Career Objectives - To be quality Leading & Efficient Telecom Specialist in today's growing Industry and to be an efficient
Telecom Professional equipped with skills to work in team, lead & manage team work.
A competent professional with lead role with 3 years & 6 months of experience in
Skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables.
Sound knowledge of installation, integration and commissioning of BTS and transmission equipments.
Expose of Managing large Turnkey and Swap projects for various operators.
Supervised the support, installation and commissioning of 3G/WCDMA/GSM/CDMA/SDH/PDH.
Abstract Presently working as a Cluster Project Lead for ZTE Telecom India Pvt. Limited.
AREAS OF EXPOSURE
Project co-ordination / Site Management
Planning and affecting the preventive maintenance schedules of telecom equipments to increase equipment reliability hence
reducing Outage.
Providing technical support / training to team clients for resolving critical technical issues.
Commissioning and Integration of Various GSM and Transmission Equipments
Submitting field technical complaints, and get it resolved
Identifying performance bottlenecks and taking adequate measures to rectify faults.
Follow-up BTS Site Folder and AT Certificates with NIL Punch Point.
Technical Support for Transmission, BTS.
Installation Commissioning and Integration of ZTE (2G & 3G), Ericsson (900 & 1800).
PRESENT ASSIGNMENT
Projects Undertaken
PREVIOUS ASSIGNMENTS
1----
Projects Undertaken
S Tel , Agartala - BTS Engineer.
Troubleshooting of Alarms in ZTE NODE B and ZXSDR BS8800 BTS within the allotted time.
Commissioning and Reconfiguration of ZTE 2G & 3G BTS (ZXSDR BS8800).
Rehoming of 3G sites (From one RNC to another RNC) and 2G sites (From one BSC to another BSC).
Providing Field level support for different Transmission Equipments-FIBCOM , CERAGON PDH & SDH.
Co-coordinating with NOC, Transmission and RF Team to clear the Alarms and to close the TT (Trouble Ticket).
Directs the development required project plan documentation identifying project goals and tasks and generating
assignments consistent to meet timely output. Ensures change management procedures, including evaluation and
communication processes, are established and followed for project duration and periodic audit of the same.
Use of Diplexers.
Maintains clear communication with customers regarding mutual expectations, and seeks to improve customer satisfaction.
Maintains established business relationships beyond the project environment, both horizontally and vertically.
Correct Radio network faults in and performance degradations as per requirements.
Execution of BSS corrective/preventive maintenance activities
Responsible for co-operating with the technical support (upgrades, faults) of 3rd party equipment and Care
Support to the remote and on-site restoration of network element functionality as defined in the agree escalation plan
Major Networks Elements supported are BSC, BTS, microwave radios of ZTE ,FIBCOM and CERAGON technologies
2-----
Projects Undertaken
Commissioning & Troubleshooting of ML Traffic Node 2P, 6P and 20P. ML High-Cap (STM-1), ML-E in 1+0, 1+1 hot
standby and working standby Configurations.
Providing media for migration of working sites from one BSC to another BSC.
Commissioning & troubleshooting of Ericsson BTS of all types indoor, outdoor, Micro BTS(RBS2204, 2204V2, 2206,2206V2,
2111, 2964,2964V2 2954,)
Commission of various cascaded sites and Integration of sites. Complete knowledge of site.
Cabinet expansion (indoor, outdoor) of sites.
TRX (EDTRU, DTRU, RRU&DRU) and TMA addition as per requirement of sites.
Sector addition as per requirement of sites.
Alarm defining, colour coding of wires.
Hop up-gradation.
Commissioning & Troubleshooting AXX 9100(Connect 2xstm1 Mux with32 E1s drop), AXX9200(Edge 8xstm1 Mux with 63
E1s drops)
Commissioning & Troubleshooting of DXX Tellabs 6320 ADM(add drop multiplexer with 21 E1s drop)
Commissioning of PDH and SDH links in Chain as well as Ring topology.
Implementation of Dual band (GSM 900, 1800) sites with TMA
Complete Quality Audit of an AirTel site (within Ericssons scope/operational point of view), which reflects the Quality index of
a Vendor.
3-----
Projects Undertaken
TECHNICAL PREVIEW
o Formation of Protection Mechanisms,1+1 Radio Protection, 1+1 E1 SNCP, Ring protection, Redundancy.
o BTS Commissioned- RBS (2204, 2204V2, 2204V3, 2206, 2206V2, 2964, 2964V2 2954, 2111) Used OMT.
o Cascading- Distribute the E1 in BTS.
o Commission Mini-Link- High Capacity SDH Hops for STM-1 Transmission.
o Configured of Mini-link E and Mini-link Traffic Nodes (2P, 6P and 20P).
o Routing the E1 for new BTS sites and checking loop back from OMCR.
o E1 Throw - Used D4 connectors and E1s connectors.
o Alignment- Ericsson micro wave antenna hops (1.8m, 1.2m, 0.6m, and 0.3m).
o Alarms Testing-Generated in the Cell Site and coordination of NOC/OMC.
o Site Masters (VSWR, Return loss, DTF, Power Measuring) by Bird and Anritsu.
o Winlink 1000 Manager for WiMax Point to Point Link.
o OMT (Operation and Maintenance Terminal), ZTE GU LMT.
o MSM 6.5 (Mini link Service Manager).
o Mini Link Craft 1.1.
o TELLABS 6300 Extended Craft Terminal.
o AXX craft terminal, DXX craft terminal, Mini-link PTP high capacity tool.
EDUCATIONAL CREDENTIALS
PERSONAL VITAE
Date of Birth 10thApril, 1986
Marital Status Single
Passport No H5525809
Address Vill Balarampur, Dist Allahabad,Utter Pradesh,India
(SACHIN KUMAR)