Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Requirement Offer
NO
Qty Item Specification Qty Item Requirement
1 1 set Split Insert Bowl Bushing, for size: Split Insert Bowl Bushing, for size:
5" DP or 4-1/2" DP Specify
6-1/2" DC or 6-3/4" DC Specify
3 1 set Pipe and Blind Ram Stock for BOP 11, 3K or 5K psi WP Pipe and Blind Ram Stock for BOP 11, 3K or 5K psi WP
4 110 jts 5" OD or 4-1/2" OD Drill Pipe 5" OD or 4-1/2" OD Drill Pipe
API Specification : 5" OD or 4-1/2" OD, 4.276" ID,
Grade G-105, 4-1/2" IF Connection, 19.5 ppf, Specify
Premium Class, Pipe R-2
Hard Banding : Smooth, flush, fine particle, non
Specify
abrasive
C/w of Internal Coating & Thread Protectors Specify
Date of current inspection report Specify
5 1 set 5" OD or 4-1/2" OD Pup Joint Drill Pipe 5" OD or 4-1/2" OD Pup Joint Drill Pipe
7 1 set 3-1/2" Pup Joint Drill Pipe 3-1/2" Pup Joint Drill Pipe
API Specification : 3-1/2" OD, 2.764" ID, Grade G-105,
3-1/2" IF Connection, 13.3 ppf, Premium Class, Pipe R- Specify
2
Length of : 5 ft, 10 ft and 15 ft for each sizes Specify
C/w of Internal Coating & Thread Protectors Specify
Date of current inspection report Specify
Requirement Offer
NO
Qty Item Specification Qty Item Requirement
10 2 set Crossover Sub Crossover Sub
Related to required drilling string Specify
Crossover 4 1/2" IF pin X 4 1/2" reg pin. Specify
Requirement Offer
NO
Qty Item Specification Qty Item Requirement
Inside BOP 3K or 5K psi for 5" DP or 4-1/2" DP & 3-1/2" Inside BOP 3K or 5K psi for 5" DP or 4-1/2" DP & 3-1/2"
12 1 ea
DP DP
To be ready at the rig floor with same connection of
Specify
Drill Pipe usage
Inside BOP 3K or 5K psi for 5" DP or 4-1/2" DP & 3-1/2" Inside BOP 3K or 5K psi for 5" DP or 4-1/2" DP & 3-1/2"
13 1 ea
DP DP
To be ready at the rig floor with same connection of
Specify
Drill Pipe usage
Full Opening Safety Valve 3K or 5K psi for 5" DP or 4-1/2" Full Opening Safety Valve 3K or 5K psi for 5" DP or 4-1/2"
14 1 ea
DP & 3-1/2" DP DP & 3-1/2" DP
Should matched with pipe connection usage, and be
Specify
ready at rig floor