Sei sulla pagina 1di 6

HSE REPORT

Project Name: Phoenix H10

EHS Statistics
A. Safety Status:
Current week
Sr.No Type of Accident
No's Mandays Lost
1 Near Miss (Mandatory) 0 N/A
2 First Aid Cases 1 0
3 Lost Time Injury 0 0
4 Fatal 0 0
5 Dangerous Occurrence 0 0
6 Fire 0 0
7 Environmental 0 0
8 Any other 0 0
B. Status of Frequency and Severity Rate:

Sr. Avg. Man Power Current Week Cumulative Since Inciption of th


No.

1 Staff 42 443
2 Contractor 187 1124
3 Total Man-day’s 6 971
Man Hours (10hours/day) 48 7768
Frequency Rate: (As per Indian standard 3786: 1983)
Number of reportable lost time injury X 1000000 0 0
Man-hours worked
Severity Rate: (As per Indian standard 3786: 1983)
Man-days lost due to reportable lost time injury X 1000000 0 0
Man-hours worked

C. HSE Training Records:

HSE trainings No. of Sessions. No of Attendees /Person

HSE Induction 3 11
Re-frseh HSE Induction 0 0
Job /Trade Specific Toolbox Talk (JSTBT) 0 0
Regular Tool Box Talk (RTBT) 6 102
Special Safety Training 0 0
Any other 0 0
D. HSE Checklist Records:

Name of HSE Checklist Cumulative Since Inciption of the


Power Tools 0 0
Full Body Harness 0 0
Fire Extinguisher 0 0
Bar Bending M/C 0 0
Bar cutting M/C. 0 0
Scaffolding 0 0
Shuttering / De-Shuttering 0 0
Electrical 0 0
TC/Mob. Crane, Builder and Passenger Hoist etc. 0 0
Plant, Vehicle/Machinery 2 2
Labour Colony 0 0
Any other 0 0
E. Potential Hazard observed & rectified:
Potential Hazard Identification Current Week Cumulative Since Inciption of the
No of Site HSE Inspections conducted. (Mandatory) 0 0
Weekly HSE Walk/Tour 0 0
Hazard observed 0 0
Hazard rectified 0 0
Hazard not attended 0 0
If not attended specify the reason in single line:
1 Total previous observations & MOM points recapped which is pending for compliance. PFA MOM.
2
3
4
5

F List of Activities & Approved Safe Work Method Statement /JSA/HIRA

1 Excavation
2 Rock Blasting
3
4
5
6
7
8
9
G. Five(5) Major / Critical HSE Concerns/Observations at Project (Mandatory)
1 2 3
C
o
n
c
e
r
n
s

I
m
a
g
e

B.BHASKARA RAO Y.SURESH

Prepard by Revi

HSEM/HSEO, PMC Pro


EPORT
Location: Hitec City - Hyderabad

atistics
10.04.2019 TO 16.04.2019
Cumilative Since Inciption of the Project Safe Man-hours since
last LTI
No's Mandays Lost
0 N/A
1 0
0 0
0 0
0
0 0
0 0
0 0
0 0

Cumulative Since Inciption of the Project. Remarks

443
1124
971
7768

Cumulative since inciption of the


No of Attendees /Persons project
11 38
0 0
0 0
102 1348
0 0
0 0

Cumulative Since Inciption of the Project. Remarks


0
0
0
0
0
0
0
0
0
2
0
0

Cumulative Since Inciption of the Project Remarks


0
0
0
0
0
Next Target Date
nce. PFA MOM.

Code / No of Approved
nt /JSA/HIRA SWMS/JSA/HI Yes No
RA
9
3

(Mandatory)
3 4 5
Y.SURESH

Reviewed & Approved by

Project Manager/PMC