Bill of Quantities(FIAP)

S.No Particulas Quantity Unit

Dismantling of Existing Pavment

1 Removal of pavement 105927 m³

2 excavation Unclassified / Surplus Material 101997 m³

Rigid Pavement (Main runway ,Turn Pads & Apron etc)

1 Sub Grade 146170 m²

2 Sand Cushion 43851 m³

3 Aggregate Base 21926 m³

4 Lean Concrete 21926 m³

5 PQC 82730 m³

6 Stell 60 Gade 1068 Ton

7 Contraction Joints 51325 M

8 Expansion Joints 5775 M

9 Red Oxide of Steel 5022 m²

Flexible Pavemet (Shoulder ,Overrun & Thickness Etc)

1 Sub Grade 76879 m²

2 Sand Cushion 23064 m³


3 Granlar Sub Base (old Material) 7536 m³

4 Granlar Sub Base (New Material) 3996 m³


5 Aggregate Base Course 11532 m³

6 Prime Coat Emulsified Asphalt 76879 m²

7 Asphalt Base 5766 m³

8 Take Coat Emulsified Asphalt 76879 m²

9 Asphalt Wearing 3844 m³

Pavement Marking

1 Marking with water Based Emulsion 14536 m²

Storm Water Drain & Culvert

1 Structural Excavation in Common Material 57379 m³

2 Lean Concrete 2849 m³


3 Concrete (Minimum 3000 Psi) 1010 m³

4 Precast Concrete (Minimum 3000 Psi) 15 m³

5 Stell 60 Gade 109 Ton

6 Water Stops 8" Size 19000 M

7 Ms Iron Grating 7191 Kg

8 MS safety step 6870 Kg

9 Expansion Joints 2075 M

10 Bitumen grade 60~70 65008 m²

11 Granula Backfill 16751 m³

12 Brick Masonry 20869 m³

13 Plaster 13mm 36027 m²