR PROCESS OPERATING STAGE PLAN VIEW B02 3RD STEP ( PLATFORM INFORMATION)

4. 870310-PTS-093-PIP-DWG-60600.004 LOADING DATA FOR PROCESS OPERATING STAGE ELEVATION DRAWING ROW 01 & ROW 02 B02 3RD STEP ( PLATFORM INFORMATION)

5. 870310-PTS-093-PIP-DWG-60600.005 LOADING DATA FOR PROCESS OPERATING STAGE SECTION DRAWING COLUMN A & B B02 3RD STEP ( PLATFORM INFORMATION)

4 4

5 B02 RE-ISSUED FOR INFORMATION RZM T.G T.I 5


B01 ISSUED FOR INFORMATION K.A.S T.G T.I

REV DATE DESCRIPTION DRAWN CHKD APPD


REVISIONS

REFERENCE
DRAWINGS /
DOCUMENTS
-

DOC. / DWG NO. TITLE

TANGGUH EXPANSION PROJECT


6 6

LOADING DATA FOR PROCESS OPERATING STAGE 043-


PLF-31004

7 CONTRACT NO. © CSTS DOC. CLASS SCALE


7
4420001030 SECURITY CLASSIFICATION:
INTERNAL 3 NTS
COMPANY DRAWING NO. X CORE SIZE REV.
- A3 B02
NON CORE
CONTRACTOR'S C-NUMBER CONTRACTOR'S S-NUMBER
- 870310-PTS-093-PIP-DWG-60600.002

A B C D E F G H J K

TEP-043-CAL-ST-BP4-0020 103 of 107 Rev. B01


© BP p.l.c.
A B C D E F G H J K L M N P

1 1

LEGEND :

: FIRE PROOFING
RESTING/GUIDE
Fxo = ±5 kN
2700 Fyw1 = -2 kN
LADDER Fyo = -5 kN LADDER
(BY CVST) Fzo = ±10 kN 400 2000 300 Ø250 1000 400 902 398 Fyw2 = -4 kN LOCATION PLAN
OPENING HOLE (BY CVST)
Fyw1 = -8 kN Ø250
2 Fyw2 = -10 kN OPENING HOLE 2

250
1000

1000
750
01 01
Ø400 Ø 250
587

Ø 200

791
807
OPENING HOLE OPENING HOLE OPENING HOLE
400 450 463

1ST. PF. EL. +21500


1900

1900
303
2.5 kN/m2

1109
Ø 300

790
3 OPENING HOLE 3
FIRE PROOF
(NOTE - 2)
4600

4600
1000

Fyw1 = 1kN 043-D-31002


Fyw2 = 2kN
LADDER
043-D-31002 (BY CVST.) 3RD. PF. EL. +27000

2700
2700

24" ACCESS HOLE


Fyw1 = 1kN LADDER
Fyw2 = 2kN (BY CVST)

4 02
4
02
1700 1000 2.5 kN/m2
2700 2700 2700 2700

5400 5400

A B A B

PLAN VIEW PLAN VIEW


5 ( 3RD. PF. T.O.S. EL. +27000) 5
( 1ST. PF. T.O.S EL. +21500 )

6 6

2700
LADDER 1000 1700 2.5 kN/m2
1500 1200 1500
(BY CVST) *1 Fyw1 = -1 kN
(TYP.4) Fyw2 = -2 kN
750 (BY CVST.)
1000

1000
7 01 7
750

01 01

1000
043-D-31002
N. 3.184.500

1500
E. 2.119.000

1900
1900

1900

NAME PLATE *1

900
*1 TOP. PF. EL. +29300

400
LADDER
4600

4600

4600

900
FIRE PROOF (BY CVST) B02 14-NOV-2018 RE-ISSUED FOR INFORM ATION R.Z.M T.G T.I

043-D-31002 (NOTE - 2)
8 LADDER Ø 400 B01 ISSUED FOR INFORM ATION K.A.S T.G T.I 8
OPENING HOLE
2700

(BY CVST.)

400 700
043-D-31002 Ø 250 REV DATE DESCRIPTION DRAWN CHKD APPD

2700
2700

*1 2ND. PF. EL. +24250 REVISION S


OPENING HOLE
Ø 250 REFER ENC E
Fyw1 = -1 kN OPENING HOLE DRAWINGS /

700
DOCUM ENTS
Fyw2 = -2 kN -

02 02 02 DOC. / DWG NO. TITLE

2.5 kN/m2
Fyw1 = -1 kN TANGGUH EXPANSION PROJECT
2700 2700 Fyw2 = -2 kN
2700 2700
1850 850 425 1075 1200
5400 9
9 5400 2700 2700
A B
A B 5400

PLAN VIEW PLAN VIEW A PLAN VIEW B

(T.O.S EL. +18000) ( 2ND. PF. T.O.S. EL. +24250 ) ( TOP. PF. T.O.S. EL. +29300 ) LOADING DATA FOR PROCESS OPERATING STAGE
043-PLF-31004

CONTRACT NO. © CSTS DOC. CLASS SCAL E


SECURITY CLASSIFICATION:
4420001030
10 INTERNAL 3 1 : 50 10
COM PANY DR AW ING NO. X CORE SIZE REV.
- A1 B02
NON CORE
CONTRACTOR'S C-NUM BER CONTRACTOR'S S-NUM BER

TEP-043-CAL-ST-BP4-0020 104 of 107 Rev. B01


© BP p.l.c.
- 870310-PTS-093-PIP-DWG-60600.003

A B C D E F G H J K L M N P

TEP-043-CAL-ST-BP4-0020 105 of 107 Rev. B01


© BP p.l.c.
A B C D E F G H J K L M N P

1 1
LEGEND :

: FOR FIRE PROOFING

LOCATION PLAN

2 2

3 3

TOP. EL. +29300 TOP. EL. +29300

TL. EL. +28650 TL. EL. +28650 LADDER


BY CVST

4 4

3RD EL+ 27000 3RD EL+ 27000

TL. EL. +25000 TL. EL. +25000


5 5
2ND EL+ 24250 2ND EL+ 24250

FIRE PROOF FIRE PROOF


(NOTE - 2) (NOTE - 2)
LADDER LADDER
BY CVST BY CVST

6 6
1ST EL+ 21500 1ST EL+ 21500

LADDER
7 BY CVST 7

FGL. EL. +18000 FGL. EL. +18000

043-D-31002 043-D-31002

B02 14-NOV-2018 RE-ISSUED FOR INFORM ATION R.Z.M T.G T.I


2700 2700 2700 2700
8 B01 ISSUED FOR INFORM ATION K.A.S T.G T.I 8
REV DATE DESCRIPTION DRAWN CHKD APPD
5400 5400
REVISION S

A B A B
REFER ENC E
DRAWINGS /
DOCUM ENTS
-

ROW "01" ROW "02" DOC. / DWG NO. TITLE

LOOKING NORTH LOOKING NORTH


TANGGUH EXPANSION PROJECT

9 9

LOADING DATA FOR PROCESS OPERATING STAGE


043-PLF-31004

CONTRACT NO. © CSTS DOC. CLASS SCAL E


SECURITY CLASSIFICATION:
4420001030
10 INTERNAL 3 1 : 50 10
COM PANY DR AW ING NO. X CORE SIZE REV.
- A1 B02
NON CORE

CONTRACTOR'S C-NUM BER CONTRACTOR'S S-NUM BER


- 870310-PTS-093-PIP-DWG-60600.004

A B C D E F G H J K L M N P
TEP-043-CAL-ST-BP4-0020 106 of 107 Rev. B01
© BP p.l.c.
TEP-043-CAL-ST-BP4-0020 105 of 107 Rev. B01

© BP p.l.c.
A B C D E F G H J K L M N P

1 LEGEND :
1

: FOR FIRE PROOF

LOCATION PLAN
2 2

LADDER BY CVST
043-D-31002 043-D-31002

3 3

TOP. EL. +29300


TOP. EL. +29300

TL. EL. +28650 TL. EL. +28650

TOS. EL. +27600


4 4

600
3RD EL+ 27000
3RD EL+ 27000

LADDER
BY CVST

TL. EL. +25000 TL. EL. +25000


5 5
2ND EL+ 24250 2ND EL+ 24250

FIRE PROOF FIRE PROOF


(NOTE - 2) (NOTE - 2)
6 6
1ST EL+ 21500
1ST EL+ 21500

7 7

FGL. EL. +18000 FGL. EL. +18000

1900 2700 1900 2700 B02 14-NOV-2018 RE-ISSUED FOR INFORM ATION R.Z.M T.G T.I

8 B01 ISSUED FOR INFORM ATION K.A.S T.G T.I 8


4600 4600
REV DATE DESCRIPTION DRAWN CHKD APPD

REVISION S

01 02 01 02
REFER ENC E
DRAWINGS /
DOCUM ENTS

COLUMN "A"
-
COLUMN "B" DOC. / DWG NO. TITLE

LOOKING EAST LOOKING EAST


(NOTE 1) (NOTE 1) TANGGUH EXPANSION PROJECT

9 9

LOADING DATA FOR PROCESS OPERATING STAGE


043-PLF-31004

CONTRACT NO. © CSTS DOC. CLASS SCAL E


SECURITY CLASSIFICATION:
4420001030
10 INTERNAL 3 1 : 50 10
COM PANY DR AW ING NO. X CORE SIZE REV.
- A1 B02
NON CORE

CONTRACTOR'S C-NUM BER CONTRACTOR'S S-NUM BE R


- 870310-PTS-093-PIP-DWG-60600.005

TEP-043-CAL-ST-BP4-0020 108 of 107 Rev. B01


© BP p.l.c.
A B C D E F G H J K L M N P

© BP p.l.c.
Tangguh Expansion Project - LNG EPC
Calculation for Operating Platform - 043-PLF-31004

Appendix 13 - Steel Structure Drawing

(REFER TO DRAWING NO. TEP-043-STL-ST-BP4-0027, 0028 & 0029)

TEP-043-CAL-ST-BP4-0020 110 of 107


© BP p.l.c.

TEP-043-CAL-ST-BP4-0020 107 of 107 Rev. B01