Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope
Limestone
48 16-Jan-18 handling & lime individual test
handling
Limestone
86 30-Jan-18 handling & Lime Individual test
Handling
Monitoring empty out lime from coal Riki & Taufik Andi 2
storage
Check & follow up by project Andi Project 2
Mow the lawn & plant posion around Riki & Taufik Andi 2
coal storage
Cleaning over flow lime to coal storage & Taufik & Andi 2
empty out lime from coal storage Rustam
Check motor, strainer, & fuel gun Eeng & Firman Hasanuddin 2
Done
Done
Continue
In Progress
Done
Continue
In Progress
Done
Continue
Change flow meter in out 2 inch,
In Progress Concrate at unloading fuel tank
area
Continue
Done
Continue
Continue
Done
Continue
Done
Done
Done
Total lime out from 3-10 January
Continue 2018 at coal Storage is 804.89 Ton
Done
Done
Done
In Progress
Done
In Progress
Done
In Progress PR done
Done Review critical list equipment
Done
Done
Continue
Done
Done
In Progress
Done
In Progress
Done
Done
In Progress
Done
Total lime out from 30 January 2018
Continue Coal storage is 1841.87 Ton
Coal storage water drainage is block around Cleaning drainage around coal
5 31-Jan-18 coal storage storage
Photo
PIC Target Date
Before After
Firman
19-Feb-18
48 General Responsibility area
54 21-Feb-18 Shift room & CCR water low flow & low pressure
Mechanical
Remove temporary chute from BC 601 Kurniawan 2
team
Need scafolding 2
Ariawan Hasanuddin
Safety training Working at High 2
Fire fighting infront of lintec office
Riki Andi 2
Safety brifing for lintec
Done
In Progress PR done
In Progress
In Progress Create WO
Done
Done
done
In Progress
Done
Done
Done
Done
Done
Done
Done
in Progress Create PR
done
Done
Done
Done
Done
Done
Total lime out from 13 February
Continue 2018 Coal storage 2063.91 Ton
Total lime out from 13 Feb 2018
Continue beside warehouse is 666.57 Ton
In Progress
Done
Done
In Progress
Done
Total lime out from 22 February
Continue 2018 Warehouse 972.38 Ton
Done
Done
Done
Done
In Progress
Done
Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily o
Limestone
6 2-Mar-18 Test run SN 101 (Commisioning)
handling
Loesche Mill & Kiln Fan, booster fan & filter fan need to
21 9-Mar-18 1 rotateing by manualy
22 12-Mar-18 Loesche Individual test
Loesche, handling All LCS need to cover for safety
23 12-Mar-18 & Kiln 1 device
Laboratory need rack for helmets &
24 12-Mar-18 Laboratory hanger for lab coat
25 12-Mar-18 Laboratory Shoeses rack need to modify
Limestone
65 27-Mar-18 Individual test
handling
Empty out all limestone from 2nd floor Riki & Taufik Andi 2
raymond building
Casting pipe line water & install shower Agus Mustofa Kurniawan 2
Don’t standing in the risk position (line All Personil Safety Dep. 1
on fire) & Apply LMRA for any activity
Cleaning & addition freon for MCC kiln & Contractor Hasanuddin 2
CCR
Estimation material for fabrication Budi Hasanuddin 2
drainage chanel office area
Individual test of lime stone handling & All Personil Andi 2
lime handling
all visitor, worker, mandatory for safety Safety dept Safety dept 1
induction
individual test blower house, rotary
bucket and rotary hopper All Personil Andi 2
Continue
Continue
Continue
In Progress
In Progress
Done
In Progress
Done
Done
Done
In Progress
Done
Done
Done
Done
In Progress
Done
In Progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Continue
Done
Done
Continue
Done
Done
Done
Done
Total lime out from 22 Mar 2018
Continue warehouse 1050.75 Ton
Waiting design for sieve shaker
In Progress screen
Done
In Progress
Continue
Done
Continue
Continue
Done
In Progress
In Progress
In Progress
In Progress
Landscape &
4 2-Apr-18 Planting need to watering
planting
Result of empty out from
5 2-Apr-18 WB warehouse lime in 29 Mar 2018
Office ( Meeting
6 2-Apr-18 Room & Server AC Split & casette need to clean)
room)
Need additional plate for close
7 3-Apr-18 Hedge external acces
Limestone
unloading,
34 10-Apr-18 Individual test
limestone handling
& lime handling
Riki, Eeng,
Estimation budgeting & take action Henda & Kurniawan 1
Agustian
Individual test of hydraulic system & All Personil Andi 2
cooling system
Saepudin &
Inspection & repairing PWS sensor 1 & 2 Hasanuddin 2
Yayan
Saepudin &
Individual test of rotary bucket Hasanuddin 2
Yayan
Install safety line away sand pile & Agus Mustofa Andi 1
pedistrian material
Done
Done
Done
Done
Done
Done
Done
Continue
Done
In Progress
Done
Done
Done
Done
Done
Done
Done
In Progress
Done
Done
Done
Done
Total lime out from 9 April 2018
Continue warehouse 1179.39 Ton
Running indication at BC 102 is but
In Progress reading for CCR is fault
Done
Done
Done
Done
Done
Done
Done
In Progress
In Progress
Continue
Done
Total lime out from 17 April 2018
Continue warehouse 1322.59 Ton
In Progress PR done
Continue
Done
Done
Done
In Progress
Done
In Progress
Total lime out from 23April 2018
Continue warehouse 1451.16 Ton
Continue
Done
In Progress
Done
Done
In Progress
Done
Powder silo & lime Concrete pillars for Powder silo &
46 23-May-2018 silo lime silo need to paint
Result of empty out from
47 23-May-2018 WB warehouse lime in 23 May 2018
Target
Action PIC WO Priority
Date
Individual test of blower house All Personil Andi 2
Create checkist for instrument of kiln 1 Haikal Hasanuddin 2
&2
In Progress
in Progress
Done
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In Progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily oper
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
Daily operation Meeting
Target
Action PIC WO Priority
Date
Andi Project 2
Follow up project
Done
Done
Done
Done
Done
In Progress
In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily op
Limestone
46 12-Jul-18 Bee hive at BC 102 & 103
handling
111
Daily operation Meeting
Training packing machine with Mr. Surez Egi, Ariawan & Andi 1 5-Jul-18
Taufik
Make sure nitrogen tube all ready in Riki Andi 1 5-Jul-18
position at coal dust building
Ihsan &
running blower house for 4 hours Andi 1
Agustian
ALL Electrical
PLC training with Mr. Fajar Hassanudin 1
crew
Done 7/4/2018
Done 7/5/2018
Done 7/4/2018
Done 7/4/2018
Done 5-Jul-18
Done 5-Jul-18
Continue 5-Jul-18
Done 5-Jul-18
Done 5-Jul-18
Done
Done
Done
Continue
Continue
Done
Done
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Continue
In Progress
Continue
Done
In Progress
In Progress
Done
Done
Continue
In Progress
Done
Done
Done
In Progress
In Progress
Done
Done
Done Inspection during kiln 1 off
Done
Done
Done
In Progress Create PR
Done
Done
Done
Done
In Progress
In Progress
Done
Done
Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily op
Lime Powder
35 18-Sep-18 Material Block at SC 602
Handling
Jumbo bag from canteen need to
40 18-Sep-18 Warehouse relocation to warehouse
122 16-10-18 All area Mapping APAR not clear in All Area
120 18-10-18 Coal Mill Co Content high after stop coal mill
Limestone
129 19-10-18 Noise at SN 101 when material plat
handling
Cover draianage inspection hole
130 22-10-18 Utility corner warehouse to the powder
silo is damage
Check termination, open cover screw & Taufik & Haikal Andi 2
cleaning material block
Relocation all jumbo bag from canteen Saeful Andi 2
to warehouse
stockpile fly ash
Stockpile kiln #1 & #2 Ihsan Trimunggara 1
Emergency Stockpile Kiln #1 & #2
Safety check
Operation team Kurniawan 2
Individual & sequence test stone
handling
Install facility unload from hi blow to silo Kurniawan Suhendro 2
powder
investigation
Socialitation new rules regarding no All people in the Trimunggara 1
smoking area in the plant since 1 palnt
October 2018
Operator
Refresh the safety rules Trimunggara 1
Excavator
Ensure manhole fully close with sealing Shif leader Ihsan 2
Investigation reports
Trimunggara Suhendro 2
Empty out all product from PS 502 All shif Leader Ihsan 2
Done
Done
Done
Done
Done
Create Insvestigation report
Done
Done
Done
Done
Continue
Done
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Bellow target PS 502 & on target
Done 501
Done
Done
Done
Done
Done Temporary Baricade
Done
in progress
Done
Done
Done
Follow up SCM & Adjusment for BC
Done cleaner at other area
Done
in progress
in progress
in progress
Done
Continue
Continue
Done
Continue
Done
in progress
Done
in progress
First Aid Box Audit
Done
Continue
Done
in progress
Done
Done
Done
Continue
Done
Done
Done
Done
in progress
in progress
Done
Done
Done
Done
Done
Done
Continue
Done
Continue
Done
in progress
Done
Continue
Continue
in progress
Continue
Done
Done
Done
Done
Done
in progress
Done
Done
Done
Continue
Done
in progress
Done
Done
in progress
Done
in progress
Done
in progress
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Continue
Continue
Done
in progress
in progress
in progress
Done
in progress
Done
Done
Done
done
Done
Done
Done
Done
Done
in progress Standby ladder
Done
in progress
in progress
in progress
in progress
Done
in progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily o
13 8-Nov-18 Safety
24 12-Nov-18 Raymond
94 6-Dec-18 Raymond
Roller mill need to add lubrication oil
95 6-Dec-18 all Area Check all equipment damage due to
lighting stikes
material flushing from sampling point
96 7-Dec-18 Safety PS 502 due to manual valve not install
yet
155 2-Jan-19 Lime handling Chute for fly ash to BC 404 is modifed
158
Daily operation Meeting
22/11/2018 Done
24/11/2018 Done
Done
Done
Done
Done
Done
Done
Done
28/11/2018 I-cam completed by 28/11/2018
Done
Done
Done
Done
Continue
Done Create PR
Done
Done
Done
Continue
Done
In Progress PR done
Done
Done
Done
Done
In Progress
Done
Done
Done
Continue
In Progress
Done
Continue
Done
Done 102 & 103 done
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Continue
Done
Done
Done
4-Jan-19 In Progress
Temporary repair done, need stop
Done raymond for 8 hrs
In Progress Create PR
Continue
Done
Done
Done
Continue
Done
Done
Done
Done
Done
Done
In Progress
Done
Done
5/1/2019 In Progress
Done
Done
Done
Continue
Continue
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In Progress Check actual urgency
In Progress
In Progress
31-Jan-19
In Progress
Done
Continue
Done
Done Estimate cost fir jack hammer
Done
In Progress
Done
Done
Continue
In Progress
In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily ope
59 25-Jan-19 Coal Grinding 1 bolt for filter MGL oil filter is damage
30-Jan-19
67 Base motor crack
30-Jan-19 Raymond
68 30-Jan-19 Raymond Dense phase flexible joint leakage
Cleaning water storage & water line Shift leader & Eeng Andi 1
for cooling tower system
Pipe cable leveling by under size & Hasanuddin Suhendro 1
ground
Continue
Done
Done
Done
Done
Done
In Progress
Done
Done
In Progress
In Progress
Done
Done
Done
Done
Done
Ultra sonic machine have to repair by
Done vendor
In Progress
In Progress
Done
Done
In Progress
In Progress
Done
Continue
In Progress
In Progress
In Progress Urgent
In Progress
Done
Done
Done
In Progress
Done
Done
Done
Done
Done
Done
Done
In Progress
In Progress
Done
In Progress
Done
In Progress
In Progress
Done
Done
Done
In Progress
In Progress
Done
In Progress
Done
In Progress
Done
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily
47 1-Mar-19 Safety
MBF
57 4-Mar-19 Supplier
PKBI
Stop activity
Saeful Trimunggara 1
Give induction & ensure PTW avialable
before performing the job
Oversize >10%
Dedi Suhendro 1
PKBI undersize >2%
Distribution pocket book & sosialitation for Trimunggara Suhendro 1
SAM procedure
Repair BC 102 Budi Kurniawan 1
Follow up SCM Hasanuddin Husni 1
Follow up SCM Hasanuddin Husni 1
Husni Trimunggara 1
Find root couse of hyraulic system bolt cut Ariawan & Kurniawan Hasanuddin 1
off
Every Friday Trimunggara Suhendro 1
Baricade lime stockpile untul normal Ihsan Trimunggara 1
temperature
Repairing done & inspestigation to find the Budi Kurniawan 1
root couse
Check pin, grase & all hydraulic bolt etc. Eeng Kurniawan 1
Done
Done
Done
In Progress
Done
Done
Done
18-Mar-19 In Progress
Review quantity
Done
Done
Done
Done
Done
Done
continue
Done
Done
Done Check actual for high limit
11-Mar-18 Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
continue
Done
Done
Done
continue
1-Mar-19 In Progress
28-Feb-19 Done
1-Mar-19 Done
1-Mar-19 Done
1-Mar-19 Done
1-Mar-19 Done
4-Mar-19 In Progress
1 crew for CCR & 1 crew for laboratory
& plant patrol (Joint 8 Apr 19)
Done
continue
Done
18-Mar-19 In Progress
0
18-Mar-19 In Progress Return to supplier
6-Mar-19 In Progress
5-Mar-19 Done
25-Mar-19 In Progress find another manufature
25-Mar-19 In Progress PR done
Looking for alternative other brend
11-Mar-19 In Progress beside Fluke
6-Mar-19 Done
8-Mar-19 Done
8-Mar-19 Done
8-Mar-19 Done
11-Mar-19 Done
11-Mar-19 Done
13-Mar-19 Done
13-Mar-19 In Progress
5-Apr-19 In Progress
5-Apr-19 In Progress
15-Mar-19 Done
15-Mar-19 continue
13-Mar-19 Done
18-Mar-19 Done
13-Mar-19 Done
14-Mar-19 Done
Done
8-Apr-19 In Progress
Done
Done
Done
Done
28-Mar-18 In Progress
In Progress
28-Mar-18 Done
1-Apr-19 Done
In Progress
In Progress
In Progress
Done
Done
Done
Done
Done
Done
Done
Done
26-Mar-19 Done
26-Mar-19 Done
22-Mar-19 Done
In Progress
In Progress
Done
Done
Done
29-Mar-19 Done
Continue
30-Apr-18 In Progress
30-Apr-18 In Progress
1-Apr-19 Done
Continue Cont. Monitoring
8-Apr-19 Done Can't cahnge rotation
8-Apr-19 In Progress
1-Apr-19 Done
1-Apr-19 Done
1-Apr-19 Done
1-Apr-19 Done
2-Apr-19 Done
8-Apr-19 In Progress
5-Apr-19 Done
31-Dec-19 In Progress
8-Apr-19 In Progress
5-Apr-19 In Progress
8-Apr-19
In Progress
Agenda: 1. Safety Issue
2. KPI Sharing
3. Operation Issue
4. Reveiw yesterday job
5. Action today
Daily
MBF
11 4-Mar-19 Supplier
PKBI
181 11-Jun-19 Raymond Level Sensor lime silo and powder silo
183 12-Jun-19 Safety After finish the jobs tools not arange in
the place
No indication for field during Hydrant
184 12-Jun-19 Safety running
185 12-Jun-19 Lime Handling Cont. spillage for BC 401 & 402 area
229 28-Jun-19 Kiln#1 Pully skip for kiln 2 need to install back
271 10-Jul-19 Kiln #1 & Coal mill VSD issue trip high current
291 15-Aug-19 Safety Silo fly ash is leaking from joint shell
Stop activity
Give induction & ensure PTW avialable Saeful Trimunggara 1
before performing the job
Stop activity
Saeful Trimunggara 1
Give induction & ensure PTW avialable
before performing the job
Oversize >10%
Husni Suhendro 1
PKBI undersize >2%
Distribution pocket book & sosialitation for Trimunggara Suhendro 1
SAM procedure
Repair BC 102 Budi Kurniawan 1
Follow up SCM Hasanuddin Husni 1
Follow up SCM Hasanuddin Husni 1
Husni Trimunggara 1
Find root couse of hyraulic system bolt cut Ariawan & Kurniawan Hasanuddin 1
off
Every Friday Trimunggara Suhendro 1
Baricade lime stockpile untul normal
temperature Ihsan Trimunggara 1
Check pin, grase & all hydraulic bolt etc. Eeng Kurniawan 1
Create permanent parking area in the front Trimunggara Andi & Kurniawan 1
of loading bay area
Check parameter lime grinding Kurniawan / Andi Suhendro 1
recomennted by raymond
Clean and check roller and replace roller if Ihsan & Budi Kurniawan 1
any roller damage
install piping and valve for new systems for BUdi Kurniawan 3
filling water storage
Repair Jaw Crusher Budi Kurniawan 1
Create Cronologhy and investigation Ihsan Trimunggara 1
Kurniawan / Franz
remove no return valve burner 17-28 Suhendro
Maerz
Full insvestigation & find the root cause Trimunggara Operation team
1-Mar-19 Done
1-Mar-19 Done
1-Mar-19 Done
4-Mar-19 Done
Done
continue
Done
8-Mar-19 Done
8-Mar-19 Done
8-Mar-19 Done
11-Mar-19 Done
11-Mar-19 Done
13-Mar-19 Done
13-Mar-19 Done
5-Apr-19 Done
15-Mar-19 Done
15-Mar-19 continue
13-Mar-19 Done
18-Mar-19 Done
13-Mar-19 Done
14-Mar-19 Done
Done
Done
Done
Done
Done
28-Mar-18 Done
28-Mar-18 Done
28-Mar-18 Done
1-Apr-19 Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
26-Mar-19 Done
22-Mar-19 Done
In Progress ???
Continue "see it,stop it report it
Done behaviour"
Done
Done
Done
Done
29-Mar-19 Done
Continue
30-Apr-18 In Progress
18-Apr-19 In Progress
1-Apr-19 Done
Continue Cont. Monitoring
8-Apr-19 Done Can't cahnge rotation
1-Apr-19 Done
1-Apr-19 Done
1-Apr-19 Done
1-Apr-19 Done
2-Apr-19 Done
Continue
2-Apr-19 Continue
2-Apr-19 Done
5-Apr-19 Done
In Progress Under inpsecction 15-Apr-19
5-Apr-19 Done
31-Dec-19 In Progress
8-Apr-19 Done
5-Apr-19 Done
8 Done
10-Apr-19 Done
10-Apr-191 Done
9-Apr-19 Done
11-Apr-19 In Progress
Done
12-May-19 In Progress
Done
12-Apr-19 Done
Continue
16-Apr-19 Done
Continue
Done
Done
22-Apr-19 Done
30-Apr-19 Done
30-Apr-19 Done
23-Apr-19 Done
Done
26-Apr-19 Done
26-Apr-19 Done
In Progress
Done
Done
7-May-19 Done
2-May-19 Done
2-May-19 Done
6-May-19 Done
16-May-19 Done
10-May-19 Done
7-May-19 Done
6-May-19 Done
7-May-19 Done
8-May-19 Done
9-May-19 Done
9-May-19 Done
12-May-19 Done
Done
Done
Done
Done
Done
Done
Done
16-May-19 Done
16-May-19 Done
16-May-19 In Progress
17-May-19 Done
20-May-19 Done
20-May-19 In Progress
20-May-19 In Progress
20-May-19 Done
Done
In Progress
10-Jun-19 Done
Done
11-Jun-19 Done
14-Jun-19 In Progress
10-Jun-19 Done
10-Jun-19 Done
15-Jun-19 Done
11-Jun-19 Done
11-Jun-19 Done
12-Jun-19 Done
13-Jun-19 Done
In Progress
14-Jun-19 Done
18-Jun-19 In Progress
14-Jun-19 Done
14-Jun-19 Done
14-Jun-19 Done
17-Jun-19 Done
17-Jun-19 In Progress
17-Jun-19 Done
17-Jun-19 Done
24-Jun-19 Done
24-Jun-19 Done
26-Jun-19 Done
Done
Done
Done
19-Jun-19 Done
Electical, Mechanical & Production
19-Jun-19 Done
Continue
19-Jun-19 Done
25-Jun-19 Done
Done
25-Jun-19 Done
9-Jul-19 Done
Done
Loading under spec at stockpile using
Done loader
25-Jun-19 Done
Done
Done
Done
Done
Done
28-Jun-19 Continue
28-Jun-19 Done
Done
3-Jul-19 Done
In Progress Urgent
12-Jul-19 In Progress
3-Jul-19 Done
3-Jul-19 Done
5-Jul-19 Done
5-Jul-19 Done
In Progress
5-Jul-19 Done
In Progress
8-Jul-19 Done
5-Jul-19 Done
8-Jul-19 Done
10-Jul-19 Done
In Progress
Continue
In Progress Create PR
In Progress Waiting inspection from Suhedro
In Progress
Done
Done
10-Jul-19 Done
Done
In Progress Waiting PO
Done
Done
In Progress
In Progress Waiting PO
In Progress
In Progress Waiting PO
Done
In Progress Create PR
In Progress
Done
Follow up list schedule PM Kiln#1 at
In Progress Monday 1 PM
Done
Done
Done
Continue
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
No Data Entered Shop / Area Discussion Point
27 17-Apr-18 BC 101 & 102 Road access to BC 102 & 103 is slippery
77
78 28-Nov-18 Kiln#1 Motor Heat Exchanger Overload
Isolation cable 20 KV need to check due
28-Nov-18 Trafo
79 to flashover
Idad Kurniawan 2
in Progress
in Progress
in Progress
in Progress
in Progress
in Progress
in Progress
in Progress empty out lime from coal storage done
in Progress
in Progress
in Progress
in Progress
in Progress
in Progress
in Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
Done
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
in progress
In Progress
In Progress
In Progress
In Progress PR done
In Progress
In Progress
In Progress
In Progress Create PR
In Progress Follow Up PR
In Progress
3 CCTV under repair by vendor, 1 CCTV
In Progress at warehouse damage waiting sparepart.
Fire alarm fault (inspection)
In Progress
In Progress
In Progress Follow up PR
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Done
Done
Done
Done
Done
In Progress
No Name Title Department
1 2
1 Wina Septiani Assisten Laboratory Laboratory √
4 Ariawan Electrical Engineer Maintenance
5 Ihsan khanipa CCR op Production √
6 M. Saeful A WB Operator SCM √
7 Andi Khairudin Production Manager Production OFF √
(Happy
8 Kurniawan Senior Mechanical Head Maintenance New
9 Rady Sandi SVP QA/QC Laboratory Laboratory Years)
10 Husni Sopro SCM Manager SCM
14 Budi S Mech op Maintenance
21 Suhendro Plant Manager
22 Hassanudin Maintenance Manager
23 Tri Munggara Safety SPV
24 Timbul Gema Marpaung HR GA & Admin
25 Riswaman Electrical Engineer
26 Coldun Mubarak Mining Service
27 Eko Setyawan Finance Manager
28 Fauzan Customers Service
LIST OF ABSENCES DAILY MORNING MEETING
January 2018
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
√ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √
OFF OFF OFF OFF OFF OFF
√
√
ING LIST OF ABSENCES DA
Feb
23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 C8 9 10 11 12
o
√ √ √ √ √ √ √ √ √ m √ √
√ √ m
√ √ √ √ √ √ √ √ √ √ √ u √ √
n
√ √ √ √ √ √ √ √ √ √ √ i √ √
√ √ √ √ √ √ t √ √
y
OFF OFF OFF OFF OFF OFF
S
√ √ e
r
√ √ √ √ √ v
i
c
e
s
L
o
a
d
F ABSENCES DAILY MORNING MEETING i
n
g
February
13 14 15 16 17 18 19 20 21 22 23 24 25 26 L27 28 1 2
c c i
√ √ o L √ √ √ o √ √ √
m
m u m
√ √ e
m n m
√ √ √ √ √ √ s √ √
u n u t
√ √ n a √ √ √ n √ √ √
o
i r i
√ √ √ √ √ n √ √
t t e
y N OFF OFF y √ OFF OFF
e &
s w s
e e l
r y r i
v e v m
i a i e
c r c
e e t
o
P
S
4
0
1
C
o Mar-18
3 4 5 6
m 7 C8 9 10 11 12 13 14 15 16 17 18
√ m o √ √ √ √ √
i m
s m
√ i √ u √ √ √ √ √
√ o n √ √ √ √ √
n i
i t
OFF OFF n y OFF OFF OFF OFF
g
S
R e
a r √ √ √ √ √
y v
m i
o c
n e
d
18
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √
√ √ √ √
OFF OFF OFF OFF
√ √ √
Apr-18
C5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
C 20 21 22 23 24 25 26 27
o √ √ √ √ √ o √ √ √ √
m m
m √ m
u √ √ √ √ √ √ √ √ √ u √ √ √ √ √
n √ √ √ √ √ √ √ √ n √ √ √ √ √
i i
t √ √ √ √ √ √ √ √ √ t √ √ √
y OFF OFF OFF OFF y OFF OFF
S S
e e
r √ √ r
v v
i i
c c
e e
A
s
c
May-18
28 29 30 1 2 3 4 5 6 7 8 9 10
e 11 12 13 14 15 16
n
√ √ √ √ √ √ s √ √ √
i
o
√ √ √ √ √ √ √ n √ √
√ M √ √ √ √ √ √ D √ √ √
A a
Y
y √ √
OFF OFF OFF OFF o OFF OFF
D f
A J
Y e
s
√ u
s
C
h
r
i
s
t
May-18
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
√ √ √ √
√
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √
√ √ √
OFF OFF OFF OFF OFF OFF OFF
Jun-18
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
√
√
√
√
OFF OFF OFF OFF OFF
24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10
√ √ √ √
√ √ √ √
√ √ √ √
√
OFF OFF OFF OFF √
√
Jul-18
11 12 13 14 15 16 17 18 19 20 21 22 23
√
√ √ √ √
√ √ √ √ √
√ √ √
√ √ √
√ OFF OFF √ √ OFF OFF
√ √ √
24 25 26 27 28 29 30 31 1 2 3 4
√
√
√
√
OFF OFF √ OFF
√
Aug-18
5 6 7 8 9 10 11 12 13 14 15 16 17 18
√ √ √ √ √
√ √ √ √ √
√ √
√ √
OFF OFF OFF √ √ OFF
√ √
19 20 21 22 23 24 25 26 27 28 29 30 31
√ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √
√ √ √ √ √
OFF OFF √ √ √ √ √
OFF
√
√
√ √ √ √
1 2 3 4 5 6 7 8 9 10
√ √ √
√ √ √
√ √ √
√ √ √
√ √ √
√ √ √
OFF OFF OFF OFF
√
√ √
Sep-18
11 12 13 14 15 16 17 18 19 20
√ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
OFF OFF
√ √ √ √ √
√
√ √
21 22 23 24 25 26 27 28 29 30
√
√
Holiday √ √
√ √
Oct-18
10 11 12 13 14 15 16 17 18 19
√ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √
Holiday √ √ √ √ √
√ √ √ √ √ √ √ √
20 21 22 23 24 25 26 27 28 29
√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √
Holiday √ √ √ √ √
√ Holiday √
√ √
√
√ √ √ √
30 31 1 2 3 4 5 5 7 8
√ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √
√ √ √ √
Holiday √
√
√
√
√
√
√
√
√ √
√ √ √ √ √ √
Nov-18
9 10 11 12 13 14 15 16 17 18
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√
√ Holiday √
√
√
√
√
√
√
√ Holiday
√ √ √ √
19 20 21 22 23 24 25 26 27 28
√
√
H √
√
√
√ √ √
√
√
O √
√
√
√
√
√
√
√
L
√
√ I √ √ √
√ Holiday √
√
D
A √ √
√ Y √ √ √
29 30 1 2 3 4 5 6 7 8
√ √
√ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √
√
√
√
√ Holiday √ √
√
√ √ √
Holiday
√ √
√ √ √ √ √
Dec-18
9 10 11 12 13 14 15 16 17 18
√ √ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
Holiday √
√
√
√
√
√
√
√
√
√ Holiday √
√
√
√
√ √ √ √
19 20 21 22 23 24 25 26 27 28
√
√ √ √
√ √ √ √
√ √ √ √ √
√ √ √
√
√ Holiday Holiday √
√
√
√
√
√
√ √ √ √ √
√ √ √
√ √ √ √
29 30 1 2 3 4 5 6 7 8
H √ √ √
o √
√
√
√
√
√
√
√
√
√
l √ √ √ √
Holiday i √
√
√
√
√
√ Holiday √
√
√
√
d
a √ √ √ √ √
y √
√ √ √
√
√ √
Jan-19
9 10 11 12 13 14 15 16 17 18
√ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√
√
√
√
√
√ Holiday √
√
√
√
√
√
√
√
√
√
√
√ √ √ √ √
√ √ √ √ √ √
19 20 21 22 23 24 25 26 27 28
√ √
√ √
√ √
√ √
Holiday √
√
√
√ Holiday
√
√ √
29 30 1 2 3 4 5 6 7 8
√
√ √ √ √ √
√ √ √ √ √
√ √ I √ √
√ √ M √ √
√
√
√
√
L √ √
E
K
√
√ √ √
Feb-19
9 10 11 12 13 14 15 16 17 18
H H √
√
√
√
√
√
√
√
√
√
H H √
√
o o √ √ √ √ √ o o √
l l √ √ √ √ √ l l √
i i √
√
√
√
√
√
√
√
√
√ i i √
√
d d d d
a a a a
y y y y
√ √ √ √ √ √
19 20 21 22 23 24 25 26 27 28
√
√
√
√
√
√
√
√
H H √
√
√
√
√
√ √
√ √ √ √ o o √ √ √ √
√ √ √ √ l l √ √ √ √
√
√
√
√
√
√
√
√ i i √
√
√
√
√
√
√
√
d d
a a
y y √
√ √ √ √ √ √ √ √
1 2 3 4 5 6 7 8 9 10
√
S
√ √ √ √ e √
√ H H √ √ √ c √ H H
√ √ √ √ l √
√ o o √ √ √ u √ o o
√ l l √ √ √ s √ l l
i i √ √ √
i √
i i
d d √ √ o √ d d
n
√
√
a a √
√
√
√ √ √
a a
y y √ √ √ d √ y y
√ √ √ √
√ √ √
a √
√ √ √ y √
Mar-19
11 12 13 14 15 16 17 18 19 20
√ √ √
√ √ √ √ √
√ √ √ H H √ √
√ √ √ √ √
√ √ √ o o √ √ √
√ √ √ l l √ √ √
√
i i
√ d d
√
√ √
√
√
a a √
√
√
√ √ √ y y √ √
√
√
√
21 22 23 24 25 26 27 28 29 30
√ √ √ √ √ √
√ √ √ √ √
√ √ √ √ √
√ H H √ √ √ √ H
√ √ o o √ √ √ √ o
l l √ √ √ √
l
i i i
√ √
d d √
√
d
a a √ √ √ a
y y √ √
y
√ √ √
31 1 2 3 4 5 6 7 8 9
√ √ √ √ √ √
√ √ √ √ √ √
√ √ √ √ √ √
H √ √ H H H √
o √ √ o √ o o √ √
l √ √
l √ √
l l √ √
√
i i i i
d d d d
a √ √ a √ √ a a √ √
y y √
y y √ √
√ √ √
√ √ √
√ √ √
Apr-19 A
10 11 12 13 14 15 16 17 18 s 19
c
√ √ √ √ e
√ √ √ √ √ n
√ √ √ √ √ s
√ √ √ H H √ √ P i
√ √ √ o o √ √ E o
n
√ √ √
l l √ √
M
D
i i I a
d d L y
√ √ √ a a √ √ U o
√
√
√ √
y y √
√
f
√ √ √ J
√ e
√ √ √ s
u
s
20 21 22 23 24 25 26 27 28 29
√ √ √ √
√ √ √ √ √
√ √ √ √ √
H H H H √
o o o o √
l l √ √ √ √
√ l l √
i i √ √ √ i i
d d √ √
d d √
a a a a
y y √
√
y y √
√
30 1 2 3 4 5 6 7 8 9
√ √ √
√ √ √ √ √
√ √ √ √ √
√ H H √ √ √
√ o o √ √ √ √
√
l l √
√
√
√
√ √
i i
d d √
√
√
√
√ a a √ √ √ √
y y √ √
√ √
√
May-19
10 11 12 13 14 15 16 17 18 19
√
√ √ √ √ √ √
√ √ √ √ √ √
√ H H √ √ √ H H
√ o o √ √ √ √ √ o o
√
l l √ √ √ √
l l
i i i i
√
d d √
√ √
d d
√ a a √ a a
y y √ √ √
y y
√ √
20 21 22 23 24 25 26 27 28 29
√ √
√ √
√ H H
√ o o
√
l l
i i
d d
√ a a
y y
30 31 1 2 3 4 5 6 7 8
√
√
H √ H H H H H H H H
o o o o o o o o o
l √ l l l l l l l l
i i i i i i i i i
d d d d d d d d d
a √ a a a a a a a a
y y y y y y y y y
Jun-19
9 10 11 12 13 14 15 16 17 18
√ √ √ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
H √ √ √ H H √
o o o √ √
l √ √ √ √ √
l l √ √
i i i
d √ √ √
d d
a √ √ √ a a √
y y y
√
19 20 21 22 23 24 25 26 27 28
√ √ √ √
√ √ √ √ √ √ √
√ √ √ √ √ √ √
H H √ √ √ √
√ √ √ o o √ √ √ √
√
√
√
√
√
√ l l √ √ √ √
√
i i
d d √
a a √ √
y y
√
29 30 1 2 3 4 5 6 7 8
√ √
√ √ √ √ √ √
√ √ √ √ √ √
H H √ √ √ √ √ H H √
o o √ √ o o √
l l √ √ √
l l √
i i √ √ √ i i
d d √ √
√
√ √ √
d d √
√
a a √ √ √ a a √
y y √ √
y y √
Jul-19
9 10 11 12 13 14 15 16 17 18
√ √ √ √ √ √
√ √ √ √ √ √
√ √ H H √ √ √ √
√ o o √ √ √ √
√ √
√ l l √
√
√
√ √ √
i i
√ √
d d √ √ √ √
√ a a √ √ √
y y √ √
19 20 21 22 23 24 25 26 27 28
√ √
√ √
√ H H √ H H
√ o o √ o o
l l √
l l
i i i i
√
d d √
d d
a a a a
y y y y
29 30 31 1 2 3 4 5 6 7
H H
o o
l l
i i
d d
a a
y y
Aug-19
8 9 10 11 12 13 14 15 16 17
√
√
√
H H √ H
o o √ o
l l l
i i i
d d d
a a √ a
y y y
9
18 19 20 21 22 23 24 25 26 27
H H H
o o o
l l l
i i i
d d d
a a a
y y y
28 29 30 31
H
o
l
i
d
a
y
No Data Entered Shop / Area Discussion Point Action
Ariawan
Rismawan
All personil
Ariawan
Budi & Rustam
Kurniawan
Kurniawan
Ariawan
Actual date Remark
No Data Entered Shop / Area Discussion Point
16 16-Oct-17 Utility
21
Maintenance dep.
37 Utility Need 1 trolly for Fabrication trolly for oxygen tube
oxygen tube
43 17-Jan-18 Lime Handling Pin for BE 406 is lost & have no sparepart
63 21-Feb-18 Shift room & CCR water low flow & low pressure
External guardrail
72 27-Mar-18 plant (Dump External guardrail need to cover with plate
Hopper area)
Truck parking (out Need parking area for truck at out side
80 4-Apr-18 side plant) plant
Door of MCC kiln need to additional
81 4-Apr-18 MCC kiln canopy
89 17-Apr-18 BC 101 & 102 Road access to BC 102 & 103 is slippery
90 17-Apr-18 BC 101 & 102 Halogen lighting at BC 102 & 103 dazzled
Idad Kurniawan 2
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Continue
Done
Done
Done
Done
Done
Done
in Progress
Done
in Progress
in Progress
Done
Done
in Progress
in Progress
Done
done
done
1 Done
in Progress
Done
Done
Estimation material for storage
Done nitrogen & accytllen (Done)
in Progress
in Progress
1 Done
in Progress
in Progress
Done PR done
in Progress
in Progress
Done
Done
In Progress PR done
Continue
Done
Done
In Progress
In Progress
Done
Done
Continue
Done
Done
Done
Continue
Done
Done
In Progress
In Progress
Done
Done
In Progress PR done
Done
Continue
Continue
Done
In Progress
NO smoking around Plant
Done
In Progress
Done
In Progress
Done
Done
Done
Done
Done
Casting by Vendor
In Progress
In Progress
Done
Continue
In Progress
In Progress
In Progress
Done
Done