CONSORTIUM POINT

SL No Activities Responsibility

1 DN 50 Branch connection from HP nitrogen (Near oxygen PRMS) L&T

2 Cyclone hoist panel installation at cyclone top L&T


3 Isolation transformer for mag flow tube installation at furnace L&T

4 Chute jam switch checking with BSP at SGPC conveyors L&T

TRT: SBV001&2 -MBV (operation with proportional valves and Pos. Transmitter
5 Consortium
calibration)

5.1 TRT: SBV001/2 -MBV fitting at cylinder ports to be replaced (6 numbers in total) Consortium

5.2 TRT: IGV-OGV FUNCTIONAL TEST Consort./BSP


7 Burden Camera gasket replacement and cleaning BSP

Stock house AUTOSAMPLER BLADE REPAIR (to be avaluated if "onsite" or


8 dismantled) Consort./BSP

9 WTP 56H 1T Transformer replacement Consort./BSP


10 BLT HOIST CABLE LAYING L&T
11 MCB SIMENS PLC STANDBY CARD INSTALLATION&TESTING L&T/BSP
12 FDA TESTING IN MCB GALLARY L&T

13 Electrical hoist of cast house north side runner cover load test - 2 No's L&T

14 electrical hoist of Upper seal valve load test - 1 no L&T


TIUM POINTS FOR NEXT BLAST FURNACE-8 SHUT DOWN

Shut Down Duration In charge


required (hrs)

L&T PWIN PWIT BSP


YES 5
Mr. Raju
YES 8 Mr.Maghesh
YES 4 Mr.Maghesh

YES 8 Mr.Maghesh

Pintoo with Akshya/Gupta/Antonov/C


YES 12 REQUIRED SMS for
Lev.1 AUT armignani

YES 2 Mr. Raju Gupta

Pintoo/Aksh Antonov/Carmignani
YES 12 Mr.Showry ya REQUIRED
YES REQUIRED

Mr. Dharmendra
YES 6 Jena / Carmignani REQUIRED

24 Mr.Maghesh REQUIRED
8 Mr.Maghesh
YES 8 Mr.Maghesh REQUIRED
YES 8 Mr.Maghesh

Mr. Dharmendra
YES 12 Jena REQUIRED

Mr. Dharmendra
YES 12 Jena REQUIRED
Remarks

EQUIPMENTS TO BE
STOPPED

COMPLETED

NOT PLANNED IN SHUT


DOWN.IT MAY BE DONE
DURING NORMAL
OPERATION
During plant operation
we can't do the load
test due to metal
tapping.

During plant operation


we can't do the load
test due to CO gas
presence.