2014 IEEE International Conference Power & Energy (PECON)

Coordination of Overcurrent Relays Protection


Systems for Wind Power Plants
Nima Rezaei 1, 2, *; Mohammad Lutfi Othman 1, 2; Noor Izzri Abdul Wahab 1, 2; Hashim Hizam 1, 2
1
Department of Electrical & Electronic Engineering, Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia
2
Centre for Advanced Power and Energy Research (CAPER), Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia
*
Corresponding Author: Nima Rezaei, Email: nima_rezaei_69@yahoo.com

Abstract-Wind farms are one of the most indispensable implement simple protection schemes which leads to
types of sustainable energies which are progressively different levels of damages to power components in the
engaged in smart grids with tenacity of electrical power plant. Moreover, most of the researches conducted
generation predominantly as a distribution generation regarding wind farm protection has been abundantly
system. Thus, rigorous protection of wind power plants is an restricted to literatures and methodologies [3 - 5]. Some
immensely momentous aspect in electrical power protection researchers have been studied the effect of fault on wind
engineering which must be contemplated thoroughly during plants specially the generators and have investigated the
designing the wind plants to afford a proper protection for effectiveness of crowbars in protecting the wind turbine
power components in case of fault occurrence. The most
generators [6]. However an overall protection scheme has
commodious and common protection apparatus are
overcurrent relays which are responsible for protecting
yet to come to solve the protection crisis in wind plants.
power systems from impending faults. In order to employ a One of the most important studies of power quality and
prosperous and proper protection for wind power plants, power system protection in wind plants is providing
these relays must be set precisely and well coordinated with adequate and continual power to the loads, therefore in
each other to clear the faults at the system in the shortest order to ensure having perpetual power from wind farms,
possible time. This paper indicates how the coordination of wind plants must feed grids continually. One way of
overcurrent relays can be effectively attained for wind power meeting this phenomena is applying a proper protection in
plants in order to protect the power constituents during fault
the system that in case of fault, only the section of faulty
incidence. Through this research Matlab/Simulink as a
powerful simulation software have been applied to model a
feeder is disconnected from the system and the rest of
wind farm and achieve precise setting for coordination of healthy parts are kept connected to the system. By using
overcurrent relays. overcurrent relays (OCRs) as a protection system and
applying an accurate coordination in wind plants, not only
Keywords-Overcurrent Relay, Coordination of Overcurrent in case of fault, the power components are protected from
Relay, Wind Power Plant, Power System Protection damages from excessive currents but also continual power
flow is fed to the grid and superb power quality is provided
I. INTRODUCTION by wind power plants.
The ever increasingly air pollution rate and the This paper demonstrates how OCRs have been
limitation of fossil fuel sources have led to comprehensive successfully used and properly coordinated in a wind
implementation of renewable energies specifically wind power plant. The software which has been used is
energy. Wind power plants have been vastly employed as Matlab/Simulink which is known as one of the best
the means of power generation in smart grids as a simulation software for electrical engineers and
distribution generation (DG) system [1]. Undoubtedly, researchers. All of the OCRs have been modelled and
wind power has come to be mainstay of the energy systems designed and the accurate settings have been selected to
in several countries and is regarded as a reliable and protect the wind plant.
financially reasonable source of electricity. The
contribution of wind energy to power generation has Section 2 of this paper, discusses about OCRs, their
reached a considerable share even on the worldwide level. function, how they are set and coordinated to provide
Among many countries that are investing hugely on wind proper protection. Moreover IEC standards for setting the
power generation, the top 10 leading nations in total power OCRs have also been represented. In section 3, the wind
generation capacity are: China, USA, Germany, Spain, plant model studied in this paper has been illustrated and
India, United Kingdom, Italy, France, Canada and Portugal load flow during normal operation and during fault
[2]. occurrence have been simulated as well. Section 4 has been
dedicated to OCRs settings for the wind plant based on the
Progressively amplification of grids by wind farms results obtained in section 3. Beside that OCRs have been
have led to emergence of some significant electrical issues tested in order to assure their credibility and validity of
including security, protection, stability, reliability and relays function. At the end, Conclusion has been brought to
power quality. Among these issues, protection aspect plays summarize all of the materials discussed in the paper.
an enormous role which needs a serious attention by
researchers. Although protection of wind farms is a crucial
issue that needs a huge attention, wind power plants still

978-1-4799-7297-5/14/$31.00 ©2014 IEEE 394


2014 IEEE International Conference Power & Energy (PECON)

II. OVERCURRENT RELAY with each other, the relay opperation time and CTI must be
OCRs have the same basic I/O signal opperation as other taken into consideration. Aftter the characteristics of these
types of relays. In these relays, if the incooming current is relays are designated, then the
t coordination of OCRs can
higher than the preset current value, the rellay will send out be properly undertaken.
an output signal to the circuit breaker (CB B) to disconnect Coordination of OCRs baasically means that the closest
the circuit in order to protect the power coomponents from relay to the fault location, which is referred to as the
the result of current excess. There are threee main types of primary relay, must first trip the CB, and in case the relay
OCRs used in power systems, which are: definite current does not trip or malfunctionss, the other relay closest to the
relay, definite time relay and inverse time relay. The most primary relay, which is calleed the backup relay, must trip.
common type is inverse time relay whichh has an inverse This coordination is extremeely crucial and is conducted in
curve characteristic. This curve defines the operation of the order to decrease the expandeed power loss and avert power
relay which functions in a faster time as the current quality compromise. The coordination
c phenomenon is
increases. These types of relays are usuallly included with depicted in Fig 1. In thiss figure, OCR1 as primary
an instantaneous unit which causes the relay r to operate protection must trip to the t fault. In case of any
instantaneously when the current reachees a high limit malfunction, OCR2 as backuup protection should trip. Also
magnitude thus eliminating the damagee to the power if OCR2 does not operate, OCR3 as the second backup
components. protection must trip and discoonnect the feeder.
Inverse time OCRs based on their seensitivity to the
current and time can have several characteeristics which is
reliant on the application. These OCRs typpes, according to
IEC standard are depicted in Table 1. Below
w.
Table 1. Different Characteristic of OCRs Based on
o IEC Standards

Type of OCR Opeeration time


Normally Inverse . TSM
T I .
I
Very Inverse . TSM
T I
I
TSM Fig 1.The Concept of
o OCRs Coordination
Extremely Inverse T I

Long Time Inverse


I
TSM III. SIMULATION RESULTS FO
OR OCRS COORDINATION IN A
T
I
I
WIND PLANT
Matlab/Simulink as a pow werful software has been used
to model the wind plant, relays, set the relay settings and
In power systems, all of these OCRs must
m be properly coordinate them well with each other. A typical wind
coordinated with each other in order to prrotect the power power plant has been modellled in this paper and based on
elements from the currents. To do so, the vital settings of the load flow, OCRs usinng IEC standard has been
OCRs, which are the Plug Setting Multipplier (PSM) and designed, set and coordinatedd.
the Time Setting Multiplier (TSM), must be set suitably.
PSM is varied in the range of 50% to 200% % and in steps of The wind power plant modelled
m in this paper, consists
25% [7]. This setting is only used for inverrse current relays of 3 wind turbines that eacch of them produce 2.5 MW
which detect phase to phase fault. For the relays
r that detect power. Their voltage and freequency are 575V and 60 Hz
phase to ground fault, the PSM is quitee different. It is respectively. Transformers corresponding to each wind
varied in in the range of 10% to 40% in steeps of 10%, or in turbine has voltage ratio of o 575V/25KV in star delta
the range of 20% to 80% in steps of 20% %. The point that configuration where the staar side is earthed. The last
should be taken into consideration is thatt the more Plug Transformer corresponding too the grid has the voltage ratio
Setting (PS) the relay has, the higher cuurrent the relay of 25KV/110KV and delta sttar configuration where star is
requires to trip. TSM ranges from 0 to 1 in steps of 0.1. earthed. The transmission linnes have 20 Km length each.
However, sometimes it varies in stepss of 0.05. The The wind power plant modell is illustrated in Fig 2. In this
maximum TSM is 1 and the minimum is 0.05. 0 In order to figure, since the protection area
a is the main scope of this
coordinate OCRs with each other, there iss a time interval paper, the breakers have been highlighted as Red colour
between a primary relay and a backup relaay operation and named by CB1, CB2 … CB88 and the corresponding relays
this is called the Coordination Time Interrval (CTI). This to each breakers, are highlighhted as green colour shown by
time interval is in the range of 0.3 and 0.5 seconds for R1, R2 … R8.
conventional relays, while for numerical relays
r it is set at
0.2 seconds, which means they operate fasster compared to
conventional relays [8]. So in order to cooordinate relays

395
2014 IEEE International Conference Power & Energy (PECON)

Fig 2. Simulink Model for Wind Power Plant

In wind power plants, since the windd is not always Fig 4. Load Flow through CB7
C during Normal Operation
stable and is fluctuating all the time, thereefore the current
generated by the wind turbines is also varyying according to 200

the wind velocity. The minimum adequatee wind speed for


150
wind turbines to produce electricity is 5m mps however the
maximum wind speed that wind turbiness can tolerate is Current (A)
100
25mps. If the wind velocity exceeds that vaalue, then it will
damage the wind turbine generators and sometimes
s cause 50
fire in case of long duration of high wind sppeed. In order to
protect the wind turbines from high winnd speed in this 0
0 10 20 30 40 50 60
paper, a protective block is located to trip the
t wind turbine Time (S)
T
as soon as the wind speed exceeds 25. Wiind speed in this
Fig 5. Load Flow through CB2
C during Normal Operation
paper is selected to be varying in range of 5 to 25mps. The
wind plant currents characteristics at eachh CB is depicted 200
in Fig 3 to 6 at normal operation.
In order to set the relays and coordinatee them properly, 150
Current (A)

the exact value of current and short circuitt current flowing


100
through each CB should be derived. Figg 7. to Fig 10.
Depicts the characteristic of current in Ammper unit at each 50
CB before, during and after fault. In thiss simulation, the
total simulation time is 60s. A three phase fault has been 0
imposed to each breaker at time 30 lasting for
f 5s. 0 10 20 30
Time (S)
T
40 50 60

120 Fig 6. Load Flow through CB1


C during Normal Operation
100
350
80
Current (A)

300
60 250
Current (A)

40 200

150
20
100
0
0 10 20 30 40 50 60 50
Time (S)
0
Fig 3. Load Flow through CB8 during Normaal Operation 0 10 20 30
Time (S)
T
40 50 60

500 Fig 7. Load Flow throough CB8 during Fault


400
Current (A)

300

200

100

0
0 10 20 30 40 50 60
Time (S)

396
2014 IEEE International Conference Power & Energy (PECON)

1500 As an example, when there is fault near CB8, relay 8


must detect the fault and send the proper tripping signal to
the CB8 to disconnect the system until the fault is cleared.
1000
As it is clear in the pictures, relay8 trips at time 30.1141
Current (A)

and the CB8 has disconnected the feeder exactly at


500 30.1141 which shows the relay and CB are working well.
The other scenario that must be taken into
0
0 10 20 30 40 50 60
consideration is that in case relay 8 has not tripped and
Time (S) malfunctioned, the closest relay to relay 8 which is relay7
Fig 8. Load Flow through CB7 during Fault
must trip after a specific delay time which is known as
CTI. In Fig 15. This phenomena is shown. Since the CTI is
2000 set to be as 0.3s, then as it is expected, relay7 must trip and
command the CB7 to disconnect the feeder at time
1500 30.5055. This concept is repeated for the rest of the relays
as well.
Current (A)

1000
This procedures have been tested for all of the faults at
500
each CB and the results of relay settings, have been
compiled in Table 2. In this table all of the current
0 measurements are in Amper unit. Ipickup and Ipickup
0 10 20 30 40 50 60
Time (S) relay refers to the minimum magnitude of current that the
relay trips before and after the Current Transformer (CT)
Fig 9. Load Flow through CB2 during Fault
respectively. The fourth column represents the CT ratio at
2000
each relay. PS, PSM and TSM corresponds to the relay
settings that describes how each relay has been set and
1500 behaves in case of fault. The last column illustrates T that
is the amount of delay time that the relay trips. One thing
Current (A)

1000 that should be taken into consideration is that since all of


the 3 wind turbine feeders have the same current
500 characteristics, therefore relay settings for relays1, 3 and 5
are the same. Also the relay setting for relays2, 4 and 6 are
0
0 10 20 30 40 50 60 the same as each other too.
Time (S)
Through the simulation results it is resulted that relays
Fig 10. Load Flow through CB1 during Fault have been set accurately and are well coordinated with
As it can be seen from the simulation, at time 30, when each other in order to protect the wind power plant. All of
a three phase fault is imposed to the system, current is the relays settings have been conducted using IEC
increased abundantly and voltage dips drastically which standards and according to section 2 of this paper
can damage the power systems and compromise the power regarding OCRs settings, all of the TSM has been set by
quality. Therefore a proper protection must be employed to standardization of 0.05 which means the value of each
prevent this catastrophe. In this paper OCRs as the best TSM has been rounded to higher value with value of 0.05.
protection relay in wind power plants have been Thus OCRs can be considered as one of the best and most
implemented and the results in the next section have successful technique of protection for wind farms.
affirmed its prosperity, effectiveness and accuracy.
IV. RESULTS AND DISCUSSION Table 2. OCRs Settings for the Wind Power Plant

After getting the required data for setting the relays, Relay Ipickup Ipickup relay CT PS PSM TSM T
R1 75 3.75 100:5 75% 45.27 0.65 1.1484
including exact value of load current and short circuit R2 75 3.75 100:5 75% 13.51 0.30 0.8055
current at each CB, OCRs can then be modelled, set and R3 75 3.75 100:5 75% 45.27 0.65 1.1484
coordinated. In order to get the best results with purpose of R4 75 3.75 100:5 75% 13.51 0.30 0.8055
R5 75 3.75 100:5 75% 45.27 0.65 1.1484
relays coordination, the exact value of short circuit current R6 75 3.75 100:5 75% 13.51 0.30 0.8055
located near each CB should be extracted and based on the R7 187.5 6.25 150:5 125% 3.91 0.1 0.5055
R8 37.5 3.75 50:5 75% 19.59 0.05 0.1141
maximum load current, relays can be set.
The results below demonstrates that relays have been
successfully set and are well coordinated with each other. 2

CTI has been opted as to be 0.3s and normal inverse relay 1.5

has been chosen in this simulation. Fig 11. To Fig 14. 1


Tripping at 30.1141
Current (A)

Illustrates the relays behaviour at each fault occurred from


0.5
time 30 to 35. In these figures, 1 means the relay is in
normal condition and has not tripped, and 0 means the 0

relay has tripped due to the fault current. Fig 16. To Fig -0.5
19. Depicts the CBs operation corresponding the each -1
relays. 29 30 31 32
Time (S)
33 34 35 36

Fig 11. Relay8 Tripping during Fault

397
2014 IEEE International Conference Power & Energy (PECON)

2 1500

1.5

1 Tripping at 30.5055 1000


Current (A)

Current (A)
0.5

0 500

-0.5

-1 0
29 30 31 32 33 34 35 36 0 10 20 30 40 50 60
Time (S) Time (S)

Fig 12. Relay7 Tripping during Fault Fig 17. CB7 Operation during Fault

2 2000

1.5
1500
1 Tripping at 30.8055
Current (A)

Current (A)
0.5 1000

0
500
-0.5

-1 0
29 30 31 32 33 34 35 36 0 10 20 30 40 50 60
Time (S) Time (S)

Fig 13. Relay2 Tripping during Fault Fig 18. CB2 Operation during Fault

2 2000

1.5
1500
Tripping at 31.1484
1
Current (A)

Current (A)

0.5 1000

0
500
-0.5

-1 0
29 30 31 32 33 34 35 36 0 10 20 30 40 50 60
Time (S) Time (S)

Fig 14. Relay1 Tripping during Fault Fig 19. CB1 Operation during Fault

2 R8 V. CONCLUSION
R7
1.5 R2
R1
In this paper, a comprehensive protection for wind
1 power plants has been successfully implemented by using
Current (A)

0.5
OCRs. Three phase fault has been imposed at each CB and
the settings for each relay has been conducted. Moreover
0
all of the relays have been modelled based on IEC
-0.5 standards in order to provide proper protection for the
-1 system, prevent the damage from fault current to the power
29 30 31 32 33 34 35 36
Time (S) components, provide perpetual power to the grid and
contribute to superb power quality. The results have shown
Fig 15. Operation of Relay 7, 2 and 1 in Case Relay 8 malfunctions
that OCRs can be successfully employed for wind power
350
plants and has proved to be effective, accurate, and be
300
considered as the best method for protection.
250 Acknowledgement
Current (A)

200

150
The authors wish to thank the Universiti Putra
100
Malaysia for the research grant “Geran Putra IPB”, project
50
no. GP–IPB/2013/9412101 and vote no. 9412101 that
funds this work.
0
0 10 20 30 40 50 60
Time (S) References
Fig 16. CB8 Operation during Fault [1] Mohd, A., Ortjohann, E., Schmelter, A., Hamsic, N., & Morton, D.
(2008, June). Challenges in integrating distributed energy storage
systems into future smart grid. In Industrial Electronics, 2008. ISIE
2008. IEEE International Symposium on (pp. 1627-1632). IEEE.
[2] Heier, S. (2014). Grid integration of wind energy. John Wiley &
Sons.
[3] Ramakumar, R., Butler, N. G., Rodriguez, A. P., & Venkata, S. S.
(1993). Economic aspects of advanced energy
technologies. Proceedings of the IEEE, 81(3), 318-332.

398
2014 IEEE International Conference Power & Energy (PECON)

[4] Hornak, D., & Chau, N. H. J. (2004). Green power-wind generated


protection and control considerations. In Protective Relay
Engineers, 2004 57th Annual Conference for (pp. 110-131). IEEE.
[5] Fuchs, R. (2004, April). Protection schemes for decentralized
power generation. InDevelopments in Power System Protection,
2004. Eighth IEE International Conference on (Vol. 1, pp. 323-
326). IET.
[6] Qureshi, W. A., & Nair, N. K. C. (2014). Wind Farm Protection.
In Large Scale Renewable Power Generation (pp. 311-329).
Springer Singapore.
[7] Hussain, M. H., Rahim, S. R. A., & Musirin, I. (2013). Optimal
Overcurrent Relay Coordination: A Review. Procedia
Engineering, 53, 332-336.
[8] Raza, S., Mahmood, T., & Bukhari, S. (2014). optimum overcurrent
relay coordination: A review. Nucleus, 51(1), 37-49.