4 BILL OF QUANTITIES (Provision
5 SUPPLY OF MATERIALS, LABOR, TOOLS, EQUIPMENT AND SU
6
7 PROJECT : SEA GAMES 2019 AQUATIC CENTER
8 LOCATION : CAPAS, TARLAC
9 SUBJECT : ARCHITECTURAL WORKS (Painting)
10 DATE : AUGUST 28 2018
11 :
12
13 Uni
Item Description Quantity unit
14 Material
15
16 A GENERAL REQUIREMENTS
17 A.1 Preliminaries
37
38 B MEASURED WORKS
39

Interior Painting; Basement & Equipment


40 B.1 3,087 m2 150.00
and Dryland Room
41 (Boysen Permacoat Latex) (1 coat)
42
43 B.2 Skim Coat for Internal Walls with Sealer 9,178 m2 300.00
44 (Zemcoat,superfine Gray) (2 coat)
45
46 B.2 Skim Coat for External Walls with Sealer 8,360 m2 300.00
47 (Zemcoat,superfine Gray) (2 coat)
48
49
50 Other to complete scope of works
51 (please specify below)
52 a.) _________________________
53 b.) _________________________
54 c.) _________________________
55
56 Sub - Total (Measured Works)
57
58 C QUALIFICATIONS/CONDITIONS OF AWARD:
59
60 The following items shall be provided and at the cost of the Gencon:
61 a) Power and water requirements on site;
62 b) Lifting equipment e.g. mobile crane, tower crane
63
64 The following items shall be provided by and at the cost of the Sub-contrac
65 a) Tools/Equipments required during painting works.
A B C D E G H
13 Uni
Item Description Quantity unit
14 Material
66 b) Supply of adequate/sufficient skilled workers and laborers in compliance with Genc
67 c) Full-time Profect In-charge/Supervisor and Foremen;
68 d) Full-time Safety Officer on site;
69 e) Subcontractor's Site Office and Office Equipment (if necessary);
70 f) Cleaning of site in coordination of Gencon's safety requirements;
71 g) In case of failure of the Subcontractor to deploy sufficient manpower, the Gencon
72 Subcontractor actual payroll of the supplemental workers plus 15% cost of money a
73 h.) Subcontractor to submit a cost proposal within 15days upon receipt of Site Instruc
74 failure to do so will be invalidate any further claims.
75
76 Other Qualifications:
77 a) Quantities to paid to the subcontractor shall be the actual installed items.
78 b) Contract Quantities are Provisional and subject to final remeasurement based on a
79 c) Subcontractor to comply to all Statutory Requirements by the national and local go
80
81
82 TOTAL AMOUNT inclusive of VAT
I J K L
1
2
3
TITIES (Provisional
4 Quantity)
LS, EQUIPMENT5 AND SUPERVISION FOR PAINTING WORKS
6
7
8
9
10
11
12
13 Unit Rate
Total Cost Remarks
14 Labor Total
15
16
17 900,000.00
37
38
39

40 75.00 225.00
694,575.00
41
42
43 135.00 435.00 3,992,430.00
44
45
46 135.00 435.00 3,636,600.00
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
cost of the Sub-contractor;
64
65
I J K L
13 Unit Rate
Total Cost Remarks
14 Labor Total
s in compliance66
with Gencon's target schedule;
67
68
69
70
t manpower, the71Gencon will takeover the delayed works and charge to the
plus 15% cost of
72money and overhead;
upon receipt of Site
73 Instruction or any statuary orders arising within the contract period,
74
75
76
77
emeasurement based
78 on actual installed;
y the national and
79 local government units;
80
81
82 Php 9,223,605.00