2 Bricks solling in trench with proper leveling Sqm 1045.200 330.612 18.406 1394.218
Plain cement concrete (1:2:4) with cement sand and Stone blast or
crushed aggregate under wall, floor & column foundation etc. including
3 protection of sides, laying compacting, curing with all complete. Cum 62.547 30.958 9.203 102.708
R.C.C Works
P.C.C for R.C.C (1:2:4or M15grade ) with cement sand and Stone Blast or
crushed aggregate in any form, size, shape and level for all reinforced
4 cement concrete including mixing, laying, compacting, curing and Cum 117.000 0.000 95.123 212.123
finishing excluding centering shuttering and
9 3mm thick cement punning in 1:1 c/s mortar Sqm 9.120 9.120
11 26 (H) 0.40 mm thick colored C.G.I. sheet roofing work (65kg/bandal) Sqm 403.766 403.766
17 Laying 18x10cm chinese roof tile on the roof as per drawing desingin Sqm 137.700 137.700
line and level all complete.
Laying 18x10cm chinese dhuri tile on the roof as per drawing desingin
18 line and level all complete. Sqm 137.610 137.610
Providing and laying ceramics brick 23x5cm on the wall in cement sand
19 mortar (1:1) in line and level all complete as per drawing, desing and Sqm 294.840 294.840
instruction net.
5x5cm salwood batten foe roof tiles work in line and level all complete
20 as per instrution net Cum 1.836 1.836
21 Providing and fixing brass Pinacle on roof as per instruction net LS 3.000 3.000
28 Installation of plants
Wall
1st steps 1.00 390.000 0.450 0.900 157.950
2nd steps 1.00 390.000 0.450 0.600 105.300
3rd steps 1.00 390.000 0.450 0.600 105.300
4th steps 1.00 390.000 0.450 0.600 105.300
Footpath 1.00 390.000 1.500 0.350 204.750
both sides of Footpath for curve stone 3.00 390.000 0.350 0.350 143.325
Total 821.925 Cum
Earth filling work by transported soil by up 3km km all
1.1 complete works
Length 1.00 390.000 1.560 0.850 517.140
Back side 1.00 390.000 1.000 0.750 292.500
Total 809.640 Cum
23 cm wall
1st steps 1.00 390.000 0.250 0.900 87.750
2nd steps 1.00 390.000 0.250 1.200 117.000
3rd steps 1.00 390.000 0.250 1.450 141.375
4th steps 1.00 390.000 0.250 1.550 151.125
Net brick work for Net Total 497.250 Cum
8 Plastering works 1:4
23 cm wall
1st steps 1.00 390.000 0.450 175.500
2nd steps 1.00 390.000 0.450 175.500
3rd steps 1.00 390.000 0.450 175.500
4th steps 1.00 390.000 0.450 175.500
Net Total 702.000 Sqm
Providing and laying M 20/20 Precast concrete in kerbs of size
38cmX20cmx25cm.(HXBXL) with 12mm thick 1:3 cement sand
mortar bedding and joints including foundation excavation
levelling etc. (1401)
9
both sides for footpath 2.00 393.000 786.000
Net Total 786.000 RM
Providing and laying of 60mm thick heavy duty interlocking
block (M20/20) for foothpath on 50 mm thick crusher dust
over the prepared base etc all complete as per instruction of
engineer
10
for footpath 1.00 393.000 1.500 589.500
For Quarter area
Part 1 1.00 10.700 10.000 107.000
Part 2 1.00 35.000 10.560 369.600
Part 3 1.00 10.000 19.000 190.000
Supplying & laying of Gardening works/turfing(Chinese dubo) 1.00 100.000 1.200 120.000
12 all complete Sqm
13 Installation of flower pots plastic (gamala) No 76.000 76.000 No
14 Installation flowers of different types parmanent trees No 353.000 353.000 No
Installation of plants 0.000
15 Papaya No 1.000 1.000 No
16 Pomegranate No 2.000 2.000 No
17 Lemon No 1.000 1.000 No
18 Orange No 1.000 1.000 No
19 fertilizer(poltry waste)(1 sack equivalent to 50kg rice sack) kg 200.000 200.000 kg
Units Remark
cum
cum
sqm
cum
sqm
cum
sqm
sqm
6.37
18.40
Kg
sqm
Rm
28.26
sqm
sqm
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Road
Division Roads Office, Lahan
District : Siraha Rate Analysis FY 073/074
Total of C #REF!
Total of A, B,C #REF!
Add 15 % Overhead #REF!
Grand total #REF!
Rate per Unit Rs. #REF!
CONCRETE WORK
STEEL WORKS
Tor /TMT Reinforcement work for R.C.C work including
supply,straighting ,cutting,bending ,binding and laying of
different diameter steel rod in all types of R.C.C work as per
design ,drawing ,specification and instruction all complete
work
8
i. Volume of Column Foundation
reinforcement steel @ 1.5% 1.00 31.71 78.500 1.50 3733.58 kg
FORM WORKS
Form work shuttering & centering with MS pipe (prop), 19
9 mm thick plyboard for Arc, beam etc all complete as per
drawing desing and instruction net.
Foundation of Footings 2.00 2.50 5.00 0.20 1.00
Government of Province
Ministry of Physical Infrastructure Development
Province No.2,Janakpurdham
Name of works : h=r'=sf=ln=leqsf] af6f],kf]v/L ,u]6 tyf cGo ef}lts ;+/rgfx?sf] ;f}GboL{s/0f ug]{ sfo{ .
Place : Jankpurdham F.Y: 2076-077
DETAILED ESTIMATE
ENTRANCE GATE
S.N. Items No. Length T.Length Breadth Height Quantity Unit
Beam 4.00 8.40 33.60 0.60 20.16
small pillar 2.00 0.92 1.84 3.30 6.07
big pillar 2.00 1.20 2.40 4.80 11.52
upper arc 2.00 6.00 12.00 0.95 11.40
upper roof 1.00 6.20 6.20 1.50 9.30
lower roof 2.00 2.00 4.00 1.50 6.00
196.36 m2
FINISHING WORKS
12.5 mm thick (1:4) c/s plaster within walls, floors, drains
10 etc. with proper levelling, curing all complete
upper arc 2.00 6.00 12.00 0.95 11.40
upper roof 1.00 6.20 6.20 1.50 9.30
lower roof 2.00 2.00 4.00 1.50 6.00
carnesh 2.00 3.00 6.00 0.30 1.80
85.50 m3
FINISHING WORKS
12.5 mm thick (1:4) c/s plaster within walls, floors, drains
1
etc. with proper levelling, curing all complete
a. Outside Surfaces
Below Plinth Level
Perimeter Wall 1.0 48.090 48.090 0.450 21.640
Front Entry steps 2.0 1.090 2.180 0.300 0.650
Back Entry Steps 2.0 0.500 1.000 0.300 0.300
Above Plinth Level
Perimeter Wall GF 1.0 48.090 48.090 2.700 129.840
Perimeter Wall FF 1.0 48.820 48.820 2.700 131.810
Perimeter of Wall SF 1.0 18.700 18.700 2.475 46.280
Parapet Wall (Terrace) 2.0 39.750 79.500 0.900 71.550
Parapet Wall (Terrace top) 2.0 39.750 79.500 0.300 23.850
Parapet Wall (Roof) 2.0 18.700 37.400 0.900 33.660
Parapet Wall (Roof) 2.0 18.700 37.400 0.300 11.220
Duct Outer 1.0 2.800 2.800 1.000 2.800
Duct Inner 1.0 1.750 1.750 6.750 11.810
Projections
Chajja Bands FF 1.0 50.155 50.155 0.6 30.090
1.0 52.220 52.220 0.375 19.580
Chajja Bands TF 1.0 47.750 47.750 0.6 28.650
1.0 46.680 46.680 0.375 17.500
Chajja Bands RF 1.0 21.100 21.100 0.6 12.660
1.0 23.500 23.500 0.375 8.810
Deduct Openings
DW -1.0 2.090 -2.090 1.960 -4.100
-1.0 1.200 -1.200 0.960 -1.160
D2 -1.0 0.900 -0.900 2.325 -2.100
0.000 -16.0 1.800 -28.800 1.575 -45.360
0.000 0.0 1.200 0.000 1.200 0.000
0.000 0.0 0.800 0.000 0.580 0.000
Sub-Total 549.980 0
b. Inside Surfaces
Living room 4.0 15.630 62.520 2.600 162.550
Bed Room 4.0 16.080 64.320 2.600 167.230
Kitchen 4.0 11.770 47.080 2.600 122.400
Corridor 4.0 5.300 21.200 2.600 55.120
Foyer/ Stair Room 1.0 14.599 14.599 2.600 37.950
1.0 16.679 16.679 2.600 43.360
Toilet 4.0 7.500 30.000 0.800 24.000
Balcony 4.0 6.200 24.800 2.600 64.480
Terrace Room 1.0 16.700 16.700 2.600 43.420
Staircase 4.0 3.540 14.160 0.000 0.000
4.0 3.540 14.160 0.000 0.000
Steps 32.0 0.420 13.440 0.000 0.000
Counter slab at windows 4.0 1.800 7.200 0.700 5.040
Counter slab at Kitchen 4.0 3.000 12.000 0.000 0.000
Deduct Openings
D1 -4.0 1.000 -4.000 2.325 -9.300
D2 -8.0 0.900 -7.200 2.325 -16.740
D3 -4.0 0.750 -3.000 2.100 -6.300
D4 -1.0 0.400 -0.400 1.500 -0.600
Sub-Total 692.610 0
Total Plaster Work (1:4) 1242.590 0
12.5 mm thick (1:3) c/s plaster within ceiling type surfaces
2
etc. with proper levelling, curing all complete
i. Inside surfaces of Building
0.000 0.0 4.300 0.000 2.800 0.000
Government of Province
Ministry of Physical Infrastructure Development
Province No.2,Janakpurdham
Name of works : h=r'=sf=ln=leqsf] af6f],kf]v/L ,u]6 tyf cGo ef}lts ;+/rgfx?sf] ;f}GboL{s/0f ug]{ sfo{ .
Place : Jankpurdham F.Y: 2076-077
DETAILED ESTIMATE
ENTRANCE GATE
S.N. Items No. Length T.Length Breadth Height Quantity Unit
0.000 0.0 4.230 0.000 2.980 0.000
Window Niches 4.0 1.800 7.200 0.815 5.860
0.000 0.0 4.300 0.000 2.700 0.000
0.000 0.0 0.930 0.000 2.850 0.000
0.000 0.0 2.000 0.000 2.550 0.000
0.0 2.970 0.000 2.500 0.000
0.000 0.0 1.350 0.000 2.400 0.000
0.000 0.0 1.200 0.000 1.750 0.000
0.000 0.0 5.720 0.000 2.550 0.000
0.000 0.0 0.000 0.000 1.200 0.000
0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.175 0.000
0.000 0.0 0.000 0.000 0.600 0.000
0.000 0.0 0.000 0.000 0.600 0.000
Windows Sills
0.000 16.0 0.000 0.000 0.375 0.000
0.000 4.0 0.000 0.000 0.375 0.000
0.000 4.0 0.000 0.000 0.375 0.000
Sub-Total 5.860 Sq.m.
ii Outside Surfaces of Building
Entry Lobby 1.0 5.550 5.550 1.200 6.660
0.000
0.000 0.0 0.000 0.000 0.850 0.000
0.000 0.0 0.000 0.000 0.850 0.000
0.000 0.0 0.000 0.000 0.850 0.000
Sub-Total 6.660 Sq.m.
Total Plaster Work (1:3) 12.52 Sq.m.
Cement punning work (1:1) c/s, mixing with color pigments
3 of approved color and patterned, proper mixing, levelling,
curing etc. with instructions of site engineer
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 1.000 0.000
0.0 0.000 0.000 1.000 0.000
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 1.000 0.000
0.000
Sides 0.0 0.000 0.000 4.000 0.000
0.000 0.0 1.250 0.000 0.450 0.000
0.000 0.0 0.000 0.000 4.000 0.000
0.000 0.0 0.000 0.000 2.000 0.000
0.000 0.0 0.000 0.000 0.300 0.000
0.000 0.0 0.000 0.000 0.300 0.000
0.000 0.0 0.000 0.000 0.300 0.000
Terrace 1.0 11.770 11.770 8.850 104.160
-1.0 4.780 -4.780 3.150 -15.060
Wall 1.0 39.750 39.750 0.300 11.920
Wall Top 1.0 40.750 40.750 0.300 12.220
Roof 1.0 5.740 5.740 2.680 15.380
Wall 1.0 17.000 17.000 0.300 5.100
Wall Top 1.0 17.000 17.000 0.300 5.100
0.000 0.0 0.000 0.000 0.150 0.000
0.0 0.000 0.000 0.610 0.000
Front Yard 1.0 21.000 21.000 3.380 70.980
Back Yards 1.0 14.000 14.000 1.500 21.000
Total 230.80 Sq.m.
Glazed / non-glazed tiles work on floors and walls with
4 proper soking, levelling, applying, curing, joints filled with
white cement paste as per instructions all complete
Kitchen floor 4.0 3.200 12.800 2.700 34.560
Entry area to kitchen 4.0 3.000 12.000 0.970 11.640
Kitchen Counter slab 4.0 4.200 16.800 1.300 21.840
Toilet / Bath floor 4.0 1.350 5.400 2.250 12.150
Toilet / Bath wall 4.0 7.200 28.800 1.800 51.840
Total 132.03 Sq.m.
Skirting work (20mm thick plaster 1:3 and punning with
5 color pigment mix 150mm high) on walls with proper
finishing, line and level all complete
0.000 0.0 0.000 0.000 0.150 0.000
Government of Province
Ministry of Physical Infrastructure Development
Province No.2,Janakpurdham
Name of works : h=r'=sf=ln=leqsf] af6f],kf]v/L ,u]6 tyf cGo ef}lts ;+/rgfx?sf] ;f}GboL{s/0f ug]{ sfo{ .
Place : Jankpurdham F.Y: 2076-077
DETAILED ESTIMATE
ENTRANCE GATE
S.N. Items No. Length T.Length Breadth Height Quantity Unit
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
2.0 2.550 5.100 0.150 0.760
0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
0.000 0.0 0.000 0.000 0.150 0.000
Total 0.76 Sq.m.
Two coats of weather proof (Apex) paint painting work
6 outer faces of building, within walls, floors, ceilings etc of
approved brand as per instruction of site engineer
Area equal to Outer Surface Plaster 556.64 Sq.m.
Two coats of water proof cement paint painting work in
7 inner faces of building, within walls, floors, ceilings etc of
approved brand and color as per instruction of site engineer
Area equal to Inner Surface 698.47 Sq.m.
Two coats of enamel Paint within doors / windows surfaces
8 of approved color as per instructions Factor
Door DW 1.0 2.090 2.090 2.200 1.960 9.012
2.0 1.200 2.400 2.200 0.600 3.168
Doors D1 4.0 1.000 4.000 2.200 2.325 20.460
Doors D2 9.0 0.900 8.100 2.200 2.325 41.431
Doors D3 4.0 0.750 3.000 2.200 2.100 13.860
Doors D4 2.0 0.400 0.800 2.200 1.500 2.640
Window W1 16.0 1.800 28.800 2.200 1.575 99.792
Window W2 4.0 1.200 4.800 2.200 1.200 12.672
Window W3 4.0 0.800 3.200 2.200 0.600 4.224
Total 207.259 Sq.m.
MISCELLANEOUS WORKS
Supplying and fixing mild steel grills made with two coats
9
of enamel paint within openings all complete
0.000 2.0 0.000 0.000 0.520 0.000
2.0 1.210 2.420 0.440 1.060
0.000 0.0 0.850 0.000 0.325 0.000
0.000 5.0 0.780 3.900 0.325 1.260
0.000 0.0 0.000 0.000 0.000
0.000 0.0 0.000 0.000 0.000
0.000 0.0 0.000 0.000 1.575 0.000
0.000 0.0 0.000 0.000 1.200 0.000
0.000 0.0 0.000 0.000 0.600 0.000
Total 2.32 Sq.m.
Total Weight @ 30kg/m2 69.600 Kg