Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date
Doc. Ref : TEP-930-PRC-HS-BP4-0001 Form No: FORM-TEP-HSSE-092
Date : 22 July 2016
TANGGUH EXPANSION – PROJECT EXECUTE
Revision No: 0
Checklist Conformance
NR Remarks :
Certification Information C NC
General
3 Equipment Condition - - Completed
4 Cable Power Cord - - Completed
5 Electrical Plug - - Completed
6 Electrical Outlet - - Completed
7 Electrical Switches - - Completed
8 Electrical Breaker - - Completed
9 Electrical Grounding - - Completed
10 Connection Cable - - Completed
11 Terminal Connection - - Completed
12 Voltage Power - -
13 Shut Down system - -
14 Pilot Lamp - -
15 Fuse - -
16 Control System Ampere Gauge - -
17 Control System volt gauge - -
18 Control System Hz gauge - -
19 Alarm system - -
20 Over load control - -
21 Control Panel - -
Remarks :
Prepare By Inspect By Review By
C : Conform
NC : Not Conform
Name Akbar Kamil Ahmad Surulil Muhammad Fatahillah
NR : Not Required
Note:
Welding Inverter has been inspected and tested, this
equipment is in good condition and good operating Signature
properly.
Date