Sei sulla pagina 1di 320

Agenda: 1.

Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope

No Data Entered Shop / Area Discussion Point


1 2-Jan-18 Safety Make clear for APAR status

2 2-Jan-18 Coal Mill CO for Raw coal silo is 72 PPM

Lime stone & lime


3 2-Jan-18 handling Individual test

Safety shower is less sturdy


4 2-Jan-18 Laboratory condition
5 3-Jan-18 Kiln 1 Individual test
BE 407 is broken ( USS error
6 3-Jan-18 Lime Handling indocation)

Kiln 1 & Loesche 2 Fan in loesche bulding & filter fan


7 3-Jan-18 at kiln 1 need to rotating 180˚

8 3-Jan-18 Coal storage Lime have to empty out

9 3-Jan-18 Shift room Pipe leaking in shift room

10 4-Jan-18 Kiln 1 Individual test

11 4-Jan-18 Workshop House keeping

No safety condition nitrogen &


12 4-Jan-18 Workshop accytllen tube storage

there is a difference of CO2 weight


13 4-Jan-18 PLC Loesche indication between display in CCR
and in the display CO2 tank area

around a coal warehouse storage


14 4-Jan-18 Coal storage pond, grass growing high altitude

Result of sales from lime in 3


15 4-Jan-18 WB January 2018
Flow meter at fuel station not
16 4-Jan-18 Fuel station functioning properly

Result of sales from lime in 4


17 5-Jan-18 WB January 2018
blade for Cutting grass machine is
18 5-Jan-18 Utility not completable

Standing suppot for palvurizer


19 5-Jan-18 Laboratory machine is damage due to insects

Maintenance dep. Need 1 trolly for


20 5-Jan-18 Utility oxygen tube
Result of sales from lime in 5
21 5-Jan-18 WB January 2018

22 6-Jan-18 WB Result of sales from lime in 6


January 2018

23 8-Jan-18 General road plant is dirty conditon

24 8-Jan-18 Kiln 1 Individual test

25 8-Jan-18 General Need plan tree for plant area


Water pipe line is leaking in shift
26 9-Jan-18 Blower room room

Result of sales from lime in 8


27 9-Jan-18 WB January 2018

28 9-Jan-18 Loesche Individual test

29 9-Jan-18 Lime reject area Lime reject need to clean

Individual test finding blower


temperature high 67˚ C, due to no
30 10-Jan-18 Coal Mill water flow to the system check
valve blocked by foreng material

near mis road plant accident in


31 10-Jan-18 Safety front of fuel station
32 10-Jan-18 Kiln 1 individual test

Result of empty out from coal


33 10-Jan-18 WB storage lime in 9 January 2018

34 11-Jan-18 Kiln 1 Individual test


Result of empty out from coal
35 11-Jan-18 WB storage lime in 10 January 2018

no facility LOTO for isolation local


36 11-Jan-18 Safety panel
37 11-Jan-18 Training room Oil training

38 12-Jan-18 Kiln 1 Individual test

39 12-Jan-18 Kiln 1 Direct chimney system never test

40 12-Jan-18 Trafo area No cover in front of trafo room

Result of empty out from coal


40 12-Jan-18 WB storage lime in 11 January 2018

41 15-Jan-18 Coal storage Drainage around coal storage block

Result of empty out from coal


42 15-Jan-18 WB storage lime in 13 January 2018

Fabrication reject box pending due


43 15-Jan-18 Workshop to no acetylene

44 15-Jan-18 Safety No list for plant machine guard

45 16-Jan-18 Safety No protection for water trap area

No shower facility at kiln &


46 16-Jan-18 Safety Raymond area

47 16-Jan-18 General area require need to concrete

Limestone
48 16-Jan-18 handling & lime individual test
handling

Result of empty out from coal


49 16-Jan-18 WB storage lime in 15 January 2018

50 17-Jan-18 Kiln 1 Individual test

Result of empty out from coal


51 17-Jan-18 WB storage lime in 16 January 2018

Pin for BE 406 is lost & have no


52 17-Jan-18 Lime Handling sparepart
operation sustainability critical
53 17-Jan-18 Prosess parameter equipment

54 18-Jan-18 Kiln 1 Individual test

Fuel gun flow is not smooth &


55 18-Jan-18 Fuel station diseel pump motor is unstabil

Result of empty out from coal


56 18-Jan-18 WB storage lime in 17 January 2018

Result of empty out from coal


57 19-Jan-18 WB storage lime in 18 January 2018

No maintenance access for lime


58 19-Jan-18 Lime Handling handling (diverter gate 401 & 402)

59 22-Jan-18 All Plant No marking for all Junction boxes

60 22-Jan-18 Kiln 1 Individual test

61 22-Jan-18 Genset Genset need to warming up

Pipe leaking in prayer room


62 22-Jan-18 Prayer room (Mushola)

Result of empty out from coal


63 22-Jan-18 WB storage lime in 19 January 2018

Result of empty out from coal


64 22-Jan-18 WB storage lime in 20 January 2018

Farmers around the factory enter


65 23-Jan-18 General the factory area without PPE

66 23-Jan-18 Loesche Individual activity

Result of empty out from coal


67 23-Jan-18 WB storage lime in 22 January 2018

3 phase outlet for the pulverizer


68 23-Jan-18 Laboratory engine is less precise placement

69 24-Jan-18 Kiln 1 Individual test


70 24-Jan-18 WB WB need preventive maintenance

Result of empty out from coal


71 24-Jan-18 WB storage lime in 23 January 2018

Result of empty out from beside


72 24-Jan-18 WB warehouse lime in 23 January 2018

73 25-Jan-18 Kiln 1 Individual test

Result of empty out from coal


74 25-Jan-18 WB storage lime in 24 January 2018

Result of empty out from beside


75 25-Jan-18 WB warehouse lime in 24 January 2018

76 25-Jan-18 Genset Genset need to fill fuel diesel


77 26-Jan-18 Kiln 1 Individual test

Result of empty out from coal


78 26-Jan-18 WB storage lime in 25 January 2018

Result of empty out from beside


79 26-Jan-18 WB warehouse lime in 25 January 2018

Result of empty out from coal


80 29-Jan-18 WB storage lime in 26 January 2018

Result of empty out from beside


81 29-Jan-18 WB warehouse lime in 26 January 2018

Result of empty out from coal


82 29-Jan-18 WB storage lime in 27 January 2018

Result of empty out from beside


83 29-Jan-18 WB warehouse lime in 27 January 2018

84 29-Jan-18 Loesche Sensor valve for sampling is broken

85 29-Jan-18 All Electrical room Electrical room need to clean

Limestone
86 30-Jan-18 handling & Lime Individual test
Handling

87 30-Jan-18 Raymond Individual test


88 31-Jan-18 Raymond Rotary feeder trip after 1 hour run

Plant road need to clean after


89 31-Jan-18 General unloading lime activity
water drainage is block around coal
90 31-Jan-18 Coal storage storage
91 31-Jan-18 Kiln 1 Individual test
Result of empty out from coal
92 31-Jan-18 WB storage lime in 30 January 2018

Result of empty out from beside


93 31-Jan-18 WB warehouse lime in 30 January 2018
Daily operation Meeting

Action PIC WO Priority Target Date


Follow up to Saripudin Ihsan Saripudin 1

Inspection for raw coal condition Budi Andi 1

Individual test of limestone handling &


lime handling All personil Andi 2

Create support for supplay pipe Agus Mustofa Kurniawan 2

Rotary bucket & cooling system All personil Andi 2


Follow up to Hasanuddin (wrong Ariawan Hasanuddin 2
conection after repairing by Lintec)

Rotate 180˚ for fan in loesche & kiln 1 Idad Kurniawan 2

Monitoring empty out lime from coal Riki & Taufik Andi 2
storage
Check & follow up by project Andi Project 2

Individual test of waste gas filter control All personil Andi 2


unit & coal dust silo filter control unit

Cleaning / House keeping benind Bayan Kurniawan 2


workshop area
Fabrication holder for noitrogen & Agus Mustofa Kurniawan 1
accytllen tube

Simulation 4-20 mA in PLC loesche Ariawan Hasanuddin 2

Mow the lawn & plant posion around Riki & Taufik Andi 2
coal storage

totally 17 trucks as 181.34 Ton Saeful Husni 2


Follow up to Maintenance manager Husni Hasanuddin 2

totally 10 trucks as 90.54 Ton Saeful Husni 2

Modify blade for cutting grass machine Bayan Kurniawan 2

Change standing suppot for palvurizer Agus Mustofa Kurniawan 2


machine

Fabrication trolly for oxygen tube Idad Kurniawan 2

totally 16 trucks as 151.59 Ton Saeful Husni 2

totally 7 trucks as 71.43 Ton Saeful Husni 2

Watering road plant by fire truck Riki & Taufik Andi 2

Individual test of cooling system & All personil Andi 2


hydraulic unit
Survey vendor for plan tree Wina Reza 2
Lock manual valve with pad lock & CCR Crew Andi 2
keeping key in CCR

totally 7 trucks as 91.53 Ton Saeful Husni 2

Individual test of loesche mill with out All personil Andi 2


hot gas
Cleaning / House keeping at lime reject Riki & Taufik Andi 2
area

Cleaning cooling water pool, check


pipeline system, check safety valve,
instal strainer, flusing pipeline system, Ihsan Andi 2
create WO for roofing & instal pressure
switch

Follow up circulation plant with sign Safety Dep. Reza P 1


board
Individual test of blower All personil Andi 2

Totally 17 trucks as 152.72 Ton Saeful Husni 2

Individual test of wate gas filter control All personil Andi 2


unit
Totally 7 trucks as 65.74 Ton Saeful Husni 2

Fabrication switch lock Budi Kurniawan 1

training oil from Eni oil Supplier Hasanuddin 3

Individual test of skip bucket & filling All personil Andi 2


kiln 1 with limestone 30-60 mm

Check & test direct chimney system Firman Andi 2

Instal cover with zink in front of trafo Idad Kurniawan 2


room

Totally 9 trucks as 76.29 Ton Saeful Husni 2

Cleaning over flow lime to coal storage & Taufik & Andi 2
empty out lime from coal storage Rustam

Totally 28 trucks as 271.81 Ton Saeful Husni 2

Follow up Kurniawan Bayan Kurniawan 2

list down plant machine guard Agus Mustofa Safety Dep. 2

For temporary create sign & baricade, Ihsan Safety Dep. 1


create WO for guarding
Reposition shower from coal storage to Andi Reza P
kiln area
fuel station, nitrogen acces, dust Andi Reza P 2
collector & lime reject area

Test individual & sequence All personil Andi 2

Totally 20 trucks as 182.76 Ton Saeful Husni 2

Individual test of rotary hopper All personil Andi 2

Totally 10 trucks as 84.76 Ton Saeful Husni 2

Crate PR Budi Kurniawan 2


List dwon critical equiment & sparepart
availability (Termocouple, pressure Ihsan Andi 2
swith, limit switch etc…)

Individual test of wate gas filter control All personil Andi 2


unit

Check motor, strainer, & fuel gun Eeng & Firman Hasanuddin 2

Totally 3 trucks as 23.67 Ton Saeful Husni 2

Totally 5 trucks as 73.26Ton Saeful Husni 2

Instal permanent platform Budi Kurniawan 2

Marking cables all junction boxes, for all Rismawan Hasanuddin 2


area
Individual test of Hydraulic unit & All personil Andi 2
cooling system

Start genset 10-15 minutes Rismawan Hasanuddin 2

Follow up Project BMA Andi Project 1

Totally 5 trucks as 46.05 Ton Saeful Husni 2

Totally 12 trucks as 117.09 Ton Saeful Husni 2

An appeal to the security forces to


remind everyone entering the factory Security Safety Dep. 1
area is required to use PPE
Individual activity of loesche mill, test All personil Andi 2
run without HGG

Totally 2 trucks as 18.95 Ton Saeful Husni 2

Relocate 3 phase outlet Ridwan Hasanuddin 2

Individual test of Combustion air & All personil Andi 2


rotary hopper
Ariawan &
Preventive maintenance for WB Hasanuddin 2
Agustian D

Totally 1 trucks as 2.79 Ton Saeful Husni 2

Totally 4 trucks as 64.60 Ton Saeful Husni 2

Individual test of waste gas filter control All personil Andi 2


unit & coal dust silo filter control unit

Totally 7 trucks as 43.66 Ton Saeful Husni 2

Totally 5 trucks as 34.84 Ton Saeful Husni 2

Fill the genset in 20 Litre Rismawan Hasanuddin 2


Individual test of skip bucket All personil Andi 2

Totally 2 trucks as 6.44 Ton Saeful Husni 2

Totally 7 trucks as 66.14 Ton Saeful Husni 2

Totally 1 trucks as 4.2 Ton Saeful Husni 2

Totally 3 trucks as 53.45 Ton Saeful Husni 2

Totally 4 trucks as Ton Saeful Husni 2

Totally 10 trucks as 54.95 Ton Saeful Husni 2

Repairing sensor sampling valve Firman Hasanuddin 2

Cleaning all electrical room & house Electrical crew Hasanuddin 2


keeping

Individual test lime handling limestone All personil Andi 2


handling without SN 102

Individual test of rotary feeder All personil Andi 2


Test by pass PLC local test All personil Andi 2

Cleaning & watering plant road by fire Taufik Andi 1


truck

Cleaning drainage around coal storage Riki & Taufik Andi 2

Individual test of rotary bucket All personil Andi 2

Totally 3 trucks as 137.36 Ton Saeful Husni 2

Totally 8 trucks as 71.04 Ton Saeful Husni 2


Status Date Closed Comment
Done

Cont. monitoring for CO content


Done ( Need to calibration for CO analyzer
for Raw coal silo & bag filter )

BE 407 USS indication broken


Done (waiting confirmation from
Hasanuddin)
Waiting sparepart (Dynabolt : Need
In Progress 12 dynabolt for 10 mm)
Done

Done

Done

Continue

In Progress

Done

Continue

Estimation material for storage


In Progress nitrogen & accytllen (Done)

In Progress

Done

Continue
Change flow meter in out 2 inch,
In Progress Concrate at unloading fuel tank
area

Continue

Done

Estimation material for standng


Done suppot palvurizer machine

In Progress Estimation matrial for trolly

Continue

Continue

Cleaning road plant every week in


Continue Friday

Done

Continue

Done Cleaning shift room & Blower room

Total lime out from 3-8 January


Continue 2018 at coal Storage is 586.43 Ton

Done

Done

Review SOP for start coal mill &


Done ensure cooling system running
before start sequence

Socialitation plant circulatuon to all


In Progress driver by Saeful WB
Done

Total lime out from 3-9 January


Continue 2018 at coal Storage is 739.15 Ton

Done
Total lime out from 3-10 January
Continue 2018 at coal Storage is 804.89 Ton

In Progress Sample done

Done

Done

Done

In Progress Crate PR for roofing bolts & paint


roll size 10 cm

Total lime out from 3-11 January


Continue 2018 at coal Storage is 881.18 Ton

In Progress

Total lime out from 3-13 January


Continue 2018 at coal Storage is 1152.99 Ton

Done Acetylene is have been ready

Done Review list of machine guard

Done

In Progress

In Progress Badget material estimation

Diverter gate 402 communication


Done error & Pin for BE 406 is lost

Total lime out from 3-15 January


Continue 2018 at coal Storage is 1335.75 Ton

Done

Total lime out from 3-16 January


Continue 2018 at coal Storage is 1420.51 Ton

In Progress PR done
Done Review critical list equipment

Done

Capasitor motor for disel pump


Done have to change

Total lime out from 3-17 January


Continue 2018 at coal Storage is 1444.18 Ton

Total lime out from 3-18 January at


Continue coal Storage 2018 is 1517.44 Ton

include in the List plant


In Progress manintenance access & create WO

In Progress Create PR for facility marking cables

Done

Done Warming up genset every 2 week

Done Out of Order

Total lime out from 3-19 January


Continue 2018 at coal Storage is 1563.49 Ton

Total lime out from 3-20 January


Continue 2018 at coal Storage is 1680. 58Ton

Continue

Done

Total lime out from 3-22 January


Continue 2018 at coal Storage is 1699. 53Ton

Done Crate WO by Wina

Done
In Progress

Total lime out from 3-23 January


Continue 2018 at coal Storage is 1702.32 Ton

Total lime out from 23 January 2018


Continue beside warehouse is 64.60 Ton

Done

Total lime out from 3-24 January


Continue 2018 at coal Storage is 1745.98 Ton

Total lime out from 24 January 2018


Continue beside warehouse is 99.44 Ton

In Progress Key of genset is not clear


Done

Total lime out from 3-24 January


Continue 2018 at coal Storage is 1752.42 Ton

Total lime out from 25 January 2018


Continue beside warehouse is 165.58 Ton

Total lime out from 3-24 January


Continue 2018 at coal Storage is 1756.62 Ton

Total lime out from 27 January 2018


Continue beside warehouse is 219.03 Ton

Total lime out from 27 January 2018


Continue Coal storage is 1804.51 Ton

Total lime out from 29 January 2018


Continue beside warehouse is 273.98 Ton

In Progress WO & PR done

In Progress

Done

Motor of rotary feeder stop every 1


In Progress hours
Monitoring temperature motor &
In Progress abnormal sound

Done

In Progress

Done
Total lime out from 30 January 2018
Continue Coal storage is 1841.87 Ton

Total lime out from 30 January 2018


Continue beside warehouse is 345.02 Ton
No Data Entered Shop / Area Discussion Point Action

around a coal warehouse Mow the lawn & plant posion


1 4-Jan-18 Coal storage storage pond, grass growing around coal storage
high altitude

Standing suppot for palvurizer Change standing suppot for


2 5-Jan-18 Laboratory machine is damage due to palvurizer machine
insects

Lime reject Cleaning / House keeping at


3 9-Jan-18 Lime reject need to clean
area lime reject area

Sensor valve for sampling is Repairing sensor sampling


4 29-Jan-18 Loesche broken valve

Coal storage water drainage is block around Cleaning drainage around coal
5 31-Jan-18 coal storage storage
Photo
PIC Target Date
Before After

Riki & Taufik

Agus Mustofa Kurniawan

Riki & Taufik

Firman

Riki & Taufik


Actual date Remark
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope

No Data Entered Shop / Area Discussion Point

1 1-Feb-18 Kiln 1 Individual test

2 1-Feb-18 First aid First aid box is empty

Result of empty out from beside


3 1-Feb-18 WB warehouse lime in 31 January 2018

4 1-Feb-18 WB Result of empty out from coal


storage lime in 31 January 2018
5 2-Feb-18 General road plant is dirty conditon
Prepare packing lime by raw coal
6 2-Feb-18 Coal storage handling
7 2-Feb-18 All Area All instruments need to clean
Behind workshop need smoking
8 2-Feb-18 Smoking area area

Water leaking MCC room & blower


9 5-Feb-18 MCC room room due to installation pipe in
shift room still not repaired

Learning hot gas generator for


10 5-Feb-18 Training electrical team

11 5-Feb-18 Kiln 1 Individual test

No SOP / WI for preventive


12 5-Feb-18 WB maintenance WB
13 6-Feb-18 Coal storage prepare for loading jumbo bag

14 6-Feb-18 coal grinding individual test

15 6-Feb-18 Laboratorium need support for tools rack


Fire extinguisher some area is not
16 7-Feb-18 Safety available

17 7-Feb-18 Kiln 1 Individual test

18 7-Feb-18 All Area Structur of equipment was coroded

Rubbish at plant area is dirty


19 7-Feb-18 All Area condition
20 8-Feb-18 Workshop Dirty condition behind workshop

Equipment & materials in workshop


21 8-Feb-18 Workshop need to relocation

22 9-Feb-18 Kiln 1 Individual test

Empty out material from coal


Coal storage &
23 9-Feb-18 storage & warehouse need to
warehouse continue form today
Sensor speed cable of BC 104 need
24 9-Feb-18 Tunnel to tidy up

25 12-Feb-18 All Area No acess for high level task

26 12-Feb-18 Lintec Office No fire trash in plant area

No using PPE for drainage


27 12-Feb-18 Safety contractor
Result of empty out from coal
28 12-Feb-18 WB storage lime in 9 Feb 2018

Result of empty out from beside


29 12-Feb-18 WB warehouse lime in 9 Feb 2018

Individual test finding : alarm of


30 12-Feb-18 Kiln 1 over load &break down

31 13-Feb-18 Safety PPE for opration team was broken

32 13-Feb-18 Kiln 1 Individual test

33 13-Feb-18 Genset Genset not ready to use

During Oparation not enough


34 13-Feb-18 Compressor pressure with 2 units compressor (3
Units run & 1 Unit stand by)

35 13-Feb-18 Quarry Limestone quality check

Result of empty out from coal


36 13-Feb-18 WB storage lime in 12 Feb 2018
Limestone Anthill in juntion box due to have
37 14-Feb-18 unloading opening acess
Limestone
38 14-Feb-18 BDS 102 fault alarm
unloading
39 14-Feb-18 Kiln 1 Individual test
Result of empty out from coal
40 14-Feb-18 WB storage lime in 13 Feb 2018
Result of empty out from beside
41 14-Feb-18 WB warehouse lime in 13 Feb 2018

42 19-Feb-18 General road plant is dirty conditon

43 19-Feb-18 Kiln 1 Individual test

Result of empty out from


44 19-Feb-18 WB warehouse lime in 14 Feb 2018
Result of empty out from
45 19-Feb-18 WB warehouse lime in 19 Feb 2018

46 19-Feb-18 General Responsibility area

47 19-Feb-18 Plant equipment Responsibility area

19-Feb-18
48 General Responsibility area

49 20-Feb-18 Loesche Individual test

Result of empty out from


50 20-Feb-18 WB warehouse lime in 20 Feb 2018
Result of empty out from coal
51 20-Feb-18 WB storage lime in 20 Feb 2018
coal storage need to clean from
52 20-Feb-18 Coal Storage lime

53 21-Feb-18 Genset Genset need to test

54 21-Feb-18 Shift room & CCR water low flow & low pressure

55 21-Feb-18 Kiln 1 Individual test


Result of empty out from
56 22-Feb-18 WB warehouse lime in 22 Feb 2018

57 22-Feb-18 Lime handing Lime handling need to clean

58 22-Feb-18 Kiln 1 Individual test


Individual test finding : Water
59 23-Feb-18 Kiln 1 inside pipe line

60 23-Feb-18 Workshop Broken line cable for CCTV

61 23-Feb-18 Kiln 1 Individual test


Performance test from 5 March - 9
62 23-Feb-18 Raymond March 2018
63 23-Feb-18 Lime handing Pin for BE 406 install by project
No individual test for BC 104
Limestone vibrating screen by project
64 23-Feb-18 handling SN 101 not yet hand over to
Operation

The distance of monitor limestone


65 23-Feb-18 CCR handling and lime handling too far
with radio communications
Daily operation Meeting

Action PIC WO Priority Target Date


Individual test of waste gas filter control All personil Andi 2
unit
Create PR for first aid kit Saeful Husni 1

Totally 13 trucks as 111.52 Ton Saeful Husni 2

Totally 13 Buckets of loeader as 25.09 Saeful Husni 2


Ton
Watering road plant by fire truck Taufik Andi 2

Fabrication temporary chute Budi Kurniawan 2

Cleaning all instruments equipment Electrical crew Hasanuddin 2


Mechanical
fabrication smoking area Kurniawan 2
team

Follow up to project Ariawan Hasanuddin 2

Learninig & presentation result of Firman Hasanuddin 2


learning hot gas system
Individual test of hydraulic system & All personil Andi 2
cooling system
Create SOP / WI for preventive Kurniawan Hasanuddin 2
maintenance WB
create base for forklift movement rustam Andi 2
test cycle without HGG and raw material
handling All personil Andi 2

create WO/ PR for dynabolt wina radi 2


Recheck all availability of fire Ihsan Andi 1
axtinguisher

Individual test of blower & rotary bucket All personil Andi 2

Repainting coroded equipment Budi Kurniawan 2

Cleaning & remaining all personil BMA / Responsibility Andi 2


Project to keep Cleaning & HK all area area personil
Cleaning & house keeping behind All personil Andi 2
workshop
Relocation equipment from in to out All personil Kurniawan 2
workshop
Individual test of waste gas filter control All personil Andi 2
unit & skip bucket

Mechanical
Remove temporary chute from BC 601 Kurniawan 2
team

Tidy up sensor cable of BC 104 Ariawan Hasanuddin 2

Need scafolding 2
Ariawan Hasanuddin
Safety training Working at High 2
Fire fighting infront of lintec office
Riki Andi 2
Safety brifing for lintec

Stop & breafing drainage contractors Andi Safety Dep 2

Totally 11 trucks as 78.28 Ton Saeful Husni 2

Totally 17 trucks as 149.15 Ton Saeful Husni 2

Trouble shooting for skip bucket kiln 1 Firman Hasanuddin 1

Create data base PPE operation team Saeful Husni 1

Individual test without BE 406 of All personil Andi 2


limestone handling & lime handling

Up date status from project Rismawan Hasanuddin 2

Follow up 2 units status compressor Hasanuddin Project 2


after relocate from compressor room

Take sample from quarry wina radi 2

Totally 12 trucks as 75.72 Ton Saeful Husni 2

Cleaning & close opening acess Rismawan Hasanuddin 2

Check conection & signal BDS 102 Firman Hasanuddin 2

Individual test of Rotary bucket All personil Andi 2

Totally 6 trucks as 42.95 Ton Saeful Husni 2


Totally 6 trucks as 60.88 Ton Saeful Husni 2

Watering road plant by fire truck Taufik Andi 1


Individual test of Cooling system & All personil Andi 2
hydraulic units

Totally 18 trucks as 222.44 Ton Saeful Husni 2

Totally 5 trucks as 46.83 Ton Saeful Husni 2

Responsibility of area Office Taufik, Saeful,


Wina, Ahmad, Husni 1
Nurul & Kiki
List down all material requirement
Responsibility of Plant equipment
readiness Ariawan, Budi & Kurniawan & 2
team Budi
List down all material requirement

Responsibility of general plant (Garden)


Riki & Afan Andi 2
List down all material requirement
Individual test of Loesche mill without All personil Andi 2
HGG

Totally 4 trucks as 12.04 Ton Saeful Husni 2

Totally 3 trucks as 22.99 Ton Saeful Husni 2

Cleaning coal storage Rustam Andi 2

Test running genset Ariawan Hasanuddin 2

Check water line pipe at Shift room & Andi Project 2


CCR
Individual test of blower house All personil Andi 2

Totally 2 trucks as 5.65 Ton Saeful Husni 2

Community service (house keeping) at All personil Andi 2


lime handling area
Individual tets of blower All personil Andi 2

Drain water before test run All personil Andi 2

Install pipe to cover line cable for CCTV Ariawan Hasanuddin 2

Individual test of waste gas filter contol All personil Andi 2


unit & Skip bucket
Safety device in place & Keep clean Riki Andi 2
condition equipment
Prepare for individual test of BE 406 Rismawan Hasanuddin 2

Up date Belt status to project


Kurniawan Project 2
Check pereformance SN 101 before
hand over

Relocate limestone handling and lime


handling monitor near communications Ariawan Hasanuddin 2
radio
Status Date Closed Comment

Done

In Progress PR done

Total lime out from 31 January 2018


Continue beside warehouse is 456.54 Ton

Continue Total lime out from 31 January 2018


Coal storage is 1866.96 Ton
Done

Done Canceled by Management

In Progress

In Progress Create WO

Done

Done

done

In Progress

Done Canceled by management

Done

In Progress dynabolt 10x40mm 10 ea

Done

Done

In Progress Create PR for Paint (yellow & grey)

Done
Done

Done outside to inside

Done Skip bucket ubnormal alarms

Done

Done

in Progress Create PR

done

All team aware with safety


continue implementation
Total lime out from 9 February 2018
Continue Coal storage 1945.24 Ton

Total lime out from 9 Feb 2018


Continue beside warehouse is 605.69 Ton

Done

In Progress Crate PR for PPE

Done

In Progress Genset trip when energize to kiln 1

Modify roof for 2 units compressor


In Progress out door

Done Support 1 person from production

Total lime out from 12 February


Continue 2018 Coal storage 2020.96 Ton

Done

Done

Done
Total lime out from 13 February
Continue 2018 Coal storage 2063.91 Ton
Total lime out from 13 Feb 2018
Continue beside warehouse is 666.57 Ton

In Progress

Done

Total lime out from 14 February


Continue 2018 Warehouse 889.01 Ton
Total lime out from 19 February
Continue 2018 Warehouse 935.84 Ton

Continue All Personil person keep cleaning


office area

All Personil person keep cleaning &


Continue ready equipment at the plant

All Personil person keep cleaning &


Continue beauty garden condition

Done

Total lime out from 20 February


Continue 2018 Warehouse 947.8 Ton
Total lime out from 20 February
Continue 2018 Coal storage 2086.90 Ton
Cleaning lime 27 Truck = 330.55 Ton
In Progress ( death stock) of 21-Feb-18
MCB not ready to switch "ON" &
Done key for fuel tank not clear

In Progress

Done
Total lime out from 22 February
Continue 2018 Warehouse 972.38 Ton

Done

Done

Continue No air to system during kiln stop

Done

Done
In Progress

Done Marking Bucket

Done

Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily o

No Data Entered Shop / Area Discussion Point

1 1-Mar-18 PS 401 Access to 2nd floor temporary stair

2 1-Mar-18 PS 401 Excavator movement area

Result of empty out from


1-Mar-18 WB warehouse lime in 1 March 2018

3 1-Mar-18 Raymond mill Empty out limestone from FS 401

4 1-Mar-18 All Area All instruments need to clean


Behind workshop need smoking
5 1-Mar-18 Smoking area area

Limestone
6 2-Mar-18 Test run SN 101 (Commisioning)
handling

7 2-Mar-18 Raymond mill Loading lime to silo PS 401

Finding issue test running BC 104 :


Limestone the Distance for 6 Rollers, 1 return
11 5-Mar-18 handling roller & 1 Seconddary cleaner
(Scrapper)

12 5-Mar-18 Kiln 1 Individual test

Limestone in 2nd floor raymond


13 5-Mar-18 Raymond mill mill building have to empty out

Limestone, lime & Plate need to


14 5-Mar-18 PS 401 tidy up

15 5-Mar-18 Raymond mill Commisioning

Individual test finding : Abnormal


16 6-Mar-18 Kiln 1 sound for Heat exchanger no 3

Finding of commisioning raymond


17 7-Mar-18 Raymond mill mill : 5 of 6 roller raymond mill is
not rotating
indication of reading in CCR is not
18 7-Mar-18 Loesche Mill actual with condition in CO2
transmitter in the CO2 tank area

19 9-Mar-18 Road Plant Road plant need to clean

20 9-Mar-18 Kiln 1 Individual test

Loesche Mill & Kiln Fan, booster fan & filter fan need to
21 9-Mar-18 1 rotateing by manualy
22 12-Mar-18 Loesche Individual test
Loesche, handling All LCS need to cover for safety
23 12-Mar-18 & Kiln 1 device
Laboratory need rack for helmets &
24 12-Mar-18 Laboratory hanger for lab coat
25 12-Mar-18 Laboratory Shoeses rack need to modify

26 12-Mar-18 Cuting grass Strarter for cuting grass is broken

27 12-Mar-18 Kiln 1 & Loesche Inspection filter bag Dust collector

2 units spare of roller is jamed


28 13-Mar-18 Raymond mill condition
Result of empty out from coal
29 13-Mar-18 WB storage lime in 8-12 Mar 2018

Result of empty out from


30 13-Mar-18 WB warehouse lime in 5-12 Mar 2018

water up in SC 603 & SC 602


31 14-Mar-18 Powder Handling
Leakages from SC 601 due to bolts
not install yet
Result of empty out from
32 14-Mar-18 WB warehouse lime in 13 Mar 2018
PS 401, FS 401 &
33 14-Mar-18 PS 501 Silo need to Inspection

AC for all area need to labeling /


34 14-Mar-18 AC All Area marking

Alarm sinchrounus error in CCR due


35 14-Mar-18 Kiln 1 to provibus line is not conect

Joint pipe the pump is leaking due


36 15-Mar-18 Fire Truck to seal is broken

37 15-Mar-18 Laboratory Vibrating screen need to calibration

Result of empty out from


38 15-Mar-18 WB warehouse lime in 14 Mar 2018
Result of empty out from coal
39 15-Mar-18 WB storage lime in 13 Mar 2018
Garden area need to install water
40 16-Mar-18 Office Area pipe line for watering plant &
cleaning

41 16-Mar-18 Powder Handling Leaking seal at RV 502

Sieve / screen for lime powder


42 16-Mar-18 Laboratory sample need to clean
Result of empty out from
43 16-Mar-18 WB warehouse lime in 15 Mar 2018

44 19-Mar-18 Kiln 1 Individual test

45 19-Mar-18 Office Area Pipe line installation at office area


need to casting
Result of empty out from
46 19-Mar-18 WB warehouse lime in 16 Mar 2018
47 20-Mar-18 Loesche Individual test
MVMDP,LVMDP & AC need to clean / service &
48 20-Mar-18 PLC Loesche Addition freon

Fire truck slip at lintec area people


21-Mar-18 Safety standing beside fire truck when
unbalance / skewed position

49 21-Mar-18 Loesche Individual Test

50 21-Mar-18 Kiln 1 Individual Test

51 21-Mar-18 Office Area Garden office improvement

52 21-Mar-18 LVMDP LVMDP tripped due to high voltage

1 water line point pipe beside


53 21-Mar-18 Office Area
office need to relocation
Stand of water valve need to
54 21-Mar-18 Office Area casting

55 22-Mar-18 Kiln 1 Individual test

Window in WB room need to install


56 22-Mar-18 WB awning
LVMDP loesche, 2 & 5 is tripped
57 22-Mar-18 LVMDP due to high voltage
Result of empty out from
58 22-Mar-18 WB warehouse lime in 22 Mar 2018

Spark for 20 KV cables for cubicle


59 23-Mar-18 MVMDP no 3

60 23-Mar-18 Kiln 1 Individual test


Result of empty out from
61 23-Mar-18 WB warehouse lime in 23 Mar 2018
Laboratory need vacum for screen
62 23-Mar-18 Laboratory shaker for lime powder sample

AC split need to clean & Addition


63 26-Mar-18 MCC Kiln & CCR for freon

64 26-Mar-18 Office Area Drainage chanel need to cover

Limestone
65 27-Mar-18 Individual test
handling

External guardrail External guardrail need to cover


66 27-Mar-18 plant (Dump with plate
Hopper area)

Result of empty out from


67 27-Mar-18 WB warehouse lime in 27 Mar 2018
68 27-Mar-18 Warehouse Wild animal (snake cobra)
AC split need to clean & Addition
69 27-Mar-18 Office Area for freon
Landslide area increasing due to
70 28-Mar-18 Landslide water from main drainage not
blocking
Material unloading at SILO powder
71 28-Mar-18 1
under SILO area full lime powder
72 28-Mar-18 spilage
No wearing PPE (dusk mask, safety
73 28-Mar-18
SILO powder gogles)
Material over flow to the truck
74 28-Mar-18 after theloscopic blocked, some
people jump from truck
No induction before entering the
75 28-Mar-18 plant

76 28-Mar-18 Kiln 1 Individual test

Result of empty out from


77 28-Mar-18 WB warehouse lime in 27 Mar 2018
Result of empty out from SILO
78 28-Mar-18 WB powder 1 lime in 27 Mar 2018
79 28-Mar-18 Plant 5S second project
Individual test finding : water inside
80 29-Mar-18 Kiln 1 combustion air pipe line
81 29-Mar-18 All Area All area need to House keeping

82 29-Mar-18 Garden area Responsible during long weekend

Prepare material for painting


83 29-Mar-18 Plant pedestrian road
Result of empty out from
84 29-Mar-18 WB warehouse lime in 28 Mar 2018
Daily operation Meeting

Action PIC WO Priority Target Date


Minimize using temporary stair & stand All Personil Safety Dep. 1
by one person ( Body System)
Baricade area & eyes contact with All Personil Safety Dep. 1
excavator operator

Totally 1 trucks as 1.2 Ton Saeful Husni 2

Worker shifting schedule available on


side, Create permit to confine space & Riki & Taufik Andi 2
Body system
Cleaning all instruments equipment Electrical crew Hasanuddin 2
Mechanical
fabrication smoking area Kurniawan 2
team

Check safety device


Kurniawan Hasanuddin 2
Check electrical parts
Check Mechanical parts
27-28 Feb - 18 Filling limestone to PS
401 is 80 ton
Andi Project 2
1 Mar-18 filling lime to PS 401 is 50 Ton

need to adjust Hasanuddin Project 2

Individual test of rotary bucket, cooling


system & hydraulic unit All Personil Andi 2

Empty out all limestone from 2nd floor Riki & Taufik Andi 2
raymond building

tidy up plate,cleaning limestone & lime Budi & Rustam Andi 2


under PS 401
Check & monitoring commisioning of All Personil Andi 2
raymond mill

Inspection heat exchanger no 3 Budi Kurniawan 2

Check & Inspectigation cause roller not Andi Project 2


rotating
Check sign (+ & -) out put load cell & Firman Hasanuddin 2
transmitter CO2 tank

Watering road plant by fire truck Riki Andi 2


Individual test of blower,wate gas filtr All Personil Andi 2
control unit & skip bucket

Rotate fan by manualy Idad Kurniawan 2

Individual test of loesche mill All Personil Andi 2


Estimation material for fabrication cover Budi Kurniawan 2
safety device
Fabrication rack for helmets & hanger Wina Radi 3
for lab coat
Modify shoeses rack Bayan Kurniawan 3

Service by supplier Budi Kurniawan 2

Open & check bag filter Budi Kurniawan 2

Service roller by mechanical Kurniawan Hasanuddin 2

Totally 2 trucks as 12.82 Ton Saeful Husni 2

Totally 5 trucks as 12.32 Ton Saeful Husni 2

Drain water & resealing for cover SC 601


& 602 with sealant
Kurniawan Project 2
Install bolts at Cover SC 601

Totally 4 trucks as 11.29 Ton Saeful Husni 2

Inspection & measuring silo capacity of


silo Eeng Kurniawan 2

Labeling all AC for all area plant Firman Hasanuddin 2

Reset server & HMI kiln 1 Ariawan Hasanuddin 2

Repairing / Change seal flanges pipe Idad Kurniawan 2

Recalibration vibrating screen for lime Wina Radi 2


powder sample

Totally 3 trucks as 8.36 Ton Saeful Husni 2

Totally 1 trucks as 5.68 Ton Saeful Husni 2


Install water pipe line Budi Kurniawan 2

Repairing / change seal for RV 502 by Kurniawan Project 2


Project
Cleaning sieve/screen lime powder Wina Radi 2
sample by air compressor

Totally 1 trucks as 6.46 Ton Saeful Husni 2

Individual test of Hydraulic & Water All Personil Andi 2


cooling system

Casting pipe line water & install shower Agus Mustofa Kurniawan 2

Totally 1 trucks as 6.77 Ton Saeful Husni 2

Individual test of loesche mill All Personil Andi 2

Cleaning / Service AC & Addition freon Contractor Hasanuddin 2

Don’t standing in the risk position (line All Personil Safety Dep. 1
on fire) & Apply LMRA for any activity

Individual test of loesche mill All Personil Andi 2

Individual test of blower & rotary bucket All Personil Andi 2

Planting grass & pine trees at garden Vendor Andi 2


office area

Reset LVMDP 2 Ridwan Hasanuddin 1

Reposition 1 water line point pipe beside Idad Kurniawan 2


office
Cont. casting concrete for stand of water Idad Kurniawan 2
valve
Individual test of waste gas filter control All Personil Andi 2
unit system

Install awning in the WB room Budi Kurniawan 2

Reset LVMDP Loesche, 2 & 5 Saefudin Hasanuddin 1

Totally 3 trucks as 12.82 Ton Saeful Husni 2

Inspection, Check installation & Ariawan Hasanuddin 1


Recommisioning for MVMDP (Cubical 3)

Individual test of skip bucket All Personil Andi

Totally 1 truck as 1.93 Ton Saeful Husni 2


Modify screen shaker Bayan Kurniawan 2

Cleaning & addition freon for MCC kiln & Contractor Hasanuddin 2
CCR
Estimation material for fabrication Budi Hasanuddin 2
drainage chanel office area
Individual test of lime stone handling & All Personil Andi 2
lime handling

Install plate at guardrail at dump hopper Budi Kurniawan 2


area

Totally 2 trucks as 11.84 Ton Saeful Husni 2

House keeping Riki Andi 1


Cleaning & addition freon for MCC kiln & Contractor Hasanuddin 2
CCR

Install stopper at main drainage Andi Project 2

House keeping Riki Andi 2

House keeping Riki Andi 2

Safety Training Safety dept Safety dept 1

Risk assesment, LMRA Safety dept Safety dept 1

all visitor, worker, mandatory for safety Safety dept Safety dept 1
induction
individual test blower house, rotary
bucket and rotary hopper All Personil Andi 2

Totally 1 truck as 1.84 Ton Saeful Husni 2

Totally 1 truck as 1.48 Ton Saeful Husni 2

Make sign board Ihsan Andi 2


Firman and
Check linking point Andi 2
Agus
House keeping Riki Andi 2

Handle by shift and security Andi Andi 2

Create PR Saepul Andi 2

Totally 2 truck as 5.1 Ton Saeful Husni 2


Status Date Closed Comment

Continue

Continue

Continue

Done Permite done before performing job

In Progress

In Progress

Done

Loading Limestone & lime to PS 401


Done done

In Progress

Done

Done

Done for plate done

Done

In Progress

Take & use 2 spare of roller from


Done workshop
Done

Done

Done

Done

Done

In Progress

In Progress WO Done to Kurniawan

Done

In Progress 1 of cutting grass ready to use

Done Good condition

In Progress

Total lime out from 13 Mar 2018


Continue Coal storage 2127.09 Ton

Total lime out from 13 Mar 2018


Continue warehouse 1003.12 Ton

Done

Total lime out from 14 Mar 2018


Continue warehouse 1014.41 Ton

Done

Done

Done

use rubber seal for temporary, have


Done to change with original packing seal

Done

Total lime out from 14 Mar 2018


Continue warehouse 1022.77 Ton
Total lime out from 14 Mar 2018
Continue Coal storage 2132.77 Ton
Done Cont. finishing

Done

Done

Total lime out from 16 Mar 2018


Continue warehouse 1029.23 Ton

Done

Done Finishing step

Total lime out from 14 Mar 2018


Continue warehouse 1036 Ton
Done

Done

Continue

Done

Done

Continue

Done

Done

Done Finishing step

Done Without compressor

Done

Monitoring incoming PLN every 2


Done hours by electrical shift
Total lime out from 22 Mar 2018
Continue warehouse 1048.82 Ton

In Progress Waiting Vendor for recomissioning

Done
Total lime out from 22 Mar 2018
Continue warehouse 1050.75 Ton
Waiting design for sieve shaker
In Progress screen

Monitoring activity by electrical


Done shift

Done Wating spare part

Done

In Progress

Total lime out from 27 Mar 2018


Continue warehouse 1061.99 Ton
Done
Monitoring activity by electrical
Continue shift

Continue

Done Postpone to Monday

Done

Continue

Continue Breafing to team done

Continue

Done

Total lime out from 27 Mar 2018


Continue warehouse 1063.83 Ton
Total lime out from 27 Mar 2018
Continue SILO powder 1 1.48 Ton
In Progress

In Progress

In Progress

In Progress

In Progress

Total lime out from 28 Mar 2018


Continue warehouse 1068.93 Ton
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope

No Data Entered Shop / Area Discussion Point

1 2-Apr-18 Workshop Smoking around workshop

Door & stair step to cabin need to


2 2-Apr-18 Fire Truck repair

3 2-Apr-18 Kiln 1 Individual test

Landscape &
4 2-Apr-18 Planting need to watering
planting
Result of empty out from
5 2-Apr-18 WB warehouse lime in 29 Mar 2018
Office ( Meeting
6 2-Apr-18 Room & Server AC Split & casette need to clean)
room)
Need additional plate for close
7 3-Apr-18 Hedge external acces

8 3-Apr-18 Laboratory AC casette need to clean

9 3-Apr-18 All Area All area need new sign board


10 3-Apr-18 PS 501 Seal of man hole need to repair
11 3-Apr-18 Loesche Individual test
Dirty condition after WB fabrication
12 4-Apr-18 Workshop
by project
13 4-Apr-18 Kiln 1 Individual test
Truck parking (out Need parking area for truck at out
14 4-Apr-18 side plant) side plant
Chute at BC 401 & 402 has been
15 4-Apr-18 BC 401 & 402 dirty condition
Door of MCC kiln need to
16 4-Apr-18 MCC kiln additional canopy
17 4-Apr-18 All Area All area need new sign board
Sieve shaker need additional vacum
18 4-Apr-18 Laboratory pan
Parking area need addition 1 water
19 4-Apr-18 Parking area point
Result of empty out from
20 4-Apr-18 Warehouse warehouse lime in 4 April 2018
Parking road is bumpy due to over
21 6-Apr-18 Parking area load

AC split in Laboratory need to


22 6-Apr-18 Laboratory recheck after service due to 2 from
3 AC split is off

23 6-Apr-18 Kiln 1 Individual test

24 6-Apr-18 Laboratory Rack in Laboratory need support

25 6-Apr-18 Warehouse Result of empty out from


warehouse lime in 5 April 2018
Result of empty out from
26 6-Apr-18 Warehouse warehouse lime in 6 April 2018
27 6-Apr-18 Office 2nd floor AC casette need to clean
Lamp of road plant need to
28 9-Apr-18 Road lamp plant inspection
29 9-Apr-18 BC 404 Cover for BC 404 need to clean

30 9-Apr-18 karcher Hose output of karcher is broken

Lime Silo, Powder Coulum of Powder silo, lime silo &


31 9-Apr-18 Silo & Parking area Parking area need to safety sign

Result of empty out from


32 9-Apr-18 Warehouse warehouse lime in 9 April 2018

33 10-Apr-18 Workshop Smoking inside workshop

Limestone
unloading,
34 10-Apr-18 Individual test
limestone handling
& lime handling

No checklist form for AC split &


35 10-Apr-18 All Area cassete
Motor in all area plant need to
36 10-Apr-18 Plant area checklist
Need additional water point at
37 10-Apr-18 Parking area parking area
38 10-Apr-18 Laboratory Drat Milling was broken
Result of empty out from
39 10-Apr-18 Warehouse warehouse lime in 9 April 2018
Individual test finding :"Signal error
for BDS BC 102 , horn is not sound
40 11-Apr-18 BC 102 before running,

Individual test finding : BC 103


11-Apr-18 BC 103 Sensor PWS is error

Individual test finding : signal of


emergency stop error if push
42 11-Apr-18 VF 101 button is running, indication in CCR
is Run

Individual finding : PWS fault at BC


43 11-Apr-18 BC 404 404 (1 of 2 from PWS is not
funtion)

44 11-Apr-18 Kiln 1 Individual test

45 11-Apr-18 Warehouse Result of empty out from


warehouse lime in 10 April 2018

46 11-Apr-18 Office Lamps in office need to change

47 12-Apr-18 Kiln 1 Handrill at kiln area need to repaint

48 13-Apr-18 Road Plant Dirty condition at road plant area

Dirty condition for lamps at


48 13-Apr-18 Kiln 1 discharge flap area
Access stair to cabin for fire truck is
49 13-Apr-18 Fire Truck broken
Result of empty out from
50 16-Apr-18 Warehouse warehouse lime in 13 April 2018
Result of empty out from
51 16-Apr-18 Warehouse warehouse lime in 14 April 2018
No safety line for Sand pile &
52 16-Apr-18 Road Plant materal for pedestrian away road
plant

53 16-Apr-18 BC 109 Structur of BC 109 need to repaint

Mechanical need power for


54 16-Apr-18 Parking area finishing water point
Result of empty out from
55 16-Apr-18 WB warehouse lime in 16 April 2018
56 17-Apr-18 Loesche Individual test
1 of Water point behind office
57 17-Apr-18 Office need to reposition due to
pedestrian way jobs
Palvulizer machine for standing pan
58 17-Apr-18 Laboratory need to adjust
Road access to BC 102 & 103 is
59 17-Apr-18 BC 101 & 102 slippery
Halogen lighting at BC 102 & 103
60 17-Apr-18 BC 101 & 102 dazzled
Stock opname (stock take)
61 17-Apr-18 Stockpile limestone & raw coal
sand truck of contractor is
62 18-Apr-18 WB overturned
63 18-Apr-18 Kiln 1 Individual test
Result of empty out from
64 18-Apr-18 WB warehouse lime in 17 April 2018

No access road for wheel carrier


65 18-Apr-18 Laboratory from out side to laboratory room

66 20-Apr-18 Road Plant Dirty condition of road plant


67 20-Apr-18 Kiln 1 Individual test
68 20-Apr-18 Office Office need flowers rack
All instruments out side need to
69 20-Apr-18 Coal Grinding checklist
Big meeting room need to
70 20-Apr-18 Office repainting
Result of empty out from
71 20-Apr-18 WB warehouse lime in 20 April 2018
Hanger for Fire extinguisher need
72 23-Apr-18 WB to repair
Shift room need to cleaning &
73 23-Apr-18 Shift room repainting
Performance test TPH not achive
74 23-Apr-18 Raymond yet (30 TPH)
Equipment cabinet need to check
75 24-Apr-18 PLC Coal Grinding
list
Lighting for mosque, CCR, Office &
76 24-Apr-18 All Area WB need to replace
77 24-Apr-18 Fire Truck Front tire noise
Result of empty out from
78 24-Apr-18 WB warehouse lime in 23 April 2018

79 25-Apr-18 Coal Storage Smoldering at coal storage

80 25-Apr-18 Kiln 1 Individual test

81 27-Apr-18 Kiln 1 Instruments list need to check

Result of empty out from


82 27-Apr-18 WB warehouse lime in 26 April 2018

83 30-Apr-18 Kiln 1 Individual test


84 30-Apr-18 LVMDP Lighting in LVMDP need to repair

85 30-Apr-18 Loading by area Loading by area need to painting

86 30-Apr-18 Safety room Safety room need shoes rack

Result of empty out from


87 30-Apr-18 WB warehouse lime in 27 April 2018
Daily operation Meeting

Action PIC WO Priority Target Date

Mapping smoking area behind workshop Ariawan Andi 1

Riki, Eeng,
Estimation budgeting & take action Henda & Kurniawan 1
Agustian
Individual test of hydraulic system & All Personil Andi 2
cooling system

Watering all plants landscape Shift personil Andi 2

Totally 2 truck as 5.1 Ton Saeful Husni 2

Cleaning AC split & Casette by vendor Firman Hasanuddin 2

Install power electricity & welding plate Budi Kurniawan 2

Cleaning Casette by vendor Firman Hasanuddin 2

Mapping sign board for all area Ihsan Andi 2


Repairing seal of man hole PS 501 Agus Mustofa Kurniawan 2
Individual test of Loesche mill All Personil Andi 2

Cleaning area before go home by Lintec All Personil Hendro 1

Individual test of blower house All Personil Andi 2

Create parking area at out side plnat Rustam Andi 2

Repainting chute Eeng Kurniawan 2

Fabrication canopy for door of MCC kiln Idad Kurniawan 2

Estimation budgeting & take action Budi Kurniawan 1

Sketh vacum pan for sieve shaker Budi Radi 2

Estimation budgeting & take action Budi Kurniawan 2

Totally 5 trucks as 10.22 Ton Saeful Husni 2


Fire truck & loader ( HME) no entering All Personil Safety Dep. 1
parking area max load 6 ton

Follow up by vendor Ariawan Vendor 2

Individual test of waste gas filter control All Personil Andi 2


unit, rotary bucket & skip bucket

Addition support for rack in laboratory Agustian D Radi 2

Totally 1 truck as 5.7 Ton Saeful Husni 2

Totally 4 trucks as 15.99 Ton Saeful Husni 2

Cleaning AC Casette by vendor Yayan Hasanuddin 2

Inspection all lamp of road plant Yayan Hasanuddin 2

Cleaning cover for BC 404 Agus Mustofa Kurniawan 2

Repairing hose output Agus Mustofa Kurniawan 2

Mapping & estimation paint for safety Budi Kurniawan 2


sign

Totally 7 trucks as 13.15 Ton Saeful Husni 2

Create sign board "No Smoking" &


estimation budget for smoking area Budi Kurniawan 1
behind workshop

Individual test without BC 104 & SN 101 All Personil Andi 2

Check logsheet of AC split & cassete due Firman Hasanuddin 2


to no checklist form
Inspection & checklist motor in area Yayan Hasanuddin 2
plant

Install water point at parking area Agus Mustofa Kurniawan 2

Repairing Budi Rady 2

Totally 8 trucks as 33.18 Ton Saeful Husni 2


Inspection & repair signal BDS for BC Saepudin & Hasanuddin 2
102 & horn sound Yayan

Saepudin &
Inspection & repairing PWS sensor 1 & 2 Hasanuddin 2
Yayan

Inspection & repairing signal emergency Saepudin & Hasanuddin 2


stop for VF 101 Yayan

Inspection & repairing PWS sensor or BC Saepudin & Hasanuddin 2


404 Yayan

Saepudin &
Individual test of rotary bucket Hasanuddin 2
Yayan

Totally 2 trucks as 22.19 Ton Saeful Husni 2

Inspection lamp & change lamps in Firman Hasanuddin 1


office

Repaint handrill at kiln area Agus Mustofa Kurniawan 2

watering road plant by fire truck Taufik Andi 2

Cleaning & inspection lamps at Yayan Hasanuddin 2


discharge area
For temporary create caution " Don't Ihsan Hasanuddin 2
Use stair acces before repair"

Totally 2 trucks as 19.58 Ton Saeful Husni 2

Totally 4 trucks as 32.96 Ton Saeful Husni 2

Install safety line away sand pile & Agus Mustofa Andi 1
pedistrian material

Repainting structure of BC 109 Idad Kurniawan 2

Conect power for mechanical jobs Firman Hasanuddin 2

Totally 4 trucks as 33.67 Ton Saeful Husni 2

Individual test of Loesche mill All Personil Andi 2

Reposition of 1 water point behind office Agus Mustofa Kurniawan 2

Inspection & repairing palvulizer Idad Kurniawan 2


machine
Road access need to improve Budi Kurniawan 1

Replace by normal lighting Ariawan Hasanuddin 1

measurment limestone stockpile & raw Ihsan Andi 2


caol storage
Caution : have to know about LMRA All Personil Safety Dep. 1
before jobs
Individual test of blower house All Personil Andi 2

Totally 4 trucks as 10.7 Ton Saeful Husni 2

Create road of wheel carrier from out Vendor Andi 2


side to laboratory room

watering road plant by fire truck Taufik Andi 2


Individual test of skip bucket All Personil Andi 2
Fabrication flower rack for office Bayan Kurniawan 2
Checklist all instruments out sidefor all Yayan Hasanuddin 2
area

Repainting big meeting room Afan Andi 2

Totally 9 trucks as 50.84 Ton Saeful Husni 2

Repairing hanger for fire extinguisher at Agus Mustofa Kurniawan 2


WB

Cleaning & repainting shift room Taufik Andi 2

Prepare redinees equipment & HK Riki Andi 2


raymond area
Checklist all equipment cabinet in PLC Firman Hasanuddin 3
coal grinding
Replace lighting for Mosque, CCR, Office Ariawan Hasanuddin 2
& WB
Inspection front tire for fire truck Eeng Kurniawan 1

Totally 7 trucks as 37.94 Ton Saeful Husni 2

Inspection & Remove smoldering at coal All Personil Andi 1


storage
Individual test of rotary bucket All Personil Andi 2

Create checkist for instrument of kiln 1 Haikal Hasanuddin 2

Totally 1 truck as 5.96 Ton Saeful Husni 2

Individual test of hydraulic system & All Personil Andi 2


cooling system
Inspection & repairing lighting for Haikal Hasanuddin 2
LVMDP room

Painting loading by area All Personil Andi 2

Fabrication shoes rack for safety room Bayan Kurniawan 2

Totally 2 truck as 6.15 Ton Saeful Husni 2


Status Date Closed Comment

In Progress Estimation material & skecth

In Progress Checklist done

Done

Continue Every morning all plantation is wet

Total lime out from 28 Mar 2018


Continue warehouse 1068.93 Ton

Done

Done

Done

Done
Done
Done

Continue

Done

In Progress

Done

In Progress Estimation done (waiting material)

Done

In Progress Estimation done (waiting material)

Done Waiting material

Total lime out from 4 April 2018


Continue warehouse 1111.37 Ton
Continue

Done

Done

Done

Continue Total lime out from 5 April 2018


warehouse 1117.07 Ton
Total lime out from 5 April 2018
Continue warehouse 1133.06 Ton
Done
Waiting sky lift, Totally 12 lamps is
Done off
Done

Done

Done

Total lime out from 9 April 2018


Continue warehouse 1146.21 Ton

In Progress

Done

Done

Done

Done Waiting for finishing

Done
Total lime out from 9 April 2018
Continue warehouse 1179.39 Ton
Running indication at BC 102 is but
In Progress reading for CCR is fault

Signal error due to project activity


In Progress in MCC Handling

Signal error due to project activity


In Progress in MCC Handling

Signal error due to project activity


In Progress in MCC Handling

Signal error due to project activity


Done in MCC Handling

Continue Total lime out from 11 April 2018


warehouse 1201.58 Ton

Done

Pending : Due to Yellow Color of


In Progress paint is different

Done

Done

Done

Total lime out from 2 April 2018


Continue warehouse 1221.16 Ton
Total lime out from 15 April 2018
Continue warehouse 1254.12 Ton

Done

Done Take picture Before After

Done

Total lime out from 16 April 2018


Continue warehouse 1311.89 Ton
Done

In Progress Casting by Vendor

Done
In Progress

In Progress

Done Waiting the result

Continue

Done
Total lime out from 17 April 2018
Continue warehouse 1322.59 Ton

In Progress PR done

Continue
Done
Done

Done

Done Repainting at 25 Apr 18

Total lime out from 20 April 2018


Continue warehouse 1373.43 Ton

Done Waiting dynabolt

In Progress Waiting paint

In Progress

Done

In Progress Waiting spare lamps

In Progress
Total lime out from 23April 2018
Continue warehouse 1451.16 Ton

Continue

Done

In Progress

Total lime out from 27 April 2018


Continue warehouse 1457.12 Ton

Done
Done

In Progress

Done

Total lime out from 30 April 2018


Continue warehouse 1463.27 Ton
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope

No Data Entered Shop / Area Discussion Point


1 02-May-18 Kiln 1 Individual test

2 02-May-18 Kiln 1 & 2 Instruments list need to check

Coal Mill Handling No LOTO facility for individual


3 02-May-18 area equipment

Result of empty out from


4 02-May-18 WB warehouse lime in 30 April 2018

5 03-May-18 Kiln 1 Individual test

Door of MCC kiln need to cover by


6 03-May-18 MCC Kiln canopy
Result of empty out from
7 03-May-18 WB warehouse lime in 2 May 2018
Crusher machine need to
8 03-May-18 Quarry performance test
No cover for drainage around office
9 04-May-18 Office area
Result of empty out from
10 04-May-18 WB warehouse lime in 3 May 2018
Loading by
11 07-May-18 Loading by area need to painting
warehouse
Result of empty out from
12 07-May-18 WB warehouse lime in 7 May 2018

No labeling and cable scoon for PLC


13 07-May-18 Loesche loesche, MCC loesche and all JB

Result of empty out from


14 08-May-18 WB warehouse lime in 8 May 2018
No labeling and scoon cable for all
15 08-May-18 Kiln 1 JB
Lime stone
16 08-May-18 handling and lime Individual test
handling
LVMDP, MVMDP Danger of tripping because of the
17 09-May-18 and PLC Loesche front door embankment
Result of empty out from
18 09-May-18 WB warehouse lime in 9 May 2018
Lighting for kiln 1 Need to check
19 09-May-18 Kiln 1 due to some lighting is off

Plange fire truck pump need to


20 09-May-18 Fire truck change
21 09-May-18 Rotary bucket Individual test

22 14-May-18 Kiln 1 Individual test

Water pipe is leaking in the


23 14-May-18 Workshop workshop
Result of empty out from
24 14-May-18 WB warehouse lime in 14 May 2018
25 15-May-18 Loesche Individual test

Lighting for booster pump Need to


26 15-May-18 Office check due to some lighting is off

Result of empty out from


27 15-May-18 WB warehouse lime in 15 May 2018
1 Double valve for product cyclone
28 15-May-18 Raymond no 1 is lost
29 16-May-18 Kiln 1 Individual test
Door for blower room need
30 16-May-18 Blower room additonal handle
Result of empty out from
31 16-May-18 WB warehouse lime in 16 May 2018
The materials falling during belt
32 17-May-18 Raymond conveyor full loading
Breasing of stair to roof coal
33 17-May-18 Coal storage storage too low

34 17-May-18 Kiln 1 Individual test

Result of empty out from


35 17-May-18 WB warehouse lime in 17 May 2018
36 18-May-18 Kiln 1 Individual test
announciator for fire truck is
37 18-May-18 Fire truck damage

38 21-May-18 Raymond Perfomance test of raymond mill

Lighting for shift room Need to


39 21-May-18 Shift room check due to some lighting is off

Compressor & Genset, compressor no 2 & 4 need


40 21-May-18 genset to relocation due to concrate work

Result of empty out from


41 21-May-18 WB warehouse lime in 21 May 2018
Compressor & Generator, compressor 2 & 4 need
42 21-May-18 genset to disconect power
Lime stone
43 22-May-2018 handling and lime Individual test
handling
Result of empty out from
44 22-May-2018 WB warehouse lime in 22 May 2018

Weightbridge need to recalibration


45 22-May-2018 WB due to expared at 18-may-2018

Powder silo & lime Concrete pillars for Powder silo &
46 23-May-2018 silo lime silo need to paint
Result of empty out from
47 23-May-2018 WB warehouse lime in 23 May 2018

48 23-May-2018 Safety All personel need to safety training

49 25-May-2018 Kiln 1 Individual test


50 25-May-2018 Kiln 1 Flyash analize
All personel electrical need to
51 25-May-2018 Electrical electrical training
Result of empty out from
52 25-May-2018 WB warehouse lime in 25 May 2018
Result of empty out from
53 28-May-2018 WB warehouse lime in 28 May 2018

54 28-May-2018 Kiln 1 Individual test

Material Handling Prepare commisioning at material


55 28-May-2018 handling
56 30-May-2018 Kiln 1 Individual test

57 30-May-2018 Kiln 1 Prepare commisioning at kiln 1

Genset & Casting done at compressor area &


58 30-May-2018 compressor genset
59 30-May-2018 Safety Training safety

60 30-May-2018 Electrical Training electrical

61 30-May-2018 Warehouse Refactory need loading to container

Result of empty out from


62 30-May-2018 WB warehouse lime in 30 May 2018

63 31-May-2018 Kiln 1 Individual test

64 31-May-2018 Lab Need place for XRF machine


Daily operation Meeting

Target
Action PIC WO Priority
Date
Individual test of blower house All Personil Andi 2
Create checkist for instrument of kiln 1 Haikal Hasanuddin 2
&2

Fabrication & Install isolation facility for Agus Mustofa Kurniawan 2


all LCS coal mill & handling panel

Totally 4 trucks as 28.73 Ton Saeful Husni 2

Individual test of waste gas filter control


unit & rotary bucket All Personil Andi 2

Install canopy for door MCC kiln Idad Kurniawan 2

Totally 7 trucks as 35.24 Ton Saeful Husni 2

Monitoring & follow up activity for All Personil Andi 2


performance test crusher plant
Fabrication cover drainage around office Bayan Kurniawan 2
area

Totally 4 trucks as 13.23 Ton Saeful Husni 2

Painting loading by area with yellow Ikhsan Andi 2


colour and black colour

Totally 3 trucks as 6.44 Ton Saeful Husni 2

Checklist labeling and cable scoon for Haikal Hasanuddin 2


PLC loesche, MCC loesche and all JB

Totally 10 trucks as 67.57 Ton Saeful Husni 2

Checklist labeling and scoon cable for all Haikal Hasanuddin 2


JB

Individual test off Lime stone handling All Personil Andi 2


and lime handling

Painting embankment in front of LVMDP, Haikal Hasanuddin 2


MVMDP and PLC Loesche

Totally 28 trucks as 268.18 Ton Saeful Husni 2


Inspection and change lighting at kiln 1 Firman Hasanuddin 2

Inspection and change fire truck pump Eeng Kurniawan 2

Individual test off rotary bucket All Personil Andi 2


Individual test off coolling system and All Personil Andi 2
hidraulic pump
Check water pipe is leakeg in the Agus Mustofa Kurniawan 2
workshop

Totally 13 trucks as 104.76 Ton Saeful Husni 2

Individual test off Loesche All Personil Andi 2

Inspection and change lighting at Haikal Hasanuddin 2


Booster pump

Totally 22 trucks as 194.08 Ton Saeful Husni 2

Follow up project for inspection double Agus Mustofa Project 2


valve is missing
Individual test of blower house All Personil Andi 2
Fabrication handle for door of blower Bayan Kurniawan 2
room

Totally 22 trucks as 203.74 Ton Saeful Husni 2

Install baricade under BC 410 All Personil Andi 2

Moving the breasing highest Agus Mustofa Kurniawan 2

Individual test of waste gas filter control All Personil Andi 2


unit

Totally 12 trucks as 106.56 Ton Saeful Husni 2

Individual test of skip bucket All Personil Andi 2


Check & repairing announciator fire Firman Hasanuddin 2
truck
monitoring & follow up activity for All Personil Project 2
performance test raymond mill

Inspection and change lighting at shift Haikal Hasanuddin 2


room

Relocation genset & compressor 2 & 4 Budi Hasanuddin 2


before concrate activity by vendor

Totally 3 trucks as 7.09 Ton Saeful Husni 2

Disconect power cable of generator, Haikal Hasanuddin 2


compressor 2 & 4
Individual test of Lime stone handling All Personil Andi 2
and lime handling

Totally 1 trucks as 7.90 Ton Saeful Husni 2

Recalibration weightbridge Saeful Husni 2

Painting concrete pillars for Powder silo Budi Andi 2


& lime silo

Totally 3 trucks as 5.87 Ton Saeful Husni 2

Training safety by Himawan All Personil Himawan 1

Individual test of rotray bucket All Personil Andi 2


Take sample from bag filter kiln 1 Ihsan Rady 2
Electrical
Training electrical by Fajar Hasanuddin 2
personil

Totally 1 trucks as 2.19 Ton Saeful Husni 2

Totally 2 trucks as 11.28 Ton Saeful Husni 2

Individual test of hidraulyc and cooling All Personil Andi 2


system
Inspection instrument and equipment All Personil Hasanuddin 2
dump hopper & bc 102
Individual test of blower house All Personil Andi 2

Checklist grasing point, instruments & All Personil Hasanuddin 2


equipment at discharge table

Reposition compressor no 2 & 4 & Budi Hasanuddin 2


genset
Cont. safety training by Himawan All Personil Himawan 2
Electrical
Training electrical by Fajar Fajar 2
personil
Monitoring loading refactory to Rustam Andi 2
countainer

Totally 1 trucks as 4.54 Ton Saeful Husni 2

Individual test of rotray bucket & wate All Personil Andi 2


gas filter control unit

Relocation safety equipment, cleaning Ariawan & Agus Radi & 2


room & install XRF machine Mustofa Hasanuddin
Status Date Closed Comment
Done

In Progress

in Progress

Total lime out from 30 April 2018


Continue warehouse 1492 Ton

Done

Done Temporary canopy need to repair

Total lime out from 2 May 2018


Continue warehouse 1527.24 Ton

Continue

In Progress Waiting angle bar & round bar

Total lime out from 3 May 2018


Continue warehouse 1516.47 Ton

Done

Total lime out from 7 May 2018


Continue warehouse 1522.91 Ton

Follow up project for labeling and


In Progress scoon cable

Total lime out from 8 May 2018


Continue warehouse 1590.48 Ton
Follow up project for labeling and
In Progress scoon cable

Done

Done

Total lime out from 9 May 2018


Continue warehouse 1858.66 Ton
Done

Done

Done

Done

Done

Total lime out from 14 May 2018


Continue warehouse 224.53 Ton
Done

In Progress Waiting spare for lamp

Total lime out from 15 May 2018


Continue warehouse 2437.33 Ton

Done

Done

Done

Total lime out from 16 May 2018


Continue warehouse 2641.07 Ton

Done

Done

Done

Total lime out from 17 May 2018


Continue warehouse 2747.63 Ton
Done

In Progress

Done

Ballast for lamp in shift room is


In Progress broken

Done

Total lime out from 21 May 2018


Continue warehouse 2756.52 Ton

Done
Done

Total lime out from 22 May 2018


Continue warehouse 2764.42 Ton

Total lime out from 21 May 2018


In Progress warehouse 2756.52 Ton

done Lime silo area in progress

Total lime out from 23 May 2018


Continue warehouse 2770.29 Ton

Done

Done
Done

Done

Total lime out from 24 May 2018


Continue warehouse 2772.48 Ton
Total lime out from 28 May 2018
Continue warehouse 2783.76 Ton

Done

Done

Done

Done

Done

Done

Done

Refactory & cement for casting


Done totally is 4 Containers 65.92 Ton
Total lime out from 28 May 2018
Continue warehouse 2788.3 Ton

Done

In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily oper

No Data Entered Shop / Area Discussion Point

Result of empty out from warehouse


1 7-june-2018 WB lime in 4-6 Juni 2018

2 7-june-2018 Raymond Mill Performance test of raymond mill

3 7-june-2018 Kiln 1 Motor at plant need to checklist

4 7-june-2018 Raymond Mill Rotary feeder need to inspection for


make spare

Checklist readinees equipment before


5 7-june-2018 Loesche start

6 8-june-2018 Raymond Mill Finding issue screw is jammed


7 Double valve is loose

Safety lime guide line install


8 8-june-2018 All shop diphoterine station with alarm system

12 8-june-2018 Warehouse TMP implementation

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
Daily operation Meeting

Target
Action PIC WO Priority
Date

Totally 8 trucks as 142.42 Ton Saeful Husni 2

Monitoring and follow project activity All personil Project 2

Checklist all Motors Rismawan Hasannudin 2


Inpection rotary feeder after raymond Budi Kurniawan 2
test

All personil Hasannudin 2

Andi Project 2
Follow up project

Create PR for Sign board Ihsan Andi 2

Marking & painting station area Ihsan Andi 2

Install frame for sign board budi Andi 2 25-June-18

Install Alarm system for diphoterine


Ariawan Hasannudin 2
station
Sign board, pedistrian road & forklift Saeful Andi 2
movement area
Status Date Closed Comment

Total lime out from 7 Juni 2018


Continue warehouse 2925.74 Ton

Done

Done

Done

Finding during loesche engineer


test : seleonide valve for hydraulic,
Done load cell conection to CCR,
purchase water spray

Done

Make sure sign board recevie 1st


done week july 2018

Done Follow lime safety guide line

Done

In Progress

In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily op

No Data Entered Shop / Area Discussion Point

1 3-July-2018 Kiln 1 Spider burner need to flusing

Preparing wood & straw material


2 3-July-2018 Kiln 1 for heating up kiln 1

3 3-July-2018 Kiln 1 Prepare coal for heating p kiln 1

Ubnormal Dumper Y2 signal in CCR


4 3-July-2018 Loesche & Loesche mill building

setting parameters for kiln start up


5 3-July-2018 CCR kiln 1 should be prepared

12 4-Jul-18 Kiln 1 Kiln 1 area need to clean


All startup materials (wood &
13 4-Jul-18 Kiln 1 straw) are collected in the bag filter
room
Genset & No handril in front of genset &
14 4-Jul-18 compressor compressor no 2 & 4 area
Termocople for Kiln 1 need to
15 5-Jul-18 Kiln 1 install for heating up prosedure
Spray water nozzle need to
16 5-Jul-18 Loesche inspection due to pressure no
enough for coal mill running
All loesche equipment need to
17 5-Jul-18 Loesche check

18 5-Jul-18 Laboratory Palvulizer cover machine is broken

All personil need to able with


19 5-Jul-18 warehouse Packing machine
Nitrogen tubes have to stand by at
20 5-Jul-18 Kiln 1 coal dust building
Discharge hopper need to
21 9-Jul-18 Kiln 1 calibration
flap trap need to adjust due to not
22 9-Jul-18 Kiln 1 moving smoutly

23 9-Jul-18 Kiln 1 blower house need to running

new employe need to giving


24 9-Jul-18 Kiln 1 knowlarge for equipment in the
plant
Limestone unloading, limestone
25 9-Jul-18 Kiln 1 handing & lime handling need to
check & test

Prepare JSA for all activities in the


26 10-Jul-18 Safety palnt

Coal spillage during loading to the


27 10-Jul-18 Raw coal intake hopper
water pipe leaking behind
29 10-Jul-18 Workshop workshop
Limestone bearing drive pulley is abnrmal
30 10-Jul-18 handling sound at BC 103

Continue coal dust trial for coal


31 10-Jul-18 Coal Dust dust transport

10 trucks loading coal at coal


32 10-Jul-18 Coal storage storage
Emergency prepare unloading limestone at
33 10-Jul-18 Stockpile emergency stockpile

No safety guard for Tubes for


34 11-Jul-18 Workshop nitrogen at workshop area

35 11-Jul-18 CCR CCTV is not ready

36 11-Jul-18 Genset Commisioning genset

37 11-Jul-18 PLC all electrical crew need PLC training

Miss record for moving spare &


38 11-Jul-18 CCR tools in CCR
Raymond building need to house
39 11-Jul-18 Raymond keeping
Pipe leaking make up to water
40 11-Jul-18 Shift room storage tank
Solenoid for pneumatc valve
41 11-Jul-18 Coal Dust silo 1 leaking at coal dust silo 1 area

all handling material need to


42 11-Jul-18 handling Material inspection
No alarm system when
43 11-Jul-18 Coal grinding temperature or CO content high at
coal grinding area
Screen for explotion door is
44 11-Jul-18 Coal Dust silo 1 damage
size is bigger than standart
Limestone
45 11-Jul-18 requarment for SN 101 (35 x 35
handling mm)

Limestone
46 12-Jul-18 Bee hive at BC 102 & 103
handling

Training & sertification for Loader


47 12-Jul-18 HME opr & Forklift opr

48 12-Jul-18 Lime handling Material block in BE 406

49 12-Jul-18 Lime handling Leaking for hose DV 406

50 12-Jul-18 Safety Install diphoterine station

BC 404 need chute for fly ash &


51 13-Jul-18 Lime handling reject product
Ensure coal dust system ready
52 13-Jul-18 Kiln 1 during operation

53 13-Jul-18 General Server room need to clean

54 13-Jul-18 Lime handling BE 406 is short circuit


wood in the warehouse area should
55 13-Jul-18 warehouse be cut

56 16-Juli-18 Raw coal Prepare start up coal mill

Compressor & Compressor & genset area need to


57 16-Juli-18 genset House keeping
HMI display for lime grinding is
58 16-Juli-18 Raymond error
Ram for loading material raw coal
59 17-Jul-18 Raw coal handling is damage
Limestone
60 17-Jul-18 BC 109 need chute for undersize
handling

Start coal grinding produce coal


61 17-Jul-18 Coal Miil dust for kiln 1

Diesel pump needs to running auto


62 17-Jul-18 Kiln1 mode
6/28pressure gouge cooling
63 17-Jul-18 kiln1 systems burner not working
64 17-Jul-18 Kiln 1 oil for blower need to replace
Thermocouple HGG outlet temp is
65 18-Jul-18 Coal Mill error

66 19-Jul-18 Coal Mill Leaking at bag filter coal mill

Fire at dedusting filter coal mill


67 25-Jul-18 Coal Mill system
Need to install electrical power
68 26-Jul-18 Utility meter
Need PO for consumable part and
69 27-Jul-18 General common spare part for
maintenance

need to install automatic valve for


70 27-Jul-18 loesche compressors cooling burner and
sealing air dust pump

stone handling BC103 dan BC102


71 27-Jul-18 material handling cant automatic sequence

BC 401 cannot operate by


72 27-Jul-18 material handling sequences
Need portable engineering station
73 27-Jul-18 general for troubleshooting

74 29-Jul-18 Kiln 1 Sipider burner no 22 is block

Mill inlet pressure is +1.2 bar &


75 29-Jul-18 Loesche HGG outlet pressure +1.3 bar

Regulator compress air for coal


76 31-Jul-18 Coal dust system 1 dust silo venting is leaking
Thermocouple reading not acutare
77 31-Jul-18 Loesche at vesel screw pump coal dust
transport
Limestone Dust every ware from discharge BC
78 31-Jul-18 unloading 103 & 102
HME not allow to pass the drainage
79 31-Jul-18 Safety cover

80 31-Jul-18 Safety No handril beside MVMDP room

Out door compressor need to


Compressor
81 31-Jul-18 install drain rain water chanel &
outdoor canopy
Hoistcrane, lighting eraster
82 31-Jul-18 All area ,pressure vassel certification
weighing bridge No 1 need to tera
83 31-Jul-18 WB calibration & certification
Expotion door for coal dust kiln #1
84 10-Aug-18 Kiln 1 open when coal dust silo 60%

85 24-Aug-18 Coal grinding HSLM trip due to high pressure

Error position of diverter gate for


85 27-Aug-18 WB inlet valve 1 K1420GV1,

86 28-Aug-18 Safety Over speed in the plant

Safety shower for laboratoy low


88 28-Aug-18 Safety pressure water

Fluditation SH501 not working well


89 28-Aug-18 Raymond & deley stat due to blower house
for kiln 3 is locked

Maintenance schedule for


90 28-Aug-18 Compressor Compressor no 2 & 4

91 28-Aug-18 Loesche regulator CO2 diagframe is damage

92 28-Aug-18 Safety Additional sign board

Flay ash space limitation in the


92 28-Aug-18 Safety plant area

93 28-Aug-18 Loesche BE 601 need to inspection

94 28-Aug-18 Loesche dew point measurement


95 28-Aug-18 Lime handling BE 406 & 407 need to inspection
BC 401 & BC 402 need to additional
96 28-Aug-18 Lime handling greaseing

Save parameter kiln 1 after need to


97 29-Aug-18 Kiln 1 save limestone mix with 55 -80 mm

99 29-Aug-18 Packing Machine Powder silo full


100 29-Aug-18 WB Printer in WB need to change
Blower coal dust transport need to
101 30-Aug-18 Coal Mill inspection

Grounding cable at coal dust


102 30-Aug-18 Safety & Scurity building & coal mill shop is missing

Water on BC 401 & BC 402 When


103 30-Aug-18 Kiln 1 rain

104 30-Aug-18 Powder Handling Powder silo manual measurement


105 30-Aug-18 Lime handling BE 406 & BE 407 need modification

Unsafe action for Aplication PPE


106 31-Aug-18 Safety standard in the plant have to
refresh
Availability for mandatory PPE in
107 31-Aug-18 Safety the plant
31-Aug-18 Safety Dust come to office
Inerting gas minimum level for CO2
108 31-Aug-18 Safety & Nitrogen
Manualy Double valve for lime
109 31-Aug-18 Lime Milling grinding is broken

110 31-Aug-18 KWH meter KWH meter base on cost center

111
Daily operation Meeting

Action PIC WO Priority Target Date


Flusing all nozlle for spider burner to Ihsan & Kurniawan 2 7/3/2018
outside system Agustian
cut wood and collect straw for heating Taufik Andi 1 7/3/2018
up process kiln 1
Making a screen to filter coal as heating Budi Andi 2 7/4/2018
up kiln 1 material
Inspection dumper Y2 & repairing Ariawan Hassanudin 1 7/4/2018
conection signal
All senior control room operators
prepare all parameters for smooth start Husni Andi 1 7/6/2018
up kiln 1
Cleaning all kiln 1 area Riki Andi 1 7/5/2018

Collect all material (wood & straw) in Taufik Andi 1 7/4/2018


bag filter room

Install handrill infront of compresor no Budi Kurniawan 1 7/4/2018


2 & 4 area

Install termocouple at kiln 1 Saefudin Hassanudin 1 5-Jul-18

Inspection & create report for inspection Eeng Kurniawan 1 5-Jul-18


nozzle

Check redyness equipment for loesche Rismawan Kurniawan 1 5-Jul-18


mill running

Repairing cover palvulizer machine cover Bayan Kurniawan 1 5-Jul-18

Training packing machine with Mr. Surez Egi, Ariawan & Andi 1 5-Jul-18
Taufik
Make sure nitrogen tube all ready in Riki Andi 1 5-Jul-18
position at coal dust building

Calibration load cell Ariawan Hassanudin 1

adjust peneumatic for trap Ariawan Hassanudin 1

Ihsan &
running blower house for 4 hours Andi 1
Agustian

training with leader shift shift leader Andi 1


Test running & inspection Limestone
unloading, limestone handing & lime shift leader Andi 1
handling until 04.30 Pm

All jobs must have LMRA,


ALL Team Himawan 1 31-Aug-18
Review LMRA for all activities & crreate
JSA
Modify Intake hopper 601 smaller than Budi All Personel 1 11-Jul-18
loader bucket for inside sliding

Inspection & Repairing water line pipe Budi Kurniawan 1 13-Jul-18

Inspection & lubrication for bearing BC Eeng Kurniawan 1 10-Jul-18


103

Discuction in CCR, process, electrical,


mechanical & CCR operator for action ALL Team Andi 1
plant

Monitoring loading trucks at coal storage Taufik Andi 2

Check quality before unloading to Radi Suhendro 2


emergency stockpile

Install safety guard for nitrogen tubes at Budi Himawan 1


workshop area

Check conection with Lintec Saefudin Hassanudin 1

Check conection with Lintec & joint Rismawan Project 2


commisioning

ALL Electrical
PLC training with Mr. Fajar Hassanudin 1
crew

Improve CCR recording at Log book All CCR personil Andi 1

HK in Raymond mill building Taufik Andi 2

Repair leaking point at storage point Agus Mustofa Kurniawan 2

Replace pneumatic valve Firman Hassanudin 2

Inspection & checklist all handling


material (check scaper,guard, sensor, All Personil Andi 2
sway, etc)
Check location for instalation alarm Hassanudin Suhendro 1

Replace screen Agus Mustofa Kurniawan 2

Replace screen for SN 101 Kurniawan Suhendro 2

Remove bee hive at BC 102 & 103 area Agustian Himawan 1


by APAR

8 personil follow training for sertification Himawan HRD 1


loader & Forklift Operator

Cleaning BE 406 Ihsan & Riki Andi 2


Ridwan &
Replace hose for DV 406 Hassanudin 2
Firman
Saefudin &
Estimation cable for diphoterine station Ridwan Hassanudin 2

Fabriacation chute for BC 404 Bayan & Ali Kurniawan 2 16-Jul-18

Simulation coal dust to kiln by sequence Husni Andi 2 13-Jul-18


forced
Cleaning server room & collect spare Ridwan & Haikal Hassanudin 2 13-Jul-18
part in server room
Tracking short cable for BE 406 Rismawan Hassanudin 2 16-Jul-18
Cutting wood for heating up kiln 1 Asep Andi 2 13-Jul-18
preparation
Loading coal to raw coal silo & Rustam & Riki Andi 2
Inspection before start
House keeping compressor & genset Rismawan Ariawan 2
area

Follow up to project Suhendro Suresh 1

Root cause analyze & create accident Himawan Suhendro 1


report

Fabriacation chute for BC 109 Bayan & Ali Kurniawan 2

Top up raw coal silo up 8 m, All


document requare ready in place, All Personil Andi 2
Inspection all equipment before start &
running coal grinding

tracking diesel pump for running auto Ariawan Hassanudin 1


mode

Replace when sparepart arrive Ariawan Hassanudin 2

Replace when sparepart arrive budi Kurniawan 2


Replace thermocouple HGG outlet temp Ariawan Hassanudin 1

Repairing leaking point at bag filter coal Kurniawan Hassanudin 1


mill
Inspection & replace bag filter of Budi Kurniawan 1
dedusting coal mill system
Inspection point for installing power Ariawan Hasanuddin 2
meter

follow up to SCM Ariawan Hasanuddin 2

inspection for installing automatic valve Hassanudin Suhendro 2

Dumper DV101 Must be installed by Suhendro project 1


project for sequence start

need to monitoring programs by nando Ariawan Hasanuddin 1

create PR for portable engineering Hassanudin Suhendro 1


station

Inspection & flusing spider burner no 22


Budi Kurniawan 1
replacement burner no 22

Mill running local empty out material on


the table& crate WI for cleaning Reject All CCR personil Ihsan 2
Box & start table by manual

Replace regulator Ariawan Hasanuddin 1

Replace with longer thermocouple & Ariawan Hassanudin 2


replace when sparepart arrive

Instal curtain Ihsan Kurniawan 2

Refresh training to all operator Ihsan Himawan 1

Install handrill Budi Kurniawan 1

install rain water chanel & canopy Budi Hassanudin 2

Follow up To Plant manager & Safety Suhendro Himawan 1


Manager

Follow up to SCM Husni Suhendro 1


Check possibility to reduce pressure coal Ariawan Hassanudin 2
dust transport (blowet screw pump)

Finding during inspection transmitter up Ariawan Hassanudin 2


level of roller not working

Inspection & replace selenoide for Ariawan Hasanuddin 2


diverter gate for inlet valve 1

Refresh TMP training to all transporter


Tri Suhendro 1
Sign board max speed "10 km" &
circulation plant

Inspection & repairing water pressure Wina Firman 1

Inspection fluditation for SH 501 Electrical team Hassanudin 2

Replace oil & filter for compressor no 2 Firman Hassanudin 2


&4

Replace regulator Hendri Hassanudin 2

Review Additional sign board in the Tri Suhendro 2


plant
Follow up hazardous waste vendor &
TPS Tri Suhendro 1
Record hazardous waste to Log book

Inspection BE 601 Budi & Agustian Kurniawan 2

Install provesion on pipe Budi & tarpin Kurniawan 2


Inspection & cleaning BE 406 & 407 Taufik Andi 2

Greasing for BC 401 & BC 402 Agustian Kurniawan 2

Save parameter kiln 1 3 days, 1 day & 8 Ihsan Andi 2


hrs

No load test packing transport Ihsan Kurniawan 2


Change printer in WB Saeful Suhendro 2
Cleaning air filter coal dust transport Budi Kurniawan 2
blower

Create some cronologis & SAM reports Operation Tri 1

Inspection & install toeboard Ihsan & Budi Kurniawan 1

Install measurement hole Budi Kurniawan 2


Modify BE 406 & BE 407 Budi Kurniawan 2

Stop unsafe condition activity, Briefing & All Personil Tri 1


Refresh safety guide line

Ensure PPE stock available All Personil Tri 1

Install door closer Budi Kurniawan 1


Top up Co2 for inerting system & Saeful Kiki `1
Nitrogen tubes

Repairing manual double valve Budi Kurniawan 2

KWH coal grindinig sparate with plant Ariawan Hasanuddin 1


admin unit service
Status Date Closed Comment
out of water in nozzle no 16 &
Done 7/3/2018 Nozzle no 27 is broken

Done 7/3/2018 Move material to Bag filter kiln 1

Done 7/4/2018 1 unfinished screen

Done 7/4/2018

Review Parameters setting for kiln 1


Done 7/6/2018 by Mr. Benoa & Mr. Vlad

Done 7/5/2018

Done 7/4/2018

Done 7/4/2018

Done 5-Jul-18

Done 5-Jul-18

Continue 5-Jul-18

Done 5-Jul-18

Up date WI for packing machine


Continue 5-Jul-18 prosedure (Created)

Done 5-Jul-18

Done

Done

Done

Continue
Continue

Sign permit on site ( confine space,


Continue WAH, Hot work & all activities at
coal area)

Modify done for inside hopper 601


Done raw coal handling

Done

Done Cleaning bering & additional grase

Back to normal position for flange


done coal dust transport system &
continue fuel system to kiln 1

Continue 141,48 Ton for 10 Jul 2018

Continue 109.13 Ton for 10 Jul 2018

Relocation nitrogen tubes to coal


grinding area beside nitrogen liquid
Done for Coal Mill (while a buffer of
nitrogen tubes is installed mine,
before the chains come)

Follow up PO of transmiter &


In Progress recivier
Solve issue with Maerz people,
Done hydraulic pump 1 can't start from
scada & start localy is trip

Done

Continue

Done

Done Waiting leaking test by pressure

Follow up PO to SCM for


Done selenoinde valve

Continue Check bearing condition BC 102


In Progress Follow up PO to SCM

Done

Done Follow up PO to SCM

Make sure no bee hive / animal


Done attacks that endanger safety more
for all area

Done Sertification starrt 12-14 July 2018

Done

Done

In Progress Follow up PO to SCM

Done

Done

Done

Done

Done

Done

Done

Done Operate with Mouse ( crate PR)

Done Top up raw coal silo to 8 M

Done

Done

Done

Done

In Progress Follow up PO toSCM


Done

In Progress Follow up PO toSCM

Done

Done

In Progress Follow up PO toSCM

In Progress Follow up PO toSCM

Done

Done

In Progress Create PR tia portal

Continue

Continue review inspection sheet

Done WI & risk assesment visible on site

Done Follow up PO toSCM

In Progress Follow up PO toSCM

In Progress

Continue

Done

In Progress

In Progress

No PO since juni 2018 (Follow up


In Progress to SCM)
Continue Continue monitiring

Done

Done

Continue

In Progress

Done

Done

Done

In Progress

In Progress

Done

Done
Done Inspection during kiln 1 off

Done

Done

Done
In Progress Create PR

Done

Done Except, coaldust systems kiln2&3

Done

Done
Done

In Progress

In Progress

Done Create PR fo door closer

Done

Done

Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily op

No Data Entered Shop / Area Discussion Point


lime exposed into eyes durring
1 2-Sep-18 Safety sampling
Interlocking screw conveyors
2 2-Sep-18 Safety reymond and review sensors
position

3 2-Sep-18 Stone Handling SN 101 Need to install new screen

4 2-Sep-18 General Water filling to fire truck

5 2-Sep-18 All area All motor need to grease

Explotion vent 1 & 2 when Stop


12 5-Sep-18 Coal Mill sequence

Share incident lime expose lime to


13 5-Sep-18 Safety the eye

14 5-Sep-18 Coal Mill Limit swit need to replace

15 5-Sep-18 Laboratory AC not working in Laboratory


16 5-Sep-18 WB WB need to calibration
Bag Filter at coal mill dust collector
17 7-Sep-18 Coal Mill still run after stop product
transport
Raymond mill drive need to
18 7-Sep-18 Raymond Mill inspection
PS 401 & 402, PS 501 & 502 full
19 7-Sep-18 Silo capacity
Fly ash at loading bay area need to
20 7-Sep-18 Loading bay relocation

21 10-Sep-18 Lime Powder Area Leaking at SC 601

Packing hopper over flow due to


22 10-Sep-18 Packing Machine interlock load cell HH not working
(3000 kg)

23 10-Sep-18 Workshop Workshop need to house keeping

24 13-Sep-18 Powder Silo Fall from high

25 13-Sep-18 Packing Machine Chain for roller conveyor is damage


Unsafe action during inspection &
26 13-Sep-18 Safety open dump truck cover (terpauline)

The New TPS B3 building unsafe


27 13-Sep-18 Safety condition

28 13-Sep-18 Safety B3 waste status

29 14-Sep-18 Raymond Mill Raymond pre test after long stop

30 14-Sep-18 Loesche Mill Oil For HSLM need to add


31 14-Sep-18 Loesche Mill High temp in blower
32 17-Sep-18 Safety No APAR in office & Plant area

Start Raymond base on customer


33 17-Sep-18 Raymond Mill require

Lime Powder
35 18-Sep-18 Material Block at SC 602
Handling
Jumbo bag from canteen need to
40 18-Sep-18 Warehouse relocation to warehouse

41 18-Sep-18 Stockpile Baricade stockpile area

Dust emission at stokpile kiln #1 &


42 18-Sep-18 Stockpile #2
No power station at stone handling
45 18-Sep-18 Stone Handling area
Belt swey & high noize at stone
46 18-Sep-18 Stone Handling handling
Packing machine not achive
47 18-Sep-18 Packing Machine capacity 8 T/H

48 19-Sep-18 Raymond Mill Prepare & Inspection raymond Mill

49 19-Sep-18 Coal Mill Dust pump need to inspection


Belt cleaner for BC 401 402 is not
50 19-Sep-18 Lime handling available
Lime handling BC adjusment far
51 19-Sep-18 Lime handling from the BC 409

52 20-Sep-18 Fire Truck Property demage for fire truck

53 20-Sep-18 Safety No parking area for HME


54 20-Sep-18 Pedistrian way Cont. for plnat pedistrian
water contamination at SC lime
55 20-Sep-18 Powder handling powder area

56 20-Sep-18 Inventory Limestone reject from Bw & SBI

Filter blockage due to high dust


57 20-Sep-18 Coal Mill contamination
58 20-Sep-18 Powder handling Rotary valve abnormal sound
Lamp for road plant need to
59 20-Sep-18 Plant area replace

61 20-Sep-18 Raymond Mill Sample point need to improvement

62 21-Sep-18 Powder handling Big gap at telescopic plat foam

63 21-Sep-18 Electical panel Electical panel open condistion

64 21-Sep-18 Coal Mill Coal mill inspection

65 21-Sep-18 Kiln #1 Shell temp monitoring

Noltec system PLC need to


66 21-Sep-18 Raymond Mill relocation
67 21-Sep-18 Coal Mill 4 motor need to grease

Toe nails hit by table not wiring


68 24-Sep-18 Safety safety shoes

69 24-Sep-18 Utility Compressors oil Is reduced

Reject product ( limestone for raw


70 24-Sep-18 Quality material, lime, lime powder)

71 24-Sep-18 Disel Station Disel pump need to replace


High temp for motor blower due to
72 24-Sep-18 Coal Mill small fan
Schedule for Individual test of kiln
75 24-Sep-18 Kiln #1 #1
High fugutive dust & No cover for
76 24-Sep-18 Lime handling discharge VF 401 & 402

WAH issue standing on the fire


77 25-Sep-18 Fire Truck truck

77 25-Sep-18 Safety Bee nest at BC 102 & 103 area


Break dwon kiln 1 due to big stone
78 25-Sep-18 Kiln1 jam in VF tunnel

Compressor level oil is low for no 1


79 25-Sep-18 Compressor &3
Selenoide coal dust transport
80 25-Sep-18 Kiln 1 distribution no 2 is leaking

81 25-Sep-18 Raymond Mill Regulator in raymond is leaking

study for run board BC 102 & BC


82 25-Sep-18 Stone Handling 103 unloading stone system

84 25-Sep-18 Silo Powder Over load & reject from customer

8 Truck of limestone reject from


85 25-Sep-18 Raw Material PKBI due to CaCo3 is Under speck

85 25-Sep-18 Waste Non B3 No Rubish can at plant area


No Permit ( JSA, LMRA & WAH)
when perform high risk job,
86 26-Sep-18 Safety deblock material in telescopic to hi
blow

87 26-Sep-18 Stone Handling DV 101 can't running in auto

Screw conveyor USS fault ( bolts is


88 26-Sep-18 Raymond Mill broken )

Combustion air blower 2 is over


89 27-Sep-18 Kiln 1 heat

90 28-Sep-18 Coal Mill Inspection sechedule for coal mill

stock take for all inventory in the


91 28-Sep-18 Stockpile plant

92 3-Oct-18 Safety WAH Standing on the truck

Noise at flash dryer area due to


93 3-Oct-18 Safety regen time to long (240 sec)
instalation additional CCTV no
94 3-Oct-18 Safety information to operation team

95 4-Oct-18 Safety Smell of cigarete in CCR

Fall hazards operator of excavator


96 4-Oct-18 Safety standing on cover engine when
performing job
Humidity contamination at man
97 4-Oct-18 PS 401 hole PS 401 due to manhole not
fully close
Water pump system have to
98 4-Oct-18 Utility improve

99 4-Oct-18 Utility Filter Booster pump need to clean

Raw material limestone reject due


100 4-Oct-18 Quality to CaCO3 <96% & surface
impurities 2.3%

101 5-Oct-18 Safety Left Eyes hit by welding chips

102 5-Oct-18 Safety coal mill inspection

103 5-Oct-18 Safety Smoldering at coal storage

Driver Standing on the Hi blow


104 10-Oct-18 Safety when performing the job
No use safety glass when
105 10-Oct-18 Safety performing the job due to galassies
is blur

Quality CaO drop, due to rotary


106 10-Oct-18 Kiln 1 coal dust redusing / trip when 6
termocouples is spike

107 10-Oct-18 Operation Iddle run for material handling

Shaape tail pulley is out on the


108 10-Oct-18 Stone Handling housing

Contruction or base plat of WB is


109 10-Oct-18 WB damage

Product silo 401 & 402 need to


110 11-Oct-18 Lime handling install new measuring hole
Vibrating feeder 101 overload due
111 11-Oct-18 Stone Handling to high speed
oil For bucket elevator need to
112 11-Oct-18 Lime handling replace

113 11-Oct-18 Workshop Scrap need to relocate to B3 room

grase bearing screw conveyor is


114 12-Oct-18 Kiln 1 melting
115 12-Oct-18 Loesche Mill BE 601 need to replace oil
Classifier bering need to additional
116 12-Oct-18 Loesche Mill grease
Driver SBK standing on the Hi Blow
117 15-10-18 Safety when performing the job
PS 501 & 502 indication level is not
118 15-10-18 Powder silo acurate

119 16-10-18 Coal Mill False air in coal grinding

120 16-10-18 Coal Mill False air in coal grinding

121 16-10-18 Plant area Draianaage Full sediment

122 16-10-18 All area Mapping APAR not clear in All Area

Indication temp at vessel is not


123 16-10-18 Coal Mill corect
Temperature hot gas & mill inlet
123 16-10-18 Coal Mill mill need to check
Lamp in coal building is not "ON" in
124 17-10-18 Loesche Mill bag filter area

125 17-10-18 Kiln 1 Hose of direct chimney is damage

126 17-10-18 Safety All APAR need to put in great place

WB need to weigh test after


127 17-10-18 WB repairing
Hose Fitting for powder silo
128 17-10-18 Utility aeration need to improve

120 18-10-18 Coal Mill Co Content high after stop coal mill

Loader Opr standing on loader


121 18-10-18 safety when performing jobs
Hose of water spray in coal mill is
122 18-10-18 Coal Mill leaking
V belt for combustion blower kiln 2
123 18-10-18 Kiln 1 is damage

Properties damage (Rolling door)


124 19-10-18 Warehouse due to crashing with Forklift

Kiln #1 tripTemperature top kiln is


125 19-10-18 Kiln 1 error

Kiln #1 trip due to Combustion air


126 19-10-18 Kiln 1 blower no 2 is in protective mode

Regulator direct chimney need to


127 19-10-18 kiln 1 relocation

128 19-10-18 Lump silo Noise when material fall to PS 402

Limestone
129 19-10-18 Noise at SN 101 when material plat
handling
Cover draianage inspection hole
130 22-10-18 Utility corner warehouse to the powder
silo is damage

Unsafe action during weekend,


131 22-10-18 Safety some task working without proper
PPE
Prepare for installation VF at
132 22-10-18 Raymond Mill raymond mill

133 22-10-18 Packing Machine Sequence test of packing machine

134 22-10-18 Coal Mill Leaking point at manhole bag filter

Limestone No Maintenance acees to Conter


135 22-10-18 handling weight BC 102 & 103

Unsafe condition during loading


136 22-10-18 Safety jumbo bag at loading bay area

Limestone conveyor for K#2 ( BC106 & 108),


137 22-10-18 handling Rubber skirt need to rectify.

Plant no smoking area, cigarete


138 23-10-18 Workshop butt at workshop area

139 23-10-18 WB Commissioning WB no 2

Need power supply to support


140 23-10-18 Coal storage vendor install hydran
Loto matrix and loto box need to
141 23-10-18 All area install at every shop
Plange burner need to install
142 24-10-18 Kiln 1
grouding cable

Commissioning alarm & training for


143 24-10-18 Safety alarm system in the plant

acid cabinet for door holder is


144 24-10-18 Laboratory damage
Unsafe condition cable at stockpile
145 25-10-18 Safety kiln 3

146 25-10-18 Safety Lime safety guide line

Limestone gear box oil for BC 102 & 103 need


147 25-10-18 handling to replace
Limestone
148 25-10-18 take up pulley for BC 103 is damage
handling

149 25-10-18 Stone Handling Spillage return roller BC 104

dark at take up pulley area 102 &


150 26-10-18 Stone Handling 103
No access for switch manual valve
151 29-10-18 Safety purging system CO2 to vessel

152 29-10-18 Safety Kiln running with pressurize

Safety coordination project task


153 29-10-18 Safety (hydran system)
154 29-10-18 WB 2 No distrube for WB 2

2 bolts for purging system is


155 29-10-18 Kiln #1 damage

Weighing load cell at raw coal is still


156 29-10-18 Coal Mill not clear

Rain coat can not use in plant due


157 30-10-18 Safety to have no reflector
158 30-10-18 safety Motor BV 401 is short
Water Contamination at BC 401 &
159 30-10-18 Safety 402 area
160 30-10-18 Raymond Mill Fan for Motor FS 401 is damage
161 31-10-18
162 31-10-18
18-10-18
Daily operation Meeting

Action PIC WO Priority Target Date

investigation meeting Tri Suhendro 1 10/3/2018

Check Interlocking raymond mill, Ariawan Kurniawan 1


inspection sensor position

Install new screen Budi Kurniawan 1

Install new water line for fire truck Budi Kurniawan 1

Install new naple for greasing than Ariawan Hasanuddin 2


greasing according spesification motor

Repair expotion door Budi Kurniawan 1

Trend Analysis & review WI stop Ihsan Andi 1


sequence Loesche Mill

Share investigation reports to all team Tri Suhendro 1 10/3/2018

Replace limit swit for explotion vent 1 & Ariawan Hasanuddin 1


2
Repairing AC in Laboratory Wina Ariawan 2
Calibration WB with vendor Saeful Hasanuddin 1

Ensure bag filter coal dust transport Off


All CCR Opr Andi 1
after stop Product Transport

Inspection raymond mill drive Budi Kurniawan 2

Relocation product to loading bay area All shif Leader Suhendro 2

Relocation fly ash Tri Suhendro 2

Close the gate with silicone at SC 601 Budi Kurniawan 2

Check signal & interlock system for lime Ariawan Hasanuddin 2


powder sequence transport

HK workshop Budi Kurniawan 2

Install safety life line Bayan Kurniawan 2

Install chain for roller conveyor Budi Kurniawan 3


Check location for dump truck Tri Kurniawan 1 31-Oct-18
inspection station

Review & Follow up to contractor Tri Suhendro 1 9-Oct-18

Fly ash data Ihsan


Chemical waste Wina
Oil, filter, majun, grease & contaminated Budi Suhendro 2
good

Electrical tonner, accu, komputer etc Ariawan

HK & individual Equipment test, stat


sequence witout material & test Ihsan Andi 2
transport system
Add HSLM oil for HSLM Budi Kurniawan 2
Create ventilation in blower Budi Kurniawan 2
review & re mapping for APAR Tri Suhendro 1
Take sample before stat to CaO >90% & Operation team
T60 <9 Min Andi 2

Monitoring screw conveyor aftr cyclone Operation team Andi 2

Check termination, open cover screw & Taufik & Haikal Andi 2
cleaning material block
Relocation all jumbo bag from canteen Saeful Andi 2
to warehouse
stockpile fly ash
Stockpile kiln #1 & #2 Ihsan Trimunggara 1
Emergency Stockpile Kiln #1 & #2

Study for install sprey system Trimunggara Suhendro 1

Install power station at stone handling Rismawan Hasanuddin 1


area
Repair discharge chute & install guide
plate Budi Kurniawan 2

Ensure packing machine system start Hasanuddin Suhendro 2


Auto system

Inspection raymond mill Operation team Andi 2 19-Sep-18

Inspepction dust pump bin vent Eeng Kurniawan 2 19-Sep-18

Install belt cleaner at BC 401 & 402 Budi Kurniawan 2

Reposition near VF 401 Ariawan Hasanuddin 2

Create cronology & repairing fire truck Tri Suhendro 2

Create parking area for HME Tri Suhendro 1


Marking & Cont. paiting Tri Suhendro 2
Add silicone for all SC lime powder Ihsan Kurniawan 2
handling
BW CaCo3 <96% & Inspection stockpile Wina Suhendro 1
before delivery to plant
SBI Big stone & clay contamination &
Inspection stockpile before delivery to Wina Suhendro 1
plant

Clening water storage & intall full cover Budi Kurniawan 2

Inspeksi rotary valve Budi Kurniawan 2

Replace lamps at plant area Ariawan Hasanuddin 2

Replace with bigger size of pipe Budi Kurniawan 2

Instal hand rail arund plat foam Budi Hasanuddin 1


Ensure all electrical panel in close All electical Hasanuddin 2
position

Inspection & start coal mill Operation team Hasanuddin 2

Mapping temp. kiln shell Operation team Andi 2

Relocation from kiln 3 blower room Suhendro Project 2

Add grease before start caol mill Rismawan Hasanuddin 2

Ensure All Personel use PPE 1


Tri Suhendro
First Aid Madichine must be Availiable at 1
all Area
Inspection Compressors for root cause Ariawan Hasanuddin 2
and fill oil compressors

Discustion point with SCM, geologist, All Manager Suhendro 2


laboratory & sales team

Replace disel pump Budi Kurniawan 2

Replace fan at motor blower Ariawan Hasanuddin 2

Individual test of kiln #1 Operation team Andi 2

Instal cover for VF 401 & 402 Budi Kurniawan 2

Install ancor point on the fire truck Kurniawan Trimunggara 1

Remove bee nest at BC 102 & 103 area Ihsan Trimunggara 1


Ensure bargate is 3 open 1 close
position, check on site & contol flow Operation team Andi 2
material by patroler & CCR opr
Top up level oil no 1 & 3 & preventive Ariawan Hasanuddin 2
maintenace
Replace selenoide coal dust transport Ariawan Hasanuddin 2
distribution no 2

Repair lekaing point at noltec system Ariawan Hasanuddin 2

Safety check
Operation team Kurniawan 2
Individual & sequence test stone
handling
Install facility unload from hi blow to silo Kurniawan Suhendro 2
powder

Inspection to stockpile PKBI Radi Suhendro 2

Cordination with government Gema Suhendro 2

Ensure all activity have permit Operation team Trimunggara 1

Ensure unloading system can stat in auto Ariawan Hasanuddin 2

Repair broken bolts for screw conveyor Budi Kurniawan 2

Inspection to cleaning filter Combustion Ariawan Hasanuddin 1


air & inspection to VSD at MCC kiln

Inspection coal mill area Operation team Andi 2

Stock take all inventory in the plant with Operation team


finance & Operation crew Suhendro 2

Ensure no standing on high level All Operation


position at 1.8 m high & use body Trimunggara 2
team
harneess
Inspection & reduce regen time for Ariawan Hasanuddin 2
pressure

Cordination with project Trimunggara Suhendro 1

investigation
Socialitation new rules regarding no All people in the Trimunggara 1
smoking area in the plant since 1 palnt
October 2018

Operator
Refresh the safety rules Trimunggara 1
Excavator
Ensure manhole fully close with sealing Shif leader Ihsan 2

Install new tank Ariawan Hasanuddin 2

Inspection & Cleaning filter booster Budi Hasanuddin 2


pump

MBF Stockpile inspection before cont. Purnomo Suhendro 2


delivery

Create cronology & create SAM reports


Kurniawan Trimunggara 1
All acident have to comunication/ share
to SVP & Superior
Create & collect all time sheet for all Ihsan Trimunggara 1
HME
Inspection, monitoring & compating coal Rustam Andi 1
at coal storage
Facility for inspection truck available in All people in the Trimunggara 1
the plant palnt

Review for type for safety google & Trimunggara Suhendro 1


monitoring minimun stock in the plant

Setting delay time to normal 10 sec &


find out the root cause of interlock Ariawan Hasanuddin 1
system
Ensure all equipment of material All CCR Opr Andi 2
handling off after operation

Repairing it Budi Kurniawan 2

Repiring Budi Kurniawan 2

Test Weigh Ariawan Hasanuddin 2

Install measuring hole Budi Kurniawan 2

Reduce speed vibrating feeder 101 Ariawan Hasanuddin 2

Replace oil Budi Kurniawan 2

inspection & filter scrap and relocate to All personel Trimunggara 1


B3 Room

Additional grease / change type of grase Budi Kurniawan 2

Replace oil for BE 601 Budi Kurniawan 2

Add grase Budi Kurniawan 2

New transporter not induction yet Tri Husni 1


Calibration level sensor Ariawan Hasanuddin 2

close gap at drag chain, flow gate, Ihsan Kurniawan 1


cassing bolts

flange bolt ducting inlet bag filter Budi Kurniawan 1

Cleaning plant drainage All shif Leader Andi 2

Share APAR possition in the plant Trimunggara Suhendro 1

Replace thermocouple with longger Ariawan Hasanuddin 1


thermocouple

Visual inspection Ariawan Hasanuddin 2

Inspection & replace Rismawan Hasanuddin 2

Replace hose Budi Kurniawan 1

Install hanger for APAR position Kurniawan Trimunggara 1

Test Weigh Rismawan Hasanuddin 2

Build up elbow / fitting Budi Kurniawan 2

Review stop sequence for safety All personel Suhendro 1


condition after stop coal mill

Refresh the safety rules All personel Trimunggara 1

Repairing / replace hose Budi Kurniawan 2

Replace v-belt Budi Kurniawan 2

Investigation reports
Trimunggara Suhendro 2

Repairing rolling door

Inspection & replace termocouple Ariawan Hasanuddin 1

Invenstigation root cause Ariawan Hasanuddin 1

Reposition regulator Budi Kurniawan 2

Install noise absorber Tarpin Kurniawan 2

Install noise absorber Budi Kurniawan 2


Replace cover Budi Kurniawan 2

Share weekend activities for safety Tri Suhendro 1


concern

Empty out all product from PS 502 All shif Leader Ihsan 2

Ensure packing machine system start Ariawan Hasanuddin 2


Auto system
Add silicone at leaking point & around Eeng Kurniawan 2
man hole bag filter

Fabrication maintenance aceess Budi Kurniawan 2

Review WI loading jumbo bag to truck ihsan Andi 2

Review Forklift Trimunggara Suhendro 1

Repairing skrit rubber Suhendro Project 2

Install information board NO smoking at All personel Trimunggara 1


workshop area
Saeful &
Join Commissioning Hasanuddin 2
Ariawan

Inform to vendor power location Ariawan Hasanuddin 2

Create PR for white board and etc Ihsan Andi 2

Install grounding cable Ariawan Hasanuddin 2

Tri, ihsan &


Joint Commisioning Project 1
Ariawan

Repairing Budi Kurniawan 1

Inspection cable Ariawan Hasanuddin 1

Install shower at kiln 1 area (Kiln door Budi Kurniawan 1


area)

Replace oil Budi Kurniawan 2

Replace bearing Budi Kurniawan 1

Adjust secondery belt cleaner BC 104 Shif leader Kurniawan 1

Install lighting Ariawan Kurniawan 1


Install plat form Budi Kurniawan 1

Check interlock with purging system Ariawan Hasanuddin 1


Review log sheet Kiln operation Ihsan Andi 1

Meeting with PT Indolock Trimunggara Suhendro 1

Waiting handover from Project Suhendro Project 1

Install new bolts Budi Kurniawan 1

Check calibraton status Suhendro Project 1

ask manual book Suhendro Project 1

Create PR for rain coat & review Trimunggara Suhendro 1

Rewinding motor Rismawan Hasanuddin 1


Inspection & install cover at
contamination area Budi Kurniawan 1

Replace impeler Budi Kurniawan 1


Status Date Closed Comment

Done Share to all Sibelco company

Done

Done

Done

Done

Done
Create Insvestigation report
Done

Done Create Root cause analysis

Done

Done
Done

Continue

Done

Continue

Done

Done

Max capacity 3000 kg reduce to


Done 2500 kg for over flow

Done

Done

Done
Done

Done Waiting for permit realase

Continue Fly ash done

Done

Done
Done
Done
Bellow target PS 502 & on target
Done 501

Done

Done

Done

Done
Done Temporary Baricade
Done

in progress

Done Replace MCB

Done

Peripication to Project & Invite


in progress vendor for give training

Done

Done
Follow up SCM & Adjusment for BC
Done cleaner at other area

Done

in progress

in progress
in progress
Done

Continue

Continue

2 Week basis for cleaning water


in progress storage
Done
Waiting sparepart to repair fitting
in progress lamp

Done Check actual quantity of sample

Done

Continue

Done

Continue Weekly Basis

in progress

Done

in progress
First Aid Box Audit

Done

Continue

Done

in progress

Done

Done

Share to all team for use body


Done harness when perform task on the
fire truck

Done
Continue

Done

Done

Done

Done

in progress

Recheck stock pile befor send


Done limestone material to plant

in progress

Done

Done

Done

Done

Done

Done

Continue

Done Reduce regen time to 120- min

Continue Share all activites in the plant

Done

Continue
Done

in progress

Done

Confirmation to Purnomo before


Continue unloading limestone at our
stockpile

in progress Waiting share point for acident

Continue

Continue

Warning all shift leader not use


Continue facility

in progress

Discustion with Armin ( Stop Coal


Continue dust supplay, Kiln OFF)

Continue

Done

Done

in progress Gap 10 Kg at repairing point

Done

Done

Done

in progress

Done

Done

Done

Continue
Done

Cont. monitoring when running


Continue condition
Cont. monitoring when running
Continue condition
Install baricade when open
Continue drainage cover

in progress

Done

Done

in progress

Done

in progress

Done

Build up fitting hose if leakage


Continue condition

in progress

Continue

Done

Done

Done

in progress Follow up SCM

Done

Done

Done

Done
Done

Continue

in progress Waiting confirmation from project

Done Test by material

Continue

Done

in progress

in progress

in progress

Done

in progress

Done

in progress Follow up SCM

Done

Done Resechedule Project Lintec

Done

done

Done

Done

Done

Done

Done
in progress Standby ladder

Done Install protect cooler


Done

Done

in progress

Reduce Compress air purging from


Done 6 to 5 mbar & change interpal 6 sec

in progress

in progress

in progress

Done No spare for motor BV

Done

in progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily o

No Data Entered Shop / Area Discussion Point


Indolok activies during installation
1 5-Nov-18 Coal storage water pipe line
Nitrogen Tube condition is usafe
2 5-Nov-18 Kiln condition

3 5-Nov-18 Coal Grinding

Diverter for 401 & 402 need to


7 6-Nov-18 Lime Handling improve

13 8-Nov-18 Safety

16 8-Nov-18 Limestone handling washing stone need to improve

Spillage at water pound difficult to


17 8-Nov-18 Water pound clean

HK tools (steal pipe, metal scrap etc) at


20 9-Nov-18 Safety pedistrian way

Near miss BC 102 cut off all the belt


22 12-Nov-18 Limestone handling flow dwon the ground area

23 12-Nov-18 Limestone handling BC 102 is cut off due to overload

24 12-Nov-18 Raymond

25 12-Nov-18 Kiln #1 6 Temperature burner Kiln spike


27 12-Nov-18 Kiln #1 Coal Dust rotary valve 2 spike

28 13-Nov-18 Safety Motor cycle enter to the plant

29 13-Nov-18 Fire Truck Sirine of Fire Truck is Demange

Waste Gas Filter Vibrating Detector


30 13-Nov-18 Kiln #1 Alarm High

First aid injury skin iriatation during


32 16-Nov-18 Safety cleaning material block in the mill

right Spion for Operatin car need to


33 16-Nov-18 Safety repairing/replace
T60 for Hi blow deliver to customer
35 16-Nov-18 Quality >12 min

36 19-Nov-18 Safety Poundation emergency silo coal dust


damage hit by loader
Take sample lime powder from chute
38 19-Nov-18 Powder Handling from 501 & 502
Door toilet Lintec container is damage
40 21-Nov-18 Safety due to hit by loader
41 21-Nov-18 Safety Fire Truck hit warehouse wall

Unsafe action during install & remove


42 21-Nov-18 Safety jumbo bag for fly ash at BC 404

Contractor not use PPE properly


43 21-Nov-18 Safety during work at out door compressor

Oil for roller of raymond mill need to


44 21-Nov-18 Raymond inspection
Power failure from PLN, during heavy
45 21-Nov-18 Plant raining
Kiln stop due to deviation discharge
46 21-Nov-18 Kiln #1 line -500 kg

47 21-Nov-18 Kiln #1 Modul cleaning filter unit error

48 21-Nov-18 Kiln #1 Skrit rubber for BC 105 is damage

PWS of BC 102 can't not reset form


50 21-Nov-18 Stone Handling out side

51 22-Nov-18 Stone Handling Cable at BC102 cables scattered about

empty Truck not allowed to parking at


52 22-Nov-18 plant front of plant due to distrub transport
access
53 22-Nov-18 Coal grinding Coal grinding need to preventive

preparation room need more electrical


54 22-Nov-18 Laboratory Power supply and air compressors

Abnormal sound at screw conveyors


55 22-Nov-18 Kiln#1 fly ash
Truck Hi-Blow driver not use PPE in
56 23-Nov-18 Safety the palnt at evening

57 23-Nov-18 Safety Man power in the plant not enough

58 23-Nov-18 Safety Nitrogen Tube no protection

59 23-Nov-18 Washing stone Plant water resources not enough

60 23-Nov-18 Safety Landslide behind tunnel kiln #3


Water distribution cooling tower not
61 23-Nov-18 Coal Mill rotate
Contractor not use PPE properly
62 28-Nov-18 Safety during work at hydrant pump

Unsafe action (WAH) hydrant water


63 28-Nov-18 Safety tank installation standing on the tank
without full body harness

RAM for loading coal to hopper 601 is


64 28-Nov-18 Coal storage damage
65 28-Nov-18 Kiln#1 Motor Heat Exchanger Overload
Isolation cable 20 KV need to check
66 28-Nov-18 Trafo due to flashover

Motor cooling water no 2 abnormal


67 28-Nov-18 Kiln#1 sound due to coupling ruber damage

Waste Gas Filter Vibrating Detector


68 28-Nov-18 Kiln#1 Alarm High
67 28-Nov-18 Coal Mill Expolosive door no 12 is leaking
Near miss at pedistrian behind
68 28-Nov-18 Preparation room preparation room due to zink not in
proper position

69 28-Nov-18 BC 105 Spillage under BC 105 need to clean

70 29-Nov-18 Safety stone sediment flow water to the river

Transportation truk is slip at


71 29-Nov-18 Safety emergency stock pile
Big stone is block at chute VF dump
72 30-Nov-18 Safety hopper
Hi Blow driver not use mandatory PPE
73 30-Nov-18 Safety in customer plant
Worker from out side not use
74 30-Nov-18 Safety mandatory PPE
75 30-Nov-18 Stone Handling Belt for BC 102 is scrath
BC 109, BC 102 & BC 103 need to
76 30-Nov-18 Stone Handling install self aligning roller
capasitor bank fro LVMDP 1 for
77 30-Nov-18 LVMDP 1 contoling cost Phi
Melting cable waste gas contol unit to
78 30-Nov-18 Bag filter K#1 field nee to replace
Weekend Lintech is not use Proply PPE
79 3-Dec-18 Safety during performing job fabrication tank
coal dust

Kiln off due to low pressure to kiln


80 3-Dec-18 Compress air system

weighing different with customers


81 3-Dec-18 WB (Laibel) 8 ton

82 3-Dec-18 Kiln #1 PM Schedule

83 4-Dec-18 Safety Truck driver not use PPE in the palnt

Welding gloves is damage & stock not


84 4-Dec-18 Safety avialable
85 4-Dec-18 Kiln #1 Temp kiln #1 is not stabil
86 4-Dec-18 Kiln #1 Rotary no 2 valve is leaking

87 4-Dec-18 Kiln #1 Position pistion spike error for no 2

Emergency cooling system pump is


88 4-Dec-18 Kiln #1 leaking

89 5-Dec-18 Safety Farmer want to harvest at garden

90 5-Dec-18 Safety Undersize stockpile need to relocated

Plant struck by lighting durring raining


91 6-Dec-18 Safety due to plant
is prone to lightning strikes

92 6-Dec-18 Safety water leakage at windows office


93 6-Dec-18 Safety safety Goggles not properly used

94 6-Dec-18 Raymond
Roller mill need to add lubrication oil
95 6-Dec-18 all Area Check all equipment damage due to
lighting stikes
material flushing from sampling point
96 7-Dec-18 Safety PS 502 due to manual valve not install
yet

Driver impact from flushing material


97 7-Dec-18 Safety red eyes driver hit by powder
Bolt is damage for cover fan whizzer
98 7-Dec-18 Raymond motor

99 7-Dec-18 Lime handling DC 403 is block due to wet dust

BC 402 is scratch due to material blok


100 7-Dec-18 Lime handling at chute to BC 404
Coal Truck driver not use PPE properly
101 10-Dec-18 Safety in the palnt

102 10-Dec-18 Kiln #1 Quantity Production lost

Hydraulic of discharge table no 2 for


103 10-Dec-18 Kiln #1 kiln #1 need to replace
104 10-Dec-18 Stone Handling BC 105 need to instal belt trainer

Current electrical LOTO device is not


105 11-Dec-18 Safety suitable with fied power cut device

106 11-Dec-18 Safety Slippery at road below lump silo


Suresh fall down between silo powder
107 11-Dec-18 Safety and warehouse
Calculation method for material
108 11-Dec-18 Raymond transport raymond mill need to check

109 12-Dec-18 Safety Fuel disel Spillage around fuel station

Skirt rubber for BC 601 need to


110 12-Dec-18 Coal mill replace
Nipple grase for hydraulic cylinder 2
111 12-Dec-18 Kiln #1 need to modify
Third party (SCG) new rules about
112 13-Dec-18 Safety transporter safety incuding pinalty for
violation
Pipe Leaking at fuel station for filling
113 13-Dec-18 Fuel Station HME
Snub pulley for BC 102 need to
114 13-Dec-18 BC 102 dislocated
115 13-Dec-18 Safety BC 109 need to install safety guard
Washing stone need to install by pass
116 13-Dec-18 Limestone handling line

New working plat form for BC 102 &


103 need to install lamp
117 13-Dec-18 BC 102 & BC 103
At tail pulley area for BC 102 & 103
need to install lamp

Loading Hi-Blow by 2 person due to


118 13-Dec-18 Slocal panel position at second floor
119 14-Dec-18 Safety Lintec office need to baricade

120 14-Dec-18 Safety Sediment pound need to bariccade


PS 502 need to packing with jumbo
121 14-Dec-18 Powder Handling bag due to Tonase in the silo is 411
Ton

122 14-Dec-18 Raymond 6 Roller oil level need to check

High pressure pump for fire truck is


123 14-Dec-18 Fire Truck leaking

Undersize quantity is different


124 14-Dec-18 Undersize between screen Laboratory & actual
screen

Foreign people in the plant ( children)


125 15-Dec-18 Safety from farm behind workshop

126 15-Dec-18 Safety Spillage fly ash from BC 402

127 15-Dec-18 Lime handling BE 406 & 407 need to inspection


Water pipe line for washing stone is
128 15-Dec-18 Water pipe leaking
129 15-Dec-18 BC 105 Gap rubber at tail BC 105

Raymond stop 4.13 hrs due tp whizzer


130 18-Dec-18 Raymond motor trip, comunication error

No scune cable for motor


Kiln stop 2.32 hrs due to modul lower
131 18-Dec-18 Kiln #1 bin hopper is short
Heat input calculate is not acuarate
132 18-Dec-18 Kiln #1 during kiln stop

133 18-Dec-18 Loesche Mill Internal inspection

134 18-Dec-18 Sample crusher V belt for crusher cut off


Operatinal car scratched during trip to
135 19-Dec-18 Operatioal car quarry
136 19-Dec-18 Garden office Carterpillar pests at garden office
Cable tray sensors lower level bin
137 19-Dec-18 Kiln #1 discharge table need to repair
138 19-Dec-18 Limestone handling Bolt loss for Diverter BC 102 & 103
139 19-Dec-18 General 8 road plant lamp is damage
Need to install alarm sirine for CO and
140 19-Dec-18 Losche O2 Content
all buctket elevator need to install
141 19-Dec-18 Lime handling incing switch for inspection

Water pipe line leaking at reducer


142 20-Dec-18 Pedistrian conection, need to create control box

143 20-Dec-18 GEneral Security post need to install CCTV

Cable tray at dust collectors need to


144 26-Dec-18 Kiln#1 reposition
145 26-Dec-18 utility Compressors No 3 oil leakage

Improvement Double valve raymond


146 26-Dec-18 Raymond need to action quickly

147 26-Dec-18 Stone Handling BC 104 Need to intall belt trainer


Welding activity near fuel station at 24
148 27-Dec-18 Safety Dec 18
149 27-Dec-18 Kiln #1 WGF cleaning control unit error
150 27-Dec-18 Lime Handling No maintenance access for DC 403

Solar pump for filling HME is damage


151 28-Dec-18 Fuel Station
Solar pump for HGG system is
abnormal
Complain about water flow after
152 28-Dec-18 Community complain modify main disposal drainage during
raining condition
PM Schedule need to cooling dwon for
153 28-Dec-18 Raymond internal inspection
154 2-Jan-19 Packing Machine Motor rolleer conveyor is burn

155 2-Jan-19 Lime handling Chute for fly ash to BC 404 is modifed

SBA Hi blow transporter no choke


156 3-Jan-19 Safety wheel during parking

157 3-Jan-19 Kiln #1 Grease line discharge table is damage

158
Daily operation Meeting

Action PIC WO Priority

Review permit & Schedule on site Trimunggara Suhendo 1

Coordination with project Suhendro Project 1

Replace selenoide valve Hasanuddin Husni 1

Improve chute for BC 401 & 402 Budi Kurniawan 2

Install LOTO BOX around loading lime Ihsan Trimunggara 1


powder area
Install auto matic valve at washing Ariawan Hassanudin 1
stone

Searching for BOBCAT Machine Andi Husni 1

Mapping area for tool box at Ihsan Trimunggara 1


limestone handling & lime handling

Fabrication tools box Budi Trimunggara 1


No go zone under BC 102 & 103
area, Potection under all conveyor Trimunggara Suhendo 1
system
Motor spec = 41.5 A
Operating current = 24 A
Ariawan Hassanudin 2
Protection = 36 A
Inspection FLI all Conveyors
install speed sensors for blade
classifier Ariawan Hassanudin 2

Observation root cause Ariawan Hassanudin 2


Check conection signal Ariawan Hassanudin 1

Review SOP for Scurity in the palnt Scurity Trimunggara 1

Replace Sirine fire truck Trimunggara Suhendro 1

Check WGF Vibrating Detector Alarm Ariawan Hassanudin 1


High

Improve body protection for PPE Trimunggara Suhendro 1

Repair / replace Gema Suhendro 1


Kiln Product T60 <7 min sent to PS Andi Suhendro 1
402 & >7 min send to PS 401

Raymond product T60 <10 min sent Andi Suhendro 1


to PS 501 & >10 min send to 502

Mix start when T60 <8 min Andi Suhendro 1

Temporary action If quality T60 >12


dispatch coordination with operation Kurniawan Suhendro 1
team prepare facility unloading
facility

Investigation property damage Trimunggara Suhendro 1

Create WI for safety sampling Radi Suhendro 1

Create I - CAM Trimunggara Suhendro 1

Create I - CAM Trimunggara Suhendro 1

Control Ihsan Andi 1

Review induction method Trimunggara Suhendro 1

Inspection oil level roller for Budi Kurniawan 2


raymond mill
Reports plant stop due to power Ariawan Hassanudin 2
failure

Melting stone between table & kiln Ihsan Andi 2

Install vortex cooler Ariawan Hassanudin 2

Fabrication skrit rubber & install sktit


rubber when PM schedule budi Kurniawan 2

Replace PWS sensor Ariawan Hassanudin 1

Inpection the cable and trim the Ariawan Hassanudin 1


cable

move area parking to front of Security Suhendro 1


warehouse

Base on PM schedule Budi Kurniawan 2


Install electrical power station and
reposition portable compressor to Ariawan Hassanudin 2
preparation room

lubricate the screw conveyor ujang tarpin Kurniawan 2


Review safety induction for all Trimunggara Suhendro 2
contrctor

Review schedule electrical shift Ariawan Hassanudin 1

Fabrication bridge & rack for coal Kurniawan Suhendro 1


dust kiln #1

Concrate coal dust floor for kiln #1 Andi Suhendro 1

look for new water sources in the Hasanuddin Suhendro 1


plant (Behind lesche building)

Monitoring landslide Purnomo Suhendro 1

Inpection when coal mill stop Ariawan Hassanudin 1

Stop job,breafing, reporting & Trimunggara Suhendro 1


review safety induction

Stop job,breafing, reporting &


review metod statement induction Trimunggara Suhendro 1

Temporary repair with gabion Trimunggara Suhendro 1

Inspection motor no 1 Ariawan Hassanudin 1

inspection cable Hasanuddin Suhendro 1

Replace ruber Budi Kurniawan 1

Inspection vibration at was gas filter Budi & Rismawan Kurniawan 2


motor
Repair explotion door Budi Kurniawan 1

Review ventilation prepareation Radi Kurniawan 1


room

Cleaning spillage Ihsan Andi 1

install trap at drianage Trimunggara Suhendro 1

Water Sendiment pond monitoring Radi Trimunggara 1

Compating with stone Andi Trimunggara 1

Control during loading lime stone to Rustam Radi 1


dump hopper

Review PPE in customer plant Trimunggara Husni 1

Remander first contol for mandatory Scurity Trimunggara 1


PPE in the plant
Repair Belt scrath Budi Kurniawan 1
Install self aligning roller Budi Kurniawan 1

Remanding project for commisioning Project Suhendro 1


LVMDP 1

Replace cable when cable arrive Husni Hassanudin 1

Remander safety mandatory PPE in Trimunggara Suhendro 1


the plant

check leaking point, improve auto


start 5.5 bar for stand by Ariawan Hassanudin 1
compressor

Check actual WB in customer plant Imam Suhendro 1

Check any issue for kiln #1 Operation team Suhendro 1

Remainder all truck driver Scurity Trimunggara 1

Purchase new welding gloves ASAP Trimunggara Suhendro 1

Inspection Nozzle spider burner Ihsan Andi 1


Inspection & repair Budi Kurniawan 1

Inspection & repair Ariawan Hassanudin 1

Check name plate, Inspection & Budi Kurniawan 1


repair
Ensure have induction & follow palnt Gema & Suhendro 1
safety rules Trimunggara

Undersize stockpile in font of the Rustam Andi 1


plant have move beside fence

Check lighting rod by certified


person / vendor, Trimunggara Hassanudin 1

Repair leakage Budi Kurniawan 1


review and brifing all personel to use Trimunggara Suhendro 1
PPE properlly

add oil at roller mill Budi Kurniawan 2

check all equipment Ariawan Hassanudin 2

Install manual valve Budi Kurniawan 1

i-Cam full investigation incident Trimunggara Suhendro 1


Replace bolt for cover fan motor Ariawan Hassanudin 1

Cleaning DC 403 & replace bag filter Ihsan / Mech Andi 1

Keep monitoring for dust contol to All shift leader Andi 1


BC 404

Safety Induction Trimunggara Husni 1

Check weighing trap & skip bucket Ariawan Hassanudin 1

Replace hydraulic discharge table Budi Kurniawan 1


unit
Install belt trainer for BC 105 Eeng Kurniawan 1

Follow up LOTO device Trimunggara suhendro 1

Clean plant road Ihsan Andi 1

Investigation incident Trimunggara Suhendro 1

Check calulation method Ariawan Hassanudin 1

Concrete floor around fuel station Ihsan Andi 1

Replace skrit rubber Budi Kurniawan 1

Modify nipple grase Budi Kurniawan 1

Sosialitation rules about safety to all Husni Suhendro 1


transporter & review MOU

Repairing leaking point Budi Kurniawan 1

Repair snub pulley Eeng Kurniawan 1

Install safety gurard for BC 109 Budi Kurniawan 1

Install by pass line Budi Kurniawan 1

Install lamp both area Ariawan Hassanudin 1

Check & analyze possibility to Ariawan Hassanudin 1


relocated electrical panel position
Install baricade around Lintec area Ihsan Trimunggara 1
Install baricade around sediment Ihsan Trimunggara 1
pound area
Packing lime powder with jumbo bag Ihsan Andi 1

Check oil level for roller raymond mill Budi Kurniawan 1

Repair leaking point Eeng Kurniawan 1

Review screen aperture Radi Suhendro 1

Install fences behind workshop & Trimunggara Suhendro 1


coal building area

Inspection spillage fly ash every 4 hrs Ihsan Andi 1

Inspection BE 406 & 407 Eeng Kurniawan 1

Repairing leaking point Budi Kurniawan 1

Repair gap rubber BC 105 Budi Kurniawan 1

Repiring error comunication Ariawan Hassanudin 1

Improve raymond cable Ariawan Hassanudin 1

Repairing short cable Haikal & Saepudin Hassanudin 1

Inspection calculation error & check Ariwan Hassanudin 1


program
Measuring wear rate at roller & Budi Kurniawan 1
table, Check nozzle water spray
replace v belt for crusher Radi Kurniawan 1

Change operatinal car to quary Gema Suhendro 1

Spary with carterpillar pets Gema Suhendro 1

Repair durring PM Kiln#1 Ariawan Hassanudin 2

Repairing bolt loss Budi Kurniawan 1


Repair and replace lamp Ariawan Hassanudin 2

Continue improvement Ariawan Hassanudin 1

Study and review control for bucket Ariawan Hassanudin 1


elevator

Install control box Hasanuddin Suhendro 1

pulling cable and install lan network Ariawan Hassanudin 2

Reposition cable tray Ariawan Hassanudin 2


Inspection Compressors no 3 Ariawan Hassanudin 2
Folow Up SCM to proccess PR Ariawan Hassanudin 2
improvement double valve

Create logic for Operational process Ihsan Andi 2

install belt trainer for BC 104 Budi Kurniawan 2

Ensure welding activity in warehouse Trimunggara Project 1

Inspection error signal Ariawan Hassanudin 1


Install flat poam at DC 403 area Budi Kurniawan 2

Inspection & replace capasitor Ariawan Hassanudin 1

Inspection strainer to HGG system Ariawan Hassanudin 1

Inspection & check actual condition Gema Suhendro 1

Inspection in the mill Hendra Kurniawan 1

Repairing motor by vendor Ariawan Hassanudin 1


Check & analyze fly ash system after All shift leader Andi 1
modify

Refresh for all safety device Trimunggara Husni 1


( Mandatory safety by transporter)

Repair grase line Budi Kurniawan 1


Target Date Status Comment
Cont. monitoring during performing
Done the job
The area is still under construction to
In Progress be completed

In Progress Follow up SCM

Done Base on PM schedule

In Progress Intstall LOTO station under PS 501 7 502

Done Reduce timer from 25 to 20 sec

Change management and Risk


Done Assesment

22/11/2018 Done

24/11/2018 Done

30/11/2018 Continue Install Sign board

Done

Done Follow Up PR to SCM

Done Still under monitoring


Done

Done

Done Issue Chas advance today 22/11/2018

Done inspection Under PM schedule

Done Issue PR manset by Today 22/11/2018

Done
Done

Done Under Monitoring

Done

In Progress Under Review and Disscustion

Done

Done
28/11/2018 I-cam completed by 28/11/2018

Done

Done

Temporary with undersize, estimate


In Progress cost for concrete floor

Done

Done

Done Follow up to PLN

Continue

Waiting PO (Install Exhoust cancel by


In Progress management)

Done Base on PM schedule

Done Create PR

Done

Done Under monitoring

Done Base on PM schedule

Done

Done
Continue

Done

In Progress Brigde Done

In Progress PR done

Done Wiaiting management approval

In Progress Monitoring every 2 weeks

Done

Done

Done

Done

In Progress Bearing motor need to replace

In Progress

Done Waiting spare part

Done

Done

Done

Continue

In Progress

In Progress Frequency weekly

Done

Continue

Done Pinalty issue

Done SOP Scurity Gate

Done
Done 102 & 103 done

In Progress capasitor bank is not active yet

In Progress waiting cable arive

Continue

Done

Driver must double checking durring


Done meassurment weight
Hydraulic cylinder and rotary valve,
Done weighing calibration

Done

Done

Done
Done

Done

Done

Done

Continue

3 CCTV under repair by vendor, 1 CCTV


In Progress at warehouse damage waiting
sparepart. Fire alarm fault (inspection)

Done under monitoring


Done

Done

Done

Done

4-Jan-19 In Progress
Temporary repair done, need stop
Done raymond for 8 hrs

In Progress Create PR

Continue

Done

Done Monitoring actual calculation

Done

Done

Jan-19 In Progress Follow Up PR

Continue

Done Cleaned under silo

Continue Calculate with actual level silo

Done Install extend fuel dump

Done

Done Base on PM sechedule

Done

Done

Done

Done

Done

In Progress

Done

Done

5/1/2019 In Progress
Done

Done

Done

In Progress Create PR screen size 30x30mm square

Continue

Continue

Done

Done

Done

Done

Done

Done Protec cable inside hopper

Done

Done

Done

In Progress waiting SBI running

Done

Done

Done
In Progress Check actual urgency

Done Change sirine

Done Estimation budget

In Progress

In Progress Follow Up SCM

In Progress Follow Up SCM


Done

In Progress
31-Jan-19
In Progress

Done

Continue

Done
Done Estimate cost fir jack hammer

Done No spare for capasitor pump

Done

In Progress

Done

Done

Continue

In Progress

In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope

No Data Entered Shop / Area Discussion Point


1 2-Jan-19 Packing Machine Motor rolleer conveyor is burn

2 2-Jan-19 Lime handling Chute for fly ash to BC 404 is modifed

SBA Hi blow transporter no choke


3 3-Jan-19 Safety wheel during parking

4 3-Jan-19 Kiln #1 Grease line discharge table is damage

5 4-Jan-19 Workshop Cutting wheel motor burn


6 4-Jan-19 Coal Grinding Motor fuel pump burn
7 4-Jan-19 Raymond PM schedule for raymond mill

8 4-Jan-19 Safety Reposition safety shower

Rubbish can have to create design &


9 4-Jan-19 General possition

B3 waste from vendor project


10 7-Jan-19 Safety hydrandt water storage is not in place

Vendor project hydrant is not use PPE


11 7-Jan-19 Safety for WAH during performing job

Water chanel for drainage behind coal


12 7-Jan-19 Main Drainage
storage is block
13 7-Jan-19 TMP Parking in front of main gate plant

14 7-Jan-19 Kiln #1 PM schedule for Kiln#1

Compressor air no 1 & 3 for running


15 7-Jan-19 Kiln #1 hrs >8000
Coal dust trnasport blower no 1 is
16 7-Jan-19 Kiln #1 leaking
Cooling blower no 3 is leaking

Limestone distribution particle size


17 8-Jan-19 Sample Request post washing spilt in to <30, 30-40, 40-
50, 50-60, >60 mm & PSD kiln product

Level sensor for coal dust silo need to


18 8-Jan-19 Kiln #1 cleaning

19 8-Jan-19 Kiln #1 Level sensor CO coal dust


Ultara sonic for cleaning sieve is
20 8-Jan-19 Laboratory damage
Puddles on the floor explotion door
21 9-Jan-19 Coal Grinding area due to no drianage

22 9-Jan-19 Coal Grinding Leaking point at manhone bag filter

water flow at cooling tower is


23 9-Jan-19 Coal Grinding abnormal condition
Pipe cable was damage in front of
24 9-Jan-19 General warehouse

25 9-Jan-19 Safety Lightening arrester sertification high


not actual with the current

26 9-Jan-19 Hoist load crane test need to prepare

27 10-Jan-19 Safety Truck stuck at limestone storage

No WAH procedure during performing


28 10-Jan-19 Safety job vendor & Maintenance

AC in the plant need to preventive


29 10-Jan-19 Safety maintenance

30 10-Jan-19 Safety Raymond mill fondation is damage

31 10-Jan-19 Raymond High vibration during operation

Dust collector for kiln #1 need to


32 10-Jan-19 Kiln #1 install ventilation

Employe driving Forklip without


33 11-Jan-19 Safety authorize / Lisence

34 11-Jan-19 Safety Truck Hi-Blow hit road lamp

35 11-Jan-19 Raymond PM schedule for raymond mill


kiln#1 off due to Waste gas filter fan
36 11-Jan-19 Kiln #1 vibration
37 14-Jan-19 Safety Smoldering at coal storage
38 14-Jan-19 Laboratory Wastafle pipe is leaking
39 14-Jan-19 Lime Stone Handling Analize size of lime 30-60 SN 101

40 14-Jan-19 Aspiratus chanell Filter at aspiratus chanel need to clean

Coupling for Slade gate for PS 401 is


41 15-Jan-19 Lime handling damage
High voltage cable 20 KV is close with
42 16-Jan-19 Safety top of hi blow tank (<1.5 m)
Unsafe action during install & remove
43 16-Jan-19 Safety jumbo bag at BC 404
Bearing for cooling pump no 1 is
44 16-Jan-19 Kiln #1 damage
Coal dust trnasport blower no 1 is
45 16-Jan-19 Kiln #1 leaking
46 16-Jan-19 Kiln #1 Kiln door no 4 is leaking
Hydrant cable line in front of loesche
47 17-Jan-19 Safety doesn't have barriace
48 18-Jan-19 Raymond PM schedule for raymond mill
Waste B3 need to do independent test
49 22-Jan-19 Safety by Vendor

50 22-Jan-19 Safety Follow up B3 test from PT Karya

Diphoterine box need to install in the


51 22-Jan-19 Safety plant

machine guard at belt conveyor bc 106


24-Jan-19 KILN #3 is open barricade

High level Bin raymond wrong position


52 24-Jan-19 Raymond and not interlocking

53 24-Jan-19 Coal Grinding Fitting for spary water injection crack

54 25-Jan-19 Safety Cable HT for need to repair


LOTOTO prosedure need to refresh
55 25-Jan-19 Safety knowladge

Trasporter need to training for safety


56 25-Jan-19 Safety guide line & loading product

Diphoterine box in the plant have to


57 25-Jan-19 Safety install pad lock
2 Nozzle Water spary in the mill need
58 25-Jan-19 Coal Grinding to install & clean

59 25-Jan-19 Coal Grinding 1 bolt for filter MGL oil filter is damage

60 25-Jan-19 Raymond PM schedule for raymond mill

61 29-Jan-19 Kiln #1 5 diagfraghma is leakage

Diesel pump leakage from mechanical


62 29-Jan-19 Kiln #1 seal
63 29-Jan-19 Kiln #1 2 Pin losses at BE 407

64 29-Jan-19 Kiln#1 Blower Center cooling oil leakage

65 29-Jan-19 Laboratory 3 AC kaset need to service


66 29-Jan-19 Office Chair at office need to repair / replace

30-Jan-19
67 Base motor crack
30-Jan-19 Raymond
68 30-Jan-19 Raymond Dense phase flexible joint leakage

Need to install safety shower around


69 30-Jan-19 safety PS 501&502 & Raymond mill

No coke whell for solar truck during


70 31-Jan-19 Safety parking in plant
71
Daily operation Meeting

Action PIC WO Priority


Repairing motor by vendor Ariawan Hassanudin 1
Check & analyze fly ash system after All shift leader Andi 1
modify

Refresh for all safety device Trimunggara Husni 1


( Mandatory safety by transporter)

Repair grase line Budi Kurniawan 1

Rewinding motor Ariawan Hassanudin 2


Rewinding motor Ariawan Hassanudin 2
Inspection raymond mill Budi Kurniawan 1
Reposition safety shower from Trimunggara Kurniawan 1
workshop to powder silo area

Create design & possiton in the plant Trimunggara Suhendro 1

Coordination with project for B3 Trimunggara Suhendro 1


waste

Remainder for mandatory PPE Trimunggara Project 1


during WAH jobs

Cleaning & install filter system at Trimunggara Suhendro 1


water chanel
Review TMP & WI for TMP Trimunggara Suhendro 1
Check & repair all finding issue
during PM Schedule All shift leader Suhendro 1

Preventive manintenance for Kurniawan Suhendro 1


compressor

Inspection leaking point & repairing Budi Kurniawan 1

Take sample at BC 105 & 402 Radi Suhendro 1

Cleaning level sensor coal dust silo Ariawan Hassanudin 1

Cleaning level sensor coal co coal Ariawan Hassanudin 1


dust
Inspection & repairing ultra sonic Ariawan Hassanudin 1
machine
Create drianage at floor explotion Trimunggara Kurniawan 1
door area

Insection & Repair leaking point Budi Kurniawan 1

Cleaning water storage & water line Shift leader & Eeng Andi 1
for cooling tower system
Pipe cable leveling by under size & Hasanuddin Suhendro 1
ground

Review sertification with the legal


Trimunggara Suhendro 1
Inspectigation by certify third party

Prepare load for load hoist crane test Budi Kurniawan 1

Identification death stock at limstone Shift leader &


storage for unloading limestone Ihsan 1
matrial Loader Opr

Stop unssafe action & condition, All People Safety 1


reward & punishment

Follow up for preventive Husni Suhendro 1


maintenance

Inspection structure integrity Trimunggara Suhendro 1

Apply interlock system Ariawan Hassanudin 1

Install venstilation in bag filter Budi Kurniawan 1

HME authorize only All Personel Andi 1

Provide lisence For fire truck


operator Trimunggara Suhendro 1

Observation rootcause property Trimunggara Suhendro 1


damage(i-Cam)
Internal Mill inspection Budi Kurniawan 1

Inspection & check vibration signal Ariawan Hassanudin 1

Compacting smoldering material Rustam Andi 1


Repair leaking point Budi Kurniawan 2
Prepare & screen lime at SN 101 Ihsan Radi 1

Cleaning aspiratus chanel Husni Andi 1

Replace Coupling Budi Kurniawan 1

No parking below high voltage cable Trimunggara Suhendro 1


& review TMP
Install plat form at BC 404 area Budi Kurniawan 1

Replace bearing for cooling pump Ariawan Hassanudin 1


motor

repair leaking point Budi Kurniawan 1

Repair leaking point Budi & Ariawan Hassanudin 1

Install baricade around cable line Trimunggara Suresh 1

Internal Mill inspection Budi Kurniawan 1


Do test flyash in product LKD by Trimunggara Suhendro 1
vendor
Contact from PT Karya for B3 (for Fly Trimunggara Suhendro 1
ash & Chemical)

ensure location for diphoterine box Trimunggara Kurniawan 1

Alarm system for diphoterine station Hasanuddin Suhendro 1

install safety guard at pulley BC 106 Trimunggara Suhendro 1

Inspection Interlocking , repair the Ariawan Hassanudin 2


program and reposition sensors

Replace fitting Budi Kurniawan 2

inspection HT cable for HT Ariawan Hassanudin 1


Refresh training for LOTOTO Trimunggara Suhendro 1
procedure

Give training for transporter Trimunggara Suhendro 1

Order for pad lock diphoterine Trimunggara Suhendro 1

Install nozzle spary & cleaning Budi Kurniawan 1

Replace bolt Budi Kurniawan 1

Inspection roller & repairing leaking Budi Kurniawan 1


point
Replace diagfrahma from kiln 2 no Ariawan Hassanudin 2
1&2

replace mechanical seal Budi Kurniawan 2

Replace pin BE 407 Budi Kurniawan 2


filling oil screw and need to do Budi Kurniawan 2
second level inspection
raise PR for service AC Hasanuddin Husni 2
replacement broken chair Gema Suhendro 2

Repair crack Budi Kurniawan 1


Fabrication new Base motor Budi Kurniawan 2

Repair Flexible joint Budi Kurniawan 1

Install safety shower below stairs to Budi Kurniawan 1


CCR

Stop it's & safety breffing All Personel Trimunggara 1


Target Date Status Comment
Done

Continue

Done

Done

Done
Done
Done

In Progress Tri will decide safety shower position

In Progress

Done

Done

In Progress

In Progress

Done

Replace oil done ( sparator, oil filter, air


In Progress filter waiting sparepart)

Done

Done

Done

Done
Ultra sonic machine have to repair by
Done vendor

In Progress

In Progress

Done

Done

In Progress

In Progress

Done

Continue

In Progress PR already raised

In Progress

Call vendor for install mill vibration


In Progress analyze

In Progress Create PR to order material

In Progress

In Progress Urgent

In Progress

Done

Done

Done
In Progress
Done

Done

Done

In Progress Ensure and intall trafic sign


Done

Done

Done

Done Durring stop kiln

Done

Done

In Progress

In Progress

Done

In Progress Follow up SCM

In Progress

Done

Done Replace temporary by fluditstion hose

Done PR already raise

In Progress

In Progress

In Progress Cash advence

In Progress Follow up Nozzle for spare coal mill

Done

Done

In Progress 3 diagfrahma waiting sparepart

Done waiting sparepart

Done

Done Check oil level every shift

In Progress
In Progress

Done
In Progress

Done

In Progress

Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily

No Data Entered Shop / Area Discussion Point


1 1-Feb-19 Safety Sirine Horn Damkar is damage

2 1-Feb-19 Safety PPE Missing

3 1-Feb-19 Safety Shift room not respresentative

4 1-Feb-19 Raymond PM Schedule for raymond mill

5 1-Feb-19 Raymond Issue raymond need to highlight

Issue material Handling need to


6 1-Feb-19 Material Handling highlight

Outlet main drainage intake pipe have


7 6-Feb-19 Safety no guard
PPE Respirator need to replace (no
8 7-Feb-19 Safety Spare)
Manset
Silo Full PS 501 & PS 502 , And Lump
9 8-Feb-19 Process lime silo full PS 401 & PS 402

Max capacity of TPH


10 9--Feb-19 Raymond
Mill inntrupstion due to low pressure
oil of mill gear box
11 11-Feb-19 Safety B3 room hit by forklift
12 11-Feb-19 Safety Pepople monitoring inside plant
13 11-Feb-19 Kiln #1 PM Schedule for kiln #1
Leaking under double valve for
14 12-Feb-19 Raymond powder transfort
all material Density need to
15 12-Feb-19 Laboratory measurement
16 12-Feb-19 Safety Fire alarm fault indicaton
17 14-Feb-19 Safety Structur for BC 109 is danger condition

Unsafe condition during performing


18 14-Feb-19 Safety individual test kiln 2 (empty out
hopper)

19 14-Feb-19 Kiln #1 1 Bolt for hyraulic kiln no 1 is damage

20 14-Feb-19 Kiln #1 Leaking point at hyraulic no 1 area


21 14-Feb-19 Kiln #1 WGF vibration limimt high

22 14-Feb-19 Kiln #1 Load cell for skip need to inspection

23 15-Feb-19 Coal mill Trial new coal supplier

No alarm at handling monitor


24 18-Feb-19 Lime handling programfor BV 105
25 18-Feb-19 HME transmission for loader is leaking
Air condition for Inerting system CO2
26 19-Feb-19 CO2 need to check
Packing machine need to inspection
27 19-Feb-19 Packing Machine due to salt conveyor is touching with
vibrator
Water flow for coal is need to
28 20-Feb-19 Coal mill inspection
MSDS slocal lump lime need to
29 20-Feb-19 Safety implementation
LOTOTO procedure need to refresh to
30 21-Feb-19 Coal mill all people in the plant
31 22-Feb-19 Safety Control box heat by loder's tire
No Alarm at handling monitor
program for BC 409 durring trip
32 22-Feb-19 Lime handling condition
No plat form for maintenance access
at BC 409
control room back side slip due to
33 22-Feb-19 CCR flooded
BC 102 & 103 need to cleaning the
34 22-Feb-19 Stone handling roller & structure from mud

High High sensor have no access to


35 26-Feb-19 Raw coal inspection and maintenance

36 26-Feb-19 Coal mill pressure water spay low


37 26-Feb-19 Lime handling BC 401 sway
38 26-Feb-19 Portal gate Portal gate cannot close
39 26-Feb-19 Raw Coal silo High High sensor not working

40 26-Feb-19 Control Room Radio Control Room need to replace


41 26-Feb-19 Raymond Quality T60 is not achive >12 min

42 26-Feb-19 Safety Level switch by pass due to no spare

43 26-Feb-19 Raymond Double valve is broken


All AC Contractor service do not use
44 28-Feb-19 Safety PPE safety goggles

45 28-Feb-19 Safety Waste from laboratory send to TPS

Level sensor Coal dust silo level is not


46 28-Feb-19 Safety accurate when coal mill is running

47 1-Mar-19 Safety

Vendor for Petroniaga not use PPE


48 1-Mar-19 Safety entering the plant & WAH Issue

Loader beakdwon on the middle road


49 1-Mar-19 Safety acces to coal storage
Lintect people Playing badminton in
50 1-Mar-19 Safety the warehouse
51 1-Mar-19 Raymond PM Schedule
2nd week CCR & Plant patrol working
12 hrs
52 1-Mar-19 Safety
Replacement man power for lab
assistant has been resign
53 4-Mar-19 Safety Smoldering at coal storage

54 4-Mar-19 Kiln #1 PM Kiln #1


Man power availability before start up
55 4-Mar-19 Sustanability kiln #2

56 4-Mar-19 Coal mill New water spray nozzle need to install

MBF
57 4-Mar-19 Supplier
PKBI

58 5-Mar-19 Safety Observation pocket book for SAM

59 5-Mar-19 Stone handling BC 102 is scretch


60 5-Mar-19 Raymond No spare Motor calssifier
61 5-Mar-19 Lime handling No spare Motor Bucket Elevator
Thermal camera for checking hot spot
62 5-Mar-19 General electrical side

5-Mar-19 Warehouse 1 CCTV for warohouse area is damage


63 5-Mar-19 CCTV CCTV for finger prints area (IP Adress)

TMP for unloading limestne to dump


64 6-Mar-19 Safety hopper need t review

65 6-Mar-19 Kiln #1 Hydration test & drawer test


Truck still parking under cable power
66 8-Mar-19 Safety in fornt of scurity gate
Near miss in front main gate when car
67 8-Mar-19 Safety turn arround
Kiln stop 11.34 hrs due to load cell skip
68 8-Mar-19 Kiln #1 is damaged
Discharge deviation is abnormal due
69 8-Mar-19 Kiln #1 to some bolts for hydraulic system
discharge table is trip
70 8-Mar-19 Raymond PM Raymond mill schedule

Costumers complain about our


71 8-Mar-19 Cordination Meeting product

Opening drainage arround coal


72 11-Mar-19 Safety storage area
73 11-Mar-19 Kiln #1 Nitrogen pipe line is leaking
Mechanical seal for cooling burner
74 11-Mar-19 Kiln #1 need to replace
AC from CCR need to reposition to
75 11-Mar-19 Shift Room Shift room
76 12-Mar-19 Safety No baricade for fly ash area

77 12-Mar-19 Safety road lamp plant hit by coal truck

Over speed >10 KM/H for PKBI truck

78 12-Mar-19 Safety Unloading lime stone not complate yet


truck was moving
Over capacity KBI truck >25 T

79 12-Mar-19 Kiln #1 hyraulic system bolt arm is cut off

80 12-Mar-19 Safety Coordination Safety meeting


Lime shifting to open yard, lime
81 13-Mar-19 Safety explose by hot material
Kiln stop 11.10 Hrs, due to bolt arm
82 13-Mar-19 Kiln #1 hyraulic piston is cut off

83 13-Mar-19 Safety Safety guad for all plant need to check

Man Toilet for 1st floor is celling in the


84 13-Mar-19 Office roof
bag filter need to inspection and
85 14-Mar-19 Loesche repalce damage bag filter
kiln stop due to Level sensor discharge
86 14-Mar-19 Kiln #1 hoppers is damage/ short circuit

87 18-Mar-19 Safety No spare for PPE mask

88 18-Mar-19 Kiln #1 bearing wheel skip need to replace

discharge hopper level sensors need


89 18-Mar-19 Kiln #1 to replace
Cable proximity sensors explotion
90 18-Mar-19 Loesche doors need to replace

91 18-Mar-19 utility Need Emergency lamp for internal


inspection

92 19-Mar-19 Safety Expotion doors bag filter

Water chanel is block arround dump


93 20-Mar-19 Safety hopper
Rain gauge beside laboratory need to
94 20-Mar-19 Laboratory install
rabber coupling for cooling pump no 2
95 20-Mar-19 Kiln #1 is damage

96 20-Mar-19 Kiln #2 Skip for load cell pulley need to install

Master Coupling for fire truck is


97 20-Mar-19 Fire Truck damage
Abnormal sound for booster pump no
98 20-Mar-19 Booster pump 1

99 21-Mar-19 Lime handling Chute BC 404 is damage

100 21-Mar-19 Coal mill Coolingpool is mossy /dirty


101 21-Mar-19 Kiln #1 Bag filter diagfram need to check

Coal mill gear box oil high temperature


102 21-Mar-19 Coal mill & coolingpool condition is dirty

Bag filtrer used from coal mill need to


103 22-Mar-19 Safety dispose arround workshop
103 22-Mar-19 Safety

Waste oil & chemical in B3 room

104 22-Mar-19 Raymond PM Raymond mill schedule

Lintect people is fall down at container


105 25-Mar-19 Safety area, arm injury

bag filter coal mil replacement


106 27-Mar-19 Safety potential falling down to the ground
floor
Poor lighting durring perform
107 27-Mar-19 Safety replacement bag filter

108 27-Mar-19 Raymond Frequency of raymond stop due to


manual double flap damage
water pipe for plant water systems
109 27-Mar-19 Utility leakage
110 27-Mar-19 raw material Lime stone supply going down
Monitoring plant drainage include
111 27-Mar-19 Safety outlate to the river

B3 from bag filter used at workshop


112 29-Mar-19 Safety area

People no use PPE proply at Limestone


113 29-Mar-19 Safety undersize area

Blind sopt at the corner beside


114 29-Mar-19 Safety starbuck area
115 29-Mar-19 Safety Safety life line under PS 401 is loss

116 29-Mar-19 Kiln abnormal sound at rotary hopper

all Alarm reports showing in kiln 1,2 &


117 29-Mar-19 Kiln 3
Raw Material mix without confrim to
118 29-Mar-19 Raw material quality
Inspection discharge table & hydraulic
1-Apr-19 PM Kiln #1
119 system

1-Apr-19 Dust emition


120 Coal Mill
Colling water heat exchanger not
1-Apr-19 Coal Mill
121 rotate

1-Apr-19 Coal Mill Coling water coal miil need to clean


122
123 1-Apr-19 Hydrant Water tank need to fill up
Raymond double valve frequenly
2-Apr-19 Raymond damage
124 Spillage at raymond area

2-Apr-19 Kiln #1 Nitrogen regulator is leaking


125
2-Apr-19 Kiln #1 Coating at rotary hopper
126
2-Apr-19 Safety No protection at rotary feeder area
128
129 2-Apr-19 Raymond Spillage at BC 410 to hopper FS 401
4-Apr-19 Coal dust supplay is stop before finish
Kiln #1 the cycle
Driver coal truck from Palmco is not
5-Apr-19 Safety
130 comply with BMA HSE rule

131 5-Apr-19 Washing Plant Water avealibility is not enough

132 5-Apr-19 Office WIFI BMA Scure is trouble or dwon


133 5-Apr-19 WB Pipe leaking at WB area
Sleeve for discharge table driving rod
134 5-Apr-19 Kiln #1 need to replace
Daily operation Meeting

Action PIC WO Priority


Replace Sirine Trimunggara Suhendro 1
Locker production dept moving to smoking Ihsan Trimunggara 1
area

Houskeeping, reposition AC follow up PR Ihsan Trimunggara 1

Follow up PM schedule for raymond mill Budi Kurniawan 1

Highlight issue speed sensors Ariawan Hasanuddin 1


Modify program for include interlock Hasanuddin Suhendro 1
sysstem of feeding system
Dumper fan Not close durring quickstop, Hasanuddin Suhendro 1
improve programable
High level Bin Vent FS 401 not working Ariawan Hasanuddin 1
Double valve cyclone Progamable Hasanuddin Suhendro 1
Pulling cable for local control panel and Ariawan Hasanuddin
control

logic High high sensors FS 401 1


Ariawan Hasanuddin
Improvement rotary cyclone 1

intall guard Budi Trimunggara 1

Purchase new PPE respirator


Trimunggara Suhendro 1
Purchase new PPE Manset

Start stop kiln#1 every 4 hours Ihsan Andi 1

Close monitoring for fan motor


Mill Motor Ariawan Hasanuddin 1
Transport system

Investigation root cause Kurniawan Hasanuddin 1

Complite investigation I CAM Ariawan Trimunggara 1


Create manual absent form Ihsan Suhendro 1
Inspection Blower room Budi Kurniawan 1

Repair leaking point Riki Kurniawan 1

Fabrication box for measurement density Budi Kurniawan 1

Replace IO module & Bazzer Modul Rismawan Hasanuddin 1


concrete & leveling with undersize Rustam Trimunggara 1

LMRA control during performance test All Personil Trimunggara 1

Replace bolt Budi Kurniawan 1

Repair leaking point Budi Kurniawan 1


Check vibration at kiln #1 Ariawan Hasanuddin 1

Inspection load cell for skip Ariawan Hasanuddin 1

Check inerting system bag filter, mill, vessel Ihsan Andi 1


& ducting
Check gas detecor
Ariawan Hasanuddin 1
Check false air coal mill system

Inspection Alarm system for BV 501 Ariawan Hasanuddin 1

Inspection & Repair by vendor Husni Suhendro 1


Find inerting system & check manual for Ariawan Hasanuddin 1
maintenance

test Load & observation Budi & Taufik Kurniawan 1

Inspection nozzle water in the mill Budi Kurniawan 1

Socialitation for MSDS system to every all Radi Suhendro 1


customers & transporter

Refresh LOTOTO procedure Trimunggara Suhendro 1

Create I CAM Trimunggara Suhendro 1

Inspection Alarm system for BV 501 Ariawan Hasanuddin 1

Install permanent plat form at BC 409 Budi Kurniawan 1

Review drianage Shift leader Ihsan 1

Cleaning BC 102 & 103 Shift leader Andi 1

list down critical sensors without platform


Ariawan Hasanuddin 1
Eliminate or install platform
Clean water Spary pipe line Budi Kurniawan 1
Install belt trainer Budi Kurniawan 1
Inspection portal gate Budi & Ariawan Kurniawan 1
Follow up PR to SCM Ariawan Hasanuddin 1

Follow up PR to SCM Ariawan Husni 1


Check quality & T60 from PS 401 & 402 Ihsan Radi 1
Sparate underspec quality in PS 501 & Ihsan Andi 1
Good quality in PS 502

List down all by pass sensor Ariawan Hasanuddin 1

Follow up spare part to SCM Ariawan Husni 1


Repair double valve Budi Kurniawan 1
Job owner responsibility for mandatory Ariawan Trimunggara 1
PPE in the plant

Create danger lebel at every waste in TPS Radi Trimunggara 1

Cleaning level sensor coal dust silo Rismawan Hasanuddin 1

Give induction & ensure PTW avialable Saeful Trimunggara 1


before performing the job

Stop activity
Saeful Trimunggara 1
Give induction & ensure PTW avialable
before performing the job

Reposition loader from middle road access Rustam Shif leader 1

Refresh induction Trimunggara Suresh 1

Inspection Budi Kurniawan 1

Hiring for new employe Gema Roslan 1

Take action for Smoldering handling Shift leader Ihsan 1


following WI Smoldering handling
Take list for PM schedule work All Personil Suhendro 1
Hiring for Legal possition employe new Gema Roslan 1
employe

Replace old nozzle water spay water Budi Kurniawan 1

Oversize >10%
Dedi Suhendro 1
PKBI undersize >2%
Distribution pocket book & sosialitation for Trimunggara Suhendro 1
SAM procedure
Repair BC 102 Budi Kurniawan 1
Follow up SCM Hasanuddin Husni 1
Follow up SCM Hasanuddin Husni 1

Follow up SCM Hasanuddin Husni 1

Replace CCTV Hasanuddin Husni 1


Follow up SCM Gema Husni 1

Socialitation TMP : Over speed, unloading


not corect, unsafe action & poor Trimunggara Suhendro 1
supervision
Take action Ihsan Radi 1

Sign board Trimunggara Suhendro 1

Create Permanent one way system Gema Trimunggara 1

Replace load cell skip Budi Kurniawan 1

Repair & Replace bolts loss Budi Kurniawan 1

Take action for PM raymond Eeng Kurniawan 1


Create reguler weekly with comersial
Coordiantion meeting & cross function Leo / Imam Suhendro 1
meeting

Cover drainage arround coal storage area Kurniawan Suhendro 1

Repair leaking point Budi Kurniawan 1

Replace mechanical seal Budi Kurniawan 1

Reposition AC from CCR Ariawan Hasanuddin 1

Baricade fly ash area Ihsan Trimunggara 1


Observation cronology, repair & update to Saeful Trimunggara 1
SAM

Sosialitation Safety TMP for supplier for Saeful Trimunggara 1


unloading procedure at BMA plant

Husni Trimunggara 1
Find root couse of hyraulic system bolt cut Ariawan & Kurniawan Hasanuddin 1
off
Every Friday Trimunggara Suhendro 1
Baricade lime stockpile untul normal Ihsan Trimunggara 1
temperature
Repairing done & inspestigation to find the Budi Kurniawan 1
root couse

Inspection all safety guad for all plant Budi Kurniawan 1

Repairing celling point Gema Suhendro 1

Replace Bag filter Budi Kurniawan 1


Bypass the signal for level sensors Ariawan Hasanuddin 1

Waiting PO from Purchasing Trimunggara Husni 1

Replace bearing skip Budi Kurniawan 1

Calibration skip sensors Ariawan Hasanuddin 1

Replace level discharge hopper Ariawan Hasanuddin 1

Replace cable proximity sensors Ariawan Hasanuddin 1

create PR for emergency Lamp Ariawan Hasanuddin 1

Spare bag filter have to ready Kurniawan Husni 1


Check all safety device in coal mill & Ariawan Hasanuddin 1
Recalibration

Review High & High High for CO content Ariawan Hasanuddin 1

Revision WI for loesche after stop & start ihsan Andi 1


coal mill
install rotary lamp when Co conten 250 Ariawan Hasanuddin 1
ppm
Isolation coal mill area Trimunggara Suhendro 1

Raw coal trial : High CV coal >6000 with Radi Suhendro 1


low CV coal <4500, CV >5000 & VM <36

Cleaning for chanel water Riki Andi 1

Installation rain gauge beside laboratory Budi Kurniawan 1

Replace rabber coupling Budi Kurniawan 1

Install load cell pulley for kiln #2 Budi Kurniawan 1

Replace master copuling for fire truck & Eeng Kurniawan 1


add brake fluid
Inspection bosster pump condition for no 1 Ariawan Hasanuddin 1
&2

Fabrication & Installation chute for BC 404 Budi Kurniawan 1

Cleaning & install cover coolingpool Ihsan Andi 1


Inspection & replace finding Ariawan Hasanuddin 1

Install auto valve in coolingpool Ariawan Hasanuddin 1

Dispose to third party Ihsan Trimunggara 1


Dispose to third party Ihsan Trimunggara 1

Follow up all activities for raymond mill Budi Kurniawan 1

Observation cronology Trimunggara Safety Lintech 2

Baricade ground floor job owner Trimunggara 1

Follow up PR portable / emergency lamp Ariawan Hasanuddin 1

Improve Double flap to reduce downtime Andi Suhendro 1

Repair pipe Budi Kurniawan 1

check issue & problem at supplier Husni Suhendro 1

perform weekly monitoring Trimunggara Gema 1

Follow up third party for remove bag filter 1


area Trimunggara Suhendro
Weigh total quantity bag filter used 1
Stop & report finding unsafe condition & 1
Action
Trimunggara Suhendro
Install Mandatory PPE sign & No Go Zone 1
area

Remove the materials by contractor Husni Gema 1

Install life line under PS 401 Budi Kurniawan 1


Cont. Inspection Budi Kurniawan 1
Possibility to change the rotation Ariawan Hasanuddin 1
Filter alarm system to SCADA 1 to Kiln#1, 2 Ariawan Hasanuddin 1
to Kiln#2 & 3 to Kiln#3

Vissible & implement WI on side Ihsan Andi 1

Check pin, grase & all hydraulic bolt etc. Eeng Kurniawan 1

inspection all chamber area at bag filter Eeng Kurniawan 1


(clean air chmaber)

Inspection & repair Eeng Kurniawan 1

Cleaning water cooling Riki Ihsan 1

Top up level water tank All Shif leader Ihsan 1

Waiting advice nederman engineer 1


All Operation Project
Cont. study at raymond area 1
Repalce regulator increase to >10 bar Ariawan Hasanuddin 1
(study )
Check DS & cleaning coating at rotary All Shif leader Ihsan 1
hopper

Reinstall handrail at rotary feeder Budi Kurniawan 1

Modify belt cleanner & chute Budi Kurniawan 1


Inspection pressure measurement for coal Ariawan Hasanuddin 1
dust flow
Safety Induction training Trimunggara Gema 1

Study for water circulation from water


treatment (Sattle pond) Hasanuddin Andi / Suhendro 1

Check by IT engginer Gema / Hasannudin Suhendro 1


Repair pipe by third party Budi Kurniawan 1
Replace before Monday 8 Apr 19 Budi Kurniawan 1
Target Date Status Comment
11-Mar-19 In Progress Waiting PR from Trimunggara

Done Follow up locker in canteen area

11-Mar-19 In Progress Locker move to Canteen

Done

Done

Done

In Progress

Done reposition sensors done


In Progress

Done Waiting programamble

Done

Done

Done

18-Mar-19 In Progress
Review quantity
Done

Done

Done Contol TPH

Done Replace oil done

Done
Done
Done

Done Ensure no leaking for cover for SC area

Done

15-Apr-19 In Progress Waiting Relay modul


continue

continue

Done

Done
Done Check actual for high limit

11-Mar-18 Done

Done

Done

Done

Done

Done

Done Setting clylinder pressure

Done

8-Mar-19 Done Jawimas Done, SBA Check

Done

Done

Check alarm signal for VF 401, 402 &


Done BC 410

Done SAM Observation

Done

Done Cleaning periodic

Done

Done
Done
Done
Done

8-Mar-19 Done Budget review 19.610.000


continue

continue

Done

Done
Done

continue

1-Mar-19 In Progress

28-Feb-19 Done

1-Mar-19 Done

Share all Schedule for incoming


1-Mar-19 Done transport to plant (Third party)

1-Mar-19 Done

1-Mar-19 Done

1-Mar-19 Done

4-Mar-19 In Progress
1 crew for CCR & 1 crew for laboratory
& plant patrol (Joint 8 Apr 19)
Done

continue

Done

18-Mar-19 In Progress
0
18-Mar-19 In Progress Return to supplier

6-Mar-19 In Progress

5-Mar-19 In Progress one man one pocket book

5-Mar-19 Done
25-Mar-19 In Progress find another manufature
25-Mar-19 In Progress PR done
Looking for alternative other brend
11-Mar-19 In Progress beside Fluke

25-Mar-19 In Progress Follow up SCM


11-Mar-19 Done Improve CCTV

18-Mar-19 In Progress Review all WI incoming truck

6-Mar-19 Done

22-Mar-19 Done Temporary action install baricade

11-Mar-19 Done Temporary action install baricade

8-Mar-19 Done

8-Mar-19 Done

8-Mar-19 Done

In Progress Follow up Suhendro

15-Apr-19 Done Cancel by plant manager with remark

11-Mar-19 Done

11-Mar-19 Done

11-Mar-19 In Progress Create PR for reposition

13-Mar-19 Done

13-Mar-19 In Progress

5-Apr-19 In Progress

5-Apr-19 In Progress

15-Mar-19 Done

15-Mar-19 continue

13-Mar-19 Done

18-Mar-19 Done

13-Mar-19 Done

Done discuss improvement for piping system

14-Mar-19 Done
Done

8-Apr-19 In Progress

Done

Done

Done

Done

28-Mar-18 In Progress

28-Mar-18 Done PO realese 19 Mar 2019

In Progress

28-Mar-18 Done

1-Apr-19 Done

In Progress

In Progress

In Progress

Done

Done

Done

Done

Done

Done

Done

Done Coal Mill Audit


Done 2 diagfram replaced

Done

26-Mar-19 Done
26-Mar-19 Done

22-Mar-19 Done

In Progress

Continue "see it,stop it report it


Done behaviour"

In Progress

Done Change bolt of double valve

Done

Done

Continue Periodicly cleaning every one week

Done

29-Mar-19 Done

Continue

30-Apr-18 In Progress

30-Apr-18 In Progress

1-Apr-19 Done
Continue Cont. Monitoring
8-Apr-19 Done Can't cahnge rotation
8-Apr-19 In Progress

1-Apr-19 In Progress Create PR for sign board

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 In Progress Hand over ???

2-Apr-19 Done Change bolt from M8 to M10

Done Monitoring improvement at BC 410


23-Apr-19 In Progress Waiting PO
2-Apr-19 Continue

2-Apr-19 Done

5-Apr-19 Done Monitoring Spillage

8-Apr-19 In Progress
5-Apr-19 Done

31-Dec-19 In Progress

8-Apr-19 In Progress
5-Apr-19 In Progress
8-Apr-19
In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily

No Data Entered Shop / Area Discussion Point

Vendor for Mechanical loader is


1 1-Mar-19 Safety entring the plant without induction &
PPE

Vendor for Petroniaga not use PPE


2 1-Mar-19 Safety entering the plant & WAH Issue

Loader beakdwon on the middle road


3 1-Mar-19 Safety acces to coal storage
Lintect people Playing badminton in
4 1-Mar-19 Safety the warehouse
5 1-Mar-19 Raymond PM Schedule
2nd week CCR & Plant patrol working
12 hrs
6 1-Mar-19 Safety
Replacement man power for lab
assistant has been resign

7 4-Mar-19 Safety Smoldering at coal storage

8 4-Mar-19 Kiln #1 PM Kiln #1


Man power availability before start up
9 4-Mar-19 Sustanability kiln #2

10 4-Mar-19 Coal mill New water spray nozzle need to install

MBF
11 4-Mar-19 Supplier
PKBI

12 5-Mar-19 Safety Observation pocket book for SAM

13 5-Mar-19 Stone handling BC 102 is scretch


14 5-Mar-19 Raymond No spare Motor calssifier
15 5-Mar-19 Lime handling No spare Motor Bucket Elevator
Thermal camera for checking hot spot
16 5-Mar-19 General electrical side

17 5-Mar-19 Warehouse 1 CCTV for warohouse area is damage

18 5-Mar-19 CCTV CCTV for finger prints area (IP Adress)

TMP for unloading limestne to dump


19 6-Mar-19 Safety hopper need t review
20 6-Mar-19 Kiln #1 Hydration test & drawer test
Truck still parking under cable power
21 8-Mar-19 Safety in fornt of scurity gate
Near miss in front main gate when car
22 8-Mar-19 Safety turn arround
Kiln stop 11.34 hrs due to load cell skip
23 8-Mar-19 Kiln #1 is damaged
Discharge deviation is abnormal due
24 8-Mar-19 Kiln #1 to some bolts for hydraulic system
discharge table is trip
25 8-Mar-19 Raymond PM Raymond mill schedule

Costumers complain about our


26 8-Mar-19 Cordination Meeting product

Opening drainage arround coal


27 11-Mar-19 Safety storage area
28 11-Mar-19 Kiln #1 Nitrogen pipe line is leaking
Mechanical seal for cooling burner
29 11-Mar-19 Kiln #1 need to replace
AC from CCR need to reposition to
30 11-Mar-19 Shift Room Shift room
31 12-Mar-19 Safety No baricade for fly ash area

32 12-Mar-19 Safety road lamp plant hit by coal truck

Over speed >10 KM/H for PKBI truck

33 12-Mar-19 Safety Unloading lime stone not complate yet


truck was moving
Over capacity PKBI truck >25 T

34 12-Mar-19 Kiln #1 hyraulic system bolt arm is cut off

35 12-Mar-19 Safety Coordination Safety meeting


Lime shifting to open yard, lime
36 13-Mar-19 Safety explose by hot material
Kiln stop 11.10 Hrs, due to bolt arm
37 13-Mar-19 Kiln #1 hyraulic piston is cut off

38 13-Mar-19 Safety Safety guad for all plant need to check

Man Toilet for 1st floor is celling in the


39 13-Mar-19 Office roof
bag filter need to inspection and
40 14-Mar-19 Loesche repalce damage bag filter

kiln stop due to Level sensor discharge


41 14-Mar-19 Kiln #1 hoppers is damage/ short circuit

42 18-Mar-19 Safety No spare for PPE mask

43 18-Mar-19 Kiln #1 bearing wheel skip need to replace


43 18-Mar-19 Kiln #1 bearing wheel skip need to replace

discharge hopper level sensors need


44 18-Mar-19 Kiln #1 to replace
Cable proximity sensors explotion
45 18-Mar-19 Loesche doors need to replace
Need Emergency lamp for internal
46 18-Mar-19 utility inspection

47 19-Mar-19 Safety Expotion doors bag filter

Water chanel is block arround dump


48 20-Mar-19 Safety hopper
Rain gauge beside laboratory need to
49 20-Mar-19 Laboratory install
rabber coupling for cooling pump no 2
50 20-Mar-19 Kiln #1 is damage

51 20-Mar-19 Kiln #2 Skip for load cell pulley need to install

Master Coupling for fire truck is


52 20-Mar-19 Fire Truck
damage
Abnormal sound for booster pump no
53 20-Mar-19 Booster pump 1

54 21-Mar-19 Lime handling Chute BC 404 is damage

55 21-Mar-19 Coal mill Coolingpool is mossy /dirty


56 21-Mar-19 Kiln #1 Bag filter diagfram need to check

Coal mill gear box oil high temperature


57 21-Mar-19 Coal mill & coolingpool condition is dirty

Bag filtrer used from coal mill need to


58 22-Mar-19 Safety dispose arround workshop

Waste oil & chemical in B3 room

59 22-Mar-19 Raymond PM Raymond mill schedule

Lintect people is fall down at container


60 25-Mar-19 Safety area, arm injury
bag filter coal mil replacement
61 27-Mar-19 Safety potential falling down to the ground
floor
Poor lighting durring perform
62 27-Mar-19 Safety replacement bag filter
Frequency of raymond stop due to
63 27-Mar-19 Raymond manual double flap damage
water pipe for plant water systems
64 27-Mar-19 Utility leakage
65 27-Mar-19 raw material Lime stone supply going down

66 27-Mar-19 Safety Monitoring plant drainage include


outlate to the river

B3 from bag filter used at workshop


67 29-Mar-19 Safety area

People no use PPE proply at Limestone


68 29-Mar-19 Safety undersize area

Blind sopt at the corner beside


69 29-Mar-19 Safety starbuck area
70 29-Mar-19 Safety Safety life line under PS 401 is loss

71 29-Mar-19 Kiln abnormal sound at rotary hopper

all Alarm reports showing in kiln 1,2 &


72 29-Mar-19 Kiln 3
Raw Material mix without confrim to
73 29-Mar-19 Raw material quality
Inspection discharge table & hydraulic
74 1-Apr-19 PM Kiln #1
system

75 1-Apr-19 Coal Mill Dust emition

Colling water heat exchanger not


76 1-Apr-19 Coal Mill rotate

77 1-Apr-19 Coal Mill Coling water coal miil need to clean

78 1-Apr-19 Hydrant Water tank need to fill up


Raymond double valve frequenly
79 2-Apr-19 Raymond damage
Spillage at raymond area

80 2-Apr-19 Kiln #1 Nitrogen regulator is leaking

81 2-Apr-19 Kiln #1 Coating at rotary hopper

82 2-Apr-19 Safety No protection at rotary feeder area

83 2-Apr-19 Raymond Spillage at BC 410 to hopper FS 401


coal burning off during before one
84 4-Apr-19 Kiln #1 cycle (EAF is limit high)
Driver coal truck from Palmco is not
85 5-Apr-19 Safety comply with BMA HSE rule

86 5-Apr-19 Washing Plant Water avealibility is not enough

87 5-Apr-19 Office WIFI BMA Scure is trouble or dwon

88 5-Apr-19 WB Pipe leaking at WB area


Sleeve for discharge table driving rod
89 5-Apr-19 Kiln #1 need to replace

90 8-Apr-19 Kiln #1 PM Kiln #1

all Fire alarm in the warehouse need


91 9-Apr-19 Safety to check & cleaning the sensor

92 9-Apr-19 Safety 9 lamps for road line need to change

No sound alarm at HMI coal mill


93 9-Apr-19 Safety loesche
Coal truck parking at dump hooper
94 9-Apr-19 Safety access area

95 9-Apr-19 Raymond Increase raymond out put

Oil indicator gear box classifier is


96 9-Apr-19 Raymond leaking
Unsafe condition round bar at access
97 10-Apr-19 Safety to stockpile kiln#3
Set ponit O2 % in mill is not reach
98 10-Apr-19 Coal Mill with the auto vlavle spray system
In coming Lime stone after 5 pm over
99 10-Apr-19 raw material size >6 mm 10%

100 11-Apr-19 Safety Truck hit Road cansting due to sleepy

101 11-Apr-19 Safety Loto violation


Hydraulic pin harus diratakan karena
102 11-Apr-19 kiln#1 ada bekas lasan pada Pin

103 12-Apr-19 Safety LAN Cable cross the pedestrian way

104 12-Apr-19 Safety Smoldering at coal storage

105 12-Apr-19 Packing Machine Special request customers


Over speed truk PT PLIB B3 waste
106 15-Apr-19 Safety material
Smoldering due to High VM at coal
107 15-Apr-19 Safety storage
108 15-Apr-19 Kiln #`1 PM Kiln #1
Coal mill delay feed due to O2 not
109 15-Apr-19 Coal Mill reach

110 15-Apr-19 Lime Handling Reject belt BC 404 spillage

Safety for commisioning foam hydrant


111 15-Apr-19 Safety system
112 16-Apr-19 Safety Licance for hydrant system

Hi blow Parking at front of loading bay


113 18-Apr-19 Safety due to parking for hi blow is full

Lime stone mix with black stone /


114 18-Apr-19 raw material another stone from quarry supplier
(MBF)
115 18-Apr-19 Coal Mill Oil Gearbox need to replace
116 22-Apr-19 Kiln #`1 PM Kiln #1

Bearing & shaft for Rotary valve 603 is


117 22-Apr-19 PS 501 damage

Temperature top kiln is error


118 23-Apr-19 Kiln 1 indication

119 24-Apr-19 Powder Handling Telescopic TS 502 Is Blocked

All Compressors alarm maintenance


120 24-Apr-19 Utility needes

Grasing & Oil for Gear box BC 102 &


121 24-Apr-19 Unloading 103 need to replace
Greasing & replace coal mill
122 24-Apr-19 Coal Mill
equipment
Greasing & replace oil all equipment
123 24-Apr-19 Raymond of raymond
Calculation for powder product to PS
124 25-Apr-19 Raymond is error
125 29-Apr-19 Safety General waste need to dispose

126 29-Apr-19 Safety Man power Lab analyst is 4 person

127 29-Apr-19 kiln#1 PM Kiln #1


128 29-Apr-19 Coal Mill Training coal mill opreation

129 30-Apr-19 Safety casting road under silo PS401 damage

Air conditioner at laboratory 3 need to


130 30-Apr-19 Safety service due to temperature bomb
calorie high
131 30-Apr-19 Safety Lamp lighting Rod not working

132 30-Apr-19 Coal Mill Leaking point at dragchain conveyor


133 30-Apr-19 Lime Handling Chute BC404 is leaking

Bearing motor DE & NDE and vibration


134 30-Apr-19 Lime Milling DE 10 mm/s & NDE 7 mm/s

Ferquently kiln trip due to Combustion


135 30-Apr-19 Kiln#1 air blower 2 error protection

Manhole solar tank is open 2 day


136 6-May-19 Safety

Rest of solar in the bucket at solar tank


area
137 6-May-19 Kiln#1 PM Kiln #1

138 6-May-19 Coal Mill BE 601 Miss aligmnet switch (MS_W2)

Calibration & maintenance schedule


140 7-May-19 WB for WB
141 8-May-19 Safety Smoldering at coal storage
New customers loading jumbo bag
142 8-May-19 Safety product to truc with different type
RV for 501 to Packing machine need to
143 8-May-19 PS 501 install
Rotary lamp in CCR need to conection
144 8-May-19 Safety to Coal mill building

145 8-May-19 Safety Not Proper Hand Gloves Using

146 9-May-19 Kiln #2 Refactory inspection

4 Trucks limestone from MBF reject


147 9-May-19 Raw Material due to calsite contamination

Alarm Co Content & temp need to


148 9-May-19 Coal Mill check

149 9-May-19 stone handling SN101 screen almost broken

150 9-May-19 Kiln Leaking point at hydraulic kiln 1 side

151 10-May-19 Raymond PM Raymond Mill Schedule


Calculation for powder product to PS
152 10-May-19 Raymond is error (Noltec System)
RV for 501 to Packing machine need to
153 10-May-19 Powder Handling test after installation
154 10-May-19 Dump Hopper Road plant is crack
155 13-May-19 Kiln#1 PM Schedule
156 14-May-19 Coal Storage Minimalisation smoldering

157 14-May-19 Safety Training gas analyzer


Water storage at coal mill loesche
158 15-May-19 Coal Mill need to clean
stone handling to kiln#2 Need to be
159 15-May-19 stone handling test without material
Bridge wood for acces to SN 101 is
160 16-May-19 Safety unsafe condition
Bolts at WB is unsafe condition, can
161 16-May-19 Safety make broke the tires

161 16-May-19 Laboratory the rotation Magnetic stirel in


laboratory is not stabil
Coal mill trip due to dust pump inlet
162 17-May-19 Coal Mill high temperature
163 17-May-19 Raymond PM Schedule
164 20-May-19 Kiln PM Schedule
Bearing fan over grase

165 20-May-19 Raymond Fan impeler start to worn out

Noltect system error


Pipe leaking at for transport system
166 20-May-19 Water Plant water plant
Spillage under BC 404 due to no belt
167 20-May-19 Lime Handling cleaner
Fan impeler start to worn out & need
168 21-May-19 Raymond to check by contractor

169 31-May-19 Raymond Calculation of Noltec system is error

Pipe leaking at for transport system


170 31-May-19 Water Plant water plant

170 10-Jun-19 Safety Restricted access for the QL bulk pile

PLC Modul noltec system is damage


171 10-Jun-19 Raymond (defferent power from 24 volt 220
volt)
Hydraulic pump no 1 is damage
172 10-Jun-19 Kiln (piston hiydraulic)

WI For loading lime powder to jumbo


bag, shifting & loading jumbo bag to
173 10-Jun-19 Packing Machine the truck need to include over load &
for fall hazard as high risk

Boster pump no 2 water suplay to the


174 10-Jun-19 Utility plat abnormal condition
need more 3 lab assistance for
175 10-Jun-19 Laboratory prepare running kiln 2 & 3
High level HD 501 error indication too
176 10-Jun-19 Raymond sensitive
unsafe condition at manual valve
177 10-Jun-19 Safety outlate, position valve < 150 M
Butterfly valve hydrant systems to
178 11-Jun-19 Safety spray No.2 for coal storage
179 11-Jun-19 Raymond Outlate ducting mill fan Leakage
180 11-Jun-19 Raymond Cover V-Belt Classifier not tight

181 11-Jun-19 Raymond Level Sensor lime silo and powder silo

182 11-Jun-19 WB WB no 2 not working

183 12-Jun-19 Safety After finish the jobs tools not arange in
the place
No indication for field during Hydrant
184 12-Jun-19 Safety running

185 12-Jun-19 Lime Handling Cont. spillage for BC 401 & 402 area

fire truck low air pressure due to


186 13-Jun-19 Safety fitting tube damage

187 13-Jun-19 Kiln#1 High deviation -450 kg

188 14-Jun-19 Plant Utility lake of water

PC client no 11,12,13, PC Server & PC


189 14-Jun-19 CCR engineering dusty
190 14-Jun-19 Mobil conveyors facility for quicklime back to silo

191 14-Jun-19 Kiln#1 Temperature Inlet bag filter > 200'C

192 14-Jun-19 Raymond Level Sensor oil gearbox need to clean

193 14-Jun-19 Raymond Preventive Maintenance raymond

194 17-Jun-19 Safety Emergency respone (Fire drill)

195 17-Jun-19 Safety Cemara tree cut off by truck


196 17-Jun-19 Kiln#1 Preventive Maintenance Kiln#1

Sampling for quality improvement at


197 17-Jun-19 Kiln#1 discharge table

198 17-Jun-19 CCR clogged toilet in CCR

5 point finding durring simulation fire


199 18-Jun-19 Safety hadling
200 18-Jun-19 Loesche Monitor HMI coal grinding , blinking

201 18-Jun-19 Raymond Material overload

202 18-Jun-19 SBI Equipment need to individual test

203 19-Jun-19 Safety Indicipliner LOTOTO procedure

Schedule for inspection wearing


204 19-Jun-19 Coal Mill measurement

Coal Delevery is out of spac ( Ash


205 19-Jun-19 Raw coal contenc is high 11 %, Calorie < 5300,
Undersize is high 10 mm 20%)

Finding check area, Roller belt


206 20-Jun-19 Lime stone handling conveyors not working

207 20-Jun-19 Coal mill Water storage at coal mill loesche

208 20-Jun-19 Utility Jaw crusher worn out


209 24-Jun-19 Safety Truck hit wall of loading bay
Unsafe conditionn, reactive lime spray
210 24-Jun-19 Safety by water
loader cannot to be use at night, have
211 25-Jun-19 Safety no lamp
212 24-Jun-19 Kiln#1 bearing wheel skip damage
213 24-Jun-19 Kiln#1 PM Kiln #1
Equipment need to individual test with
214 24-Jun-19 SBI mining contractor (Rajawali)
215 24-Jun-19 Raymond 3 lamp at 3rd raymond floor

Personal pad lock (Eeng) leave to


216 25-Jun-19 Safety outher personal (Haikal)

No PIC for Stand by car (Inova) : Batery


217 25-Jun-19 Safety is left, Fuel is empty, Tire is broken Etc

218 25-Jun-19 Safety Car 4 WD can't start

Socialittion safety guide line & risk


219 25-Jun-19 Safety register

Enveiroment issue at spillage fuel after


220 26-Jun-19 Safety loading fuel at fuel station
Road accident (Firman) after go home
221 26-Jun-19 Safety 3rd shift

222 26-Jun-19 Safety Fork of forklift need exstenstion

Back pressure for filling pipe fuel


223 26-Jun-19 Fuel Station station
WI for loading fuel at fuel staton need
224 26-Jun-19 Fuel Station to review due to filling methode &
cleaning spillage
Kiln stop 4 hrs due to installation
225 26-Jun-19 Kiln #1 pulley drive skip
Bomb calorie Preventive maintenance
226 26-Jun-19 Laboratory schedule
shifting ground near the area of the
227 28-Jun-19 Safety pump bosster
228 28-Jun-19 Safety Smoldering at coal storage

229 28-Jun-19 Kiln#1 Pully skip for kiln 2 need to install back

230 28-Jun-19 Raymond PM Schedule

231 29-Jun-19 Safety Poor Lighting at loading bay area

Procedure BPJS system as following


232 1-Jul-19 Safety accident case
Lighting office area rod wrong
233 2-Jul-19 Safety installation
234 3-Jul-19 Safety Bee nest at Top silo PS 401 & 402
Material for commisioning & start up
235 3-Jul-19 Kiln #2 kiln 2 have to readyness
236 3-Jul-19 Limestone handling PM Schedule
237 3-Jul-19 Kiln#1 CAB no 2 high curent
Dwontime Raymond due to HLS &
238 4-Jul-19 Raymond HHLS error
Sensor low level MGL is error
239 4-Jul-19 Raymond indication

Dust emition from unloading


240 5-Jul-19 Safety limestone handling

241 5-Jul-19 LVMDP Capasitor bank for LVMDP 1 is damage

242 5-Jul-19 WB No UPS computer WB 1 & 2


Spillage & V design for BC 601 need to
243 5-Jul-19 Raw coal handling inspection 7 repair

244 5-Jul-19 Lime Handling Spillage at BC 409 & 410

245 5-Jul-19 Coal Mill Visit for Loesche engineer

246 5-Jul-19 Raymond PM Raymond Mill Schedule


Colant system need to inspection /
247 5-Jul-19 Kiln replace
Air leaking form kiln near shaft
248 5-Jul-19 Kiln #1 hydraulic rod south side

249 8-Jul-19 Safety Smoldering at coal storage


Lamp in coal mill building is off : bag
250 8-Jul-19 Safety filer,1 explotion door 2 lamp, drag
chain area 1
251 8-Jul-19 Safety Trafo area is high temperature
No maintenance acces for bag filter
252 8-Jul-19 Safety kiln area
kiln Top kiln PT 100 temperature
253 8-Jul-19 Kiln #1 always damage when exceed high
temperature
254 8-Jul-19 Raymond HLS sensor need to replace
255 8-Jul-19 MCC Kiln 2 Wall in sealing side is creck
Observation for new pipe line leaking
256 9-Jul-19 Safety & for flow metter 1 Inch can't use due
to back pressure

266 9-Jul-19 Plant Maintain plant area clean

Sparator oil compressor 1-4 need to


267 9-Jul-19 Compressor replacement
268 9-Jul-19 Compressor PM Schedule
Fludistation system is connected with
269 10-Jul-19 Kiln #1 kiln #2
Limestone from MBF is over size
270 10-Jul-19 Raw Material comming

271 10-Jul-19 Kiln #1 & Coal mill VSD issue trip high current

Transfer Sampler from QC to


272 10-Jul-19 Man power production

lake of Lighting in top cover bag filter


273 10-Jul-19 Coal Mill floor
Lake Education internal BPJS system of
274 10-Jul-19 Man power BMA employes

274 15-Jul-19 Lime Handling Coupling motor dislocated for BC 401

Water quantity at workshop area is


275 15-Jul-19 Workshop lake
Lake of lighting in room Shift room &
276 16-Jul-19 Safety toilet CCR

277 16-Jul-19 Safety high fugutive dust from kiln operation

278 17-Jul-19 Safety High temperature in MCC room kiln


279 17-Jul-19 Raymond Impeler fan need to repair need 80 hrs

No Protection under & high voltage in


280 17-Jul-19 Safety MVMDP

281 18-Jul-19 Safety No water in WB & Scurity post

282 19-Jul-19 Raymond PM Raymond Mill Schedule

283 19-Jul-19 Lime Handling Coupling motor dislocated for BC 401

Jaw plate crusher for sampling lime


284 19-Jul-19 Laboratory need to replace

285 19-Jul-19 Kiln #2 Commisioning prepareation

286 19-Jul-19 BC 102 Spillage at snap pulley


Lake of water in the plant for
287 23-Jul-19 Water Plant consumable in CCR
Observation for new pipe line leaking
288 23-Jul-19 Kiln#1 & for flow metter 1 Inch can't use due
to back pressure

289 23-Jul-19 Kiln#1 High pressure CAB no 2

Sensor low level WGF High High is


290 23-Jul-19 Kiln#1 error (damage)

291 15-Aug-19 Safety Silo fly ash is leaking from joint shell

292 15-Aug-19 Safety Filter dedusting is leaking


293 15-Aug-19 Safety Emergenct coal dust silo is dusty

294 15-Aug-19 Safety Explotion from bag filter of coal mill

system fan High vibration & high


295 15-Aug-19 Raymond temperature bearng inboard

296 15-Aug-19 Kiln#2 Low indication for combustion air

297 15-Aug-19 Raymond Interlocking mill fan not working


Expotion doors at bag filter of coal mill
298 15-Aug-19 Loesche need to house keeping
Daily operation Meeting

Action PIC WO Priority

Stop activity
Give induction & ensure PTW avialable Saeful Trimunggara 1
before performing the job

Stop activity
Saeful Trimunggara 1
Give induction & ensure PTW avialable
before performing the job

Reposition loader from middle road access Rustam Shif leader 1

Refresh induction Trimunggara Suresh 1

Inspection Budi Kurniawan 1

Hiring for new employe Gema Roslan 1

Take action for Smoldering handling Shift leader Ihsan 1


following WI Smoldering handling
Take list for PM schedule work All Personil Suhendro 1
Hiring for Legal possition employe new Gema Roslan 1
employe

Replace old nozzle water spay water Budi Kurniawan 1

Oversize >10%
Husni Suhendro 1
PKBI undersize >2%
Distribution pocket book & sosialitation for Trimunggara Suhendro 1
SAM procedure
Repair BC 102 Budi Kurniawan 1
Follow up SCM Hasanuddin Husni 1
Follow up SCM Hasanuddin Husni 1

Follow up SCM Hasanuddin Husni 1

Replace CCTV Hasanuddin Husni 1

Follow up SCM Gema Husni 1

Socialitation TMP : Over speed, unloading


not corect, unsafe action & poor Trimunggara Suhendro 1
supervision
Take action Ihsan Radi 1

Sign board Trimunggara Suhendro 1

Create Permanent one way system Gema Trimunggara 1

Replace load cell skip Budi Kurniawan 1

Repair & Replace bolts loss Budi Kurniawan 1

Take action for PM raymond Eeng Kurniawan 1


Create reguler weekly/ Monthly with
comersial Coordiantion meeting & cross Leo / Imam Suhendro 1
function meeting

Cover drainage arround coal storage area Kurniawan Suhendro 1

Repair leaking point Budi Kurniawan 1

Replace mechanical seal Budi Kurniawan 1

Reposition AC from CCR Ariawan Hasanuddin 1

Baricade fly ash area Ihsan Trimunggara 1


Observation cronology, repair & update to Saeful Trimunggara 1
SAM

Sosialitation Safety TMP for supplier for Saeful Trimunggara 1


unloading procedure at BMA plant

Husni Trimunggara 1
Find root couse of hyraulic system bolt cut Ariawan & Kurniawan Hasanuddin 1
off
Every Friday Trimunggara Suhendro 1
Baricade lime stockpile untul normal
temperature Ihsan Trimunggara 1

Repairing done & inspestigation to find the Budi Kurniawan 1


root couse

Inspection all safety guad for all plant Budi Kurniawan 1

Repairing celling point Gema Suhendro 1

Replace Bag filter Budi Kurniawan 1

Bypass the signal for level sensors Ariawan Hasanuddin 1

Waiting PO from Purchasing Trimunggara Husni 1

Replace bearing skip Budi Kurniawan 1


Calibration skip sensors Ariawan Hasanuddin 1

Replace level discharge hopper Ariawan Hasanuddin 1

Replace cable proximity sensors Ariawan Hasanuddin 1

create PR for emergency Lamp Ariawan Hasanuddin 1

Spare bag filter have to ready Kurniawan Husni 1


Check all safety device in coal mill & Ariawan Hasanuddin 1
Recalibration

Review High & High High for CO content Ariawan Hasanuddin 1

Revision WI for loesche after stop & start ihsan Andi 1


coal mill
install rotary lamp when Co conten 250 Ariawan Hasanuddin 1
ppm

Isolation coal mill area Trimunggara Suhendro 1

Raw coal trial : High CV coal >6000 with Radi Suhendro 1


low CV coal <4500, CV >5000 & VM <36

Cleaning for chanel water Riki Andi 1

Installation rain gauge beside laboratory Budi Kurniawan 1

Replace rabber coupling Budi Kurniawan 1

Install load cell pulley for kiln #2 Budi Kurniawan 1

Replace master copuling for fire truck & Eeng Kurniawan 1


add brake fluid
Inspection bosster pump condition for no 1 Ariawan Hasanuddin 1
&2

Fabrication & Installation chute for BC 404 Budi Kurniawan 1

Cleaning & install cover coolingpool Ihsan Andi 1


Inspection & replace finding Ariawan Hasanuddin 1

Install auto valve in coolingpool Ariawan Hasanuddin 1

Dispose to third party Ihsan Trimunggara 1

Follow up all activities for raymond mill Budi Kurniawan 1

Observation cronology Trimunggara Safety Lintech 2


Baricade ground floor job owner Trimunggara 1

Follow up PR portable / emergency lamp Ariawan Hasanuddin 1

Improve Double flap to reduce downtime Andi Suhendro 1

Repair pipe Budi Kurniawan 1

check issue & problem at supplier Husni Suhendro 1

perform weekly monitoring & Cleaning Trimunggara Gema 1

Follow up third party for remove bag filter 1


area Trimunggara Suhendro
Weigh total quantity bag filter used 1
Stop & report finding unsafe condition & 1
Action
Trimunggara Suhendro
Install Mandatory PPE sign & No Go Zone 1
area

Remove the materials by contractor Husni Suhendro 1

Install life line under PS 401 Budi Kurniawan 1


Cont. Inspection Budi Kurniawan 1
Possibility to change the rotation Ariawan Hasanuddin 1
Filter alarm system to SCADA 1 to Kiln#1, 2 Ariawan Hasanuddin 1
to Kiln#2 & 3 to Kiln#3

Vissible & implement WI on side Ihsan Andi 1

Check pin, grase & all hydraulic bolt etc. Eeng Kurniawan 1

inspection all chamber area at bag filter Eeng Kurniawan 1


(clean air chmaber)

Inspection & repair Eeng Kurniawan 1

Cleaning water cooling Riki Ihsan 1

Top up level water tank Riki Ihsan 1

Waiting advice nederman engineer 1


All Operation Project
Cont. study at raymond area 1
Repalce regulator increase to >10 bar Ariawan Hasanuddin 1
(study )
Check DS & cleaning coating at rotary All Shif leader Ihsan 1
hopper

Reinstall handrail at rotary feeder Budi Kurniawan 1

Modify belt cleanner & chute Budi Kurniawan 1


Inspection Coal pressure measurement Ariawan Hasanuddin 1

Safety Induction training Trimunggara Gema 1

Study for water circulation from water Hasanuddin Andi / Suhendro 1


treatment (Sattle pond)

Check by IT engginer Gema / Hasannudin Suhendro 1

Repair pipe by third party Budi Kurniawan 1

Replace before Monday 8 Apr 19 Budi Kurniawan 1

Inspection dischargae table & Hydraulic


system, inspection distrbustion start, check All Team Suhendro 1
regulator WGF

Inspection & cleaning all sensor at Ariawan Hasanuddin 1


warehouse

Replace 9 lamps for road line Ariawan Hasanuddin 1

Sounding in alarm HMI Loesche Ariawan Hasanuddin 1

Create permanent parking area in the front Trimunggara Andi & Kurniawan 1
of loading bay area
Check parameter lime grinding Kurniawan / Andi Suhendro 1
recomennted by raymond

repairing leaking point Budi Kurniawan 1

Cut off round bar Agus M Kurniawan 1

Check nozzle & Check manual book Budi Kurniawan 1

Follow up supplier Husni Suhendro 1

Investigasi incident Saeful Trimunggara 1

Training Loto procedure Trimunggara Suhendro 1

Ratakan hidraulic Pin saat PM Budi Kurniawan 1

Setup LAN conection for every table Gema Suhendro 1

Take action following WI smoldering All Operation Ihsan 1


handling
Prepare one Ton slocal jumbo bag Hendra Ihsan 1

Stop it, brefing & report All Personel Suhendro 1

Mix & Compacting Rustam Ihsan 1


Follow up PM List All Team Andi 1

Inspection & cleaning nozzles water spray Budi Kurniawan 1

repair & modife Budi Kurniawan 1

Joint commisioning at 2 PM Project Operation team 2

Coordination with project for licance Project Suhendro 1

sosialisation for new parking area at front Trimunggara Suhendro 1


of loading bay

visit stockpile MBF and not dumping at Radi Suhendro 1


stock pile sibelco

Replace oil gearbox Budi Kurniawan 1


Follow up PM List All Team Andi 1

Replace bearing Budi Kurniawan 1

Repair shaft with third party/vendor Budi Kurniawan 1


Inspection termocouple for top kiln Ariawan Hasanuddin 1
temperature
refresh WI after stop slide gate need to Ihsan Andi 1
close

Sparepart already PR Hasanuddin Suhendro 1

Gresing & Replace oil gearbox Budi Kurniawan 1

Gresing &Replace oiil for coal mill area Budi Kurniawan 1

Gresing &Replace oil for raymond Budi Kurniawan 1

Inspection calcuation & material Rismawan Hasanuddin 1


transport / Noltec system
Dispose to contrac trasnforter Gema Trimunggara 1
Immedietly Replacemant before kiln #2 Gema Suhendro 1
start
Follow up list of PM Schedule Budi Kurniawan 1
Follow base schedule at 2-3 May 2019 All Personel Andi 1

Internal Investigasi incident Ihsan Andi 1

Create PR for sevice AC Radi Suhendro 1

Install lamp Ariawan Hasanuddin 1

Repair leaking point Budi Kurniawan 2


Repair leaking point Budi Kurniawan 2

Inspection bearing motor condition Ariawan Hasanuddin 2

Themporary open door for cabinet for air Ariawan Hasanuddin 2


circulation to VSD

Take sample from solar tank Radi Suhendro 1


Create sign for keep close manhole solar Saeful Ihsan 1
tank
Study for modify inlet for unloading Solar Shift leader Hasanuddin 1
to fuel station
Revision WI for Unloading solar tank Ihsan Andi 1

Fill in to waste oil drum rest of solar Budi Trimunggara 1

Follow up list of PM Schedule Budi Kurniawan 1

Inspection & repairing Ariawan Hasanuddin 1

Internal Calibration & maintenance Kurniwan Hasanuddin 1


schedule
Mix & Compacting Rustam Ihsan 1
Make sure JSA & safety during loading Riki Ihsan 1
jumbo bag to truck

Instatll RV to packing machine Budi Kurniawan 1

Conenct rotary lamp at CCR with Co Ariawan Hasanuddin 1


Content & Temperature indication

Socialitation for proper hand gloves using All Operation Trimunggara 1

Prepare PTW, rope leder Ihsan Andi 1


Prepare winch Budi Andi 1
Prepare lighting Ariawan Andi 1
Stop delivery until Further inspection Husni Suhendro 1
mining inspection, quarry inspection & Choldun & Radi Suhendro 1
crusher inspection

Inspection & funciton test for alarm Ariawan Hasanuddin 1

repair screen based on PM schedule / BUdi Kurniawan 1


During kiln stop

Repair leaking point during kiln stop Budi Kurniawan 1

Follow up list of PM Schedule Budi Kurniawan 1

Inspection transport noltec system Ariawan Hasanuddin 1

Test RV 603 Operation Andi 1

Repair crack point Ihsan Andi 1


Following list PM kiln schedule Operation Suhendro 1
Coal with sun contamination have to move Rustam Shift Leader 1
to center side
Follow training schedule Operation Trimunggara 1

clean water storage Ihsan Andi 1

Running without material Ihsan Andi 1

Remove wood bridge Taufik Andi 1

Modify bolts installation Budi Kurniawan 1

Repair it's Ariawan Hasanuddin 1

Replace check valve for circulation pump Budi Kurniawan 1


cooling tower
Follow up list of PM Schedule Budi Kurniawan 1
Follow up list of PM Schedule Budi Kurniawan 1
Inspection bering fan Budi Kurniawan 1

Inspection condition & posibility to repair Budi Kurniawan 1

Repair noltec system Ariawan Hasanuddin 1

Replace Pipe leaking Budi Kurniawan 1

Install belt cleaner at BC 404 Budi Kurniawan 1

Stop raymond mill & confrim by Pak Kurniawan / Andi Suhendro 1


Kurniawan

Try for purchase HLS sensor HD 501 Ariawan Hasanuddin 1

Replace Pipe leaking Budi Kurniawan 1

Baricade QL bulk in the warehouse Egi Ihsan 1

Replace input modul & calibrate Hasanuddin Ariawan 1

Inspection & replace impeler for piston Budi Kurniawan 1


hydraulic

Review WI for loading lime powder to


jumbo bag, shifting jumbo bag & loading Ihsan Andi 1
jumbo bag to the truck to include over load
& hazard

Inspection & repair it's Budi Kurniawan 1

Recruitmnent posibillity lab assistance Radi Gema 1


Recalibrate the sensors Ariawan Hasanuddin 2

install Guard for valve Tarpin Kurniawan 1

Repair Leakage Budi Kurniawan 1

Repair leakage point Budi Kurniawan 1


Tighten bolt of Cover Budi Kurniawan 1

Cleaning sensor Ariawan Hasanuddin 1

Check WB no 2 Saeful Andi 1


Make sure tools in the place after finish the All Team Shift Leader 1
jobs

Install sirine Ariawan Hasanuddin 1

Repair belt cleaner at BC 401 & 402 Budi Kurniawan 1

Replace fitting Ihsan Trimunggara 1

Inspection dischargae table & Hydraulic Budi Kurniawan 1


system
Hasanuddin &
Study for source water & water circulation Suhendro 1
Kurniawan

Clean all PC carefully Ariawan Hasanuddin 1

study and fabrication mobile conveyor kurniawan Suhendro 1


Ensure control quinch air automatic and Ihsan Andi 1
set temperature to 180'C

Clean sensors Ariawan Hasanuddin 1

Mill gearbox, Fan , Lubrication, screw Budi Kurniawan 1


,double valve
Sosialisation for WI hydrant systems
Review personil for Rescue team
Sosialisation Hierarchy communication Trimunggara Suhendro 1
plant
Hierarchy Emergency Call
Create Chronology report Gema Suhendro 1
PM Based on list Ariawan Hasanuddin 1
Take samaple Undersize,oversize and
melting qicklime, also check T60 Ca0 and T Radi Andi 1
Max, Loi
Repair clogged toilet Kurniawan Husni 1

Observation & Study finding Trimunggara Suhendro 1

Review WI Ihsan Suhendro 1


Refresh training hydrant for grup 1 & 2 Trimunggara Andi 1
Check rootcause Ariawan Hasanuddin 1

Find rootcause Ihsan & Ariawan Andi 1


Cleaning raymond mill Ihsan Andi 1
Running without material Ihsan Suhendro 1
prepare person in charge Ihsan & Choldun Suhendro 1
Make sure LOTOTO procedure completed All Operation Trimunggara 1
before working

Inspection & Check wearing measurement Budi Trimunggara 1

Stop delivery until supplier sent check Radi Husni 1


sample & COA certificate

Clean and check roller and replace roller if Ihsan & Budi Kurniawan 1
any roller damage
install piping and valve for new systems for BUdi Kurniawan 3
filling water storage
Repair Jaw Crusher Budi Kurniawan 1
Create Cronologhy and investigation Ihsan Trimunggara 1

Lime Safety guide line Trimunggara Suhendro 1

Inform contractor immediately Husni Suhendro 1

Replace bearing eeng Kurniawan 1


PM Based on list All Personel Suhendro 1

Prepare person in charge from operation Ihsan Suhendro 1

Replace lamp Ariawan Hasanuddin 1

Training Loto procedure Trimunggara Suhendro 1

Create PIC for Stand by car Gema Suhendro 1

Coordination with owener Gema Suhendro 1

Need weekly review safety training


Trimunggara Suhendro 1
Coolect all JSA

Create discharge pound Trimunggara Suhendro 1

Investigasi incident, find root cause Gema Suhendro 1

coordination with supplier forklift for fork Ihsan Andi / Husni 1


extenstion

Inspection, estimate & replace pipe for Operation Kurniawan 1


fiiling fuel from truck to storage fuel
Review WI loading fuel at fuel station Ihsan Andi 1

Coordination, Stop & installation pulley Budi Kurniawan 1


skip bucket
Follow up bomb calorie & monitoring with Wina Radi 1
vendor
Inspection schedule & patched with Trimunggara Suhendro 1
asphalt for a broken road
follow up smoldering base on WI All Shif leader Ihsan 1

Install back pully skip at kiln #2 Budi Kurniawan 1

Follow up list of PM Schedule Budi Kurniawan 1


Inspectioion excisting lighting & additionall Ariawan Hasanuddin 1
require
Socialittion procedure BPJS system as Gema Suhendro 1
following accident case

Repair it's Hasanuddin Husni 1

Remove / clear bee nest Trimunggara Gema 1

Prepare material for start up kiln#2 All Shif leader Ihsan 1

Followup list PM Schedule BUdi Kurniawan 1


Replacce oil CAB 2 BUdi Kurniawan 1

Reposition sensor HLS & HHLS Rismawan Hasanuddin 1

Inspection by Vendor Budi Hasanuddin 1

make sure stockpile #2 always full ,Install Budi Kurniawan 1


curtain at loading limestone stockpile

Inpection by vendor Hasanuddin Vendor 1

install UPS for computer 1 & 2 Saeful Hasanuddin 1

Repair skrit rubber & repair V design Budi Kurniawan 1

Improve Cover BC 409 for maintenance Budi Kurniawan 1


access
Prepare & collect data for all issue durinng All Team Loesche Engineer 1
operation
Follow up list of PM Schedule Budi Kurniawan 1

Follow up vendor Budi Hasanuddin 1

replace seal of shaft rod discharge table Budi Kurniawan 1

Spray with hydrant, compact & mix coal Rustam Ihsan 1


from MBS 1 bucket & 3 from Palmco
Replace off Lamp at coal mill building Rismawan Hasanuddin 1

Install additional blower Trimunggara Hasanuddin 1

Fabrication plat form Trimunggara Suresh 1

Every 2 hrs stop kiln PT 100 info to Rismawan Ihsan 1


dismantle from CCR

Replace HLS sensor with probe sensor Rismawan Hasanuddin 1


Inspection & Make estimate for repair Hasanuddin Suhendro 1

Repair leaking point & create PR for Flow Husni /


Kurniawan 1
metter with 2 inch diameter pipe Hasanuddin

Lounching schedule for House keeping day


(Safety breafing, tools box meeting, HK Trimunggara Suhendro 1
area & Meal consumtion)

Replace oil sparator 1-4 Budi Kurniawan 1

Follow up PM list for compressor Ridwan Hasanuddin 1


Need to sparate independent between kiln Ihsan Franz 1
#1 & Kiln #2

Follow up supplier Choldun & Husni Suhendro 1

ALL VSD need to inspection by Siemens Hasanuddin Suhendro 1


vendor
QC is ready to transfer 3 Man power,
Waiting one more hiring man power before Gema Suhendro 1
transfer
Install new light in coal mill building at top Rismawan Hasanuddin 1
cover bag filter area
Invite Mrs. Elvi / Mr. Dwi from SLM for
share knowlage of BPJS procedure Gema / Trimunggara Suhendro

Repair dislocated Budi Kurniawan

Install toren at workshop area Budi & rismawan Hasanuddin

Inspection & repair lighting in room Rismawan Hasanuddin

Coordination with Project to connect dust Suhendro Suresh


line from Bag filter to LKD silo
Coordination with SCM for Loading LKD Trimunggara Husni
from LKD silo
Commisioning schedule & Hand over All Team Project
Create PR for install standing floor VSD for Hasanuddin Suhendro
MCC kiln#3
Create schedule stop for repair time Ihsan & Saeful Andi

Install protection Hasanuddin Suhendro

Inpection & repair water pipe line move Budi Kurniawan


line pipe to the office line
Follow up list of PM Schedule Budi Kurniawan
Repair coupling motor dislocated coupling Budi Kurniawan
motor BC 401

replace jaw plate Wina Radi

Cleaning area skip bucket kiln#2 & move


material from coal storage to skip bucket Ihsan Andi
kiln#2
Cleaning spillage at structure BC 102 Shift leader Ihsan
Ihsan &
Buy water from 3rd party Saeful Trimunggara

Full Inspestigation & find the root cause Operation Suhendro

Kurniawan / Franz
remove no return valve burner 17-28 Suhendro
Maerz

Replace sensor HH sensor Ariawan Hasanuddin

Follow up Project Suhendro Project

Follow up Project Suhendro Project


Follow up Project Suhendro Project

Full insvestigation & find the root cause Trimunggara Operation team

Check by vendor Ariawan Hasanuddin

Cleaning filter CAB 1,2 & 3 & coal transport


1,2 & aspiratus chanel Hendra Franz

Ensure interlocking working properly Ariawan Hasanuddin


Ensure CO content & O2 at bag filter area Ihsan Andi
before working
Target Date Status Comment

Share all Schedule for incoming


1-Mar-19 Done transport to plant (Third party)

Share all Schedule for incoming


1-Mar-19 Done transport to plant (Third party)

1-Mar-19 Done

1-Mar-19 Done

1-Mar-19 Done

4-Mar-19 Done

Done

continue

Done

18-Mar-19 Done Not approve

18-Mar-19 Done Replace during PM / coal mill stop

continue Weekly schedule inspection to suplier

Mechanical all ready given, waiting for


5-Mar-19 In Progress other (22-April-19)
5-Mar-19 Done
25-Mar-19 In Progress Appoval purchase budget (124 jt)
25-Mar-19 In Progress Estimation in first september 2019

11-Mar-19 Done Waiting appropal

25-Mar-19 Done Follow up SCM

11-Mar-19 In Progress Create new PR

18-Mar-19 In Progress Review all WI incoming truck


6-Mar-19 Done

22-Mar-19 Done Temporary action install baricade

11-Mar-19 Done Temporary action install baricade

8-Mar-19 Done

8-Mar-19 Done

8-Mar-19 Done

30-Apr-19 In Progress Not confrimation from sales

15-Apr-19 Done Cancel by plant manager with remark

11-Mar-19 Done

11-Mar-19 Done

11-Mar-19 Done Waiting PO

13-Mar-19 Done

13-Mar-19 Done

5-Apr-19 Done

5-Apr-19 continue Warning driver

15-Mar-19 Done

15-Mar-19 continue

13-Mar-19 Done

18-Mar-19 Done

13-Mar-19 Done

Done discuss improvement for piping system

14-Mar-19 Done

Done

8-Apr-19 Done Waiting arrive

Done
Done

Done

Done

28-Mar-18 Done

28-Mar-18 Done

continue Part of coal mill audit evey month

28-Mar-18 Done

1-Apr-19 Done

30-Apr-19 Done Waiting PO

Create sign at door acces to explotion


18-Apr-19 In Progress door

Done

Done

Done

Done

Done

Done

Done

Done

Done Coal Mill Audit


Done 2 diagfram replaced

Done

26-Mar-19 Done

22-Mar-19 Done

In Progress ???
Continue "see it,stop it report it
Done behaviour"

Done

Done Change bolt M8 to M10

Done

Done

Continue Create Schedule Inspection periodic

Done

29-Mar-19 Done

Continue

30-Apr-18 In Progress

18-Apr-19 In Progress

1-Apr-19 Done
Continue Cont. Monitoring
8-Apr-19 Done Can't cahnge rotation

8-Apr-19 Done Follow up when maerz engineer arived

1-Apr-19 Continue Sosialitation

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 Done

1-Apr-19 Done Hand over ???

2-Apr-19 Done

Continue

23-Apr-19 Done Estimate 30 Apr 2019

2-Apr-19 Continue

2-Apr-19 Done

5-Apr-19 Done
In Progress Under inpsecction 15-Apr-19

5-Apr-19 Done

31-Dec-19 In Progress

8-Apr-19 Done

5-Apr-19 Done

8-Apr-19 Done Inspection durinig stop kiln#1

8 Done

16-Apr-19 In Progress Waiting invoice From Skylif

16-Apr-19 In Progress Waiting invoice from skylif

10-Apr-19 Done

16-Apr-19 Done Painting

Continue Create PR flow mater

10-Apr-191 Done

9-Apr-19 Done

10-Apr-19 Done Replace with old nozzle 2 from 5

10-Apr-19 Continue Monitoring by shift leader

20-Apr-19 Done Repaired

11-Apr-19 In Progress

Done

12-May-19 In Progress

Done

12-Apr-19 Done

Continue

15-Apr-19 Continue High Vm 44% PT MBS


15-Apr-19 Done

16-Apr-19 Done

Cleaning & monitoring after modife


Done chute

16-Apr-19 Done continue Class sesion

In Progress Licance permit before handover

Continue

Done

Done
22-Apr-19 Done

30-Apr-19 Done

30-Apr-19 Done

23-Apr-19 Done

Done

Compressors outdoor 2 & 4 (Out dor)


6-May-19 In Progress Waiting PO , Estimation 3 week after
created PO (Indor Compressor)

26-Apr-19 Done

26-Apr-19 Done

26-Apr-19 Done Waiting PM Schedule

25-Apr-19 Done 50 Minutes running 35.68 Ton

6-May-19 In Progress Register vendor

In Progress

Done
Done

30-Apr-19 Done Repaired

7-May-19 Done

14-May-19 In Progress Discuss with Suhendro

2-May-19 Done
2-May-19 Done

install new vibration measurement


5-May-19 Done point at the cover motor

Waiting install standing floor for MCC


20-Apr-19 In Progress kiln #2

6-May-19 Done

16-May-19 Done

Done Wacth together during unloading solar

10-May-19 Done

7-May-19 Done

6-May-19 Done

6-May-19 Done Sensors damage, PR already raised

7-May-19 Done

8-May-19 Done
9-May-19 Done

9-May-19 Done

12-May-19 Done

Done

Done Waiting schedule inspection


Done Waiting schedule inspection
Done Waiting schedule inspection
16-May-19 Continue continue inspection

16-May-19 Done 2nd inspection 14 May 19

Done

Done

Done Base on PM schedule

Done

Continue Under monitoring

Done Install bolts

Done Create PR for asphalt


13-May-19 Done
14-May-19 Done

Done

Done

Done

16-May-19 Done

16-May-19 Done

16-May-19 In Progress

17-May-19 Done Waiting sparepart

17-May-19 Done
20-May-19 Done
20-May-19 In Progress

20-May-19 In Progress

20-May-19 Done

21-May-19 Done Got leaking more at 30 May 19

Done

In Progress

31-May-19 Done Inspection noltec system by electical

temporary repairing water leakage by


In Progress concrate ( need to purchase 2 eksten
HDPE)

10-Jun-19 Done

Done

24-Jun-19 In Progress Waiting spare part

20-Jun-19 Done Curent practie use reuse jumbo bags

11-Jun-19 Done

14-Jun-19 In Progress
10-Jun-19 Done

10-Jun-19 Done

15-Jun-19 Done

11-Jun-19 Done Cont. leaking Monitoring


11-Jun-19 Done

11-Jun-19 Done

11-Jun-19 Done

Continue Refresh training 5 S

25-Jun-19 In Progress Follow up Hydrant electrical wiring

12-Jun-19 Done

13-Jun-19 Done

13-Jun-19 Done Replace one bolts is damage

In Progress

14-Jun-19 Done

18-Jun-19 In Progress

14-Jun-19 Done

14-Jun-19 Done

14-Jun-19 Done

17-Jun-19 Done

17-Jun-19 In Progress
17-Jun-19 Done

17-Jun-19 Done

20-Jun-19 Done Checked by contractor

24-Jun-19 Done

24-Jun-19 Done
26-Jun-19 Done
Done

Done
Done
19-Jun-19 Done
Electical, Mechanical & Production
19-Jun-19 Done

Continue

19-Jun-19 Done

25-Jun-19 Done

Done

25-Jun-19 Done

9-Jul-19 Done
Done
Loading under spec at stockpile using
Done loader

25-Jun-19 Done

Done Follow Up critical spare


Done

Done

9-Jul-19 In Progress 2 lamp is waiting spare part

Create schedule training & prepare


1-Jul-19 In Progress regulation LOTOTO procedure

Done User inform to HRD

Done

1-Jul-19 Continue Every Friday

Estimatiion budget & drawing


In Progress (2x1x0.5)

Done

Check spesification & Coordination


Done with vendor

5-Jul-19 Done Without flow meter & Need to try


1-Jul-19 Done

Done

Done

Done Control by geotechnic weekly

28-Jun-19 Continue

28-Jun-19 Done estimate 4-5 hrs for stop kiln#1

28-Jun-19 Done

Done

3-Jul-19 Done

In Progress Urgent

Done Prepare JSA

12-Jul-19 In Progress

3-Jul-19 Done
3-Jul-19 Done

5-Jul-19 Done

5-Jul-19 Done

In Progress

In Progress 8-Jul-19 inspestion by vendor

5-Aug-19 In Progress Waiting PO

5-Jul-19 Done

In Progress

8-Jul-19 Done

5-Jul-19 Done

Done Cont. take sample during PM schedule

In Progress Check PR status

8-Jul-19 Done
10-Jul-19 Done

Done Create PR for 2 pcs

In Progress

Continue

In Progress Create PR
In Progress Waiting inspection from Suhedro

In Progress Create PR for replace flow metter

In Progress

Done

Done

10-Jul-19 Done

Done

In Progress Waiting PO

Done

Done

In Progress

After finish repair, make sure dust


Done transport from WGF is smoth

In Progress Waiting PO

In Progress Waiting spare part

In Progress

In Progress Coordination with 3rd party for loading


with Hi blow system
In Progress

In Progress Waiting PO
Done

In Progress Create PR

In Progress

Done
Follow up list schedule PM Kiln#1 at
In Progress Monday 1 PM

Done

Done

Done

Continue

In Progress Invite Franz

In Progress

Waiting spare parts & temporary take


Done from kiln #3

In Progress

In Progress
In Progress

In Progress

In Progress Stop when everything ok

In Progress

In Progress

In Progress
No Data Entered Shop / Area Discussion Point

Unsafe action durring performing jobs,


standing on the screw casing when
1 13-Oct-17 Silo powder opening manual gate from the silo to
the telescopic

More areas have no access for


2 24-Oct-17 All area manintenance & inspection
( permanent platform)

3 25-Oct-17 Lime handling Telescopic for PS 401 wrong installation

4 24-Oct-17 CCR CCTV is not working

No machine guard for BC 401 & BC 402


at work way

5 3-Nov-17 Lime handling

Sliper at work way of BC 401 & BC 402

capasitor bank not conect completely


6 7-Nov-17 LVMDP 1 & not setting yet from project

7 21-Nov-17 Lime handling Joint BC 105 crack


Fence coal storage crack due to
8 22-Nov-17 Coasl storage overload material

Plaster of cement for roof in damaged


9 27-Dec-17 CCR COR (Possibility of yesterday's
earthquake)

there is a difference of CO2 weight


10 4-Jan-18 PLC Loesche indication between display in CCR and
in the display CO2 tank area

Flow meter at fuel station not


11 4-Jan-18 Fuel station functioning properly

Maintenance dep. Need


12 Utility Fabrication trolly for oxygen tube
1 trolly for oxygen tube

13 11-Jan-18 Safety no facility LOTO for isolation local panel

No shower facility at kiln & Raymond


14 16-Jan-18 Safety area
Unloading area at fuel station is not
15 16-Jan-18 General level
No maintenance access for lime
16 19-Jan-18 Lime Handling handling (diverter gate 401 & 402)

17 22-Jan-18 All Plant No marking for all Junction boxes

18 1-Feb-18 First aid First aid box is empty


No SOP / WI for preventive
19 5-Feb-18 WB maintenance WB
20
12-Feb-18 All Area No acess for high level task
21
Loesche, handling &
22 12-Mar-18 All LCS need to cover for safety device
Kiln 1
Laboratory need rack for helmets &
23 12-Mar-18 Laboratory hanger for lab coat
24 28-Mar-18 Plant 5S second project
Truck parking (out side Need parking area for truck at out side
25 4-Apr-18 plant) plant
Sieve shaker need additional vacum
26 4-Apr-18 Laboratory pan

27 17-Apr-18 BC 101 & 102 Road access to BC 102 & 103 is slippery

Halogen lighting at BC 102 & 103


28 17-Apr-18 BC 101 & 102 dazzled
Performance test TPH not achive yet
29 23-Apr-18 Raymond (30 TPH)
Lighting for mosque, CCR, Office & WB
30 24-Apr-18 All Area need to replace
31 24-Apr-18 Fire Truck Front tire noise

32 8-june-2018 Warehouse TMP implementation

Safety lime guide line install


33 8-june-2019 All shop diphoterine station with alarm system

34 11-Jul-18 CCR CCTV is not ready

No alarm system when temperature or


35 11-Jul-18 Coal grinding CO content high at coal grinding area

36 12-Jul-18 Safety Install diphoterine station

37 19-Jul-18 Coal Mill Leaking at bag filter coal mill

Need PO for consumable part and


38 27-Jul-18 General common spare part for maintenance

need to install automatic valve for


39 27-Jul-18 loesche compressors cooling burner and sealing
air dust pump
Need portable engineering station for
40 27-Jul-18 general troubleshooting
Dust every ware from discharge BC 103
41 31-Jul-18 Limestone unloading & 102

Out door compressor need to install


42 31-Jul-18 Compressor outdoor drain rain water chanel & canopy

Hoistcrane, lighting eraster ,pressure


43 31-Jul-18 All area vassel certification

44 28-Aug-18 Safety Additional sign board

Flay ash space limitation in the plant


45 28-Aug-18 Safety area

46 29-Aug-18 WB Printer in WB need to change


Unsafe action for Aplication PPE
47 31-Aug-18 Safety standard in the plant have to refresh

Availability for mandatory PPE in the


48 31-Aug-18 Safety plant

49 2-Sep-18 General Water filling to fire truck

Share incident lime expose lime to the


50 5-Sep-18 Safety eye

51 13-Sep-18 Packing Machine Chain for roller conveyor is damage

52 13-Sep-18 Safety Unsafe action during inspection & open


dump truck cover (terpauline)

53 13-Sep-18 Safety B3 waste status

54 13-Sep-18 Stockpile No safety guard around stockpile area

55 18-Sep-18 Stockpile Dust emission at stokpile kiln #1 & #2

No power station at stone handling


56 18-Sep-18 Stone Handling area
Packing machine not achive capacity 8
57 18-Sep-18 Packing Machine T/H
Belt cleaner for BC 401 402 is not
58 19-Sep-18 Lime handling available

59 20-Sep-18 Fire Truck Property demage for fire truck

20-Sep-18 Safety No parking area for HME


60
20-Sep-18 Pedistrian way Cont. for plnat pedistrian

61 20-Sep-18 Inventory Limestone reject from Bw & SBI

Filter blockage due to high dust


62 20-Sep-18 Coal Mill contamination

63 20-Sep-18 Plant area Lamp for road plant need to replace

64 21-Sep-18 Raymond Mill Noltec system PLC need to relocation

Toe nails hit by table not wiring safety


65 24-Sep-18 Safety shoes
Toe nails hit by table not wiring safety
65 24-Sep-18 Safety shoes

Reject product ( limestone for raw


66 24-Sep-18 Quality material, lime, lime powder)

High temp for motor blower due to


67 24-Sep-18 Coal Mill small fan

68 25-Sep-18 Silo Powder Over load & reject from customer

69 25-Sep-18 Waste Non B3 No Rubish can at plant area


Nitrogen Tube condition is unsafe
73 5-Nov-18 Kiln condition
Low pressure for working pressure
74 5-Nov-18 Coal Grinding HSLM

Unsafe action, standing on the top high


8-Nov-18 Safety blow when hi blow truk is moving
75
76 21-Nov-18 Kiln #1 Modul cleaning filter unit error

23-Nov-18 Safety Nitrogen Tube no protection

77
78 28-Nov-18 Kiln#1 Motor Heat Exchanger Overload
Isolation cable 20 KV need to check due
28-Nov-18 Trafo
79 to flashover

29-Nov-18 Safety stone sediment flow water to the river


80
capasitor bank fro LVMDP 1 for
LVMDP 1
81 30-Nov-18 contoling cost Phi
Melting cable waste gas contol unit to
Bag filter K#1
82 30-Nov-18 field nee to replace

Plant struck by lighting durring raining


6-Dec-18 Safety due to plant
is prone to lightning strikes
83

Driver impact from flushing material


7-Dec-18 Safety red eyes driver hit by powder
84
7-Dec-18 Lime handling DC 403 is block due to wet dust
85

Current electrical LOTO device is not


11-Dec-18 Safety suitable with fied power cut device
86
New working plat form for BC 102 &
87 103 need to install lamp
13-Dec-18 BC 102 & BC 103
At tail pulley area for BC 102 & 103
88 need to install lamp
Plant struck by lighting durring raining
6-Dec-18 Safety due to plant
is prone to lightning strikes
89

Driver impact from flushing material


7-Dec-18 Safety red eyes driver hit by powder
90
7-Dec-18 Lime handling DC 403 is block due to wet dust
91

Current electrical LOTO device is not


11-Dec-18 Safety suitable with fied power cut device
92
New working plat form for BC 102 &
93 103 need to install lamp
13-Dec-18 BC 102 & BC 103
At tail pulley area for BC 102 & 103
94 need to install lamp

14-Dec-18 Safety Sediment pound need to bariccade


95

Undersize quantity is different between


14-Dec-18 Undersize screen Laboratory & actual screen
96
Operatinal car scratched during trip to
19-Dec-18 Operatioal car
97 quarry
98 19-Dec-18 General 8 road plant lamp is damage

Water pipe line leaking at reducer


20-Dec-18 Pedistrian conection, need to create control box
99
20-Dec-18 GEneral Security post need to install CCTV
100
Cable tray at dust collectors need to
26-Dec-18 Kiln#1
101 reposition

102 Improvement Double valve raymond


26-Dec-18 Raymond need to action quickly
103
Complain about water flow after
28-Dec-18 Community complain modify main disposal drainage during
104 raining condition
Follow up PIC WO Picture

Install plat form for maintenance & Budi Kurniawan


operation access

Install permanent platform for All Personel Hasanuddiin


maintenance & sampling

Repair telescopic system Budi Hasanuddin

Check & coordination with Lintec Hasanuddin Project

Install safety guard Agus

Install greating plat Agus Hasanuddin

Follow up to project Ariawan Hasanuddin

Repair cover strip Budi Kurniawan


Repair fance after empty lime at coal Andi Suhendro
storage

Follow up Project Andi Project

Simulation 4-20 mA in PLC loesche Ariawan

Follow up to Maintenance manager Husni

Idad Kurniawan 2

Fabrication switch lock Budi Kurniawan

Crear WR Kurniawan Hasanuddin

Concreate fuel station area Andi Plant Manager

Instal permanent platform Budi Hasanuddin

Marking cables all junction boxes, for Rismawan Hasanuddin


all area
Create PR for first aid kit Saeful Husni
Create SOP / WI for preventive Kurniawan Hasanuddin
maintenance WB
Need scafolding
Ariawan Hasanuddin
Safety training Working at High
Estimation material for fabrication Budi Kurniawan
cover safety device
Fabrication rack for helmets & hanger Wina Radi
for lab coat
Make sign board Ihsan Andi

Create parking area at out side plnat Rustam Andi


Sketh vacum pan for sieve shaker Budi Radi

Road access need to improve Budi Kurniawan

Replace by normal lighting Ariawan Hasanuddin

Prepare redinees equipment & HK Riki Andi


raymond area
Replace lighting for Mosque, CCR, Ariawan Hasanuddin
Office & WB
Inspection front tire for fire truck Eeng Kurniawan
Sign board, pedistrian road & forklift Saeful Andi
movement area

Install Alarm system for diphoterine Ariawan Hasannudin


station

Check conection with Lintec Saefudin Hassanudin

Check location for instalation alarm Hassanudin Suhendro

Estimation cable for diphoterine Saefudin & Hassanudin


station Ridwan
Repairing leaking point at bag filter Kurniawan Hassanudin
coal mill

follow up to SCM Ariawan Hasanuddin

inspection for installing automatic Hassanudin Suhendro


valve

create PR for portable engineering Hassanudin Suhendro


station

Instal curtain Ihsan Kurniawan

install rain water chanel & canopy Budi Hassanudin

Follow up To Plant manager & Safety Suhendro Himawan


Manager
Review Additional sign board in the Tri Suhendro
plant
Follow up hazardous waste vendor &
TPS
Tri Suhendro
Record hazardous waste to Log book

Change printer in WB Saeful Suhendro


Stop unsafe condition activity, All Personil Tri
Briefing & Refresh safety guide line

Ensure PPE stock available All Personil Tri

Install new water line for fire truck Budi Kurniawan

Share investigation reports to all Tri Suhendro


team

Install chain for roller conveyor Budi Kurniawan

Check location for dump truck Tri Kurniawan


inspection station
Fly ash data Ihsan
Chemical waste Wina
Oil, filter, majun, grease & Budi Suhendro
contaminated good

Electrical tonner, accu, komputer etc Ariawan

Stockpile kiln #1 & #2


Trimunggara Suhendro
Emergency Stockpile Kiln #1 & #2

Study for install sprey system Trimunggara Suhendro

Install power station at stone Rismawan Hasanuddin


handling area
Ensure packing machine system start Hasanuddin Suhendro
Auto system

Install belt cleaner at BC 401 & 402 Budi Kurniawan

Create cronology & repairing fire Tri Suhendro


truck
Create parking area for HME Tri Suhendro
Marking & Cont. paiting Tri Suhendro

BW CaCo3 <96% & Inspection Wina Suhendro


stockpile before delivery to plant

SBI Big stone & clay contamination &


Inspection stockpile before delivery Wina Suhendro
to plant

Clening water storage & intall full Budi Kurniawan


cover

Replace lamps at plant area Ariawan Hasanuddin

Relocation from kiln 3 blower room Suhendro Project

Ensure All Personel use PPE


Tri Suhendro
First Aid Madichine must be Tri Suhendro
Availiable at all Area

Discustion point with SCM, geologist, All Manager Suhendro


laboratory & sales team

Replace fan at motor blower Ariawan Hasanuddin

Install facility unload from hi blow to Kurniawan Suhendro


silo powder
Cordination with government Gema Suhendro

Coordination with project Suhendro Project

Replace selenoide valve Hasanuddin Husni

Install LOTO BOX around loading lime Ihsan Trimunggara


powder area

Install vortex cooler Ariawan Hassanudin


Fabrication bridge & rack for coal Kurniawan Suhendro 1
dust kiln #1

Concrate coal dust floor for kiln #1 Andi Suhendro 1

Inspection motor no 2 Ariawan Hassanudin 1

inspection cable Hasanuddin Suhendro 1

install trap at drianage Trimunggara Suhendro 1

Water Sendiment pond monitoring Radi Trimunggara 1

Remanding project for commisioning Project Suhendro 1


LVMDP 2

Replace cable when cable arrive Husni Hassanudin 1

Check lighting rod by certified person Trimunggara Hassanudin 1


/ vendor,

i-Cam full investigation incident Trimunggara Suhendro 1

Cleaning DC 403 & replace bag filter Ihsan / Mech Andi 1

Follow up LOTO device Trimunggara suhendro 1

Install lamp both area Ariawan Hassanudin 1


Check lighting rod by certified person Trimunggara Hassanudin
/ vendor,

i-Cam full investigation incident Trimunggara Suhendro

Cleaning DC 403 & replace bag filter Ihsan / Mech Andi

Follow up LOTO device Trimunggara suhendro

Install lamp both area Ariawan Hassanudin

Install baricade around sediment Ihsan Trimunggara


pound area

Review screen aperture Radi Suhendro

Change operatinal car to quary Gema Suhendro

Repair and replace lamp Ariawan Hassanudin

Install control box Hasanuddin Suhendro

pulling cable and install lan network Ariawan Hassanudin

Reposition cable tray Ariawan Hassanudin

Folow Up SCM to proccess PR Ariawan Hassanudin


improvement double valve

Create logic for Operational process Ihsan Andi

Inspection & check actual condition Gema Suhendro


Status Remarks

Scoaffolding requare for temporary


in Progress access

in Progress

in Progress

in Progress

in Progress

in Progress

in Progress

in Progress
in Progress empty out lime from coal storage done

in Progress

in Progress CO2 need to recalibration

in Progress

in Progress

in Progress

in Progress

in Progress Service job

in Progress

in Progress

In Progress Follow up SCM


In Progress

In Progress
In Progress

In Progress

In Progress

In Progress Follow up SCM


In Progress
In Progress

In Progress

In Progress

In Progress

In Progress

In Progress

In Progress

In Progress

In Progress Follow up PO of transmiter & recivier

In Progress Follow up PO to SCM

In Progress Follow up PO to SCM

In Progress Follow up PO toSCM

In Progress Follow up PO toSCM

In Progress Follow up PO toSCM

In Progress Create PR tia portal

In Progress

In Progress

In Progress

In Progress

In Progress

In Progress
In Progress

In Progress

in progress

in progress

in progress

in progress

Continute Monitoring by CCR

in progress

in progress
in progress

in progress

in progress

in progress

in progress

Done

in progress
in progress

in progress

in progress

in progress

in progress

in progress

in progress
in progress

in progress

in progress

in progress

in progress

In Progress The area is stillcompleted


under construction to be

In Progress

In Progress

In Progress

In Progress Brigde Done

In Progress PR done

In Progress Bearing motor need to replace

In Progress

In Progress

In Progress Frequency weekly

In Progress capasitor bank is not active yet

In Progress waiting cable arive

3 CCTV under repair by vendor, 1 CCTV


In Progress at warehouse damage waiting sparepart.
Fire alarm fault (inspection)

In Progress

In Progress Create PR

In Progress Follow Up PR

In Progress
3 CCTV under repair by vendor, 1 CCTV
In Progress at warehouse damage waiting sparepart.
Fire alarm fault (inspection)

In Progress

In Progress

In Progress Follow up PR

In Progress

In Progress

In Progress

In Progress

In Progress

In Progress

Done

Done

Done

Done

Done

In Progress
No Name Title Department
1 2
1 Wina Septiani Assisten Laboratory Laboratory √
4 Ariawan Electrical Engineer Maintenance
5 Ihsan khanipa CCR op Production √
6 M. Saeful A WB Operator SCM √
7 Andi Khairudin Production Manager Production OFF √
(Happy
8 Kurniawan Senior Mechanical Head Maintenance New
9 Rady Sandi SVP QA/QC Laboratory Laboratory Years)
10 Husni Sopro SCM Manager SCM
14 Budi S Mech op Maintenance
21 Suhendro Plant Manager
22 Hassanudin Maintenance Manager
23 Tri Munggara Safety SPV
24 Timbul Gema Marpaung HR GA & Admin
25 Riswaman Electrical Engineer
26 Coldun Mubarak Mining Service
27 Eko Setyawan Finance Manager
28 Fauzan Customers Service
LIST OF ABSENCES DAILY MORNING MEETING
January 2018
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
√ √ √ √ √ √ √ √ √ √ √ √

√ √ √ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √
OFF OFF OFF OFF OFF OFF



ING LIST OF ABSENCES DA
Feb
23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 C8 9 10 11 12
o
√ √ √ √ √ √ √ √ √ m √ √
√ √ m
√ √ √ √ √ √ √ √ √ √ √ u √ √
n
√ √ √ √ √ √ √ √ √ √ √ i √ √
√ √ √ √ √ √ t √ √
y
OFF OFF OFF OFF OFF OFF
S
√ √ e
r
√ √ √ √ √ v
i
c
e
s
L
o
a
d
F ABSENCES DAILY MORNING MEETING i
n
g
February
13 14 15 16 17 18 19 20 21 22 23 24 25 26 L27 28 1 2
c c i
√ √ o L √ √ √ o √ √ √
m
m u m
√ √ e
m n m
√ √ √ √ √ √ s √ √
u n u t
√ √ n a √ √ √ n √ √ √
o
i r i
√ √ √ √ √ n √ √
t t e
y N OFF OFF y √ OFF OFF
e &
s w s
e e l
r y r i
v e v m
i a i e
c r c
e e t
o

P
S

4
0
1
C
o Mar-18
3 4 5 6
m 7 C8 9 10 11 12 13 14 15 16 17 18
√ m o √ √ √ √ √
i m
s m
√ i √ u √ √ √ √ √
√ o n √ √ √ √ √
n i
i t
OFF OFF n y OFF OFF OFF OFF
g
S
R e
a r √ √ √ √ √
y v
m i
o c
n e
d
18
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
√ √ √ √ √ √ √ √

√ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √
√ √ √ √
OFF OFF OFF OFF

√ √ √
Apr-18
C5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
C 20 21 22 23 24 25 26 27
o √ √ √ √ √ o √ √ √ √
m m
m √ m
u √ √ √ √ √ √ √ √ √ u √ √ √ √ √
n √ √ √ √ √ √ √ √ n √ √ √ √ √
i i
t √ √ √ √ √ √ √ √ √ t √ √ √
y OFF OFF OFF OFF y OFF OFF

S S
e e
r √ √ r
v v
i i
c c
e e
A
s
c
May-18
28 29 30 1 2 3 4 5 6 7 8 9 10
e 11 12 13 14 15 16
n
√ √ √ √ √ √ s √ √ √
i
o
√ √ √ √ √ √ √ n √ √
√ M √ √ √ √ √ √ D √ √ √
A a
Y
y √ √
OFF OFF OFF OFF o OFF OFF
D f
A J
Y e
s
√ u
s

C
h
r
i
s
t
May-18
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
√ √ √ √

√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √
√ √ √
OFF OFF OFF OFF OFF OFF OFF
Jun-18
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23




OFF OFF OFF OFF OFF
24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10

√ √ √ √
√ √ √ √
√ √ √ √

OFF OFF OFF OFF √


Jul-18
11 12 13 14 15 16 17 18 19 20 21 22 23

√ √ √ √
√ √ √ √ √
√ √ √
√ √ √
√ OFF OFF √ √ OFF OFF

√ √ √
24 25 26 27 28 29 30 31 1 2 3 4





OFF OFF √ OFF


Aug-18
5 6 7 8 9 10 11 12 13 14 15 16 17 18

√ √ √ √ √
√ √ √ √ √
√ √
√ √
OFF OFF OFF √ √ OFF

√ √
19 20 21 22 23 24 25 26 27 28 29 30 31
√ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √
√ √ √ √ √
OFF OFF √ √ √ √ √
OFF


√ √ √ √
1 2 3 4 5 6 7 8 9 10
√ √ √
√ √ √
√ √ √
√ √ √
√ √ √
√ √ √
OFF OFF OFF OFF

√ √
Sep-18
11 12 13 14 15 16 17 18 19 20
√ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
OFF OFF
√ √ √ √ √


√ √
21 22 23 24 25 26 27 28 29 30


OFF OFF OFF OFF


1 2 3 4 5 6 7 8 9
√ √
√ √
√ √
√ √
√ √

Holiday √ √

√ √
Oct-18
10 11 12 13 14 15 16 17 18 19
√ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √
Holiday √ √ √ √ √

√ √ √ √ √ √ √ √
20 21 22 23 24 25 26 27 28 29

√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √

Holiday √ √ √ √ √
√ Holiday √

√ √


√ √ √ √
30 31 1 2 3 4 5 5 7 8
√ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √
√ √ √ √
Holiday √







√ √

√ √ √ √ √ √
Nov-18
9 10 11 12 13 14 15 16 17 18
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √


√ Holiday √






√ Holiday

√ √ √ √
19 20 21 22 23 24 25 26 27 28


H √


√ √ √


O √







L

√ I √ √ √
√ Holiday √

D
A √ √

√ Y √ √ √
29 30 1 2 3 4 5 6 7 8
√ √
√ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √



√ Holiday √ √

√ √ √
Holiday

√ √
√ √ √ √ √
Dec-18
9 10 11 12 13 14 15 16 17 18

√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √

Holiday √








√ Holiday √


√ √ √ √
19 20 21 22 23 24 25 26 27 28

√ √ √
√ √ √ √
√ √ √ √ √
√ √ √

√ Holiday Holiday √




√ √ √ √ √
√ √ √
√ √ √ √
29 30 1 2 3 4 5 6 7 8

H √ √ √

o √









l √ √ √ √

Holiday i √




√ Holiday √



d
a √ √ √ √ √

y √
√ √ √

√ √
Jan-19
9 10 11 12 13 14 15 16 17 18

√ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √





√ Holiday √









√ √ √ √ √
√ √ √ √ √ √
19 20 21 22 23 24 25 26 27 28

√ √
√ √
√ √
√ √

Holiday √


√ Holiday


√ √
29 30 1 2 3 4 5 6 7 8

√ √ √ √ √
√ √ √ √ √
√ √ I √ √
√ √ M √ √





L √ √

E
K

√ √ √
Feb-19
9 10 11 12 13 14 15 16 17 18

H H √









H H √

o o √ √ √ √ √ o o √
l l √ √ √ √ √ l l √

i i √








√ i i √

d d d d
a a a a
y y y y
√ √ √ √ √ √
19 20 21 22 23 24 25 26 27 28









H H √




√ √
√ √ √ √ o o √ √ √ √
√ √ √ √ l l √ √ √ √







√ i i √







d d
a a
y y √
√ √ √ √ √ √ √ √
1 2 3 4 5 6 7 8 9 10


S
√ √ √ √ e √
√ H H √ √ √ c √ H H
√ √ √ √ l √
√ o o √ √ √ u √ o o
√ l l √ √ √ s √ l l
i i √ √ √
i √
i i
d d √ √ o √ d d
n


a a √


√ √ √
a a
y y √ √ √ d √ y y
√ √ √ √
√ √ √
a √
√ √ √ y √
Mar-19
11 12 13 14 15 16 17 18 19 20

√ √ √
√ √ √ √ √
√ √ √ H H √ √
√ √ √ √ √
√ √ √ o o √ √ √
√ √ √ l l √ √ √

i i
√ d d

√ √


a a √


√ √ √ y y √ √



21 22 23 24 25 26 27 28 29 30

√ √ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ H H √ √ √ √ H
√ √ o o √ √ √ √ o
l l √ √ √ √
l
i i i
√ √
d d √

d
a a √ √ √ a
y y √ √
y
√ √ √
31 1 2 3 4 5 6 7 8 9

√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √
H √ √ H H H √
o √ √ o √ o o √ √

l √ √
l √ √
l l √ √

i i i i
d d d d
a √ √ a √ √ a a √ √

y y √
y y √ √
√ √ √
√ √ √
√ √ √
Apr-19 A
10 11 12 13 14 15 16 17 18 s 19
c
√ √ √ √ e
√ √ √ √ √ n
√ √ √ √ √ s
√ √ √ H H √ √ P i
√ √ √ o o √ √ E o
n
√ √ √
l l √ √
M
D
i i I a
d d L y
√ √ √ a a √ √ U o


√ √
y y √

f
√ √ √ J
√ e
√ √ √ s
u
s
20 21 22 23 24 25 26 27 28 29

√ √ √ √
√ √ √ √ √
√ √ √ √ √
H H H H √
o o o o √

l l √ √ √ √
√ l l √

i i √ √ √ i i
d d √ √
d d √
a a a a
y y √

y y √

30 1 2 3 4 5 6 7 8 9

√ √ √
√ √ √ √ √
√ √ √ √ √
√ H H √ √ √
√ o o √ √ √ √

l l √



√ √

i i
d d √



√ a a √ √ √ √

y y √ √
√ √

May-19
10 11 12 13 14 15 16 17 18 19


√ √ √ √ √ √
√ √ √ √ √ √
√ H H √ √ √ H H
√ o o √ √ √ √ √ o o

l l √ √ √ √
l l
i i i i

d d √
√ √
d d
√ a a √ a a
y y √ √ √
y y
√ √
20 21 22 23 24 25 26 27 28 29

√ √
√ √
√ H H
√ o o

l l
i i
d d
√ a a
y y
30 31 1 2 3 4 5 6 7 8



H √ H H H H H H H H
o o o o o o o o o
l √ l l l l l l l l
i i i i i i i i i
d d d d d d d d d
a √ a a a a a a a a
y y y y y y y y y
Jun-19
9 10 11 12 13 14 15 16 17 18

√ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
H √ √ √ H H √
o o o √ √

l √ √ √ √ √
l l √ √

i i i
d √ √ √
d d
a √ √ √ a a √

y y y

19 20 21 22 23 24 25 26 27 28

√ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
H H √ √ √ √
√ √ √ o o √ √ √ √





√ l l √ √ √ √

i i
d d √

a a √ √

y y

29 30 1 2 3 4 5 6 7 8

√ √
√ √ √ √ √ √
√ √ √ √ √ √
H H √ √ √ √ √ H H √
o o √ √ o o √

l l √ √ √
l l √

i i √ √ √ i i
d d √ √

√ √ √
d d √

a a √ √ √ a a √

y y √ √
y y √
Jul-19
9 10 11 12 13 14 15 16 17 18

√ √ √ √ √ √
√ √ √ √ √ √
√ √ H H √ √ √ √
√ o o √ √ √ √
√ √
√ l l √


√ √ √
i i
√ √
d d √ √ √ √
√ a a √ √ √

y y √ √
19 20 21 22 23 24 25 26 27 28

√ √
√ √
√ H H √ H H
√ o o √ o o
l l √
l l
i i i i

d d √
d d
a a a a
y y y y
29 30 31 1 2 3 4 5 6 7

H H
o o
l l
i i
d d
a a
y y
Aug-19
8 9 10 11 12 13 14 15 16 17




H H √ H
o o √ o
l l l
i i i
d d d
a a √ a
y y y
9
18 19 20 21 22 23 24 25 26 27

H H H
o o o
l l l
i i i
d d d
a a a
y y y
28 29 30 31

H
o
l
i
d
a
y
No Data Entered Shop / Area Discussion Point Action

Sensor speed cable of BC 104 Tidy up sensor cable of BC 104


1 9-Feb-18 Tunnel need to tidy up

Limestone Anthill in juntion box due to


2 14-Feb-18 Cleaning & close opening acess
unloading have opening acess

Lime Community service (house


3 22-Feb-18 Lime handling need to clean
handing keeping) at lime handling area

The distance of monitor Relocate limestone handling


limestone handling and lime
4 23-Feb-18 CCR and lime handling monitor
handling too far with radio near communications radio
communications
Limestone, lime & Plate need to tidy up plate,cleaning
5 5-Mar-18 PS 401 tidy up limestone & lime under PS 401

Drain water & resealing for


Powder
6 14-Mar-18 water up in SC 603 & SC 602 cover SC 601 & 602 with
Handling sealant

Powder Leakages from SC 601 due to


7 14-Mar-18 Install bolts at Cover SC 601
Handling bolts not install yet

Inspection, Check installation &


Spark for 20 KV cables for
8 23-Mar-18 MVMDP Recommisioning for MVMDP
cubicle no 3 (Cubical 3)
Photo
PIC Target Date
Before After

Ariawan

Rismawan

All personil

Ariawan
Budi & Rustam

Kurniawan

Kurniawan

Ariawan
Actual date Remark
No Data Entered Shop / Area Discussion Point

Handraill at Classifier area is unsafe


1 5-Sep-17 Loesche condition

Loesche mill grounding cable instalation is


2 18-Sep-17 Loesche not corect

3 20-Sep-17 General Plant drainage is open condition

4 20-Sep-17 Shift Room leakage of plumbing in the shift room

2 Hoses for pnuematic silinder is leak,


5 20-Sep-17 Kiln 1 because getting hot from chimny flap body

6 26-Sep-17 All area Lighting rod

Monitoring compressor by control room


7 26-Sep-17 General operator
Level sensor high for telescopic is not
8 11-Oct-17 Raymond working
Manhole top silo PS 501 & 502 is not
9 11-Oct-17 Raymond sealing
10 11-Oct-17 Raymond commisioning raymond mill
Commisioning genset is failure, motor trip
11 11-Oct-17 Utility when start
12 11-Oct-17 Raymond commisioning raymond mill

13 11-Oct-17 Raymond Sampling point is not applicable

Unsafe action durring performing jobs,


standing on the screw casing when
14 13-Oct-17 Silo powder opening manual gate from the silo to the
telescopic

Rotary feeder jammed when feeding


15 13-Oct-17 Raymond material (indication in CCR is ON)

Pipe leakage in office

16 16-Oct-17 Utility

Pipe leakage in Shift room

17 16-Oct-17 Stone handling Finding individual test Stone handling


Discaharge filter dust to BC 401 & 402 cut
18 19-Oct-17 Kiln 1 by Lintech
Kiln 1 opening skip to kiln hopper, still
19 20-Oct-17 Kiln 1 & 2 cover by taupolin to apoide rain water
enter kiln

Coal spillage during loading to the intake


20 24-Oct-17 Raw coal hopper

More areas have no access for


24-Oct-17 All area manintenance & inspection ( permanent
platform)

21

22 25-Oct-17 Lime handling Telescopic for PS 401 wrong installation

Not enough pressure for operation due to


25-Oct-17 Plant compressor 2 unit compressor is not ready yet after
removed from compressor room area

23 26-Oct-17 laboratory Rack lab equipment not available


24 24-Oct-17 CCR CCTV is not working

No machine guard for BC 401 & BC 402 at


work way

25 3-Nov-17 Lime handling

Sliper at work way of BC 401 & BC 402

Water pipe line is leaking in bathroom


26 6-Nov-17 Office Office area

27 6-Nov-17 Shift room Water pipe line is leaking in shiftroom

capasitor bank not conect completely &


28 7-Nov-17 LVMDP 1 not setting yet from project
29 21-Nov-17 Lime handling Joint BC 105 crack

Fence coal storage crack due to overload


30 22-Nov-17 Coasl storage material

Ceiling damage of impact from water


31 23-Nov-17 General leaking

32 4-Dec-17 Office Ceiling office 1st floor is water leaking


Leaking water pipe in bathroom for office
28 18-Dec-17 Utility area 1st floor

Landslide due to main drinage direct going


29 19-Dec-17 General to chasm

Plaster of cement for roof in damaged COR


30 27-Dec-17 CCR (Possibility of yesterday's earthquake)

31 3-Jan-18 Shift room Pipe leaking in shift room

32 2-Jan-18 Laboratory Safety shower is less sturdy condition

Water spillage at Shift room due to water


33 3-Jan-18 Shift room pipe is leaking.
No safety condition nitrogen & accytllen
34 4-Jan-18 Workshop tube storage

there is a difference of CO2 weight


35 4-Jan-18 PLC Loesche indication between display in CCR and in
the display CO2 tank area
Flow meter at fuel station not functioning
36 4-Jan-18 Fuel station properly

Maintenance dep.
37 Utility Need 1 trolly for Fabrication trolly for oxygen tube
oxygen tube

near miss road plant accident in front of


38 10-Jan-18 Safety fuel station

39 11-Jan-18 Safety no facility LOTO for isolation local panel

Taupoline cover for Travo room was


40 12-Jan-18 Trafo area damage

41 16-Jan-18 Safety No shower facility at kiln & Raymond area

42 16-Jan-18 General Unloading area at fuel station is not level

43 17-Jan-18 Lime Handling Pin for BE 406 is lost & have no sparepart

No maintenance access for lime handling


44 19-Jan-18 Lime Handling (diverter gate 401 & 402)

45 22-Jan-18 All Plant No marking for all Junction boxes

46 29-Jan-18 Loesche Sensor valve for sampling is broken

47 30-Jan-18 Raymond Rotary feeder Test run

48 31-Jan-18 Raymond Rotary feeder trip after 1 hour run

Floaded at coal storage area due to


49 31-Jan-18 Coal storage drainage is blocked

50 14-Feb-18 settling pond No guarding for fall protection


51 1-Feb-18 First aid First aid box is empty

52 2-Feb-18 All Area All instruments need to clean

53 2-Feb-18 Smoking area Behind workshop need smoking area


No SOP / WI for preventive maintenance
54 5-Feb-18 WB WB
55 6-Feb-18 Laboratorium need support for tools rack
56 7-Feb-18 All Area Structur of equipment was coroded
57
12-Feb-18 All Area No acess for high level task
58
59 13-Feb-18 Genset Genset not ready to use
During Oparation not enough pressure
60 13-Feb-18 Compressor with 2 units compressor (3 Units run & 1
Unit stand by)

61 19-Feb-18 General road plant is dirty conditon

62 20-Feb-18 Coal Storage coal storage need to clean from lime

63 21-Feb-18 Shift room & CCR water low flow & low pressure

Performance test from 5 March - 9 March


64 23-Feb-18 Raymond 2018

65 1-Mar-18 All Area All instruments need to clean

66 1-Mar-18 Smoking area Behind workshop need smoking area

Finding issue test running BC 104 : the


Limestone
67 5-Mar-18 Distance for 6 Rollers, 1 return roller & 1
handling Seconddary cleaner (Scrapper)

Individual test finding : Abnormal sound


68 6-Mar-18 Kiln 1 for Heat exchanger no 3
Loesche, handling
69 12-Mar-18 All LCS need to cover for safety device
& Kiln 1
Laboratory need rack for helmets &
70 12-Mar-18 Laboratory hanger for lab coat
71 12-Mar-18 Cuting grass Strarter for cuting grass is broken

External guardrail
72 27-Mar-18 plant (Dump External guardrail need to cover with plate
Hopper area)

73 28-Mar-18 Plant 5S second project


Individual test finding : water inside
74 29-Mar-18 Kiln 1 combustion air pipe line
75 29-Mar-18 All Area All area need to House keeping
76 29-Mar-18 Garden area Responsible during long weekend
Prepare material for painting pedestrian
77 29-Mar-18 Plant road

78 2-Apr-18 Workshop Smoking around workshop


79 2-Apr-18 Fire Truck Door & stair step to cabin need to repair

Truck parking (out Need parking area for truck at out side
80 4-Apr-18 side plant) plant
Door of MCC kiln need to additional
81 4-Apr-18 MCC kiln canopy

82 4-Apr-18 Laboratory Sieve shaker need additional vacum pan


Individual test finding :"Signal error for
83 11-Apr-18 BC 102 BDS BC 102 , horn is not sound before
running,

84 11-Apr-18 BC 103 Individual test finding : BC 103 Sensor PWS


is error
Individual test finding : signal of
85 11-Apr-18 VF 101 emergency stop error if push button is
running, indication in CCR is Run
Individual finding : PWS fault at BC 404 (1
86 11-Apr-18 BC 404 of 2 from PWS is not funtion)

87 12-Apr-18 Kiln 1 Handrill at kiln area need to repaint

1 of Water point behind office need to


88 17-Apr-18 Office reposition due to pedestrian way jobs

89 17-Apr-18 BC 101 & 102 Road access to BC 102 & 103 is slippery

90 17-Apr-18 BC 101 & 102 Halogen lighting at BC 102 & 103 dazzled

No access road for wheel carrier from out


91 18-Apr-18 Laboratory side to laboratory room

92 23-Apr-18 Shift room Shift room need to cleaning & repainting

Performance test TPH not achive yet (30


93 23-Apr-18 Raymond TPH)
Lighting for mosque, CCR, Office & WB
94 24-Apr-18 All Area need to replace

95 24-Apr-18 Fire Truck Front tire noise

96 27-Apr-18 Kiln 1 Instruments list need to check

97 30-Apr-18 Loading by area Loading by area need to painting


98
Follow up PIC WO

Repair and install additional Bayan & Agus Kurniawan


handrail

follow up to lintec Firman Hasanudin

Make work request to Kurniawan Budi Kurniawan

Follow up to Project Andi Project BMA

Replace the hose of air pnumatic Budi Kurniawan

Reposition to high position of kiln 2 Ariawan Saripudin

Compressor panel need to Ariawan Hasanudin


reposition to Contol room

Check level Sensor Ariawan Hasanudin

Instal rubber seal & replace all Budi Kurniawan


bolts
Following project activities All Personel Andi

Check grounding generator Ariawan Hasanudin

Following project activities All Personel Andi


Reposition sampling point raymond Radi Kurniawan
mill product

Install plat form for maintenance & Budi Kurniawan


operation access

Cleaning material above rotary for Riki & Taufik Andi


inspection

inspection for leaking and Follow Budi Kurniawan


up to project

BC 102 & BC 103 Belt drift switch Ariawan Hasanuddin


need to modified posisition

Diverter gate 101 Automatic not Budi Kurniawan


installed yet
Monitoring proper instalation Agus Mustofa Radi

Install permanen cover ( Door ) Kurniawan Hasanuddin

Modify Intake hopper 601 smaller Budi All Personel


than loader bucket

Install permanent platform for All Personel Hasanuddiin


maintenance & sampling

Repair telescopic system Budi Hasanuddin

Need to check status compressor Hasanuddin Project


from project

Fabrication / buy the rack Wina Kurniawan


Check & coordination with Lintec Hasanuddin Project

Install safety guard Agus

Install greating plat Agus Hasanuddin

Follow up to project Andi Project BMA

Follow up to project Andi Project BMA

Follow up to project Ariawan Hasanuddin

Repair cover strip Budi Kurniawan

Repair fance after empty lime at Andi Reza


coal storage

Repairing ceiling damage all area Hasanuddin Reza

Repair pipe line for leaking point Andi Project


Follow up Project Andi Project BMA

Monitor landslide during project Andi Project


prepare new drinage line

Follow up Project Andi Project

Check & follow up by project Andi Project

Create support for supplay pipe Agus Mustofa

Follow up project to repair it Andi Project


Fabrication holder for noitrogen & Agus Mustofa
accytllen tube

Simulation 4-20 mA in PLC loesche Ariawan

Follow up to Maintenance manager Husni

Idad Kurniawan 2

Follow up circulation plant with Safety Dep. Plant Manager


sign board

Fabrication switch lock Budi Kurniawan

Instal cover with zink in front of Kurniawan Hasanuddin


trafo room

Crear WR Kurniawan Hasanuddin

Concreate fuel station area Andi Plant Manager

Crate PR Budi Kurniawan

Instal permanent platform Budi Hasanuddin

Marking cables all junction boxes, Rismawan Hasanuddin


for all area

Repairing sensor sampling valve Firman Hasanuddin

Follow project team All personil

Follow up to Arvos with project All personil Suresh


team

Cleaning drainage around coal Riki & Taufik Andi


storage

Install handrill around settling pond Safety Dep. Plant Manager


Create PR for first aid kit Saeful Husni

Cleaning all instruments equipment Electrical crew Hasanuddin

fabrication smoking area Mechanical team Kurniawan


Create SOP / WI for preventive Kurniawan Hasanuddin
maintenance WB
create WO/ PR for dynabolt wina Radi
Repainting coroded equipment Budi Kurniawan
Need scafolding
Ariawan Hasanuddin
Safety training Working at High
Up date status from project Rismawan Hasanuddin
Follow up 2 units status
compressor after relocate from Hasanuddin Project
compressor room

Watering road plant by fire truck Taufik Andi

Cleaning coal storage Rustam Andi


Check water line pipe at Shift room
& CCR Andi Project

Safety device in place & Keep clean Riki Andi


condition equipment

Cleaning all instruments equipment Electrical crew Hasanuddin

fabrication smoking area Mechanical team Kurniawan

need to adjust Hasanuddin Project

Inspection heat exchanger no 3 Budi Kurniawan

Estimation material for fabrication Budi Kurniawan


cover safety device
Fabrication rack for helmets &
hanger for lab coat Wina Radi

Service by supplier Budi Kurniawan

Install plate at guardrail at dump Budi Kurniawan


hopper area

Make sign board Ihsan Andi

Check linking point Firman and Agus Andi

House keeping Riki Andi


Handle by shift and security Andi Andi

Create PR Saepul Andi

Mapping smoking area behind Ariawan Andi


workshop
Estimation budgeting & take action Riki, Eeng, Henda & Kurniawan
for repeiring fire truck Agustian
Create parking area at out side Rustam Andi
plnat
Fabrication canopy for door of MCC Idad Kurniawan
kiln

Sketh vacum pan for sieve shaker Budi Radi

Inspection & repair signal BDS for Ariawan Hasanuddin


BC 102 & horn sound

Inspection & repairing PWS sensor Ariawan Hasanuddin


1&2

Inspection & repairing signal Saepudin & Yayan Hasanuddin


emergency stop for VF 101

Inspection & repairing PWS sensor Saepudin & Yayan Hasanuddin


or BC 404

Repaint handrill at kiln area Agus Mustofa Kurniawan

Reposition of 1 water point behind Agus Mustofa Kurniawan


office

Road access need to improve Budi Kurniawan

Replace by normal lighting Ariawan Hasanuddin

Create road of wheel carrier from Vendor Andi


out side to laboratory room

Cleaning & repainting shift room Taufik Andi

Prepare redinees equipment & HK


raymond area Riki Andi

Replace lighting for Mosque, CCR, Ariawan Hasanuddin


Office & WB

Inspection front tire for fire truck Eeng Kurniawan

Create checlist for instrument of Haikal Hasanuddin


kiln 1
Painting loading by area All Personil Andi
Picture Status Remarks

Done

Done

Done

Done

Done

Done

Done

Done

Done

Done

Done Follow up project

Continue

Done

Scoaffolding requare for


in Progress temporary access

Waiting project for next


Done commissioning

Done

Done

Done

Done
Done

Continue monitor taupoling


Continue condition

Done Follow up project

in Progress

in Progress Follow up Project

Done

Done Buyed from vendor


in Progress

in Progress

in Progress

Done

Done

in Progress

in Progress

empty out lime from coal storage


in Progress done

Done

done
done

1 Done

in Progress

Done

Waiting sparepart (Dynabolt :


Done Need 12 dynabolt for 10 mm)

Done
Estimation material for storage
Done nitrogen & accytllen (Done)

in Progress CO2 need to recalibration

in Progress

in Progress

1 Done

in Progress

Crate PR for roofing bolts & paint


Done roll size 10 cm

in Progress

in Progress Service job

Done PR done

in Progress

in Progress

Done WO & PR done

Motor of rotary feeder stop every


Done 1 hours
Monitoring temperature motor &
Done abnormal sound

Done

Done
In Progress PR done
Continue

In Progress NO smoking around Plant


In Progress

Done
Done
In Progress
In Progress
Done

Done

Continue

Done

Done

Done

Continue

In Progress NO smoking around Plant

Done

Done

In Progress

In Progress

Done

Done

In Progress PR done
Done

Continue
Continue

Done

In Progress
NO smoking around Plant
Done

In Progress

Done

In Progress

Done

Done

Done

Done

Pending : Due to Yellow Color of


Done paint is different

Done
Casting by Vendor
In Progress

In Progress

Done

Continue

In Progress

In Progress

In Progress

Done

Done