Contents
1 Scope ............................................................. 2
2 Conflicts and Deviations ................................. 2
3 References ..................................................... 2
4 Definitions and Abbreviations ......................... 4
5 General Requirements ................................... 5
6 Modification to Industry Standard ................... 6
7 Inspection and Testing Requirements .......... 10
8 Other Miscellaneous Requirements ............. 11
1 Scope
This specification, together with Instrument Specification Sheet and Saudi Aramco
Library Drawing defines the minimum mandatory requirements for onshore
Atmospheric Portable Tank Prover used to calibrate royalty/custody transfer meters in
truck loading and unloading operations, air fueling and defueling operations, and
dispensing operations, and in rail car loading and unloading operations.
This entire specification may be attached to and made a part of purchase orders.
2.1 Any conflicts between this document and other applicable Mandatory Saudi
Aramco Engineering Requirements (MSAERs) shall be addressed to the
EK&RD Coordinator.
2.2 Any deviation from the requirements herein shall follow internal company
procedure SAEP-302.
3 References
Material or equipment supplied to this specification shall comply with the latest edition
of the references listed below, unless otherwise noted.
4.1 Definitions
Buyer's Representative: The person acting on behalf of the buyer, who may be
from the Engineering, Inspection, Purchasing, or user organization.
Nearshore: Any outdoor, onshore location within one kilometer from the
shoreline of the Arabian Gulf; all of the Ras Tanura Refinery and Terminal; and
within three kilometers from the shoreline of the Red Sea.
SAMSS, the Third Party Inspector has particular knowledge of and experience
with industry custody measurement standards and procedures.
Vendor: The party that supplies or sells integrated metering systems, metering
equipment, or components.
4.2 Abbreviation
API MPMS American Petroleum Institute, Manual on Petroleum
Measurement
ASME American Society of Mechanical Engineers
IEC International Electrotechnical Commission
ISS Instrumentation Specification Sheet
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Agency
SAEP Saudi Aramco Engineering Procedure
SAES Saudi Aramco Engineering Standards
SAMSS Saudi Aramco Materials System Specifications
SASD Saudi Aramco Standard Drawings
5 General Requirements
5.1 Application
5.4.1 The vendor shall supply a complete atmospheric portable tank prover
System that includes the following major components as a minimum:
Tank prover
Trailer with spare tire (for atmospheric portable tank prover)
Pump
Grounding cables
Hoses
Couplers
Temperature sensors
5.4.2 The vendor shall provide all tools and accessories required for operation,
maintenance of the tank prover and trailer.
The atmospheric portable tank prover system and associated equipment shall be
suitable for installation in the applicable environment specified in SAES-A-112
and shall meet the environmental requirements specified in 34-SAMSS-831.
(Addition-1) All piping associated with the tank prover shall be designed
and constructed in accordance with ASME B31.3 and furnished in
accordance with the information specified on the Instrument Specification
Sheet (ISS), Form SA-8020-122 and library drawing number DC-950599.
(Addition-4) Tank prover shall be furnished with an inlet hose and inlet hose
adapter and an outlet hose and outlet hose coupler for connection of the
prover to the meter under test. The hoses, adapter and coupler shall meet the
requirements of API RP 1004.
(Addition-5) Tank prover shall have top and bottom graduated necks with
pump assembly.
The full trailer shall be equipped with a tow-bar and a means of attaching the
tow-bar to the towing and towed vehicles. The two-bar and the means of
attaching it shall meet the following:
- They shall be of structure adequate to withstand the weight being drawn.
- They shall be properly and securely mounted.
- They shall be provided with a locking device that prevents accidental
separation of the towed and towing vehicles. The mounting of the trailer
hitch on the towing vehicle shall include reinforcement or bracketing of
the frame sufficient to produce strength and rigidity of the frame to prevent
its undue distortion.
(Modification-1) Each tank prover shall be furnished with upper and lower
necks or upper neck only with bottom drain. The upper neck shall be provided
with an inverted splash cone for use with top loading metering systems.
(Modification-1) Each tank prover shall have a volume equal to twice the
maximum volume that can pass through the meter in one minute [maximum
continuous flow rate (capacity) x 2 minutes].
7.1 Inspection
The vendor shall implement and maintain a quality program which shall include
clearly defined and documented procedures for the relevant Quality System
functions. The Quality Program documents shall be made available to the buyer
representative for review and audit.
7.3 Hydrotest
Hydrotest shall be performed on tank shell and all tank prover piping prior to the
application of internal coating and external painting. The test shall be
performed per manufacturer procedures. A copy of hydro test certificate shall
be part of shipping package.
7.4 Calibration
8.1 Identification
8.2.1 General
All equipment and internals being shipped shall be braced and temporary
supports shall be provided, if required, to prevent damage during shipment.
All bolts, nuts and the faces of open flanged connections shall be coated
with temporary protective coating. Permanent blind flanges or covers
shall be installed with the gaskets and bolts required for service.
Each connection shall be fitted with a neoprene gasket, and vapor tight
steel cover. The cover shall be held in place by a minimum of four
equally spaced bolts.
Revision Summary
4 July 2016 Major revision for following reasons:
1. To apply overlay format.
2. To include calibration of Royalty Transfer Meter in bulk plan operation.
2 May 2019 Editorial revision as part of content confirmation