The document summarizes a student project to design and analyze a shell and tube heat exchanger to recover waste heat from textile industry wastewater. The project aims to cool wastewater from dyeing and chemical processes at around 80°C before treating it to reduce environmental impacts and save on energy costs compared to existing chilling plants. The project will be guided by a professor and sponsored by a hosiery mill.
The document summarizes a student project to design and analyze a shell and tube heat exchanger to recover waste heat from textile industry wastewater. The project aims to cool wastewater from dyeing and chemical processes at around 80°C before treating it to reduce environmental impacts and save on energy costs compared to existing chilling plants. The project will be guided by a professor and sponsored by a hosiery mill.
The document summarizes a student project to design and analyze a shell and tube heat exchanger to recover waste heat from textile industry wastewater. The project aims to cool wastewater from dyeing and chemical processes at around 80°C before treating it to reduce environmental impacts and save on energy costs compared to existing chilling plants. The project will be guided by a professor and sponsored by a hosiery mill.
Department of Mechanical Engineering Academic Year 2018-19 ''Design and CFD Analysis of Shell and Tube Heat Exchanger for Waste water Heat Recovery in Textile Industry” Problem Definition Textile industry is consuming lacks of liter water per day for different chemical processes. After processing water exits at around 80℃ with chemical contain. This water containing huge heat is directly released into atmosphere which badly affects environment and amount of energy wasted is also considerable. Also exit processing water having chemical is to be sent to Effluent Treatment Plant (ETP) for further processing. Before sending it to ETP the water should be cooled, in existing plant it is done by chilling plant. So, chilling plant adds extra initial and operating cost to company. Proposed work Dyeing Processes