Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Contractor
Localized shutdown □ Required Not Required Supervisor TAE RYONG KIM – 050-893-4889
(Name and Contact No)
Sub-Contractor
Contractor Department CIVIL Supervisor KARTHIK BABU - 050-1366523
(Name and Contact No)
Sub-Contractor
Sub-Contract HILALCO HSE Supervisor HARPREET SINGH - 056-406-9900
(Name and Contact No)
KEPCO HSE Plan and Safety procedures are to be followed at all times.
Minimum PPE to be worn at all times.
This JHA to be available at all points of work – operatives must be informed of this JHA and understand the risk involved in the works.
General safety condition
Tool box talk / pre-job brief to be given at the start of each work shift and before starting a new task or activity.
requirements Summer and Ramadan working hour changes are to be observed and details posted at worksite.
Paramedical or ambulance facilities to be available.
Emergency evacuation drill will be implemented and tested.
Minimum PPE required Hard Hat, Safety goggles, Hi-viz vest, Cover-all Safety Shoes
LS Likelihood / Frequency
CS Severity of consequence
HSJV Hyundai Samsung Joint Venture
E – Environmental
Consequence H – Health
S – Safety
-1-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Analysis criteria:
Severity
Probability
Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent (5) 5 10 15 20 25
15 – 25 Extreme Risk (E) Activity must not proceed in current form.
8 – 12 High Risk (H) Activity must be modified to include further control measures and be subject to detailed HSE dept assessment.
4–6 Moderate Risk (M) Activity can proceed subject to appropriate direct and continuous supervision and/or task modification.
1–3 Low Risk (L) No action required. Activity can proceed subject to compliance with the specified control measures.
Descriptor Likely Frequency LS Probability
Environment Health and Safety
Frequent Continuous or will happen frequently. Occurs several times a year at location. 5
Often 5 – 12 times per year. Occurs several times a year in similar industries in UAE 4
Likely 1 – 5 times per year. Has occurred at least once in UAE 3
Possible Once every 5 years. Has occurred in industry (Worldwide). 2
Rare Less than once every five years Never encountered in industry. 1
Descriptor Consequence CS Severity
Environment Health and Safety
Catastrophic Long term severe / permanent impact on ecosystem Multiple fatalities 5
Major Significant widespread impact on ecosystem Fatality 4
Moderate Significant localized impact on ecosystem Serious injuries – off site medical treatment 3
Minor Minor changes to ecosystem Injuries – on site medical treatment 2
Insignificant Insignificant occasional change to ecosystem Minor injuries – first aid 1
-2-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
SPECIFIC RISK
A,Survey work Working on Employees can 4 3 12 2 2 4 Site M NO
existing get injured by Existing underground
Supervisor
1,Survey points undergroun contacting utilities must be identified
marking in d utilities. existing live prior to start by approved /
existing area underground drawing from HSJV/Use
HSJV to
utilities. CAT tool for detecting
having under monitor
electrical buried lines.
ground utilities.
Ensure adequate
supervision by competent
engineer.
Surveyor& assisting crews
must be equipped with
adequate PPE.
Pre-job meeting to be
conducted prior to start the
activity.
2,Survey work Vehicle/equi Employyes may 4 3 12 Close supervision and 2 2 4 Site M NO
on existing pment hit by moving monitoring by competent
Supervisor
traffic. moving in vehicles/equipm supervisor.
service ent and get Existing site traffic must /
access. injured. be controlled by HSJV to
providing adequate monitor
warning signages and
third party certified
flagmen,
-3-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
-4-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
Loading and M NO
B, unloading of Equipment 4 4 16 Ensure adequate 2 2 4 Subcontrac
failure may lead maintenance and daily
1,Loading and equipments tor
to roll over of inspection of equipments
Off loading of from and to other as per the manufactures supervisor.
equipments by Low bed equipments to instruction manual.
from and to the trailer. the Faulty equipment to be HSJV area
Low workers/property repaired/replaced on supervisor
bed/Trailer. will cause time. to monitor
serious While unloading/loading
injury/fatality/pro employees must be keep
perty damage. away in a safe distance.
Use adequate PPE.
Ensure effective
supervision.
2, Loading or Loading and Loading trailer 4 3 12 Only use competent 2 2 4 M NO
Offloading in unloading in can topple and operators/drivers. Subcontrac
un even uneven
employees get Prior to loading/unloading tor
injured/property check the surface and
surface. surface. can damage. ensure even. supervisor.
Ensure correct parking
and use of parking brake HSJV area
and placement of stop supervisor
blocks. to monitor
-5-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
-6-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
-8-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
-9-
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
2,Road work- Laying of By hitting by moving 4 4 16 All the operators must be 2 2 4 M YES
Laying of sub sub vehicle follow safe defensive Subcontrac
workers/other driving techniques while
base ,base base/base tor
people can get driving in working area.
course & course by injury/may lead to All the equipments must supervisor.
graval by laying and fatality. be provided with
laying and compacting revolving light and HSJV area
compacting machine reverse alarm. supervisor
equipments. near other Trained and third party to monitor
certified banks man must
people’s/wo
be available with all the
rkers. equipments.
Adequate supervision
must be available.
Pre-job meeting to be
conducted prior to start
the activity.
3,Road work- Laying of Workers may struck 4 4 16 Proper road traffic 2 2 4 M YES
with moving management must be
Laying of sub sub
arranging with adequate
Subcontrac
equipments and get
base, base base/base warning signage’s. tor
severaly
course & course by injured/property Trained and third party supervisor.
graval by laying and certified banks man must
damage by hitting
be available with all the
laying and compacting equipments. equipments. HSJV area
compacting machine All the operators must be supervisor
equipments. near other trained and competent as to monitor
per the project & Legal
vehicle/equi
requirements.
pment All the equipments must be
moving equipped with revolving
area. lights and reverse alarm.
Close supervision must be
done by competent
supervisor.
Engage minimum number
of people near the
equipment moving area
- 10 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 11 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 12 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 14 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 15 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 16 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 17 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 18 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 19 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 20 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 21 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
- 23 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
L, Excavation near Contact with live 4 3 12 Refer the approved 2 2 4 Subcontrac M YES
1, Excavation or on existing existing utilities will drawing of area by tor
lead injury to competent person to
and back filling. underground supervisor.
workers/operators/d identify existing
utilities by amage to the underground services.
excavator. properties. The identifying services HSJV area
must be marked to supervisor
prevent accidently to monitor
contact by equipments.
Close supervision to be
provided.
Use the Cable Avoidance
Tool device to identify if
any live electrical cables
in that area.
Pre-job meeting to be
conducted prior to start
the activity.
Follow KEPCO
procedure
P-28-Excavation.
2, Excavation Mechanical 4 3 12 Good planning and 1 3 3 Subcontrac M YES
and back filling. excavation on Excavation collapse experienced personnel to tor
will lead injuries to be deployed at work
loose soil near supervisor.
workers, place.
other operators&equipme A person having
excavation. nt damage. competency to look after HSJV area
excavation/trench safety supervisor
and daily checklists. to monitor
Excavated soil must be
stacked a minimum
distance of one meter
from the edge of
excavation.
Follow the safe
angle/step system to
prevent collapse of
- 24 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
excavation edges.
Avoid the formation of
cave in during the time of
excavation.
Loose soil areas to be
protected by
shoring/shielding
supports to prevent
collapse.
Excavated areas must be
barricaded and adequate
warning signages to be
placed.
Excavation near the live
cable must be carried out
manually or by keeping
1.5 m distance for
mechanical excavation.
3, Excavation Excavation by Equipment failure 4 3 12 All the equipments must 2 2 4 Subcontrac M YES
and back filling. using will lead accidents be inspected and colour tor
and cause injury to coded as per the BNPP
excavator. supervisor.
adjacent procedure prior to use at
workers/operators/d site.
amage to the All the equipments must HSJV area
properties. be maintenance/service supervisor
on time to prevent to monitor
unwanted
breakdown/mishaps.
Use
competent/experienced
operators/drivers.
Ensure the daily check-
up and proper
maintenance of
equipments as per the
manufactures instruction
manual.
- 25 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
Supervisors should be
co-ordinate/communicate
with adjacent contractors
to re-route/shut down any
live cable routed nearby
excavation area.
Follow KEPCO
procedure.
P-43-Plant and
equipment.
- 26 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
5, Excavation Excavation and Uneven surface will 4 3 12 Use the correct type of 2 2 4 Subcontrac M YES
and back filling back filling on affect the stability of material for back filling. tor
by using uneven surface.
equipments wrongly Removed the large rocks supervisor.
and it may fall and from the backfilling
equipments. can cause injuries to material.
(excavator& adjacent Watering the ground on HSJV area
Wheel loader) workers/operators/d regular basis & proceed supervisor
amage to the the compacting. to monitor
properties.
6, Excavation Excavation and Workers may 4 3 12 Barriers, reflective 2 2 4 Subcontrac M YES
and back filling back filling by struck/entrap with signages and safety tor
moving posters will be erected to
by using equipment s supervisor.
vehicles/equipments keep unauthorized
equipments. near site traffic. and get severaly personnel clear and
(excavator& injured/property monitoring traffic near the HSJV area
Wheel loader) damage by hitting working area. supervisor
equipments. Competent flagman’s to be to monitor
deployed for equipment
and truck movements.
All the workers must be
undergone excavation
safety training prior to
start the activity.
Pre-job meeting to be
conducted prior to start
the activity by supervisor
and keep the records.
Safe access and egress
to be provided
To be provide adequate
PPEs for workers.
Follow KEPCO
Procedure
P-28-Excavation.
P-42-Machine&Hand tool
P-09-Signs&Barricading.
- 27 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
Manual Digging by The workers can get 4 3 12 All hand tools should be 2 1 2 Subcontrac L YES
excavation. using hand cut injuries due to maintained defect free. tor
tools.
improper use/with Safe storage of sharp supervisor.
damaged hand hand tools.
tools. Ensure adequate
supervision. HSJV area
supervisor
Workers must attend the
to monitor
training of hand and
power tools prior to start
the activity.
Adequate/appropriate
PPE to be provided.
Return the hand tools
after the task.
Follow KEPCO
procedure
P-42-Machine&hand
tools.
Manual Manual Contact with live 4 3 12 Refer the approved drawing 2 1 2 Subcontrac L YES
existing utilities will of area by competent
excavation excavation near tor
lead injury to person to identify existing
or on existing underground services. supervisor.
workers.
underground The identifying services
utilities by hand must be marked to prevent HSJV area
accidently contact by supervisor
tools. equipments. to monitor
Close supervision to be
provided.
If possible use the CAT
device to identify if any live
electrical cables in that
area.
Pre-job meeting to be
conducted prior to start the
activity.
Follow KEPCO procedure
P-28-Excavation.
- 29 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
Manual Manual digging The workers can get 3 3 9 All the workers must be 2 1 2 L NO
excavation. for road sign muscle stress and completed basic trainings Subcontrac
physical fatigue due including safe manual
board tor
to unsafe handling techniques prior
installation. posture/poor manual to start the activity. supervisor.
handling techniques. Use wheel barrows for
transferring inter lock HSJV area
tiles one location to other supervisor
location. to monitor
Keep safe posture for the
work.
Do not over reach for
laying tiles.
Use appropriate and
adequate PPPs.
P-39-Manual handling.
- 30 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Hazards 1st Risk 2nd Risk
Hazardous Assessment Assessment Action by Residual PTW
Key Stages Consequence Control Measures (Due date) Risk Needed
Activity LS CS
(Who and how) RATING LS CS RATING
General Risk
4 3 12 3 1 3
Extreme weather Working in Workers Closed supervision in place especially out Site L NO
involve door works.
inhalation of dust supervisor
may occur
and particles. Stop and review work if wind average wind /
lungs
effect due speed for 10 minutes is over 35 Kph or 10 [HSJV
to m/s.
Monitor]
inhalation Tie-down/stabilize potentially mobile
of dust. materials.
Ensure the weather report received before
sarting work.restrict access to work areas.
Follow KEPCO Procedure:
P07- Emergency Response
Working under Workers 4 2 8 Follow mid day break rule during the 2 2 4 YES
General outdoor day adverse condition can get summer. Subcontr M
working. such as high heat stress Provide portable drinking water. actor
temperature or high due to supervis
Water container must be kept clean and
humidity. dehydratio or.
daily inspect and update the seal.
n.
Rotation of work force,shift working. HSJV
Follow the TWL regulation and BNPP flag area
system. supervis
AC recovery rooms are avilable. or to
monitor
First aid facilities must be avilable.
The workers should attend heat stress
awareness training.
- 31 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Working in low light The 4 2 8 Enough lighting should be provided 3 1 3
Night Working which is difficult to workers minimum 55 Lux outdoors. Site L NO
distinguish the may be get All workers should wear high visibility supervisor
jacket/vest and clear glasses in night shift.
objects and injury in a /
Ensure that the work place access and
access&egress. collision or [HSJV
egress safe and secure.
fall,trip slip Ensure adequate supervision. Monitor]
due to Follow KEPCO procedure
insufficient P-33 Night Working.
illumination
.
Access and Egress to Walking/step on Wokers can 3 3 9 Route of entry must be define multiple 2 1 2 Subcontra L No
working area. uneven/unsafe trip/slip/fall and entry/exit points ctor
accessess. will get injured. Ensure access and egress area free from supervisor
obstructions. .
Entry/Exits points must be properly
illuminated and directional signs posted. HSJV
Provide safe walk ways on the top of area
reinforcement bars. supervisor
to monitor.
- 32 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Working in poor Collision between Workers can 4 3 12 Workplace to be well illuminated(outdoor: 3 1 3 Site L NO
min .55 lux, indoor: min.100
visibilty/dusty/foggy vehicle/equipment. get personel supervisor
lux.(emergency exit route indoor:min.110
conditions injuries due to /
lux)
the poor Movable materials by wind to be tied [HSJV
visibility. down. Monitor]
Provide proper lghtings when
waste/materials handling and
housekeeping.
Keep wearing visiblity vest.
All working equipment/vehicle should keep
light/beacon on with alarms.
Ensure that work areas are clean and free
from unnecessary scattered materials to
avoid slip and trip.
Remove spills immediately to avoid slips.
Do not run,kkep eyes on the path whilw
walking,and be aware of surroundings.
Install barricades and barriers in the work
area and ensure proper signage shall be
posted.
Follow KEPCO procedure.
P09-Signs,Signals&Barricades.
Housekeeping Genreal housekeeping Workers can 3 3 9 Dust mask and gloves to supplied 2 1 2 Site L NO
and cleaning of working get illness adequate resource to be used for manual supervisor
area. /injury by poor handling tasks. /
manual Proper positioning while doing manual lift. [HSJV
Manual handling training.
handling/inade Monitor]
Follow KEPCO Procedure:
quate PPEs.
P14- Housekeeping
P39- Manual Handling
- 33 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure
Signature/ Signature Signature Signature
Prepared by: Name Review by: Name Verified by: Name Approved by: Name
Date / Date / Date / Date
Contractor
Sub- Contractor KEPCO
Site
Contractor Construction Construction
manager
Site Manager Manager Manager
HSJV KEPCO
Position: Position:
Date:
Date:
- 34 -
JHA-Earthwork for PPS Civil & MEP 3&4 Arch. Structure