Item Descripción ParcialIncluidoPie1

ITEM METAS COSTO

01 INICIAL INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO 32,742.02


02 PRIMARIA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO 102,907.22
03 SECUNDARIA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO 180,312.99
04 TANQUE SEPTICO (01 UND) 2,760.66
05 POZO PERCOLADOR (01 UND) 4,270.42
06 CONSTRUCCION CERCO PERIMETRICO 79,176.81
07 MURO DE CONTENCION TIPO 1 221,823.82
08 MURO DE CONTENCION TIPO 2 62,751.27
09 AREAS VERDES 5,236.00
10 FLETE TERRESTRE 28,865.26
COSTO DIRECTO 720,846.47
GASTOS GENERALES 73,084.65
SUPERVISION 36,542.32
EXPEDIENTE TECNICO 10,000.00
PRESUPUESTO TOTAL DE OBRA 840,473.44