Sei sulla pagina 1di 5

Total Length Approved Promoter of

S.No Project Name Mode Programme NH No LOA Date State RO PIU


(Km) TPC Rs(Cr) Concessionaire

1 Development of existing road in town (Khed EPC Balance Road works 60 9.14 38.93 24/04/2018 Roadway Solution Maharashtra RO-Mumbai Nashik
and Narayangaon) under NHDP Pvt. Ltd.
2 Upgradation of 4 laning of old NH-6 from EPC NH(O) 53 7.3 92.2 31/05/2018 M/S Jandu Maharashtra RO-Mumbai Amravati
Km.296 to 304 passing through Khamgaon Construction Company (MH)
City
3 Bellary to Byrapura Section km 253.600 to km HAM Bharatmala- 150A 54.95 1027.6 01/06/2018 M/s Dilip Buildcon Ltd Karnataka RO-Bangluru Hospet
308.550 of NH-150A Economic Corridor
4 Challakere to Hariyur section from km HAM Bharatmala- 150 A 56 0 01/06/2018 M/s PNC Infratech Karnataka RO-Bangluru Chitradurga
358.500 to km 414.205 of NH-150 A Economic Corridor Limited
5 Service Road on ICTT (Kalamassery- EPC Miscellaneous/Other 966A 2.6 21.47 14/06/2018 Yoga & Co. - Notch Kerala RO- Cochin
Vallapardam) (Additional Works) s India Projects (JV) Thiruanantha
6 Major Saraswati Bridge EPC Bharatmala- 44 0.51 19.9 20/06/2018 Ram Kumar Haryana RO_Chandig Ambala
National Corridor Contractor arh
Efficiency
Improvements
7 Sattanathapuram to Nagapattinam (Design Ch HAM Balance Road works 32 55.76 1872.68 05/07/2018 M/s. Welspun Tamil Nadu RO-Chennai Viluppuram
Km 123.800 to Km 179.555) under NHDP Enterprises Ltd.
8 Balance work of Gwalior - Jhansi section Item Rate Balance Road works 44 82.46 419 13/07/2018 Gawar Construction Madhya RO_Bhopal Gwalior
under NHDP Limited Pradesh
9 Slip roads for Airport (T3), Airport (T1), Atlas EPC Miscellaneous/Other 48 27.76 16.8 25/07/2018 Mahavir Prasad Delhi RO-Delhi Gurgaon
chowk and Shyam chowk s Gupta & Sons
10 Elevated Structure including Major Bridge on EPC Miscellaneous/Other 58 1.05 56 01/08/2018 M/s Ram kumar Uttarakhand RO- Dehradun
Mayapuri Escape Channel on Muzzaffarnagar s Contractor Dehradun
- Haridwar Section
11 Development of existing roads in EPC Miscellaneous/Other 52 and 65 22.51 28.44 13/08/2018 S M Autade Pvt Ltd Maharashtra RO-Mumbai Solapur
Ule,Suuratgaon,Malumbra,Tuljapur,Shingoli, s
Yedeshi, Naldurg & Omerga
12 Bridge over Ganga River at d/s of Farraka EPC Miscellaneous/Other 12 5.47 622.04 20/08/2018 CQCE - RKEC (JV) West Bengal RO-Kolkata Malda
Barrage including Approaches connecting s
Farakka-Raiganj
13 EPE Cossing to start of Shamli Bypass EPC Bharatmala- 709-B 61.41 435.15 27/08/2018 Krishna Constructions Uttar Pradesh RO-Lucknow Baghpat
Economic Corridor
14 Flyover at Butibori-MIDC-T Junction EPC Balance Road works 44 1.69 51.93 14/09/2018 T&T Infra Pvt. Ltd. Maharashtra RO-Mumbai Nagpur (PD-
under NHDP 1)
15 Kazhakuttam Junction - Technopark Junction EPC Bharatmala- 66 2.72 322.79 25/09/2018 M/S RDS-CVCC Kerala RO- Thiruvananth
Economic Corridor Thiruanantha apuram
puram
16 Karaipettai to Walajapet from Km 71.015 to EPC Balance Road works 48 36 602.16 05/10/2018 M/s. SPK & CO. Tamil Nadu RO-Chennai Kanchipuram
107.091 of NH-48( Old NH-4-4) under NHDP
17 Dwarka Expressway Pkg-III (Delhi/HR Border EPC Bharatmala- 248 BB 10.2 1831.27 09/10/2018 Larsen & Toubro India Delhi RO-Delhi Dwarka
to Start of RoB Gurugram) National Corridor
Efficiency
Improvements
18 Flyover of Hinganghat-Nandgaon Junction EPC Balance Road works 44 1 68.08 24/10/2018 Vidya InfraBuilt Pvt. Maharashtra RO-Mumbai Nagpur (PD-
under NHDP Ltd. 1)
19 Saundard ROB on Raipur Nagpur EPC Balance Road works 53 1.6 97.67 24/10/2018 Rajdeep Buildcon Pvt. Maharashtra RO-Mumbai Nagpur (PD-
under NHDP Ltd. 1)
20 Construction of Under Ground U-turn near EPC Bharatmala- 48 2.78 161.9 09/11/2018 M/s Ram Kumar Haryana RO_Chandig Gurgaon
Ambience Mall and Elevated U-Turn near National Corridor Contractor arh
Shankar Chowk on NH-48 Efficiency
Improvements
21 Construction of Emergency Landing Facility EPC Bharatmala- Inter- NH-151A 5 94.97 13/11/2018 M/s. Bhimji Velji Gujarat RO-Gandhi Dwarka (Guj)
from Km. 171.800 TO Km 176.500 (Design corridor & Feeder Sorathia Construction Nagar
Length 4.70 KM) On Khambhaliya – Limbadi Roads Pvt. Ltd.
section of NH151-A near Juvanpur and
Datrana Village in Gujarat on EPC

22 Sitapur Road to Kursi Road EPC Balance Road works 24 14.61 292.07 14/11/2018 DineshChandra R. Uttar Pradesh RO-Lucknow Lucknow
under NHDP Agrawal Infracon Pvt.
Ltd.
23 Flyovers in Akola City EPC NH(O) To be 4.8 207.99 20/11/2018 Ram Kumar Maharashtra RO-Mumbai Amravati
Determined Contractor - Jandu (MH)
24 Deesa Elevated Corridor EPC Special Projects 27 3.75 0 03/12/2018 M/S. Rachana Gujarat RO-Gandhi Gandhidham
Construction Co. Nagar
25 Gondal Chokdi Flyover at Rajkot EPC Miscellaneous/Other NH 27 1.5 87.53 05/12/2018 M/s Sarasvati Gujarat RO-Gandhi Rajkot
s Construction. Co Nagar
26 Balance Work for Raiganj Dalkola section EPC Balance Road works 12 50.29 1548.07 05/12/2018 M/s Dineshchandra R. West Bengal RO-Kolkata Malda
from km 398.00 to km 452.700 (excl. Dalkola under NHDP Agrawal Infracon Pvt.
Bypass) Ltd.

27 Balance Work of Piprakothi-Motihari-Raxaul Item Rate Balance Road works 527D 68.6 0 10/12/2018 M/s Ram Kripal Singh Bihar RO-Patna Motihari
on NH-28A under NHDP Construction Pvt Ltd

28 Tunnel at Khambataki Ghat Section and its EPC Balance Road works 48 6.46 493 13/12/2018 Crescent EPC Maharashtra RO-Mumbai Pune
approaches from existing Km. 771.730 to under NHDP Projects & Technical
existing Km. 782.000 Services Ltd.

29 Dwarka Expressway Pkg-I (Shivmurti Chowk- EPC Bharatmala- 248BB 4.5 1349 17/12/2018 J. Kumar and J. Delhi RO-Delhi Dwarka
RuB near Dwarka Sector 21) National Corridor Mhatre (JV)
Efficiency
Improvements
30 Balance work Haridwar dehradun Pkg 2 Item Rate Balance Road works 58 &72 22.2 244 20/12/2018 M/s. Atlas – NKC JV, Uttarakhand RO- Dehradun
under NHDP 102, Sector- 15, Dehradun
Faridabad- 1

31 Balance work Haridwar Dehradun Pkg 1 Item Rate Balance Road works 58 &72 14.95 349.9 20/12/2018 M/s. UP State Bridge Uttarakhand RO- Dehradun
under NHDP Corporation Limited, Dehradun
Setu Bha

32 Integrated structure at Chandni chowk Flyover EPC Balance Road works 48 2.2 397.61 21/12/2018 M/s NCC Ltd. Maharashtra RO-Mumbai Pune
under NHDP
33 Kalaparru to Chinna Avutupalli including 6 EPC Bharatmala- 16 27.4 697.49 08/01/2019 Lakshmi Infrastructure Andhra Pradesh RO- Vijayawada
lane Hanuman Junction bypass National Corridor & Developers Pvt Ltd Vijaywada
Efficiency
Improvements
34 Vadipatti to Thamaraipatti EPC Miscellaneous/Other 744A 29.96 833.16 14/01/2019 NCC Limited Tamil Nadu RO-Chennai Madurai
s
35 4/6 laning of Narnaul Bypass crossing to HAM Balance Road works 11/148B 45 0 15/01/2019 Gawar Narnaul Haryana RO_Chandig Rewari
Paniyala mor (NH-148B) (at NH-48 under NHDP Highway Private arh
junction)=31.24 km & Nizampur Link Road = Limited
2.76 Km & Narnaul Bypass crossing to
Pacheri Kalan = 11.30 km (NH-11)

36 Sriperumbudur to Karaipettai EPC Balance Road works 48 34 654.26 23/01/2019 M/s. KMC Tamil Nadu RO-Chennai Kanchipuram
under NHDP Constructions Limited

37 Shamli Byapss- Saharanpur EPC Bharatmala- 709-B 63 0 05/02/2019 M/s Gawar Uttar Pradesh RO-Lucknow Baghpat
Economic Corridor Construction Ltd.
38 Melur to Karaikudi EPC Bharatmala- Inter- 338,36,383 45.86 1103.86 06/02/2019 KMC Constructions Tamil Nadu RO-Chennai Madurai
corridor & Feeder Ltd. - JSR Infra
Roads Developers Pvt.

39 Kamalapuram to Oddanchatram HAM Bharatmala- Inter- 83 36.5 1038.51 11/02/2019 M/s.DRN Tamil Nadu RO-Chennai Dindigul
corridor & Feeder Infrastructure Private
Roads Limited
40 Madathukulam - Pollachi HAM Balance Road works 83 50.07 1342.62 13/02/2019 M/s.D.P.Jain & Co Tamil Nadu RO-Chennai Dindigul
under NHDP
41 UP/HR Border to Rohna Section HAM Balance Road works 334B 40.5 693.43 28/02/2019 Gawar Construction Haryana RO_Chandig Rohtak
under NHDP Ltd. arh
42 Upgradation of 4 lane of Rewari-Ateli Mandi HAM Bharatmala- Inter- NH-11 31 0 28/02/2019 H G Infra Engineering Haryana RO_Chandig Rewari
Section of NH-11 from Km11.780 to Rewari to corridor & Feeder Ltd. arh
Ex. Km 43.445 near Ateli Mandi Roads

43 Balance work of Ranchi-Mahulia Section of EPC Balance Road works 33 26.27 0 28/02/2019 Ram Kripal Singh Jharkhand RO-Ranchi Ranchi
NH-33 from Km 113.730 (Vikas) to Km under NHDP Construction Ltd.
140.000 (Rampur)
44 Balance work of Ranchi-Mahulia Section of EPC Balance Road works 33 77.3 0 28/02/2019 Bvepl Bhartia JV Jharkhand RO-Ranchi Ranchi
NH-33 from Km 140.000 (Rampur) to Km under NHDP
217.300 (Chowka).
45 Balance work of Ranchi-Mahulia Section of EPC Balance Road works 33 44.22 0 28/02/2019 Iron Triangle Ltd Jharkhand RO-Ranchi Ranchi
NH-33 from Km 233.350 (Saharbeda) to Km under NHDP
277.568 (Mahulia).
46 Natham - Thuvarankurichi EPC Bharatmala- Inter- 785(E) 24.42 526.32 28/02/2019 M/s.RR Infra Private Tamil Nadu RO-Chennai Dindigul
corridor & Feeder Limited
Roads
47 Ismailabad - Narnaul Pkg - 5 EPC Bharatmala- 152D 23 0 01/03/2019 Gawar Construction Haryana RO_Chandig Bhiwani
National Corridor Ltd. arh
Efficiency
Improvements
48 Delhi-Vadodara Greenfield Alignment (NH- EPC Bharatmala- 148N 29 1961.58 05/03/2019 APCO Infratech Pvt. Haryana RO_Chandig Sohna
148N) (Pkg-02) (Ch 18+500 to Ch 47+000) Expressways Ltd. arh
[KMP Expressway and ends at Ch. 47+000
near Khanpur Ghati]
49 Delhi-Vadodara Greenfield Alignment (NH- EPC Bharatmala- 148N 19 1740.03 05/03/2019 M/s APCO Infratech Haryana RO_Chandig Sohna
148N) (Pkg-01) (Ch 0+000 to Ch 18+461) Expressways Pvt. Ltd. arh
[Sohna-Gurugram Road (NH-248A) near
Alipur village and ends before KMP
Expressway]
50 Oddanchatram - Madathukulam HAM Bharatmala- 83 45.38 1267.87 07/03/2019 M/s.KNR Construction Tamil Nadu RO-Chennai Dindigul
Economic Corridor Limited
51 Elevated structure including appraoches from EPC Balance Road works 44 1 147.29 07/03/2019 Ceigall India Ltd. Haryana RO_Chandig Ambala
km.352+675 to km.354+430 and VUP at under NHDP arh
km.355+400 including approaches at
Pharwara City
52 Suryapet to Khamam HAM Bharatmala- Inter- 365BB 58.62 1307.67 08/03/2019 Adani Transport Telangana RO- Khammam
corridor & Feeder Limited and Prakash Vijaywada
Roads Asphaltings

53 Mancherial to Repallelwada HAM NH(O) 363 42 1041.4 08/03/2019 M/s. Adani Transport Telangana RO- Mancherial
Ltd. Prakash Vijaywada
54 Sangariya (near Chautala)-Rasisar (near EPC Bharatmala- 754K 30 0 08/03/2019 Rajendra Singh Rajasthan RO-Jaipur Hanumangar
Bikaner) section of NH-754K (Phase-I) (AJ/SR- Economic Corridor Bhamboo Infra Pvt. h
Package-7) Ltd.-A.G. Constructor
55 Sangariya (near Chautala)-Rasisar (near EPC Bharatmala- 754K 25 0 08/03/2019 VRC construction Rajasthan RO-Jaipur Hanumangar
Bikaner) (Phase-I) (AJ/SR-Package-8) Economic Corridor (India) Pvt Ltd.- S&P h
Infrastructure
56 Rasisar (near Bikaner)-Deogarh (near EPC Balance Road works 754K 28 0 08/03/2019 NKC Projects Pvt. Ltd. Rajasthan RO-Jaipur Jodhpur
Dhandhaniya) (Phase-I) (AJ/RD-Package-5) under NHDP

57 Rasisar (near Bikaner)-Deogarh (near EPC Balance Road works 754K 30 0 08/03/2019 NKC Projects Pvt. Ltd. Rajasthan RO-Jaipur Jodhpur
Dhandhaniya) (Phase-I) (AJ/RD-Package-2) under NHDP

58 Rasisar (near Bikaner)-Deogarh (near EPC Balance Road works 754K 30 0 08/03/2019 VRC-VCL-CIL JV Rajasthan RO-Jaipur Jodhpur
Dhandhaniya) (Phase-I) (AJ/RD-Package-4) under NHDP

59 Bardawadi village to Kamliya village EPC Bharatmala- 148N 25 0 08/03/2019 GHV India Pvt Ltd. Madhya RO_Bhopal Ujjain
Expressways Pradesh
60 Dwarka (Kuranga)-Khambhaliya -Devariya HAM Bharatmala- Coastal 151A 71.89 1024.69 08/03/2019 M/s G R Gujarat RO-Gandhi Rajkot
& Port Connectivity INFRAPROJECTS Nagar
Roads LTD

61 Ismailabad - Narnaul Pkg - 6 EPC Bharatmala- 152D 34 0 08/03/2019 Gawar Construction Haryana RO_Chandig Bhiwani
National Corridor Ltd. arh
Efficiency
Improvements
62 Ismailabad - Narnaul Pkg - 7 EPC Bharatmala- NH-152D 35 0 08/03/2019 Gawar Construction Haryana RO_Chandig Bhiwani
National Corridor Ltd. arh
Efficiency
Improvements
63 Ismailabad - Narnaul Pkg - 8 EPC Bharatmala- NH-152D 27.02 0 08/03/2019 Gawar Construction Haryana RO_Chandig Bhiwani
National Corridor Ltd. arh
Efficiency
Improvements
64 Ambala - Saha EPC Bharatmala- Inter- 444A 14.84 0 08/03/2019 Ceigall India Ltd. Haryana RO_Chandig Ambala
corridor & Feeder arh
Roads
65 Jind - Gohana (PKG-1) HAM Bharatmala- NH-352A 40.6 0 08/03/2019 Brij Gopal Haryana RO_Chandig Rohtak
National Corridor Construction arh
Efficiency Company Ltd.
Improvements
66 Chilkararupet bypass HAM Bharatmala- 16 17 902.83 08/03/2019 M/s.BSCPL Andhra Pradesh RO- Amravati
National Corridor Infrastructure Ltd., Vijaywada (AP)
Efficiency
Improvements
67 Tumkur –Shimoga (Pkg-IV) HAM Bharatmala- 69 56.35 0 08/03/2019 Ashoka Concession Karnataka RO-Bangluru Tumakuru
National Corridor Pvt Ltd.,
Efficiency
Improvements
68 Gohana - Sonipat (PKG-2) HAM Bharatmala- NH-352A 38.24 0 08/03/2019 Brij Gopal Haryana RO_Chandig Rohtak
National Corridor Construction arh
Efficiency Company Ltd.
Improvements
69 Construction of proposed Narnaul Bypass HAM Bharatmala- 11/148 B 40.8 0 08/03/2019 H G Infra Engineering Haryana RO_Chandig Rewari
(design length 23.46 km) & Ateli Mandi to Economic Corridor Ltd. arh
Narnaul section of NH-11 from km 43.445 to
km 56.900 (design length 14.05km) &
Proposed connectivity to ILMH: 3.3 Km

70 Delhi-Vadodara Greenfield Alignment (NH- EPC Bharatmala- 148N 37 1179.25 09/03/2019 H G Infra Engineering Haryana RO_Chandig Sohna
148N) (Pkg-04) (Ch 78+800 to Ch 115+700) Expressways Ltd. arh
[HR-Raj border to junction with SH44]

71 Nagpur Umred EPC NH(O) 353D 41 684.42 09/03/2019 D.P. Jain & Co. Maharashtra RO-Mumbai Nagpur (PD-
Infrastructure Pvt. Ltd. 1)
72 Saoner - Dhapewada - Kalmeshwar - EPC Balance Road works 547 (E) 29 703.42 09/03/2019 Dilip Buildcon Limited Maharashtra RO-Mumbai Nagpur (PD-
Gondkhairi under NHDP 1)
73 Sinnar-Shirdi (including Sinnar Bypass) HAM Bharatmala- Inter- 160 50.94 1357.51 09/03/2019 Ms Monte Carlo Ltd Maharashtra RO-Mumbai Nashik
corridor & Feeder
Roads
74 Delhi-Vadodara Greenfield Alignment (NH- EPC Bharatmala- 148N 36 1155.88 09/03/2019 KCC Buildcon Pvt. Ltd. Haryana RO_Chandig Sohna
148N) (Pkg-05) (Ch 115+700 to Ch 151+840) Expressways arh
[Junction at SH44 to Junction with Keshopura
Road]
75 Delhi-Vadodara Greenfield Alignment (NH- EPC Bharatmala- 148N 31 0 09/03/2019 KCC Buildcon Pvt. Ltd. Rajasthan RO-Jaipur Dausa
148N) (Pkg-06) (Ch 151.840 to Ch 183.000) Expressways
[Keshopura Road -Junction with NH-11]

76 Mirza Chauki to Farkka (Pkg-I) HAM Balance Road works 80 42.71 661.14 10/03/2019 Ram Kripal Singh Jharkhand RO-Ranchi Sahibganj
under NHDP Construction Ltd.
77 Balance work of Ranchi-Mahulia Section of EPC Balance Road works 33 16.05 0 10/03/2019 Ram Kripal Singh Jharkhand RO-Ranchi Ranchi
NH-33 from Km 217.300 (Chowka) to Km under NHDP Construction Ltd.
233.350 (Saharbeda).