All slabs are two-way slabs
Live load calculation (L.L) WL = 3 kN/m2
Dead load calculation (D.L) and Superimposed dead load (SDL)
Weight of gypsum plastering = 0.02 * 13.5 = 0.27 kN/m2
Weight of slab = 24 * t = 24 * 150 = 3.6 kN/m2
Weight of tiles with mortar = ( 0.02 * 0.03 ) * 23 = 1.15 kN/m2
Wd = 5.02 kN/m2
Wu = 5.02 * 1.2 + 3 * 1.6 = 10.824 kN/m2
WuL=3*1.6=4.8 kN/m2
WuD=5.02 * 1.2= 6.024 kN/m2
La = 4 m; Lb = 4 m ; m = 1 ; ∅ = 0.9;
d short = t- cover – db/2 (cover =20 mm , db = 12mm) = 150-20-12/2 = 124mm
La=Lb direction:
2
R = M / ∅ *b*d *fc’ = 9.3672*1000000/0.9*1000*124*124*25 = 0.0271