P-48 90 J3 J4 21
P-49 90 J4 J35 22 43 30.401 2.58
498
744
1036
2054.23
width Trench Bedding Pipe Volu Backfill
0.8 318.72 39.84 15.64513
0.74 407.4144 55.056 11.45299
0.71 522.2476 73.556 9.845437
0.675 935.8538 138.645 9.074294
2184.236 307.097 46.01785 1831.121
BILL-Pipe Supply & Laying (Pipe Work) For DhagahleyKebele
Item Descriptoin Unit QTY Unit Rate Amount
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 40mm PN 10,PE100 ml 364.00
1.02 HDPE pipe OD 50mm PN 10,PE100 ml 278.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 Stub flange but weld DN 50mm Pcs 1
2.02 Backing ring flanged 50mm Pcs 4
2.03 Bolt, nut and washer M-24 Pcs 4
2.04 DCI double flanged Pipe, L= 6m, DN 110 mm Pcs 4
2.05 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 110 mm 2
2.06 Stub flange but weld DN 110mm Pcs 3
2.07 Backing ring flanged 110mm Pcs 3
2.08 Bolt, nut and washer M-24 Pcs 98
2.09 Bend 90°, DCI, DN 100 mm Pcs 2
2.10 45o Elbow 40x40mm Pcs 2
2.11 Tee Equal butt weld 50x50mm Pcs 1
2.12 Reducer butt weld 110x50mm Pcs 2
2.13 Reducer butt weld 50x40mm Pcs 2
2.14 Welding point 50 mm Fitting WP 3
2.15 Welding point 40 mm Fitting WP 2
2.16 Welding point 110 mm Pipe 2
2.17 Welding point 50 mm Pipe WP 6
2.18 Welding point 40 mm Pipe WP 2
2.19 Laying and installation of 63mm pipe ml
2.20 Laying and installation of 40mm pipe ml 364.00
2.21 Laying and installation of 50mm pipe ml 278.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 392.64
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 354.12
3.50 10cm thick Bedding by selected materials for the whole
m3 38.52
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No 2
Tees etc
445.053
BILL-Pipe Supply & Laying (Pipe Work) For Irresaa Kebele
Item Descriptoin Unit QTY Unit Rate Amount
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 180mm PN 10,PE100 ml 403.00
1.02 HDPE pipe OD 125mm PN 10,PE100 ml 377.00
1.03 HDPE pipe OD 90mm PN 10,PE100 ml 249.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 Stub flange but weld DN 180mm Pcs 1
2.02 Backing ring flanged 150mm Pcs 1
2.03 Bolt, nut and washer M-24 Pcs 12
2.05 90o Elbow 125x125mm Pcs 1
2.06 Tee Reducer butt weld 180x125x180mm Pcs 1
2.07 Reducer butt weld 180x90mm Pcs 1
Reducer butt weld 125x90mm Pcs 1
2.07 Welding point 180 mm Fitting WP 2
Welding point 125 mm Fitting WP 3
2.08 Welding point 90 mm Fitting WP 2
2.09 Welding point 180 mm Pipe WP 34
Welding point 125 mm Pipe WP 32
2.10 Welding point 90 mm Pipe WP 9
2.11 Laying and installation of 180mm pipe ml 403.00
2.12 Laying and installation of 125mm pipe ml 377.00
2.13 Laying and installation of 90mm pipe ml 249.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 568.80
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 493.82
3.50 10cm thick Bedding by selected materials for the whole
m3 74.99
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No