GENERAL PROVISIONS
SECTION 101. Title
“Revised Implementing Rules and Regulations of National Building Code of the Philippines
The “IRR”
1
SECTION 104. General Building Requirements
All buildings or structure
o safe construction
o suited to the purpose (functional)
observe adequate environmental safeguards for
o buildings for manufacture and/or production of products
all buildings and parts
o maintained
in safe, sanitary & good working condition
SECTION 105. Site Requirements
the site should be
o sanitary,
o hygienic or
o safe
abode or houses
o safe distance from (determined by competent authorities)
bodies of water
sources of polluted air
volcano or volcanic site
risky buildings - fire or explosion
2
Assembly of all the components
Installation of utilities, machineries and equipment
CONVERSION - change in the use or occupancy of buildings/structures or parts
Which has different requirements
DEMOLITION - systematic dismantling or destruction of a building/structure, in whole or in
part
DEPARTMENT – DPWH
EXECUTIVE DIRECTOR - The Executive Officer or Head of the NBCDO
National Building Code Development Office
MOVING - transfer of buildings/structures or part
Same lot or not
OFFICE OF THE BUILDING OFFICIAL (OBO) - authorized to enforce the provisions of the
Code and its IRR
REFERRAL CODES – applicable provisions of other agency and technical professional
codes
That are supplementary to the code or
Can be added to the code
RENOVATION - Any physical change made on buildings/structures
to increase the value & quality
to improve the aesthetic
REPAIR - Remedial work on any damaged or deteriorated portion/s
restore to its original condition
SECRETARY – Head or Chief Executive Officer of DPWH
STAFF – The personnel of the National Building Code Development Office (NBCDO).
RULE 2
ADMINISTRATION AND ENFORCEMENT
SECTION 203. General Powers and Functions of the Secretary under this Code
Formulate
o policies,
o plans,
o standards
3
o guidelines on
building design,
construction,
use,
occupancy and
maintenance, in accordance with the law
Issue of promulgate (ipaalam) rules and regulations (in form of Memorandum Circulars) to
o Implement the provisions of the code
o Ensure compliance with
Policies
Plans
Standards and
Guidelines
o Issue office guidelines or Memorandum Circulars to guide the actions of the Building
Official
in the performance of his duties and responsibilities
jurisdiction over the decisions and orders of the Building Official.
o Order or decision of the Secretary shall final and executory
o subject only to review by the Office of the President of the Republic
Referral Codes
o Evaluate, review, approve and/or take final action on changes and/or amendments to
existing referral codes
o incorporation of other referral codes which are not yet expressly made part of this Code
Prescribe and impose the amount of fees and other charges
o the Building Official shall collect in connection with the performance of regulatory
functions
Appoint a Building Official,
o separate and distinct from the Office of the City/Municipal Engineers
o in all Cities and Municipalities
4
o on PD 1096 and its IRR conducted by the DPWH
5. Upon complaint or motu propio and after due notice/s and hearing, initiate action towards
o Non-issuance, suspension, revocation and/or invalidation of a building permit or
certificate of occupancy
o Issuance of work stoppage order,
or an order for discontinuance of the use or occupancy of the building/structure
or portion
o Declaration of a building/structure as ruinous or dangerous;
o The imposition of appropriate fines/penalties
6. Submit a quarterly situational report to the Secretary through the NBCDO
o status of all existing, on-going, and proposed public & private building/structure
activities
7. Undertake such other duties and tasks as may be assigned by the Secretary from time to time
5
Procedure for the proper reporting and recording of collections and disbursements of the funds of the
Office of the Secretary of the DPWH
Recording of Collections
o Every Building Official shall keep a permanent record and accurate account of all fees
and other charges
o The Order of Payment issued by the Building Official
share of the local government concerned - 80%
share of the national government - 20%
o Every Building Official shall keep a separate record from the DPWH Central Office of
all
Allotments - Special Allotment Release Order (SARO)
Notice of Cash Allocation (NCA)
Funding Checks
from Department of Budget and Management (DBM)
funds shall cover all the necessary operating expenses of the OBO including
purchase of equipment
supplies and materials, etc
subject to existing budgetary and auditing rules and regulations
o He shall render the reports required under the Centralized Accounting System
Disposition of Collections
o collection shall be made by the Local Treasurer
share of the local government concerned - 80%
share of the national government - 20%
o Local Treasurer shall remit to the Bureau of the Treasury, the 20% of his collection
The remaining 80% shall be deposited with the Authorized Government
Depository Bank (AGDB)
for the account of the Local Government
6
and shall accrue to the general funds of the City or Municipality
concerned
Administrative Fines
o Light Violations – 5,000.00
Failure to post Certificate of Occupancy/Use/Operation
Failure to post Building Permit construction information sign
Failure to provide or install appropriate safety measures for the protection
of workers, inspectors, visitors, immediate neighbors and pedestrians.
7
Non-compliance with order to abate or demolish
Non-compliance with work stoppage order for construction/demolition without
permit
Change in the existing use or occupancy without Certificate of Change of
Occupancy/Use/Operation
Excavations left open without any work being done in the site for more than
one hundred twenty (120) days.
Penalty or surcharge
o Iba pa to dun sa fines kanina
o pagnapatunayang naviolate mo yung mga knina may fine ka
o then syempre para matuloy yung construction magaapply ka ng karampatang permits
o dun papasok tong mga penalty na to sa permit fees
8
Structural hazard
o any building/structure or portion thereof has been damaged by
fire, earthquake, wind, flood, or by any other cause
to such an extent that the structural strength or stability thereof is materially
less than it was before
less than the minimum requirements of the National Structural Code of the
Philippines (NSCP)
o any portion or member or appurtenances thereof is likely to
fall, or to become detached
o any portion of a building/structure or any member, appurtenance or ornamentation on
the exterior
not of sufficient strength or stability, or is not anchored, attached or fastened
in place
not capable of resisting a wind pressure of one-half of that specified in the
NSCP for such type of buildings
o exterior walls or other vertical structural member lean or buckle
a plumb line passing through the center of gravity does not fall inside the
middle one-third of the base.
o the foundation
supporting member or members - shows 33% or more damage or deterioration
non-supporting members, enclosing or outside walls or coverings - 50%
o building/structure has been so damaged by fire, wind, earthquake or flood, or has
become so dilapidated or deteriorated
an attractive nuisance to public
harbor for vagrants (pulubi), criminals or immoral persons,
a resort for purposes of committing unlawful or immoral acts
o strength, fire & weather resistant qualities
non-supporting members – < 50%
supporting members - < 66%
o remains of demolished building
o abandoned building/structure or portion
more than 12 months
became nuisance or hazard to the public
Fire hazard
o Yun nga if may parts, equipments or vegetation na pwedeng magcause ng fire
Or makapagpabilis ng kalat ng apoy
Like dun sa Grenfell Tower fire incident sa London
Aluminum cladding with a core material –
o may palaman na polyethylene which is combustible
o no fire retardants
o meron naming fire retandant na ganung materials pero yung
ginamit nila yung normal lang yung wala
o buildings/structures or portions not provided with the required
fire-resistive or
fire-protective construction or
fire-extinguishing system or equipment
o not of sufficient width or size
door, aisle or other means of exit
or not arranged to provide safe means of exit in case of fire
o any building/structure in violation of the Fire Code PD 1185
9
Unsafe Electrical Wiring
o All wiring systems or installations
Non-compliant in the latest Philippine Electrical Code
Unsafe Mechanical Installation
o Mechanical systems or installations not conforming to the Philippine Mechanical
Code.
o Lack of or improper operation
required ventilating equipment or air-conditioning systems
Inadequate Sanitation/Plumbing and Health Facilities
o All sanitation and plumbing systems or installations
not conforming to the Code on Sanitation of the Philippines and the Revised
National Plumbing Code
o Infestation of insects, vermin or rodents and
lack of adequate control for the same
o Lack of adequate garbage and rubbish
storage and removal or disposal facilities.
o Source of pollution
Architectural Deficiency
o All buildings/structures or portion thereof used or occupied for
purposes other than their intended uses.
o Improper/Unauthorized Occupancy/Location
o Insufficient amount of natural light and ventilation
due to inadequate open spaces such as
courts and yards as required.
o Inadequate sizes of
rooms and
space dimensions and
window openings
o Dilapidated, blighted and other unpresentable buildings/structures against generally
accepted aesthetic standards. (di kaaya-aya sa paningin)
10
o Closure of building/structure
Malilift lng yung closure if maayos yung defects
Decision of BO is final after 15 days
o Owner has also 15days to vacate or cause to be vacated, repaired, renovated,
demolished and removed
o If may appeal si “D” suspended ang 15 days
o If yung motion for consideration ni “D” is denied (yung appeal) proceed yung 15 days
Kung ilang araw nalang natitira yun na lang ang time ni “D” para maperfect nya
yung appeal
o If na approved naman yung motion for considerqation ni “D” si “C” may 15 days para
maperfect nya yung appeal nya (macounter)
pag nafinal na decision ni BO
o 15 days - time limit to appeal ang desisyon ni BO to Secretary
o If the appeal to the secretary is meritorious
Secretary may designate a competent representative/s
to undertake the re-inspection or re-investigation of the building/structure
to complete reports within the period of thirty (30) days from the date
of termination of re-inspection or re-investigation
If after investigation the findings is the same (hazardous)
o the Secretary through the Building Official shall notify the owner
o not more than fifteen (15) days to vacate and make necessary repair, etc. to the
building
o owner shall secure permits within that 15 days
Upon failure of the owner to comply after fifteen (15) days
o the Building Official shall cause the building or structure to be repaired, etc.
all expenses chargeable to the owner
the building materials gathered after the demolition
o shall be held by the OBO until full reimbursement of the cost is made by the owner
not more than 30 days from completion of repair, etc.
o after 30 days materials shall be sold to public auction
to satisfy the claim
any excess amount from the sale shall be delivered to owner
Enforcement and execution
o BO secure assistance of local police or any peace officer in the locality
11
o Accessory Permits for activities being undertaken prior to or during the processing
of the building permit
ground preparation and excavation
fence not exceeding 1.80 meters high
sidewalk construction
erection of scaffolding
12
SECTION 302. Application for Permits
In case the applicant is the registered owner of the lot:
o Certified true copy of OCT/TCT, on file with the Registry of Deeds,
o Tax Declaration
o Current Real Property Tax Receipt
In case the applicant is not the registered owner of the lot, in addition from above
o notarized copy of the Contract of Lease or
o Deed of Absolute Sale
5 sets of plans, specifications and other documents
o signed and sealed over the printed names of the duly licensed and registered
professionals
Architectural Documents
o Architectural Plans/Drawings
Vicinity Map/Location Plan for
commercial, industrial, and institutional complex –
o 2.00 kilometer radius
residential buildings
o ½ kilometer radius
Minimum scale 1:100
Civil/Structural Documents
o Boring and load tests
(3) storeys and higher
lower buildings/structures at areas with potential geological/geotechnical
hazards
13
14
Then evaluates other documents
o Civil/Structural
o Electrical, etc
15
SECTION 305. Validity of Building Permits
Grounds for expiration and nullification of building permit
o within a period of one (1) year after the issuance of the building permit
if building or work authorized therein is not commenced
o work suspended or abandoned for 120 days
16
RULE IV - TYPES OF CONSTRUCTION
SECTION 401. Types of Construction
Type I - wood construction
Type II - wood construction with one-hour fire-resistive throughout
Type III - masonry and wood construction, incombustible construction for wall
building shall be one-hour fire-resistive throughout
Type IV - shall be steel, iron, concrete, or masonry construction
Incombustible construction for walls, ceiling and permanent partitions
o permanent non-bearing partitions of one-hour fire-resistive construction
may use fire-retardant treated wood within the framing assembly
Type V - shall be four-hour fire-resistive throughout and
o the structural elements shall be of steel, iron, concrete, or masonry construction
17
SECTION 507. Designation of Fire Zones
Fire-resistive Standards
Table for fire resistive ratings
18
RULE IX – SANITATION
19
The clearance between the established grade of the street and/ or sidewalk and the lowest
under surface of any part of the balcony
o shall not be less than 3.00 meters
20
SECTION 1005. Canopies (Marquees)
permanent roofed structure above a door attached to and supported by the building and
o projecting over a wall or sidewalk
Projection and Clearances
o horizontal clearance between the outermost edge of the marquee and the curb line
shall be not less than 300 mm
o vertical clearance – 3 meters
Construction
o incombustible material or materials
o not less than 2 hr fire resistivity
o It shall be provided with necessary drainage facility
Location
o not to interfere with the operation of any exterior standpipe connection
o not to obstruct the clear passage from stairway exits from the building or the installation
or maintenance of electroliers
21
o horizontal clearance between the awning and the curb line shall not be less than
300mm
o vertical clearance – 2.4m
22
SECTION 1107. Maintenance and Removal of Protective Devices
Ladders
if no temporary stairways or runways are required,
ladders shall be provided to give access to all floors, stagings or platforms
o more than five (5) storeys above
max 6 m length
landing 1.20m square with handrails and toe boards
300mm ladder rung spaces
Min 900mm extension from floor, staging or platforms
If serving both directions min 1m wide
Temporary Stairways
If permanent stairways are not applicable
o 1 temporary stairway for more 18m building height
Height of 2 stairs & width of 1 tread
o 460mm-700mm
Min. 900mm width
Landings
o Min 750mm long
Flight
o Max 3.6m
Runways and Ramps
Max slope 1:3
Max rise between landings 1.8m
If slope is more than 1:3
o Cleats with max spacing of 20mm
Guardrails and Toe Boars
Top rail min 900mm height
o Max 2.4m apart support
Toe Boards 150mm max
o Max 1.2m apart support
23
o attached to a backing or structural components of the building
o for the purpose of ornamentation, protection, or enclosure
Shall not support load except
o Its own weight
o Vertical dead load of veneer immediately above
SECTION 1207. Stairs, Exits, and Occupant Loads
Occupant load
The total number of persons that might occupy a building or portion thereof at any one time
The number of persons for which the means of egress of a building or portion thereof is
designed
Determination of Occupant Loads
Determination of Occupant Loads
o divide the floor area assigned to that use by the unit area allowed per occupant
if not provided on the table
o use the most nearly resembles occupancy
if fixed seats
o number of installed fixed seats
occupant load can be increased if necessary exits are provided
Exception
Accessory areas
o Occupant load of this area should not be included in computing the total occupant load
of the building
Changes in elevation
Except in Group A occupancies
o Change in floor elevation of along exits less than 300m with 10 or more occupant load
By means of ramp
Table XII.1. General Requirements for Occupant Loads and Exits*
24
Exits
Every building or usable portion shall have
o at least 1 exit
Floors above ground floor with more than 10 occupant load
o 2 exits min
Mezzanine not use for storage
o More than 185 sq.m
o More than 18m in any dimension
o 2 stairways to an adjacent floor
Every storey or portion thereof
o 500-999 O.L. – 3 exits
o 1000 or more – 4 exits
o For multi storey buildings additional occupant load
50% of occupant load in the first adjacent floor
25% of occupant load in the storey immediately beyond the first adjacent
storey
Floors above the second storey, basement and cellars use other than service of the building
o Min 2 exits
AUDITORIUM 5mx10m
OCCUPANT LOAD
total area 50 sqm
classroom unit area per 0.65 sqm
occupant
total occupant load 30/1.8
76.92308
77 OC
EXIT
more than 50 OL 2 exits
Width of exits
o Total width of exits
Not less than occupant load divided by 165
For example
77 OL divided by 165 = 0.47m
Total width for 2 exits
Arrangement of exits
o 2 exits – 1/5 of the perimeter (distance to each other)
o For example
Total perimeter = 30
30 / 5 = 6m max distance
Distance to exits
o w/o sprinkler – 45m
o w/ sprinkler – 60m
25
Doors
All provisions are for more than 10 OL
Swing
o Swing in the direction of exit
Hazardous areas
50 or more OL
o Double acting doors
Shall not be used as exits serving more than 100 OL
Shall not be used as part of fire assembly, nor equipped with panic hardware.
View panel min. 1300 sq.cm
Type of lock or latch
o Exit doors should be openable from the inside
o Except
Exit doors for Group E or F occupancy
if there is a conspicuous, readily visible and durable sign
stating that the door is to remain unlocked during business hours.
o Flush bolts or surface bolts are prohibited (usually for double doors on top or bottom)
Width and Height
o Min width – 900mm
o Min height – 2m
o Can be open at least 90 degrees
Door leaf width
o Max 1.2 m
Special Doors
o Don’t use as exit
Revolving, sliding and overhead doors
Change in floor level at doors
o Floor or landing shall be leveled on each side of exit door
Or 50mm lower than the threshold of the doorway
o Group A & B occupancies
May open on the top of a flight of stairs or an exterior landing
The door does not swing over the top step or exterior landing
Max 200mm below the floor level
26
Stairways
Width
o More than 50 OL – min. 1.10m
o 50 OL or less – min. 900mm
o Less than 10 OL – min. 750mm
o Trim and handrails max 100mm
Rise and Run
o Rise max 200mm, Run min. 250mm
o 5mm tolerance
Winding Stairways
o In group A and in private stairways in Group B
o Max 300mm from narrower side – 250mm
o Min. 150mm width at any point
Circular Stairways
o Run min width – 250mm
o 5mm tolerance
Landings
o Landing dimension equal to stairway width
o Max 1.2 for straight run
o Max 100mm projections – doors when fully opened, trims and handrails
Basement Stairways
o Where a basement stairway and a stairway to an upper storey
terminate in the same exit enclosure
an approved barrier shall be provided
to prevent persons from continuing on to the basements
Directional exit signs shall be provided
Distance Between Landings
o Max 3.60 m vertical distance between landings
Handrails
o Stairways should have handrails in each side
o If stairway required to be more than 3.0m in width
1 intermediate handrail
o Intermediate handrails
shall be spaced approximately equal within the entire width of the stairway
o Height from treads nosing
800 – 900mm
Shall returned or terminate in newel posts (???????) or safety terminals
1.10m stairs or less or stairway serving individual dwelling unit in Group A & B
May have 1 handrail
If both side is open – both sides should have handrails
o If less than 4 risers – handrails not required
Stairway Construction
o Interior – 1 hr fire resistive for walls and soffits enclosing the usable space under the
stair
o Exterior
Incombustible materials
Stairway to Roof
o Buildings with 4 or more storeys in height – 1 stairway shall extend to the roof
o If the roof slope is not greater than 1:3
Headroom
o Min 2.0m
27
Ramps
Ramps width same provisions for corridors
Horizontal Exit
Ambulatory occupant – 0.30 sqm
Non-ambulatory occupant – 1.90 sqm
Exit enclosure
Interior stairway, ram or escalator shall be enclosed
Group D Occupancy stairway, ramp or escalator serving only one adjacent floor and
o not connected with corridors or stairways serving other floors
o may not be enclosed
o also Group-A Occupancy stairs
min 2 hr fire resistivity
shall be no openings except
o exit doorways and opening in exterior walls
Smokeproof Enclosures
vestibule and a continuous stairway enclosed from the highest point to the lowest point by
walls
2 hr fire resistive
5 storey or more buildings – 1 smokeproof enclosure required
Access through a vestibule 1 wall 50 % open 1 door from building interior and 1 door leading
to the enclosure or open exterior balcony
Opening from building interior
o Self-closing door with 1hour fire resistivity
Exit to the public way or exit passageway (no openings 2 hr fire resistive enclosure) leading to
public way
Aisles
Width – cross aisles or foyer minimum at the point farthest from the exit
o 1 side – min 800mm
o 2 sides – min 1m
o + 30mm every m towards the exit
Side aisles
o Min 1.10m width
Exit distance
o In areas occupied by seats or Group H & I Occupancies
Line of travel to an exit door by an aisle – max 45m
o Aisle spacing
28
Between the wall and an Aisle - max 7 seats
Between aisles – max 14 seats
May increase to 30 if
o Provide 1 pair of exit door in each side every 5 rows
o Seat distance back to back is 1m min
o Provide 1.7m exit doors width
Cross aisles
o Aisles shall terminate in a
Cross aisles, foyer or exit
o Min width
Widest aisles plus 50% of the total required width of the remaining aisle leading
thereto
o In group C, H and E
Max 6m dead end of aisles is allowed
Vomitories
Min width
o Widest aisles plus 50% of the total required width of the remaining aisle leading thereto
Seats
Spacing
o Row spacing back to back – min. 840mm
o Continental seating clear spacing
18 seats or less – 450mm
35 seats or less – 500mm
45 seats or less – 525mm
46 seats or more – 550mm
Width
o Min 450mm
Reviewing Stands, Grandstands, and Bleachers
Height
o Combustible framing materials – max 11 rows or 2.m height
Spacing of seats
o Seats w/o back rest – min 600mm back to back in open air stand
o With back rest – min 750mm
o Chair seating – min 850mm
Rise between rows
o Max 400mm
Seat width – 450mm – 480mm
Number of Seats Between Aisles
o max 15 seats
Open air stands w/o backrest
far open air stands with backrests
seats without backrests within buildings
o max 6 seats
for seats with backrests in buildings
w/o aisles
o w/o backrest
o max rise 300mm
o max number of rows 11
o max height of top seating board is 3m
o max height of 1st seating board is 500mm
o aisle min width – 1.10m
o aisle dead end – max 16 rows
29
Stairs
o Max rise 200mm, min run 280mm
Ramps
o Max slope 1:8
Exits
o Max line of travel – 45m
If w/o seat can be straight line
o Aisle can be considered exit if
Both ends access to a legal building exit or to a safe dispersal area
o 2 exits
1st seating board not more than 500mm open ends at the bottom of stand
Inside the building max 50 persons
Open air stands w/o backrest max 300 persons
o 3 exits
Inside the building more than 300 persons
Open air stands w/o backrest more than 1000 persons
o 4 exits
More than 100O occupants all except
Open air stands w/o backrest more than 3000 persons
o Width of exits
Min 1.10m width
o Location of exits
If 2 exits only – min 1/5 of the perimeter
Special hazards
Boiler rooms
o Except in Group A
o 2 egress 1 can be a ladder
Cellulose Nitrate handling – 2 egress
30
o Locations
Enclosed stairway landings or near it
Within 300mm from an opening of a smokeproof tower
An outside exit stairway
o Siamese connection
100mm – 2 siamese fire department connection
125mm – 3 siamese fire department connection
150mm – 4 siamese fire department connection
Located on a street front of the building
300mm to 1.20m above grade
o Outlets
63mm outlet max 1.20m above floor level at each storey
2-way 63 mm outlet if above the roof
Wet Standpipe
o Every Group H and I Occupancy of any height\
o Group C Occupancy - (2) or more storeys in height,
o Group B, D, E, F and G Occupancy – 3 storey or more\
o Group G and E Occupancy over 1800 sq.m in area
o Exception
Group H buildings w/o stage and less than 500 seating cap.
o Size
Min internal diameter of standpipe – 50mm not attached to an automatic fire-
extinguishing system.
o Number
All portions of the building should be within 6m of a nozzle attached to a 23m
hose
o Location
Group H and I Occupancies – 500 or more OL
1 of each side of the stage
1 at the rear of the auditorium
1 at the rear of the balcony
Group B, C, D, E, F and G same as dry standpipes
o Outlets
38mm, 0.30m – 1.20m height
31
SECTION 1302. Mechanical Regulations
Elevators
Hoistway pits
o Should have min. of 600mm clearance between underside of the car and bottom of
the pit when the car rest on a fully compressed buffers
If 4 or more elevators
o Min 2 hoistways
o Max number of elevators per hoistway – 4 elevators
Min number of hoisting ropes
o Traction elev. – 3
o Drum type elev. – 2
Min. diameter of hoisting and counterweight ropes
o 30mm
In apartments or residential condo of 5 or more storeys
o Min 1 passenger elev kept on 24 hrs constant service
Escalators
Max 30˚ from horizontal
Balustrade width – 560mm to 1.2m
Speed rate along angle of inclination – max 38m per minute
Refrigeration and Air Conditioning
Effective temperature for comfortable cooling - 20˚ to 24˚ Celsius
Effective humidity of air – 50% to 60%
Air movement – 4.60 to 7.60 meters per minute
32
RULE XVIII – GLASS AND GLAZING
Table for glass area limitation for use in large area along shopping malls, commercial buildings,
theaters, offices, institutional public buildings and factories other except
Group A, B and J Occupancies
RULE XX – SIGNS
Projecting Signs
Non arcaded RROW
o Max 1.20m extension over the sidewalk
Arcaded RROW
o Max 0.60m from the outermost portion of the arcade
If without sidewalks
o Max 0.30m
Vertical Clearance
o w/o arcade – min. 3.0m
o w/ arcade – min. 5.0m
Neon signboards or other advertisement
clear distance between signboards – min 4.0m
sign board shall be on the same vertical lines
top of signboard shall not extend beyond parapet or bottom of roof eaves
2 adjacent buildings
o Min. 2.0m from the common boundary lines
See figure xx.3
Study illustrations
33
RULE 7 & 8
SECTION 701 – CLASSIFICATION OF OCCUPANCY
General
o No building shall be constructed unless it adjoins or has direct access to a public space, yard
or street on at least one of its sides.
o Eaves over required windows shall not be less than 750 millimeters from the side and rear
property lines.
Building Footprint & Firewall requirements
34
Footprint based on Firewall Provisions
o Measuring Building Footprint with firewall
35
1 side and rear firewall
Side - max 65%
Rear – max 50%
All firewalls shall not exceed 60% of the perimeter
Side Firewall allowed for a Max for 8 storey only
Rear firewall max 14 m height
o Commercial, institutional and industrial building
Allowed 70% of perimeter if provided with functional sprinkler system or other
fire suppression devices
36
Establishing grade
37
Other Considerations in Height Determination
Factors
o Base on Building Bulk
< PSO (Percentage of Site Occupancy), AMBF (Allowable Maximum Building
Footprint) or MACA (Maximum Allowable Construction Area) – higherVice versa
o > TGFA (Total Gross Floor Area) – higher
o Higher FLAR (Floor to Lot Area Ration) – higher
o Wider RROW – higher
RROW-based Limitations
Other Factors
o Mostly Geographic Conditions
38
OBSTACLE LIMITATION SURFACES FOR AERODROMES WHERE TURBO AND NO TURBO JETAIRCRAFT
OPERATES
39
OBSTACLE LIMITATION SURFACES FOR
AERODROMES WHERE TURBO AND NO TURBO
JETAIRCRAFT OPERATES
40
OBSTACLE LIMITATION SURFACES FOR
AERODROMES WHERE TURBO AND NO
TURBO JETAIRCRAFT OPERATES
41
ATO Air Transportation Office
rules and regulations shall govern the construction of buildings/structures within
o 24 KM radius – where turbo-jet aircraft operate
o 10 KM radius – where non turbo-jet aircraft operate
The height of buildings/structures within this area shall be limited by an imaginary line with slope of
o 2% (1:50) for aerodromes where turbo-jet aircraft operates
o 2.5% (1:40) for aerodromes where no turbo-jet aircraft operates
A height clearance permit shall be first secured from the Air Transportation Office (ATO) before a building
permit may be issued for the construction of buildings/structures located:
o Within 4 KM radius of the runway ends of an aerodrome regardless of height
o Turbo jet - From 4KM to 24KM radius of the runway ends more than 45m in height
o Non- turbo jet - From 4KM to 10KM radius of the runway ends more than 45m in height
42
R-2, R-3, GI, C, C-2 and C-3 front yard uses
o Driveways
o Off RROW loading spaces
o Short term off-RROW parking
o Landscaping
Basic R-2 and Basic R-3 (single family dwellings only)
o 50% of the front yard may be paved/hardscaped for carport use
43
Table VII.G.1. Reference Table of Floor to Lot Area Ratio (FLAR) Designations/Rights
44
The AMVB Allowable Maximum Volume of Building shall be primarily determined by the following
Multiply the AMBF (in square meters) for the lot by the applicable BHL (in meters)
Later discuss
45
RULE VIII - LIGHT AND VENTILATION
Table VIII.1. Reference Table of Maximum Allowable PSO, Maximum Allowable ISA, the MACA,
the Minimum USA and the TOSL by Type of Land Use Zoning per Lot
Notes:
a) per duly-approved City/ Municipal Comprehensive Land Use Plan (CLUP)
b) per duly-approved City/Municipal Zoning Ordinance (ZO) and its IRR
c) PSO + ISA = MACA (Maximum Allowable Construction Area)
d) PSO + TOSL = TLA (Total Lot Area).
e) without firewall
f) with firewall
46
o Lot Type/Location
47
SECTION 804. Sizes and Dimensions of Courts
All inner courts shall be connected to a street or yard, either by a passageway with a minimum width of
1.20 meters or by a door through a room or rooms.
Notes:
a) The setback requirements in Table VIII.2. above are for newly-developed subdivisions.
b) * Total setback only at grade (or natural ground) level, i.e., 3.00 meters + 5.00 meters = 8.00
meters (to accommodate part of the minimum parking requirement outside the designated area
for the front yard). The second and upper floors and mezzanine level shall thereafter comply with
the minimum 3.00 meters setback unless otherwise provided under the Code.
c) ** Setback required for only one (1) side. Setbacks on two sides shall be optional.
d) *** Abutments on two sides and rear property lines may be allowed with conditions as enumerated
under Section 804, Subsection 10 of this Rule.
e) **** Mixed-Use Buildings/Structures in R-5 lots shall be considered a commercial use or occupancy if
a substantial percentage, i.e., 55% of the Gross Floor Area (GFA) is commercial.
f) In cases where yards/setbacks are impossible to attain or where frontage and depth of lots are
similar to that of Open Market or Medium Cost Housing Projects, abutments on the sides and rear
property lines may be allowed and 1.50 meters front yard is left open as transition area.
48
Min width of court – 2m, 1.5m if in cluster living like quadruplex, rowhouse or the like
o with adjacent courts with an area of not less than 3.00 sq. meters
o separation walls or fence – max 2m
o if triangular lot and courts may be exempted from the minimum width
49
SECTION 805. Ceiling Heights
School Rooms – 3.00 cu. meters with 1.00 sq. meter of floor area per person
Workshop, Factories, and Offices – 12.00 cu. meters of air space per person;
Habitable Rooms – 14.00 cu. meters of air space per person
Natural Ventilation
o window or windows total free area – 10% of the floor area
o min. 1sqm
Toilet and bath, laundry and similar rooms
o Window or windows opening area – 1/20 of the floor area
o Min. 240sqmm
Required windows may open into a roofed porch where the porch
o Abuts a court, yard, public street or alley, or open watercourse and other public open spaces
o With min ceiling height of 2.70m
o One of the longer sides open and unobstructed – min 65%
Eaves, canopies, awnings (or media agua) over required windows
o Min 750mm from rear and side property lines
No windows on abutments like firewalls
o Exept vent wells
Windows as emergency egress
o Can be open without any tools
o Min. width – 820mm, min. height – 1m
o Max. window sill height – 820mm
50
A. EASEMENTS
51
except for public safety
52
Min. Access requirements
o RROW/access streets or alleys shall have the following widths:
Interior or rear lots
Min 3m
Should have Min 4m chaflan in its intersection with the main road
shall not be used for any form of parking
53
D. SIDEWALKS
54
Grade of sidewalks
o as much as possible, be level and of uniform grade throughout the entire length of the street
o street slope of max 1/12 – grade of the sidewalk shall follow the street slope
55
F. BASEMENTS