Sei sulla pagina 1di 2

B L KASHYAP & SONS LTD.

PARCEL 9 @ETV PROJECT


Daily Checklist for Concrete Pump Identifcation No. BLK/CP/P9@ETV/CL/01
Equip ID: Date
Sl. No. Check points Mon Tue Wed Thu Fri Sat Sun Remarks
1 Competent Operator
2 Engine (does it sound normal?)
3 Engine Oil levels
4 Fuel level/gauges (check for normal readings)
5 Hoses / pipe free of damage
6 Hydraulic System Leaks
7 Wheels, tires (condition/pressure)
8 Light and Indicator
9 Hopper Grill & Interlock
10 Delivery Hose
11 Outrigger Support
12 Proper House keeping around the pump
13 Emergency Switch
14 Overall Condition of Concrete pump
Checked By Plant Incharge / PM -
Verified By HSE Officer -

OK √ NOT OK × N/A
NOT APPLICABLE
B L KASHYAP & SONS LTD.
PARCEL 9 @ETV PROJECT
Daily Checklist for Concrete Batching Plant Identifcation No. BLK/BP/P9@ETV/CL/01
Equip ID: Date
Sl. No. Check points Mon Tue Wed Thu Fri Sat Sun Remarks
i Emergency Switches (2 nos)
ii Limit Switch condition (4 nos)
a Mixer bucket limit switch top
b Mixer bucket limit switch bottom
c Skip bucket limit switch top
d Skip bucket limit switch bottom
iii Adequate guards for movable parts
iv Operator controls are clearly visible
v Proper House keeping
vi Electrical Related
a Earthing
b RCCB Status
c Panel Board doors
vii Warning boards displayed
v Motor condition
a Mixer Highest motor
b Admixture motor
c Skip motor
viii Record Keeping
a Maintenance report
b Breakdown report
c D.G Maintenance report
c Blower Report
ix Rope condition
a Scrapper rope(Top & Bottom)
b Support rope
c Skip rope
d Mixer rope
x Supports
a cement silo
b GGBS silo
c Screw conveyor
xi Breather hose
xii Boom condition
xiii Ladder condition
xiv Foudation(free from Crack&damage)
xv Silo leg Condition(Free from rust &crack)
xvi Base plate Grouted
xvii Bolt condition
Xviii Cross and diagonal support condition
xix Air pollution
Checked By Plant Incharge / PM -
Verified By HSE Officer -

OK √ NOT OK × N/A
NOT APPLICABLE

Potrebbero piacerti anche