NOTES:

01. ALL EARTH FILLING BELOW FLOOR & TRENCH SHOULD BE


WELL COMPACTED SALT FREE FILL .
02. POLYTHENE SHEET TO BE PROVIDED OVER COMPACTED FILL
25 mm DIA LIFTING HOLE
BEFORE PLACING ANY CONCRETE.
03. ALL TRENCH FLOORS, WALLS, & PLINTH FLOOR LEVEL
CHEQURED PLATE COVER TO BE REINFORCED WITH A-393 MESH (BRC).
04. ALL ALUMINIUM LOUVERED DOORS SHOULD BE AS PER
DEWA's SPECIFICATION AND STANDARDS.
05. THE DOOR SHALL HAVE PAD LOCKING ARRANGEMENT TO SUIT
DEWA's STANDARD PAD LOCK.
06. EACH CHEQURED PLATES AREA SHALL NOT
EXCEED 3600 SQ. CM.
07. ALL CHEQURED PLATES SHALL HAVE SUITABLE
LIFTING HOOKS/KEYS ARRANGEMENT.
08. ALL CHEQURED PLATES, COVERS TO BE MINIMUM 6 mm THICK,
HOT DIP GALVANISED SUITABLY STRENGTHENED IN CENTRE
TO AVOID ANY DEFLECTION. TRENCH COVERS, SIDE SUPPORTS
TO BE 40mm x 40mm MS ANGLE WITH 13 mm x 6 mm EDGE KERB.
09. THE SHADED AREA SHOWS CHEQURED PLATE TO BE
PLACED OVER CHANNEL .
DETAIL OF LIFTING HOLE 10. CHANNEL AREAS MARKED CHEQURED PLATES ARE NOT
(2 NO'S ON EACH
CHEQURED PLATE) TO BE PROVIDED.
DOOR 11. ALL TRENCH TURNINGS, INTERSECTION SHALL HAVE A RADIUS OF
45 cm AT LOWER HALF DEPTH.
12. ALL INTERNAL WALL OF SUBSTATION SHALL BE PLASTERED AND
PAINTED WITH APPROVED WHITE EMULSION PAINT. THE
EXTERNAL SURFACE SHALL BE PLASTERED, PAINTED, TREATED
IN THE SAME MANNER AS THE EXTERNAL SURFACE OF
FOR DETAILS REFER THE BUILDING .
DETAILS Z-Z 13. THIS LAYOUT IS BASED ON THE EQUIPMENT PRESENTLY
13mm X6mm FLAT BAR 6 mm th HOT DIP GALVENISED AVAILABLE WITH US, YOU MIGHT BE ASKED TO CARRY OUT
CHEQ'D PLATE WELDED TO ANGLE CHEQUERED PLATE COVER SLIGHT MODIFICATION, SHOULD THE EQUIPMENT AVAILABLE
FFL AT THE SAME TIME OF COMMISSIONING OF YOUR
SUBSTATION DIFFER .
14. THE WALLS EXPOSED TO TRAFFIC SHALL BE PROTECTED BY
25mmX25mmX3mm
ANGLE WELDED TO 10 cm Dia.1Mts. HIGH G.I. REMOVABLE PIPES PAINTED IN RED & WHITE.
CHEQUERED PLATE
COVER ON TWO SIDES 15. THE ROOF SHALL BE RCC SLAB & SHALL BE PANTED WITH THE SAME
PAINT OF THE INTERNAL WALLS.
60mmX60mmx6mm
EDGE ANGLE 16. THE FIXED ALU. LOUVERS SHALL BE OF THE SAME TYPE / DESIGN
T10 ANCHOR WELDED AS THE ALU. LOUVRED DOORS.
TO ANGLE @300C/C
17. FIRE FIGHTING / DETECTING SYSTEM OR ANY OTHER
SERVICES SHALL NOT BE INSTALLED INSIDE SUBSTATION ROOM.
18. SUBSTAION FLOOR TO BE SAND CEMENT NET FINISHING ONLY.
DETAIL Z-Z (TYPICAL SECTION) 19. CROSS CHECK THIS DRAWING WITH YOUR PROJECT DETAIL
DRAWING IN CASE OF ANY DISCREPANCIES. PLEASE INFORM US
WITH IN TWO WEEKS FOR REVISION (IF REQUIRED).
20. ALL INTERNAL WIRING WITHIN SUBSTATION ROOM SHALL BE
CONCEALED TYPE ENSURING FIRE SAFETY.

ELECTRICAL DETAILS
L.V. ROOM
SYMBOL DESCRIPTION MOUNTING HEIGHT
FROM F.F.L.
FLOURESCENT
AL. LOUVER TUBE 280CM/9'-2"
CHEQ'D PLATE 4'-0 LONG
R.T.U.
+ 0.30 SSFFL S.P SWITCH 137CM/4'-6"

13A SWITCHED SOCKET 46CM/1'-6"


+ 0.15 FFL.
CHANNEL MCB DISTRIBUTION
150MM ØPVC ALU. LOUVER WINDOWS BOARD WITH
AT TRENCH LVL AS DOOR DETAILS 30 Amp SPN
ABOVE FFL OF 0.60 PE 150CM/5'-0"
ISOLATOR
SLO
TRANSFORMER BASE OPENING
3.20 (W) x 2.15 (H)
(TO BE CONNECTED
12 WAY L.V.DB

TO CONSUMER LV DB)
P.C.C D1 = 305X275 ALL LOUVERED DOOR
SECTION X-X
DOOR DETAILS REF.
DrG No. P-DS/DOOR/01/96 "B"
R.M.U.

DrG No. P-DS/DOOR/02/96 "A"


NO PARKING SIGN IS TO BE PROVIDED
INFRONT OF S/S . DOOR (BY PARTY)
+ 0.30 SSFFL.
PCC KERB
D1 COVER HEAVY DUTY
X X A JAVITH LAYOUT MODIFIED DUE TO SITE CONDITIONS 10-03-2019
Rev. Description Date Sign.

8"THK BLOCK WORK


CABLES 2 DUBAI, UNITED ARAB EMIRATES
30N/MM
ALU. LOUVER WINDOWS X X PC CONCRETE
AS DOOR DETAILS
3"Ø DRAIN IN
ABOVE FFL OF 0.60 + 0.15 FFL.

DUBAI ELECTRICITY & WATER AUTHORITY


FLOOR AT 2M C/C
1.52 (W) x 2.15 (H)
T T T T
Channel width
P.O.BOX: 564, DUBAI - U.A.E., FAX : 04-5066495, TEL : 04-5066666
POLYTHENE SHEET COMPACTED
EARTH

PLAN SECTION T-T


DESIGN BY ABD TITLE. 11-6.6/0.4kV S/STN. For bldg. for
24 HOURS DRAWN BY JAVITH MHD MAZEN KOUKEH
DEWA ACCESS ONLY APPROVED BY ON PLOT NO. IC3-C-1
DATE 20-02-2019 AT WARSAN FOURTH (SS18652)
DRG.NO. REV.
SCALE: 1:75
SHEET NO: 1 OF 1 13294-2019 A