COMBINACION PARA MEZCLA ASFALTICA EN CALIENTE


OBRA : CAMANA-DVO QUILCA-MATARANI-EL ARENAL-PTA BOMBON ING° RES :
TRAMO : CAMANA-DVO QUILCA-MATARANI-EL ARENAL-PTA BOMBON TECNICO :
SUB TRAMO 1 : MATARANI-EL ARENAL FECHA :
SUB TRAMO 2 : EL ARENAL-PTA BOMBON
DATOS DE LA MUESTRA
CANTERA :
MUESTRA : CARPETA RODADURA
COMPOSICION DE MEZCLA
COMBINACION PARA MEZCLA ASFALTICA EN CALIENTE ASTM D3515
Cortes(roca)
Arena Arena Especificaciones Mezcla
P-1 Chanc Chan-Lav % pasa
Tamices plg Tamices mm <3/4" <1/4" <1/4" ASTM D3515
37.0% 48.0% 15.0% min max
3/4" 19.00 #REF! 100.0 100.0 100 #REF!
1/2" 12.50 #REF! 100.0 100.0 90 100 #REF!
3/8" 9.50 #REF! 100.0 100.0 #REF!
1/4'' 6.30 #REF! #REF! 100.0 #REF!
Nº 4 4.75 #REF! #REF! #REF! 44 74 #REF!
Nº 8 2.36 #REF! #REF! #REF! 28 58 #REF!
Nº 50 2.000 #REF! #REF! #REF! 5 21 #REF!
Nº200 0.425 #REF! #REF! #REF! 2 10 #REF!

#REF!

N°200 N°100 N°80 N°50 N°40 N°30 N°16 N°10 N°8 N°4 1/4 " 3/8" 1/2 3/4"
100 "

90

80
GRAFICO CON LOS
PROMEDIOS
70

60

50

40

30

20

10

0
0.01 0.10 1.00 10.00 10

Limite Inferior Especificaciones

Limite Superior

Curva Granulometrica

OBSERVACIONES :

CONSTRUCTORA KAPALA S.A


Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Arturo Guevara H.
ION PARA MEZCLA ASFALTICA EN CALIENTE
WILIAM SILUPU C.
ARTURO GUEVARA H.
5/16/2016

DATOS DE LA MUESTRA

COMPOSICION DE MEZCLA
ARA MEZCLA ASFALTICA EN CALIENTE ASTM D3515

Tolerancias

+/-5%
+/-5%
+/-5%
+/-5%
+/-5%
+/-4%
+/- 3%
+/-2%

N°50 N°40 N°30 N°16 N°10 N°8 N°4 1/4 " 3/8" 1/2 3/4"
"

1.00 10.00 100.00


Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 40% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 13.28 17
< 10 0.6 0.24 66.8 26.72 83
TOTAL 100.00 40.00 100.00 40.00 100.00

C.A 4.5 56.25 C.A 5.0


AGREGADOS 95.5 1193.75 AGREGADOS 95.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.50 95.50 1/2" 8.00
grava chancada 3/8" 10.28 122.72 218.22 3/8" 10.28
40% N4 20.44 244.00 462.22 N4 20.44
N 10 1.04 12.42 474.64 N 10 1.04
< 10 0.24 2.87 477.50 < 10 0.24
Arena Chancada N 10 13.28 158.53 636.03 N 10 13.28
40% < 10 26.72 318.97 955.00 < 10 26.72
Arena N 10 3.40 40.59 995.59 N 10 3.40
Zarandeada 20% < 10 16.60 198.16 1193.75 < 10 16.60
Cemento 30% < 10 16.88 1210.63 < 10
100.00 1210.63 100.00
C.A 5.5 68.75 C.A 6.0
AGREGADOS 94.5 1181.25 AGREGADOS 94.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.50 94.50 1/2" 8.00
grava chancada 3/8" 10.28 121.43 215.93 3/8" 10.28
40% N4 20.44 241.45 457.38 N4 20.44
N 10 1.04 12.29 469.67 N 10 1.04
< 10 0.24 2.84 472.50 < 10 0.24
Arena Chancada N 10 13.28 156.87 629.37 N 10 13.28
40% < 10 26.72 315.63 945.00 < 10 26.72
Arena N 10 3.40 40.16 985.16 N 10 3.40
Zarandeada 20% < 10 16.60 196.09 1181.25 < 10 16.60
Cemento 30% < 10 20.63 1201.88 < 10
100.00 1201.88 100.00
C.A 6.5 81.25 C.A 7.00
AGREGADOS 93.5 1168.75 AGREGADOS 93.00
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 93.50 93.50 1/2" 8.00
grava chancada 3/8" 10.28 120.15 213.65 3/8" 10.28
40% N4 20.44 238.89 452.54 N4 20.44
N 10 1.04 12.16 464.70 N 10 1.04
< 10 0.24 2.81 467.50 < 10 0.24
Arena Chancada N 10 13.28 155.21 622.71 N 10 13.28
40% < 10 26.72 312.29 935.00 < 10 26.72
Arena N 10 3.40 39.74 974.74 N 10 3.40
Zarandeada 20% < 10 16.60 194.01 1168.75 < 10 16.60
Cemento 30% < 10 24.38 1193.13 < 10
100.00 1193.13 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 30%

3.40
16.60
20.00

62.50
1187.50
1250.00
PESOS Pesos Acum.

95.00 95.00
122.08 217.08
242.73 459.80
12.35 472.15
2.85 475.00
157.70 632.70
317.30 950.00
40.38 990.38
197.13 1187.50
18.75 1206.25
1206.25
75.00
1175.00
1250.00
PESOS Pesos Acum.

94.00 94.00
120.79 214.79
240.17 454.96
12.22 467.18
2.82 470.00
156.04 626.04
313.96 940.00
39.95 979.95
195.05 1175.00
22.50 1197.50
1197.50
87.50
1162.50
1250.00
PESOS Pesos Acum.

93.00 93.00
119.51 212.51
237.62 450.12
12.09 462.21
2.79 465.00
154.38 619.38
310.62 930.00
39.53 969.53
192.98 1162.50
26.25 1188.75
1188.75
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 40% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 13.28 17
< 10 0.6 0.24 66.8 26.72 83
TOTAL 100.00 40.00 100.00 40.00 100.00

C.A 4.0 50.00 C.A 4.5


AGREGADOS 96.0 1200.00 AGREGADOS 95.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 96.00 96.00 1/2" 8.00
grava chancada 3/8" 10.28 123.36 219.36 3/8" 10.28
40% N4 20.44 245.28 464.64 N4 20.44
N 10 1.04 12.48 477.12 N 10 1.04
< 10 0.24 2.88 480.00 < 10 0.24
Arena Chancada N 10 13.28 159.36 639.36 N 10 13.28
40% < 10 26.72 320.64 960.00 < 10 26.72
Arena N 10 3.40 40.80 1000.80 N 10 3.40
Zarandeada 20% < 10 16.60 199.20 1200.00 < 10 16.60
Cemento 20% < 10 10.00 1210.00 < 10
100.00 1210.00 100.00
C.A 5.0 62.50 C.A 5.5
AGREGADOS 95.0 1187.50 AGREGADOS 94.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.00 95.00 1/2" 8.00
grava chancada 3/8" 10.28 122.08 217.08 3/8" 10.28
40% N4 20.44 242.73 459.80 N4 20.44
N 10 1.04 12.35 472.15 N 10 1.04
< 10 0.24 2.85 475.00 < 10 0.24
Arena Chancada N 10 13.28 157.70 632.70 N 10 13.28
40% < 10 26.72 317.30 950.00 < 10 26.72
Arena N 10 3.40 40.38 990.38 N 10 3.40
Zarandeada 20% < 10 16.60 197.13 1187.50 < 10 16.60
Cemento 20% < 10 12.50 1200.00 < 10
100.00 1200.00 100.00
C.A 6.0 75.00 C.A 6.50
AGREGADOS 94.0 1175.00 AGREGADOS 93.50
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.00 94.00 1/2" 8.00
grava chancada 3/8" 10.28 120.79 214.79 3/8" 10.28
40% N4 20.44 240.17 454.96 N4 20.44
N 10 1.04 12.22 467.18 N 10 1.04
< 10 0.24 2.82 470.00 < 10 0.24
Arena Chancada N 10 13.28 156.04 626.04 N 10 13.28
40% < 10 26.72 313.96 940.00 < 10 26.72
Arena N 10 3.40 39.95 979.95 N 10 3.40
Zarandeada 20% < 10 16.60 195.05 1175.00 < 10 16.60
Cemento 20% < 10 15.00 1190.00 < 10
100.00 1190.00 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 20%

3.40
16.60
20.00

56.25
1193.75
1250.00
PESOS Pesos Acum.

95.50 95.50
122.72 218.22
244.00 462.22
12.42 474.64
2.87 477.50
158.53 636.03
318.97 955.00
40.59 995.59
198.16 1193.75
11.25 1205.00
1205.00
68.75
1181.25
1250.00
PESOS Pesos Acum.

94.50 94.50
121.43 215.93
241.45 457.38
12.29 469.67
2.84 472.50
156.87 629.37
315.63 945.00
40.16 985.16
196.09 1181.25
13.75 1195.00
1195.00
81.25
1168.75
1250.00
PESOS Pesos Acum.

93.50 93.50
120.15 213.65
238.89 452.54
12.16 464.70
2.81 467.50
155.21 622.71
312.29 935.00
39.74 974.74
194.01 1168.75
16.25 1185.00
1185.00
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 40% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 13.28 17
< 10 0.6 0.24 66.8 26.72 83
TOTAL 100.00 40.00 100.00 40.00 100.00

C.A 4.0 50.00 C.A 4.5


AGREGADOS 96.0 1200.00 AGREGADOS 95.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 96.00 96.00 1/2" 8.00
grava chancada 3/8" 10.28 123.36 219.36 3/8" 10.28
40% N4 20.44 245.28 464.64 N4 20.44
N 10 1.04 12.48 477.12 N 10 1.04
< 10 0.24 2.88 480.00 < 10 0.24
Arena Chancada N 10 13.28 159.36 639.36 N 10 13.28
40% < 10 26.72 320.64 960.00 < 10 26.72
Arena N 10 3.40 40.80 1000.80 N 10 3.40
Zarandeada 20% < 10 16.60 199.20 1200.00 < 10 16.60
Cemento 10% < 10 5.00 1205.00 < 10
100.00 1205.00 100.00
C.A 5.0 62.50 C.A 5.5
AGREGADOS 95.0 1187.50 AGREGADOS 94.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.00 95.00 1/2" 8.00
grava chancada 3/8" 10.28 122.08 217.08 3/8" 10.28
40% N4 20.44 242.73 459.80 N4 20.44
N 10 1.04 12.35 472.15 N 10 1.04
< 10 0.24 2.85 475.00 < 10 0.24
Arena Chancada N 10 13.28 157.70 632.70 N 10 13.28
40% < 10 26.72 317.30 950.00 < 10 26.72
Arena N 10 3.40 40.38 990.38 N 10 3.40
Zarandeada 20% < 10 16.60 197.13 1187.50 < 10 16.60
Cemento 10% < 10 6.25 1193.75 < 10
100.00 1193.75 100.00
C.A 6.0 75.00 C.A 6.50
AGREGADOS 94.0 1175.00 AGREGADOS 93.50
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.00 94.00 1/2" 8.00
grava chancada 3/8" 10.28 120.79 214.79 3/8" 10.28
40% N4 20.44 240.17 454.96 N4 20.44
N 10 1.04 12.22 467.18 N 10 1.04
< 10 0.24 2.82 470.00 < 10 0.24
Arena Chancada N 10 13.28 156.04 626.04 N 10 13.28
40% < 10 26.72 313.96 940.00 < 10 26.72
Arena N 10 3.40 39.95 979.95 N 10 3.40
Zarandeada 20% < 10 16.60 195.05 1175.00 < 10 16.60
Cemento 10% < 10 7.50 1182.50 < 10
100.00 1182.50 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 10%

3.40
16.60
20.00

56.25
1193.75
1250.00
PESOS Pesos Acum.

95.50 95.50
122.72 218.22
244.00 462.22
12.42 474.64
2.87 477.50
158.53 636.03
318.97 955.00
40.59 995.59
198.16 1193.75
5.63 1199.38
1199.38
68.75
1181.25
1250.00
PESOS Pesos Acum.

94.50 94.50
121.43 215.93
241.45 457.38
12.29 469.67
2.84 472.50
156.87 629.37
315.63 945.00
40.16 985.16
196.09 1181.25
6.88 1188.13
1188.13
81.25
1168.75
1250.00
PESOS Pesos Acum.

93.50 93.50
120.15 213.65
238.89 452.54
12.16 464.70
2.81 467.50
155.21 622.71
312.29 935.00
39.74 974.74
194.01 1168.75
8.13 1176.88
1176.88
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 40% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 13.28 17
< 10 0.6 0.24 66.8 26.72 83
TOTAL 100.00 40.00 100.00 40.00 100.00

C.A 4.5 56.25 C.A 5.0


AGREGADOS 95.5 1193.75 AGREGADOS 95.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.50 95.50 1/2" 8.00
grava chancada 3/8" 10.28 122.72 218.22 3/8" 10.28
40% N4 20.44 244.00 462.22 N4 20.44
N 10 1.04 12.42 474.64 N 10 1.04
< 10 0.24 2.87 477.50 < 10 0.24
Arena Chancada N 10 13.28 158.53 636.03 N 10 13.28
40% < 10 26.72 318.97 955.00 < 10 26.72
Arena N 10 3.40 40.59 995.59 N 10 3.40
Zarandeada 20% < 10 16.60 198.16 1193.75 < 10 16.60
100.00 1193.75 100.00
C.A 5.5 68.75 C.A 6.0
AGREGADOS 94.5 1181.25 AGREGADOS 94.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.50 94.50 1/2" 8.00
grava chancada 3/8" 10.28 121.43 215.93 3/8" 10.28
40% N4 20.44 241.45 457.38 N4 20.44
N 10 1.04 12.29 469.67 N 10 1.04
< 10 0.24 2.84 472.50 < 10 0.24
Arena Chancada N 10 13.28 156.87 629.37 N 10 13.28
40% < 10 26.72 315.63 945.00 < 10 26.72
Arena N 10 3.40 40.16 985.16 N 10 3.40
Zarandeada 20% < 10 16.60 196.09 1181.25 < 10 16.60
100.00 1181.25 100.00
C.A 6.5 81.25 C.A 5.10
AGREGADOS 93.5 1168.75 AGREGADOS 94.90
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS TAMIZ %RET
3/4" 3/4"
1/2" 8.00 93.50 93.50 1/2" 8.00
grava chancada 3/8" 10.28 120.15 213.65 3/8" 10.28
40% N4 20.44 238.89 452.54 N4 20.44
N 10 1.04 12.16 464.70 N 10 1.04
< 10 0.24 2.81 467.50 < 10 0.24
Arena Chancada N 10 13.28 155.21 622.71 N 10 13.28
40% < 10 26.72 312.29 935.00 < 10 26.72
Arena N 10 3.40 39.74 974.74 N 10 3.40
Zarandeada 40% < 10 16.60 194.01 1168.75 < 10 16.60
100.00 1168.75 100.00

CONSORCIO SUPERVISOR VIAL MATARANI


Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20%

3.40
16.60
20.00

62.50
1187.50
1250.00
PESOS Pesos Acum.

95.00 95.00
122.08 217.08
242.73 459.80
12.35 472.15
2.85 475.00
157.70 632.70
317.30 950.00
40.38 990.38
197.13 1187.50
1187.50
75.00
1175.00
1250.00
PESOS Pesos Acum.

94.00 94.00
120.79 214.79
240.17 454.96
12.22 467.18
2.82 470.00
156.04 626.04
313.96 940.00
39.95 979.95
195.05 1175.00
1175.00
63.75
1186.25
1250.00
PESOS Pesos Acum.

94.90 94.90
121.95 216.85
242.47 459.32
12.34 471.65
2.85 474.50
157.53 632.03
316.97 949.00
40.33 989.33
196.92 1186.25
1186.25
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 39% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 12.95 17
< 10 0.6 0.24 66.8 26.05 83
TOTAL 100.00 40.00 100.00 39.00 100.00

C.A 4.0 50.00 C.A 4.5


AGREGADOS 96.0 1200.00 AGREGADOS 95.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 96.00 96.00 1/2" 8.00
grava chancada 3/8" 10.28 123.36 219.36 3/8" 10.28
40% N4 20.44 245.28 464.64 N4 20.44
N 10 1.04 12.48 477.12 N 10 1.04
< 10 0.24 2.88 480.00 < 10 0.24
Arena Chancada N 10 12.95 155.38 635.38 N 10 12.95
39% < 10 26.05 312.62 948.00 < 10 26.05
Arena N 10 3.40 40.80 988.80 N 10 3.40
Zarandeada 20% < 10 16.60 199.20 1188.00 < 10 16.60
Cemento 1% < 10 1.00 12.00 1200.00 < 10 1.00
100.00 1200.00 100.00
C.A 5.0 62.50 C.A 5.5
AGREGADOS 95.0 1187.50 AGREGADOS 94.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.00 95.00 1/2" 8.00
grava chancada 3/8" 10.28 122.08 217.08 3/8" 10.28
40% N4 20.44 242.73 459.80 N4 20.44
N 10 1.04 12.35 472.15 N 10 1.04
< 10 0.24 2.85 475.00 < 10 0.24
Arena Chancada N 10 12.95 153.76 628.76 N 10 12.95
40% < 10 26.05 309.37 938.13 < 10 26.05
Arena N 10 3.40 40.38 978.50 N 10 3.40
Zarandeada 20% < 10 16.60 197.13 1175.63 < 10 16.60
Cemento 1% < 10 1.00 11.88 1187.50 < 10 1.00
100.00 1187.50 100.00
C.A 6.0 75.00 C.A 4.60
AGREGADOS 94.0 1175.00 AGREGADOS 95.40
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.00 94.00 1/2" 8.00
grava chancada 3/8" 10.28 120.79 214.79 3/8" 10.28
40% N4 20.44 240.17 454.96 N4 20.44
N 10 1.04 12.22 467.18 N 10 1.04
< 10 0.24 2.82 470.00 < 10 0.24
Arena Chancada N 10 12.95 152.14 622.14 N 10 12.95
40% < 10 26.05 306.11 928.25 < 10 26.05
Arena N 10 3.40 39.95 968.20 N 10 3.40
Zarandeada 40% < 10 16.60 195.05 1163.25 < 10 16.60
Cemento 1% < 10 1.00 11.75 1175.00 < 10 1.00
100.00 1175.00 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 1%

3.40
16.60
20.00

56.25
1193.75
1250.00
PESOS Pesos Acum.

95.50 95.50
122.72 218.22
244.00 462.22
12.42 474.64
2.87 477.50
154.57 632.07
311.00 943.06
40.59 983.65
198.16 1181.81
11.94 1193.75
1193.75
68.75
1181.25
1250.00
PESOS Pesos Acum.

94.50 94.50
121.43 215.93
241.45 457.38
12.29 469.67
2.84 472.50
152.95 625.45
307.74 933.19
40.16 973.35
196.09 1169.44
11.81 1181.25
1181.25
57.50
1192.50
1250.00
PESOS Pesos Acum.

95.40 95.40
122.59 217.99
243.75 461.74
12.40 474.14
2.86 477.00
154.40 631.40
310.67 942.08
40.55 982.62
197.96 1180.58
11.93 1192.50
1192.50
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 38% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 12.62 17
< 10 0.6 0.24 66.8 25.38 83
TOTAL 100.00 40.00 100.00 38.00 100.00

C.A 3.5 43.75 C.A 4.0


AGREGADOS 96.5 1206.25 AGREGADOS 96.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 96.50 96.50 1/2" 8.00
grava chancada 3/8" 10.28 124.00 220.50 3/8" 10.28
40% N4 20.44 246.56 467.06 N4 20.44
N 10 1.04 12.55 479.61 N 10 1.04
< 10 0.24 2.90 482.50 < 10 0.24
Arena Chancada N 10 12.62 152.18 634.68 N 10 12.62
38% < 10 25.38 306.19 940.88 < 10 25.38
Arena N 10 3.40 41.01 981.89 N 10 3.40
Zarandeada 20% < 10 16.60 200.24 1182.13 < 10 16.60
Cemento 2% < 10 2.00 24.13 1206.25 < 10 2.00
100.00 1206.25 100.00
C.A 4.5 56.25 C.A 5.0
AGREGADOS 95.5 1193.75 AGREGADOS 95.0
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.50 95.50 1/2" 8.00
grava chancada 3/8" 10.28 122.72 218.22 3/8" 10.28
40% N4 20.44 244.00 462.22 N4 20.44
N 10 1.04 12.42 474.64 N 10 1.04
< 10 0.24 2.87 477.50 < 10 0.24
Arena Chancada N 10 12.62 150.60 628.10 N 10 12.62
38% < 10 25.38 303.02 931.13 < 10 25.38
Arena N 10 3.40 40.59 971.71 N 10 3.40
Zarandeada 20% < 10 16.60 198.16 1169.88 < 10 16.60
Cemento 2% < 10 2.00 23.88 1193.75 < 10 2.00
100.00 1193.75 100.00
C.A 5.5 68.75 C.A 4.20
AGREGADOS 94.5 1181.25 AGREGADOS 95.80
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.50 94.50 1/2" 8.00
grava chancada 3/8" 10.28 121.43 215.93 3/8" 10.28
40% N4 20.44 241.45 457.38 N4 20.44
N 10 1.04 12.29 469.67 N 10 1.04
< 10 0.24 2.84 472.50 < 10 0.24
Arena Chancada N 10 12.62 149.03 621.53 N 10 12.62
38% < 10 25.38 299.85 921.38 < 10 25.38
Arena N 10 3.40 40.16 961.54 N 10 3.40
Zarandeada 40% < 10 16.60 196.09 1157.63 < 10 16.60
Cemento 2% < 10 2.00 23.63 1181.25 < 10 2.00
100.00 1181.25 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 2%

3.40
16.60
20.00

50.00
1200.00
1250.00
PESOS Pesos Acum.

96.00 96.00
123.36 219.36
245.28 464.64
12.48 477.12
2.88 480.00
151.39 631.39
304.61 936.00
40.80 976.80
199.20 1176.00
24.00 1200.00
1200.00
62.50
1187.50
1250.00
PESOS Pesos Acum.

95.00 95.00
122.08 217.08
242.73 459.80
12.35 472.15
2.85 475.00
149.82 624.82
301.44 926.25
40.38 966.63
197.13 1163.75
23.75 1187.50
1187.50
52.50
1197.50
1250.00
PESOS Pesos Acum.

95.80 95.80
123.10 218.90
244.77 463.67
12.45 476.13
2.87 479.00
151.08 630.08
303.97 934.05
40.72 974.77
198.79 1173.55
23.95 1197.50
1197.50
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 37% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 12.28 17
< 10 0.6 0.24 66.8 24.72 83
TOTAL 100.00 40.00 100.00 37.00 100.00

C.A 3.0 37.50 C.A 3.5


AGREGADOS 97.0 1212.50 AGREGADOS 96.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 97.00 97.00 1/2" 8.00
grava chancada 3/8" 10.28 124.65 221.65 3/8" 10.28
40% N4 20.44 247.84 469.48 N4 20.44
N 10 1.04 12.61 482.09 N 10 1.04
< 10 0.24 2.91 485.00 < 10 0.24
Arena Chancada N 10 12.28 148.94 633.94 N 10 12.28
37% < 10 24.72 299.68 933.63 < 10 24.72
Arena N 10 3.40 41.23 974.85 N 10 3.40
Zarandeada 20% < 10 16.60 201.28 1176.13 < 10 16.60
Cemento 3% < 10 3.00 36.38 1212.50 < 10 3.00
100.00 1212.50 100.00
C.A 4.0 50.00 C.A 4.5
AGREGADOS 96.0 1200.00 AGREGADOS 95.5
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 96.00 96.00 1/2" 8.00
grava chancada 3/8" 10.28 123.36 219.36 3/8" 10.28
40% N4 20.44 245.28 464.64 N4 20.44
N 10 1.04 12.48 477.12 N 10 1.04
< 10 0.24 2.88 480.00 < 10 0.24
Arena Chancada N 10 12.28 147.41 627.41 N 10 12.28
37% < 10 24.72 296.59 924.00 < 10 24.72
Arena N 10 3.40 40.80 964.80 N 10 3.40
Zarandeada 20% < 10 16.60 199.20 1164.00 < 10 16.60
Cemento 3% < 10 3.00 36.00 1200.00 < 10 3.00
100.00 1200.00 100.00
C.A 5.0 62.50 C.A 5.50
AGREGADOS 95.0 1187.50 AGREGADOS 94.50
TOTAL MEZCLA 100.0 1250.00 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.00 95.00 1/2" 8.00
grava chancada 3/8" 10.28 122.08 217.08 3/8" 10.28
40% N4 20.44 242.73 459.80 N4 20.44
N 10 1.04 12.35 472.15 N 10 1.04
< 10 0.24 2.85 475.00 < 10 0.24
Arena Chancada N 10 12.28 145.87 620.87 N 10 12.28
37% < 10 24.72 293.50 914.38 < 10 24.72
Arena N 10 3.40 40.38 954.75 N 10 3.40
Zarandeada 20% < 10 16.60 197.13 1151.88 < 10 16.60
Cemento 3% < 10 3.00 35.63 1187.50 < 10 3.00
100.00 1187.50 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20% Cemento 3%

3.40
16.60
20.00

43.75
1206.25
1250.00
PESOS Pesos Acum.

96.50 96.50
124.00 220.50
246.56 467.06
12.55 479.61
2.90 482.50
148.18 630.68
298.14 928.81
41.01 969.83
200.24 1170.06
36.19 1206.25
1206.25
56.25
1193.75
1250.00
PESOS Pesos Acum.

95.50 95.50
122.72 218.22
244.00 462.22
12.42 474.64
2.87 477.50
146.64 624.14
295.05 919.19
40.59 959.78
198.16 1157.94
35.81 1193.75
1193.75
68.75
1181.25
1250.00
PESOS Pesos Acum.

94.50 94.50
121.43 215.93
241.45 457.38
12.29 469.67
2.84 472.50
145.10 617.60
291.96 909.56
40.16 949.73
196.09 1145.81
35.44 1181.25
1181.25
Malla N° GRAVA CHANCADA 40% ARENA CHANCADA 40% ARENA ZARAND. 20%
1/2" 20.0 8.00
3/8" 25.7 10.28
N4 51.1 20.44
N 10 2.6 1.04 33.2 13.28 17
< 10 0.6 0.24 66.8 26.72 83
TOTAL 100.00 40.00 100.00 40.00 100.00

C.A 4.0 50.00 C.A 4.5


AGREGADOS 95.0 1187.50 1187.50 AGREGADOS 94.5
CEMENTO 1.0 12.50 1200.00 CEMENTO 1.0
TOTAL MEZCLA 100.0 1250.00 1250.0 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS Pesos Acum. TAMIZ %RET
3/4" 3/4"
1/2" 8.00 95.00 95.00 1/2" 8.00
grava chancada 3/8" 10.28 122.08 217.08 3/8" 10.28
40% N4 20.44 242.73 459.80 N4 20.44
N 10 1.04 12.35 472.15 N 10 1.04
< 10 0.24 2.85 475.00 < 10 0.24
Arena Chancada N 10 13.28 157.70 632.70 N 10 13.28
40% < 10 26.72 317.30 950.00 < 10 26.72
Arena N 10 3.40 40.38 990.38 N 10 3.40
Zarandeada 20% < 10 16.60 197.13 1187.50 < 10 16.60
100.00 1187.50 100.00
C.A 5.0 62.50 C.A 5.5
AGREGADOS 94.0 1175.00 1175.00 AGREGADOS 93.5
CEMENTO 1.0 12.50 1187.50 CEMENTO 1.0
TOTAL MEZCLA 100.0 1250.00 1250.0 TOTAL MEZCLA 100.0
TAMIZ %RET PESOS TAMIZ %RET
3/4" 3/4"
1/2" 8.00 94.00 94.00 1/2" 8.00
grava chancada 3/8" 10.28 120.79 214.79 3/8" 10.28
40% N4 20.44 240.17 454.96 N4 20.44
N 10 1.04 12.22 467.18 N 10 1.04
< 10 0.24 2.82 470.00 < 10 0.24
Arena Chancada N 10 13.28 156.04 626.04 N 10 13.28
40% < 10 26.72 313.96 940.00 < 10 26.72
Arena N 10 3.40 39.95 979.95 N 10 3.40
Zarandeada 20% < 10 16.60 195.05 1175.00 < 10 16.60
100.00 1175.00 100.00
C.A 6.0 75.00 C.A 5.10
AGREGADOS 93.0 1162.50 1162.50 AGREGADOS 93.9
CEMENTO 1.0 12.50 1175.00 CEMENTO 1.0
TOTAL MEZCLA 100.0 1250.00 1250.0 TOTAL MEZCLA 100.00
TAMIZ %RET PESOS TAMIZ %RET
3/4" 3/4"
1/2" 8.00 93.00 93.00 1/2" 8.00
grava chancada 3/8" 10.28 119.51 212.51 3/8" 10.28
40% N4 20.44 237.62 450.12 N4 20.44
N 10 1.04 12.09 462.21 N 10 1.04
< 10 0.24 2.79 465.00 < 10 0.24
Arena Chancada N 10 13.28 154.38 619.38 N 10 13.28
40% < 10 26.72 310.62 930.00 < 10 26.72
Arena N 10 3.40 39.53 969.53 N 10 3.40
Zarandeada 40% < 10 16.60 192.98 1162.50 < 10 16.60
100.00 1162.50 100.00
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
CONSORCIO SUPERVISOR VIAL MATARANI
Carretera Camana-Dvo Quilca-Matarani
El Arenal-Pta Bombon
Sub tramo 1:Matarani-El Arenal
Sub Tramo 2: El Arenal-Pta Bombon

____________________________
Tec. Hugo Ponte C.
ZARAND. 20%

3.40
16.60
20.00

56.25
1181.25 1181.25
12.50 1193.75
1250.00 1250.0
PESOS Pesos Acum.

94.50 94.50
121.43 215.93
241.45 457.38
12.29 469.67
2.84 472.50
156.87 629.37
315.63 945.00
40.16 985.16
196.09 1181.25
1181.25
68.75
1168.75 1168.75
12.50 1181.25
1250.00 1250.0
PESOS Pesos Acum.

93.50 93.50
120.15 213.65
238.89 452.54
12.16 464.70
2.81 467.50
155.21 622.71
312.29 935.00
39.74 974.74
194.01 1168.75
1168.75
63.75
1173.75 1173.75
12.50 1186.25
1250.00 1250.0
PESOS Pesos Acum.

93.90 93.90
120.66 214.56
239.91 454.48
12.21 466.68
2.82 469.50
155.87 625.37
313.63 939.00
39.91 978.91
194.84 1173.75
1173.75
RESISTENCIA AL DAÑO INDUCIDO POR
HUMEDAD (LOTTMAN)
MTC E504 ASTMD1559 - AASHTO T245 L - 023

Obra: Construccion de la Carretera Huacho Pativilca Certificado: L - 002


Tramo: Km. 147+000- 161+500 Hecho por: Laboratorio de asfalto
Lugar: Huacho Fecha: 13/12/07

Estructura: MEZCLA AFALTICA EN CALIENTE Progresiva :


Ubicación: PLANTA DE ASFALTO Lado :
SIN MEJORADOR DE ADHERENCIA
Anillo de carga -2.7923994 3.6594808 -0.0002368
Volquete N°
Hora de muestreo 0:00

PORCENTAJE QUE PASA POR EL TAMIZ


1" 3/4" 1/2" 3/8" #4 #8 # 30 # 50
Límites de Especificación 100 100 80/100 70/90 50/70 35/50 18/29 13/23
Muestra 100 100.0 87.6 72.9 51.6 39.1 25.8 21.5

GRAVEDAD ESPECIFICA Composicion de la mezcla % en peso de toda la mezcla


Número de Espécimen
MATERIAL
Aparente Bulk NATURAL PREACONDICIONADO
1 2 3 4 4
A GRAVA TRIT. G1 2.764 2.71 P1 45.62 45.62 45.62 45.62 45.62
B ARENA G2 2.731 2.645 P2 44.78 44.78 44.78 44.78 44.78
C ARENA FINA G3 2.274 2.274 P3 3.77 3.77 3.77 3.77 3.77
D AGREGADOS Gag 2.725 2.659 Pag 94.17 94.17 94.17 94.17 94.17
E ASFALTO Gb 1.016 Pb 5.83 5.83 5.83 5.83 5.83
1 Peso del espécimen seco gr. 1248.1 1251.3 1242.8 1246.9 1241.8
2 Peso del espécimen saturado con superficie seca gr. 1251.3 1254.7 1245.4 1249.8 1244.3
3 Peso del espécimen sumergido gr. 708.4 710.2 705.9 706.6 703.7
4 Volumen del espécimen cc 542.9 544.5 539.5 543.2 540.6
5 Gravedad específica de la mezcla compactada gr./cc 2.299 2.298 2.304 2.295 2.297
6 Gravedad específica máxima de la mezcla suelta gr./cc 2.481 2.481 2.481 2.481 2.481
7 Gravedad específica efectiva de los agregados en la mezcla gr./cc 2.724 2.724 2.724 2.724 2.724
8 Asfalto absorbido % 0.92 0.92 0.92 0.92 0.92
CÁLCULOS
9 Contenido efectivo de asfalto % 4.97 4.97 4.97 4.97 4.97
10 Vacíos de aire % 7.3 7.4 7.1 7.5 7.4
11 Peso del espécimen sometido a vacío 1283.7 1276.4
12 Peso del espécimen al vacío sumergido en agua 706.6 703.7
13 Volumen del espécimen 577.1 572.7
14 Gravedad específica de la mezcla al vacío compactada 2.161 2.168
15 Agua absorvida 33.9 32.1
16 Grado de saturacióm 83.6 80.2
17 Lectura del dial del anillo de carga 100 102 102 71 72
18 Estabilidad kg 361 368 368 256 259
19 Promedio 365.60 259.46
16 Estabilidad Remanente kg 71

ELABORADO POR APROBADO POR


L - 002
Laboratorio de asfalto
13/12/07

PORCENTAJE QUE PASA POR EL TAMIZ


# 100 # 200
8/16 4/10
9.5 5.5

Composicion de la mezcla % en peso de toda la mezcla


Número de Espécimen
PREACONDICIONADO
4
45.62
44.78
3.77
94.17
5.83
1237.8
1241.2
701.9
539.3
2.295
2.481
2.724
0.92

4.97
7.5
1274.2
701.9
572.3
2.163
33.0
81.8
73
263
259.46
71
Jr.Paita Nª 161,Zona Industrial S.J.M-Lima Telfs 4669110 - 4667961, Fax 2760620

GRAVEDAD ESPECIFICA Y ABSORCION DE LOS AGREGADOS


OBRA : CAMANA-DVO QUILCA-MATARANI-EL ARENAL-PTA BOMBON ING° RESP :
TRAMO : CAMANA-DVO QUILCA-MATARANI-EL ARENAL-PTA BOMBON TECNICO :
SUB TRAMO 1 : MATARANI-EL ARENAL FECHA :
SUB TRAMO 2 : EL ARENAL-PTA BOMBON
DATOS DE LA MUESTRA
CANTERA : MATERIAL DE CORTES(roca)
MUESTRA : ARENA CHANCADA -ZARANDEADA
GRAVEDAD ESPECIFICA Y ABSORCION DEL AGREGADO FINO MTC E205,NTP 400.022, ASTM C128, AASHTO T84
A Peso Mat.Sat.Sup Seco ( al aire) ( gr) 146.5 141.4
B Peso Frasco + Agua (gr) 724.0 745.0
C Peso del Frasco + Agua +A (gr) 870.5 886.4
D Peso Mat+Agua en el frasco (gr) 818.6 836.4
E Vol de Masa +Vol de vacio = C-D (gr) 51.9 50.0
F Peso Mat. Seco en estufa (105 C) (gr) 145.9 140.7
G Vol de Masa = E- (A-F) (gr) 51.3 49.3
Pe Aparente = F / B + A - D 2.811 2.814
Pe Aparente (Sat.Sup.Seco) = A / B + A - D 2.823 2.828
Pe Nominal = F / B + F - D 2.844 2.854
% de Absorcion = A - F / F * 100 0.411 0.498
OBSERVACIONES: Agregados obtenidos de la curva granulometrica de diseño

CANTERA : MATERIAL DE CORTES(roca)


MUESTRA : PIEDRA CHANCADA

GRAVEDAD ESPECIFICA Y ABSORCION DEL AGREGADO GRUESO MTC E206,NTP 400.021, ASTM C127 , AASHTO T85
A Peso Mat.Sat.Sup Seco ( al aire) ( gr) 2372.5 2169.5
B Peso Mat.Sat.Sup Seco ( en agua) ( gr) 642.4 554.4
C Vol de Masa +Vol de vacio = A- B (gr) 1730.1 1615.1
D Peso Mat. Seco en estufa (105 C) (gr) 983.2 846.8
E Vol de Masa = C - ( A-D ) (gr) 340.8 292.4
Pe Aparente = D / A - B 0.568 0.524
Pe Aparente ( Sat.Sup.Seco) = A / A - B 1.371 1.343
Pe Nominal = D / D - B 2.885 2.896
% de Absorcion = A-D / D * 100 141.304 156.200
OBSERVACIONES: Agregados obtenidos de la curva granulometrica de diseño
IFICA Y ABSORCION DE LOS AGREGADOS
WILIAM SILUPU C.
ARTURO GUEVARA H.
10/28/2015

DATOS DE LA MUESTRA

DEL AGREGADO FINO MTC E205,NTP 400.022, ASTM C128, AASHTO T84

2.813
2.825
2.849
0.454

EL AGREGADO GRUESO MTC E206,NTP 400.021, ASTM C127 , AASHTO T85

0.364
0.905
1.927
99.168