Sei sulla pagina 1di 71

DAFTAR PENGENAAN PAJAK

Nama Kegiatan : Pembangunan Desa


Lokasi : Area Balai Desa Punten
Tahun Anggaran : 2019
Harga Sblm Pajak DPP PPN PPh Psl 22 Total Pajak
No Bahan Sat.
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
(100/110)*4 10% * 5 1,5% * 5 6+7
BAHAN
1 Pasir Urug m³ 125,000 125,000
2 Pasir Pasang m³ 210,000 210,000
3 Batu Kali m³ 195,000 195,000
4 Portland Cement zak 51,000 46,364 4,636 695 56,400
5 Koral m³ 240,000 218,182 21,818 3,273 265,100
6 Besi Ø8" ljr 51,000 46,364 4,636 695 56,400
7 Besi Ø12" ljr 86,000 78,182 7,818 1,173 95,000
8 Besi Beton kg 10,500 9,545 955 143 11,600
9 Kawat Beton kg 20,000 18,182 1,818 273 22,100
10 PVC Ø1.1/4" m¹ 7,500 6,818 682 102 8,300
11 Kayu Kelas II m³ 3,000,000 2,727,273 272,727 40,909 3,313,700
12 Kayu Kelas III m³ 1,150,000 1,045,455 104,545 15,682 1,270,300
13 Paku Biasa 2"-5" kg 20,000 18,182 1,818 273 22,100
14 Plywood Tebal 9 mm lbr 120,000 109,091 10,909 1,636 132,600
15 Kayu Dolken 4m' btg 8,500 7,727 773 116 9,400
16 Cat Dinding Setara Jotun kg 68,000 61,818 6,182 927 75,200
17 Plamir Dinding kg 20,000 18,182 1,818 273 22,100
18 Bata Merah 5x11x22 bh 620 564 56 8 700
19 Plastik Polythene m² 1,900 1,727 173 26 2,100
20 Bend Knee GI 3" m² 40,000 36,364 3,636 545 44,200
21 Galvalume C-75 , 0.8 m¹ 15,000 13,636 1,364 205 16,600
22 Galvalume C-75 , 0.6 m¹ 12,500 11,364 1,136 170 13,900
23 Baut (screw driver) bh 400 364 36 5 500
24 Dynabolt bh 3,500 3,182 318 48 3,900
25 Reng Galvalume 0,45 m¹ 6,333 5,757 576 86 7,000
26 Talang jurai m¹ 27,600 25,091 2,509 376 30,500
27 Besi Profil WF kg 12,000 10,909 1,091 164 13,300
28 Kawat Las Listrik kg 23,500 21,364 2,136 320 26,000
29 Solar ltr 6,500 5,909 591 89 7,200
30 Minyak Pelumas ltr 45,000 40,909 4,091 614 49,800
31 Sewa Las Listrik jam 50,000 45,455 4,545 682 55,300
32 Hollow 0,4 m¹ 6,900 6,273 627 94 7,700
33 Hollow 0,2 m¹ 5,200 4,727 473 71 5,800
34 Genteng eks. Karang Pilang bh 5,200 4,727 473 71 5,800
35 Gypsumboard 9 mm lbr 71,000 64,545 6,455 968 78,500
36 Bubungan Genteng eks. Karang Pilang bh 5,000 4,545 455 68 5,600
37 Ubin Warna 40 x 40 bh 11,667 10,606 1,061 159 12,900
38 Semen Warna kg 12,000 10,909 1,091 164 13,300
39 Kusen Aluminium Profil 4" Brown m¹ 100,000 90,909 9,091 1,364 110,500
40 Slimar jendela Alumunium Profil 3/8" mo m¹ 160,000 145,455 14,545 2,182 176,800
41 Slimar Pintu Alumunium m¹ 180,000 163,636 16,364 2,455 198,900
42 Kisi kisi aluminium 10 cm m¹ 80,000 72,727 7,273 1,091 88,400
43 Sealant Tube 37,000 33,636 3,364 505 40,900
44 Kalsiplang l=30cm t=9mm m¹ 20,100 18,273 1,827 274 22,300
45 Kalsiplang l=20cm t=9mm m¹ 14,700 13,364 1,336 200 16,300
46 Paku Skrup kg 47,400 43,091 4,309 646 52,400
47 Seng galvalum 0,3 lebar 60 cm m¹ 36,500 33,182 3,318 498 40,400
48 Besi Strip kg 8,200 7,455 745 112 9,100
49 Meni kg 35,000 31,818 3,182 477 38,700
50 Cat Kayu kg 59,000 53,636 5,364 805 65,200
51 Kuas bh 20,000 18,182 1,818 273 22,100
52 Thinner A Spesial ltr 45,000 40,909 4,091 614 49,800
53 Amplas lbr 10,000 9,091 909 136 11,100
54 Plamir Kayu kg 35,000 31,818 3,182 477 38,700
55 Pintu Kayu Kuputarung unit 2,100,000 1,909,091 190,909 28,636 2,319,600
56 Pintu Kayu Single unit 1,500,000 1,363,636 136,364 20,455 1,656,900
57 Jendela Kayu Single unit 450,000 409,091 40,909 6,136 497,100
58 Jendela Kayu Double unit 600,000 545,455 54,545 8,182 662,800
59 Daun Pintu Kaca unit 1,500,000 1,363,636 136,364 20,455 1,656,900
60 Engsel Pintu unit 37,000 33,636 3,364 505 40,900
61 Kunci Pintu unit 57,500 52,273 5,227 784 63,600
62 Door Closer unit 450,000 409,091 40,909 6,136 497,100
63 Spigot m¹ 11,000 10,000 1,000 150 12,200
64 Karet m¹ 2,500 2,273 227 34 2,800
65 Kaca Rayban 5 mm m² 110,000 100,000 10,000 1,500 121,500
66 Engsel Casement 10" bh 25,000 22,727 2,273 341 27,700
67 Grendel Jendela bh 21,000 19,091 1,909 286 23,200
68 Hak Angin bh 20,500 18,636 1,864 280 22,700
69 Grendel Pintu Tanam bh 110,000 100,000 10,000 1,500 121,500
70 Batu Tempel Alur m² 150,000 136,364 13,636 2,045 165,700
71 Mortar zak 115,000 104,545 10,455 1,568 127,100
72 Bata Ringan 10 x 20 x 60 m³ 700,000 636,364 63,636 9,545 773,200
73 Bata Ringan 10 x 20 x 60 bh 8,400 7,636 764 115 9,300
74 Saklar Tunggal ex. Broco bh 19,050 17,318 1,732 260 21,100
75 Kabel NYA 1 x 2,5 ex. Supreme m¹ 5,100 4,636 464 70 5,700
76 Kabel NYA 1 x 1,5 ex. Supreme m¹ 4,650 4,227 423 63 5,200
77 Pipa Pralon 5/8 m¹ 3,500 3,182 318 48 3,900
78 T Doos Pvc bh 3,200 2,909 291 44 3,600
79 Fiting Plafond ex. Broco bh 27,000 24,545 2,455 368 29,900
80 Klem Pipa 5/8 bh 750 682 68 10 900
81 Lampu bh 89,000 80,909 8,091 1,214 98,400
82 Stop Kontak ex. Broco bh 63,600 57,818 5,782 867 70,300
83 List Gypsum m¹ 18,000 16,364 1,636 245 19,900
84 Cat Exterior Setara Dulux kg 86,000 78,182 7,818 1,173 95,000
85 Roll Cat bh 25,000 22,727 2,273 341 27,700
86 Pipa PVC AW θ 4" m¹ 25,000 22,727 2,273 341 27,700
87 Rooster bh 35,000 31,818 3,182 477 38,700
88 Asbes Gelombang Tb.5 mm (1.8 x 0.92) lbr 75,500 68,636 6,864 1,030 83,400
89 Paku Payung kg 25,000 22,727 2,273 341 27,700
90 Closet Jongkok bh 275,000 250,000 25,000 3,750 303,800
91 Bak Mandi Fiber Glass bh 337,000 306,364 30,636 4,595 372,300
92 Floor Drain bh 35,000 31,818 3,182 477 38,700
93 Pipa PVC AW Ø 3/4" m¹ 17,000 15,455 1,545 232 18,800
94 Kran Air bh 36,000 32,727 3,273 491 39,800
95 Sealtape bh 5,500 5,000 500 75 6,100
96 Pagar Hollow bh 400,000 363,636 36,364 5,455 441,900
97 Atap Kanopi Hollow bh 450,000 409,091 40,909 6,136 497,100
98 Atap Kanopi Hollow bh 62,500 56,818 5,682 852 69,100
ANALISA HARGA SATUAN PEKERJAAN

Propinsi : Jawa Timur


Kabupaten : Sidoarjo
Kecamatan : Tulangan
Desa : Punten

AHSP PUPR NO. 28 Th. 2016


I. 1 m² Pembongkaran Atap tidak dipakai kembali (an. HSPK PROP JATIM 2005 A III.15.004)
Upah
0.0375 OH Mandor @ Rp.
0.075 OH Pekerja @ Rp.

I. 1 m² 1 m² Pekerjaan Pembongkaran Penutup Atap Dipakai Kembali(an. HSPK PROP JATIM 2005 A III.15.004)
Upah
0.075 OH Mandor @ Rp.
0.750 OH Pekerja @ Rp.

I. 1 m² 1 m³ Pekerjaan Pembongkaran Beton Bertulang (SNI 03-2835-2002 Analisa Biaya Konstruksi Bangunan Gedung)
Upah
0.333 OH Mandor @ Rp.
6.667 OH Pekerja @ Rp.

II. 1 m³ Pembongkaran Dinding Tembok Bata Merah (SNI 03-2835-2002 Analisa Biaya Pek. Persiapan (6.14))
Upah
0.0333 OH Mandor @ Rp.
1.625 OH Pekerja @ Rp.

A. PEKERJAAN TANAH
1.A 1 m³ Galian Tanah Biasa ( A.2.3.1.1 )
Tenaga
0.750 OH Pekerja @ Rp.
0.025 OH Mandor @ Rp.

1.B 1 m³ Galian Tanah Keras ( A.2.3.1.4 )


Tenaga
1.000 OH Pekerja @ Rp.
0.032 OH Mandor @ Rp.

2 1 m³ Pengurugan dengan Pasir Urug ( A.2.3.1.11 )


Bahan
1.200 m³ Pasir Urug @ Rp.
Tenaga
0.300 OH Pekerja @ Rp.
0.010 OH Mandor @ Rp.

Total Upah dan Bahan


B. PEKERJAAN PASANGAN
3.A 1 m³ Pasangan Pondasi Batu Belah Camp. 1 SP : 5 PP ( A.3.2.1.3 )
* Konversi Semen dari kg ke zak
Bahan
1.200 bh Batu Belah @ Rp.
3.400 Zak Portland Cement @ Rp.
0.544 m³ Pasir Pasang @ Rp.

Tenaga
1.500 OH Pekerja @ Rp.
0.750 OH Tukang @ Rp.
0.075 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.

Total Upah dan Bahan


3.B 1 m² Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 Bata camp 1:4 ( A.4.4.1.4 )
* Konversi Semen dari kg ke zak
Bahan
140.000 bh Bata Merah @ Rp.
0.555 zak Portland Cement @ Rp.
0.102 m³ Pasir Pasang @ Rp.

Tenaga
0.600 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.020 OH Kepala Tukang @ Rp.
0.030 OH Mandor @ Rp.

Total Upah dan Bahan


4 10 kg Pembesian Dengan Besi Polos atau Besi Ulir ( A.4.4.1.17 )
* Konversi ke /1 kg
Bahan
1.050 kg Besi Beton Polos / Ulir @ Rp.
0.015 kg Kawat Beton @ Rp.

Tenaga
0.007 OH Pekerja @ Rp.
0.007 OH Tukang @ Rp.
0.0007 OH Kepala Tukang @ Rp.
0.0004 OH Mandor @ Rp.

Total Upah dan Bahan


5 1 m² Bekisting untuk Sloof & Ring Balk ( A.4.1.1.21 )
Bahan
0.045 m³ Kayu Kelas III @ Rp.
0.300 kg Paku 5 cm - 10 cm @ Rp.
0.100 ltr Minyak Bekisting @ Rp.

Tenaga
0.520 OH Pekerja @ Rp.
0.260 OH Tukang @ Rp.
0.026 OH Kepala Tukang @ Rp.
0.026 OH Mandor @ Rp.

Total Upah dan Bahan


6 1 m² Bekisting untuk Kolom ( A.4.1.1.22 )
Bahan
0.040 m³ Kayu Kelas III @ Rp.
0.400 kg Paku 5 cm - 10 cm @ Rp.
0.200 ltr Minyak Bekisting @ Rp.
0.015 m³ Balok Kayu Kelas II @ Rp.
0.350 lbr Plywood Tebal 9 mm @ Rp.
2.000 btg Dolken Kayu Ø 8-10 cm Panj. 4 m' @ Rp.

Tenaga
0.660 OH Pekerja @ Rp.
0.330 OH Tukang @ Rp.
0.033 OH Kepala Tukang @ Rp.
0.033 OH Mandor @ Rp.

Total Upah dan Bahan


7 1 m³ Pasang Bekisting untuk Lantai (Analisa SNI 2010 PB. 6.32)
Bahan
0.040 m³ Kayu Sembarang @ Rp.
0.400 kg Paku Biasa 2" - 5" @ Rp.
0.200 ltr Minyak Bekisting @ Rp.
0.015 m³ Balok Kayu Sembarang @ Rp.
0.350 lbr Plywood tebal 9 mm @ Rp.
6.000 btg Kayu Dolken @ Rp.

Upah
0.320 Oh Pekerja @ Rp.
0.330 Oh Tukang @ Rp.
0.033 Oh Kepala Tukang @ Rp.
0.006 Oh Mandor @ Rp.

Total Upah dan Bahan


8 1 m³ Beton 1 PC : 2 PS : 3 KR ( Analisa SNI 2016 ; B.01.c )
* Konversi Semen dari kg ke zak
Bahan
5.675 m³ Portland Cement @ Rp.
0.618 m³ Pasir @ Rp.
0.744 m³ Koral @ Rp.

Tenaga
1.320 OH Pekerja @ Rp.
0.220 OH Tukang @ Rp.
0.022 OH Kepala Tukang @ Rp.
0.013 OH Mandor @ Rp.

Total Upah dan Bahan


9 1 m² Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1/2 Bata camp 1:4 ( A.4.4.1.9 )
* Konversi Semen dari kg ke zak
Bahan
70.000 bh Bata Merah @ Rp.
0.288 zak Portland Cement @ Rp.
0.043 m³ Pasir Pasang @ Rp.

Tenaga
0.300 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.

Total Upah dan Bahan


10 1 m² Pemasangan Dinding Bata Ringan t : 10 cm dengan Mortar siap Pakai ( A.4.4.1.26 )
Bahan
8.400 bh Bata Ringan @ Rp.
0.063 zak Mortar @ Rp.

Tenaga
0.671 OH Pekerja @ Rp.
0.810 OH Tukang @ Rp.
0.130 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


NB. : 1 m³ Bata Ringan = Rp. 742.500,- (Include Pajak)
Vol. 1 bh Bata Ringan =
Tebal =
Lebar =
Panjang =
Volume =

Jadi 1 m³ Bata Ringan =


1 m³ / Vol. 1 bh Bata Ringan
= 83.333333
jadi 1 bh Bata Ringan harganya =
= Rp 9,278.40
C. PEKERJAAN FINISHING DINDING
11 1 m² Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm ( A.4.4.2.4 )
* Konversi Semen dari kg ke zak
Bahan
0.156 zak Portland Cement @ Rp.
0.024 m³ Pasir Pasang @ Rp.

Tenaga
0.300 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.

Total Upah dan Bahan


12 1 m² Finishing Siar Pas. Batu Belah 1 : 2 ( A.4.4.2.26 )
* Konversi Semen dari kg ke zak
Bahan
0.1585 zak Portland Cement @ Rp.
0.0120 m³ Pasir Pasang @ Rp.

Upah
0.300 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.

Total Upah dan Bahan


13 1 m² Pekerjaan Acian ( A.4.4.2.27 )
* Konversi Semen dari kg ke zak
Bahan
0.081 zak Portland Cement @ Rp.

Tenaga
0.200 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.010 OH Mandor @ Rp.

Total Upah dan Bahan


14 1 m¹ Pekerjaan Benangan / Tali Air
* Konversi Semen dari kg ke zak
Bahan
0.100 zak Portland Cement @ Rp.

Tenaga
0.050 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.010 OH Mandor @ Rp.

Total Upah dan Bahan


D. PEKERJAAN ATAP
21 1 m³ Pemasangan Konstruksi Gordeng (SNI 2016 ; 4.6.1.15)
Bahan
1.100 m³ Balok Kayu @ Rp.
15.000 kg Besi Strip @ Rp.
3.000 kg Paku 12 cm @ Rp.

Tenaga
6.700 OH Pekerja @ Rp.
20.100 OH Tukang @ Rp.
2.010 OH Kepala Tukang @ Rp.
0.335 OH Mandor @ Rp.

Total Upah dan Bahan


22 1 m² Pemasangan Kaso + Reng Genteng Kodok (SNI 2002 ; 6.31 )
Bahan
0.012 m³ Kaso + Reng @ Rp.
0.150 kg Paku 12 cm @ Rp.

Tenaga
0.100 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.100 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.

Total Upah dan Bahan


15 1 m² Pemasangan Rangka Atap Galvalume untuk Genteng Metal atau Biasa
Bahan
1.488 m¹ Galvalume C-75 , 0.8 @ Rp.
2.232 m¹ Galvalume C-75 , 0.6 @ Rp.
38.000 bh Baut (screw driver) @ Rp.
1.600 bh Dynabolt @ Rp.
5.400 m¹ Reng Galvalume 0,45 @ Rp.
0.124 m¹ Talang jurai @ Rp.

Tenaga
0.200 OH Pekerja @ Rp.
0.450 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.050 OH Mandor @ Rp.

Total Upah dan Bahan


16 1 kg Pasang Besi Profil (Analisa SNI 2016 4.2.1.1)
Bahan
1.150 kg Besi Profil @ Rp.

Upah
0.060 Oh Pekerja @ Rp.
0.060 Oh Tukang @ Rp.
0.006 Oh Kepala Tukang @ Rp.
0.006 Oh Mandor @ Rp.

Total Upah dan Bahan


17 10 cm Pengerjaan Pengelasan dengan Las Listrik (SNI 2016 ; 4.2.1.5)
Bahan
0.400 kg Kawat Las Listrik @ Rp.
0.300 ltr Solar @ Rp.
0.040 ltr Minyak Pelumas @ Rp.

Sewa Alat
0.170 jam Sewa Alat @ Rp.

Upah
0.040 Oh Pekerja @ Rp.
0.020 Oh Tukang @ Rp.
0.002 Oh Kepala Tukang @ Rp.
0.002 Oh Mandor @ Rp.

Total Upah dan Bahan


18 1 m¹ Pemasangan talang ½ lingkaran D-15 cm, seng galvalum 0,3 lebar 60 (A.4.2.1.19)
Bahan
1.050 m Seng 0,3 lebar 60 cm @ Rp.
0.010 kg Paku 1 cm – 2,5 cm @ Rp.
0.500 kg Besi strip @ Rp.

Tenaga
0.150 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


19 1 m² Pemasangan Atap Genteng Kodok ( A.4.5.2.2 )
Bahan
25.000 bh Genteng Kodok @ Rp.

Tenaga
0.150 OH Pekerja @ Rp.
0.075 OH Tukang @ Rp.
0.008 OH Kepala Tukang @ Rp.
0.008 OH Mandor @ Rp.

Total Upah dan Bahan


20 1 m² Pemasangan Atap Asbes Gelombang Tebal 5 mm (1,8 x 0,92) ( SNI 03-3436-2002 Analisa Biaya Konstruksi Bangu
Bahan
0.750 lbr Asbes Gelombang Tb.5 mm (1.8 x 0.92) @ Rp.
0.120 m³ Paku Payung @ Rp.

Tenaga
0.140 OH Pekerja @ Rp.
0.070 OH Tukang @ Rp.
0.007 OH Kepala Tukang @ Rp.
0.007 OH Mandor @ Rp.

Total Upah dan Bahan


21 1 m² Pemasangan Bubungan Genteng Kodok ( A.4.5.2.5 )
* Konversi Semen dari kg ke zak
Bahan
5.000 bh Bubungan Genteng Kodok @ Rp.
0.200 zak Portland Cement @ Rp.
0.032 m³ Pasir Pasang @ Rp.

Tenaga
0.400 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.020 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


22 1 m¹ Pemasangan listplang 1 m kalsi plang (0,9x30) cm ( A.4.5.1.10 )
Bahan
1.100 m Kalsiplang @ Rp.
2.500 m Holow galvalum 2x4 @ Rp.
0.050 kg Paku skrup @ Rp.

Tenaga
0.100 OH Pekerja @ Rp.
0.050 OH Tukang @ Rp.
0.005 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


23 1 m¹ Pemasangan talang ½ lingkaran D-15 cm, seng galvalum 0,3 lebar 60 (A.4.2.1.19)
Bahan
1.050 m Seng 0,3 lebar 60 cm @ Rp.
0.010 kg Paku 1 cm – 2,5 cm @ Rp.
0.500 kg Besi strip @ Rp.

Tenaga
0.150 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


E. PEKERJAAN PLAFOND
24 1 m² Pekerjaan Pasang Rangka Plafond Hollow (an. LPPM UNAIR)
Bahan
2.750 m¹ Galvalume Hollow 40 x 40 mm ; 1,2 @ Rp.
4.000 bh Baut (Screw Drive) @ Rp.

Tenaga
0.250 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.

Total Upah dan Bahan


25 1 m² Pekerjaan Langit - Langit Gypsum Board, (120x240) Tebal 9 mm ( SNI 2016 A.4.5.1.7 )
Bahan
0.364 m¹ Gypsum Board tb. 9 mm @ Rp.
12.000 bh Baut (Screw Drive) @ Rp.

Tenaga
0.250 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.

Total Upah dan Bahan


26 1 m² Pekerjaan List Langit - Langit Gypsum ( SNI 2016 A.4.5.1.9 )
Bahan
1.050 m¹ List Gypsum @ Rp.
0.010 kg Paku @ Rp.

Tenaga
0.050 OH Pekerja @ Rp.
0.050 OH Tukang @ Rp.
0.005 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


F. PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING
27 1 m³ Pekerjaan Pembuatan Beton Tumbuk 1 PC : 3 Psr : 5 Kr untuk lantai kerja / Bedding(SNI 2016 ; B.01.a Tipe 1)
* Konversi Semen dari kg ke zak
Bahan
5.000 m³ Portland Cement @ Rp.
0.522 m³ Pasir @ Rp.
0.862 m³ Koral @ Rp.

Tenaga
1.320 OH Pekerja @ Rp.
0.220 OH Tukang @ Rp.
0.022 OH Kepala Tukang @ Rp.
0.132 OH Mandor @ Rp.

Total Upah dan Bahan


28 1 m² Pekerjaan Pasang Lantai Ubin Warna uk. 40 x 40 ( A.4.4.3.4 )
* Konversi Semen dari kg ke zak
Bahan
6.630 bh Granit 40 x 40 @ Rp.
0.245 zak Portland Cement @ Rp.
0.600 kg Semen Warna @ Rp.
0.045 m³ Pasir Pasang @ Rp.

Tenaga
0.240 OH Pekerja @ Rp.
0.120 OH Tukang @ Rp.
0.012 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.

Total Upah dan Bahan


29 1 m² Pekerjaan Pengecatan Tembok Baru (1 Lapis Plamir,1 Lapis Cat Dasar,2 Lapis Cat Penutup) ( A.4.7.1.10 )
Bahan
0.100 kg Plamir @ Rp.
0.100 kg Cat Dasar @ Rp.
0.260 kg Cat Penutup @ Rp.

Tenaga
0.020 OH Pekerja @ Rp.
0.063 OH Tukang @ Rp.
0.006 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


30 1 m² Pekerjaan Pengecatan Tembok Baru Exterior ( 23.07.05.19 )
Bahan
0.100 kg Cat tembok exterior setara Dulux Weathershiel@ Rp.
0.160 kg Cat dasar @ Rp.
0.500 lbr Ampelas @ Rp.
0.010 bh Roll Cat @ Rp.

Tenaga
0.200 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


31 1 m² Pekerjaan Pengecatan Kayu Baru (1 Lapis Plamir,1 Lapis Cat Dasar,2 Lapis Cat Penutup) ( A.4.7.1.4 )
Bahan
0.200 kg Cat Meni @ Rp.
0.150 kg Plamir Kayu @ Rp.
0.170 kg Cat Kayu Dasar @ Rp.
0.260 kg Cat Kayu Penutup @ Rp.
0.010 buah Kuas @ Rp.
0.030 ltr Thinner @ Rp.
0.200 lbr Amplas @ Rp.

Tenaga
0.070 OH Pekerja @ Rp.
0.009 OH Tukang @ Rp.
0.006 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


32 1 m² Batu Tempel Hitam ( A.4.3.58 )
* Konversi Semen dari kg ke zak
Bahan
1.100 m² Batu Tempel @ Rp.
0.294 zak Portland Cement @ Rp.
0.035 m³ Pasir Pasang @ Rp.

Tenaga
0.700 OH Pekerja @ Rp.
0.350 OH Tukang @ Rp.
0.035 OH Kepala Tukang @ Rp.
0.035 OH Mandor @ Rp.

Total Upah dan Bahan


G. PEKERJAAN PINTU JENDELA
33 1 m¹ Pekerjaan Pemasangan 1 m kusen pintu alluminium ( A.4.2.1.11 )
Bahan
1.100 kg Profil alluminium 4" Brown @ Rp.
2.000 kg Skrup fixer @ Rp.
0.060 kg Sealant @ Rp.

Tenaga
0.0430 OH Pekerja @ Rp.
0.0430 OH Tukang @ Rp.
0.0043 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


34 1 m¹ Pekerjaan Pemasangan pintu alluminium ( A.4.2.1.13 )
Bahan
1.000 unit Daun Pintu Kaca @ Rp.

Tenaga
0.200 OH Pekerja @ Rp.
0.625 OH Tukang @ Rp.
0.012 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.

Total Upah dan Bahan


35 1 bh Pekerjaan Pemasangan Engsel pintu alluminium ( A.4.6.2.5 )
Bahan
1.000 unit Engsel Pintu @ Rp.

Tenaga
0.015 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.

Total Upah dan Bahan


36 1 bh Pekerjaan Pemasangan Kunci pintu alluminium ( A.4.6.2.6 )
Bahan
1.000 unit Kunci Pintu @ Rp.

Tenaga
0.015 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.

Total Upah dan Bahan


37 1 bh Pekerjaan Pemasangan Door CLoser ( A.4.6.2.10 )
Bahan
1.000 unit Door Closer @ Rp.

Tenaga
0.050 OH Pekerja @ Rp.
0.500 OH Tukang @ Rp.
0.050 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


38 1 m² Pemasangan jendela kaca rangka alluminium casement 3 profil (A.4.2.1.13)
Bahan
4.400 m profil Jendela alluminium casement 3" @ Rp.
0.800 m Spigot @ Rp.
16.000 bh Screw Drive @ Rp.
4.400 m Karet @ Rp.
0.270 Tube Sealant @ Rp.

Tenaga
0.085 OH Pekerja @ Rp.
0.085 OH Tukang @ Rp.
0.009 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


39 1 m² Pemasangan kaca tebal 5 mm (A.4.6.2.17)
Bahan
1.100 m Kaca Rayban 5 mm @ Rp.
0.050 Tube Sealant @ Rp.

Tenaga
0.015 OH Pekerja @ Rp.
0.15 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Total Upah dan Bahan
40 1 bh Pemasangan 1 buah engsel casement (A.4.6.2.7)
Bahan
1.000 bh Engsel Casement 10" @ Rp.

Tenaga
0.015 OH Pekerja @ Rp.
0.15 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


41 1 bh Pemasangan 1 buah Grendel Jendela (A.4.6.2.14)
Bahan
1.000 bh Grendel Jendela @ Rp.

Tenaga
0.01 OH Pekerja @ Rp.
0.1 OH Tukang @ Rp.
0.01 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


42 1 bh Pemasangan 1 buah Hak Angin (A.4.6.2.17)
Bahan
1.000 bh Hak Angin @ Rp.

Tenaga
0.01 OH Pekerja @ Rp.
0.1 OH Tukang @ Rp.
0.01 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


43 1 bh Pemasangan 1 buah Grendel Pintu Tanam (A.4.6.2.21)
Bahan
1.000 bh Grendel Pintu Tanam @ Rp.

Tenaga
0.025 OH Pekerja @ Rp.
0.25 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


H. PEKERJAAN INSTALASI LISTRIK
44 1 Unit Pekerjaan Pemasangan 1 Titik Lampu menggunakan Kabel NYA ( 23.07.07.02 )
* Konversi Semen dari kg ke zak
Bahan
1.000 bh Saklar Tunggal ex. Broco @ Rp.
5.000 m¹ Kabel NYA 1 x 2,5 ex. Supreme @ Rp.
5.500 m¹ Kabel NYA 1 x 1,5 ex. Supreme @ Rp.
5.000 m¹ Pipa Pralon 5/8 @ Rp.
1.000 bh T Doos Pvc @ Rp.
1.000 bh Fiting Plafond ex. Broco @ Rp.
0.800 kg Paku Biasa @ Rp.
0.041 zak Semen Portland @ Rp.
5.000 bh Klem Pipa @ Rp.

Tenaga
0.1500 OH Pekerja @ Rp.
0.5000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


45 1 Unit Pekerjaan Pemasangan 1 Titik Lampu (Lengkap) ( 23.07.07.07 )
Bahan
1.000 bh Lampu @ Rp.

Tenaga
0.0050 OH Pekerja @ Rp.
0.0200 OH Tukang @ Rp.
0.0100 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


46 1 unit Pekerjaan Pemasangan 1 Titik Stop Kontak (23.07.07.01 )
Bahan
5.000 m¹ Kabel NYA 1 x 2,5 ex. Supreme @ Rp.
2.000 m¹ Pipa Pralon 5/8 @ Rp.
1.000 bh Stop Kontak ex. Broco @ Rp.
1.000 bh T Doos Pvc @ Rp.

Tenaga
0.0050 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


47 1 m³ Pekerjaan Pengangkutan Material ke Lokasi sejauh 100 m¹ ( 23.01.01.06 )
Tenaga
0.600 OH Pekerja @ Rp.
0.060 OH Mandor @ Rp.

Alat
0.050 unit/hr Cangkul/Sekop/Linggis @ Rp.
0.050 unit/hr Gerobak @ Rp.

H. PEKERJAAN SANITASI GEDUNG


48 1 m¹ Pekerjaan Pemasangan Pipa PVC Type AW θ 4" ( 23.07.02.36 )
Bahan
1.200 m¹ Pipa PVC AW θ 4" @ Rp.
0.350 harga Pi Perlengkapan @ Rp.

Tenaga
0.0050 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


49 1 bh Pekerjaan Pemasangan Closet Jongkok Porselen (A.5.1.1.2)
* Konversi Semen dari kg ke zak
Bahan
1.000 bh Closet Jongkok @ Rp.
0.150 zak Portland Cement @ Rp.
0.010 m³ Pasir Pasang @ Rp.

Tenaga
0.0050 OH Pekerja @ Rp.
0.4000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


50 1 bh Pekerjaan Pemasangan Bak Mandi Fiberglass (A.5.1.1.7)
Bahan
1.000 bh Bak Mandi Fiberglass @ Rp.
0.120 Ls Accessorries Bak Mandi @ Rp.

Tenaga
0.3000 OH Pekerja @ Rp.
0.4500 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.090 OH Mandor @ Rp.
Total Upah dan Bahan
51 1 bh Pekerjaan Pemasangan Floor Drain (A.5.1.1.14)
Bahan
1.000 bh Floor Drain @ Rp.

Tenaga
0.0100 OH Pekerja @ Rp.
0.1000 OH Tukang @ Rp.
0.0100 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.

Total Upah dan Bahan


52 1 m¹ Pekerjaan Pemasangan Pipa PVC AW Ø 3/4" (A.5.1.1.26)
Bahan
1.200 m¹ Pipa PVC AW Ø 3/4" @ Rp.
0.420 Ls Accessorries Pipa PVC AW Ø 3/4" @ Rp.

Tenaga
0.0360 OH Pekerja @ Rp.
0.0600 OH Tukang @ Rp.
0.0060 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.

Total Upah dan Bahan


53 1 bh Pekerjaan Pemasangan Kran Air 1/2 " atau 3/4" (A.5.1.1.19)
Bahan
1.000 bh Kran Air @ Rp.
0.025 bh Seal Tape @ Rp.

Tenaga
0.0100 OH Pekerja @ Rp.
0.4000 OH Tukang @ Rp.
0.0400 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.

Total Upah dan Bahan


54 1 unit Pekerjaan Pemasangan Rooster
Bahan
1.000 unit Rooster @ Rp.

Tenaga
0.1000 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.

Total Upah dan Bahan


AAN

016

- = Rp. -
100,000.00 = Rp. 7,500.00
Sub total = Rp. 7,500.00
Total Upah = Rp. 7,500.00
PROP JATIM 2005 A III.15.004)

- = Rp. -
100,000.00 = Rp. 75,000.00
Sub total = Rp. 75,000.00
Total Upah = Rp. 75,000.00
isa Biaya Konstruksi Bangunan Gedung)

- = Rp. -
100,000.00 = Rp. 666,700.00
Sub total = Rp. 666,700.00
Total Upah = Rp. 666,700.00
Biaya Pek. Persiapan (6.14))

- = Rp. -
100,000.00 = Rp. 162,500.00
Sub total = Rp. 162,500.00
Total Upah = Rp. 162,500.00

100,000.00 = Rp. 75,000.00


0.00 = Rp. 0.00
Sub total = Rp. 75,000.00
Total Upah = Rp. 75,000.00

100,000.00 = Rp. 100,000.00


0.00 = Rp. 0.00
Sub total = Rp. 100,000.00
Total Upah = Rp. 100,000.00

125,000.00 = Rp. 150,000.00


Sub total = Rp. 150,000.00

100,000.00 = Rp. 30,000.00


0.00 = Rp. 0.00
Sub total = Rp. 30,000.00
Total Upah dan Bahan = Rp. 180,000.00

195,000.00 = Rp. 234,000.00


56,400.00 = Rp. 191,760.00
210,000.00 = Rp. 114,240.00
Sub total = Rp. 540,000.00

100,000.00 = Rp. 150,000.00


120,000.00 = Rp. 90,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 240,000.00
Total Upah dan Bahan = Rp. 780,000.00

700.00 = Rp. 98,000.00


56,400.00 = Rp. 31,302.00
210,000.00 = Rp. 21,420.00
Sub total = Rp. 150,722.00

100,000.00 = Rp. 60,000.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 84,000.00
Total Upah dan Bahan = Rp. 234,722.00

11,600.00 = Rp. 12,180.00


22,100.00 = Rp. 331.50
Sub total = Rp. 12,511.50

100,000.00 = Rp. 700.00


120,000.00 = Rp. 840.00
- = Rp. -
- = Rp. -
Sub total = Rp. 1,540.00
Total Upah dan Bahan = Rp. 14,051.50
1,270,300.00 = Rp. 57,163.50
22,100.00 = Rp. 6,630.00
- = Rp. -
Sub total = Rp. 63,793.50

100,000.00 = Rp. 52,000.00


120,000.00 = Rp. 31,200.00
- = Rp. -
- = Rp. -
Sub total = Rp. 83,200.00
Total Upah dan Bahan = Rp. 146,993.50

1,270,300.00 = Rp. 50,812.00


22,100.00 = Rp. 8,840.00
- = Rp. -
1,270,300.00 = Rp. 19,054.50
132,600.00 = Rp. 46,410.00
9,400.00 = Rp. 18,800.00
Sub total = Rp. 143,916.50

100,000.00 = Rp. 66,000.00


120,000.00 = Rp. 39,600.00
- = Rp. -
- = Rp. -
Sub total = Rp. 105,600.00
Total Upah dan Bahan = Rp. 249,516.50

1,270,300 = Rp. 50,812.00


22,100 = Rp. 8,840.00
= Rp. -
1,270,300 = Rp. 19,054.50
132,600 = Rp. 46,410.00
9,400 = Rp. 56,400.00
Sub total = Rp. 181,516.50

100,000.00 = Rp. 32,000.00


120,000.00 = Rp. 39,600.00
- = Rp. -
- = Rp. -
Sub total = Rp. 71,600.00
Total Upah dan Bahan = Rp. 253,116.50
56,400.00 = Rp. 320,070.00
210,000.00 = Rp. 129,780.00
265,100.00 = Rp. 197,234.40
Sub total = Rp. 647,084.40

100,000.00 = Rp. 132,000.00


120,000.00 = Rp. 26,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 158,400.00
Total Upah dan Bahan = Rp. 805,484.40

700.00 = Rp. 49,000.00


56,400.00 = Rp. 16,215.00
210,000.00 = Rp. 9,030.00
Sub total = Rp. 74,245.00

100,000.00 = Rp. 30,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 42,000.00
Total Upah dan Bahan = Rp. 116,245.00

9,300.00 = Rp. 78,120.00


127,100.00 = Rp. 8,007.30
Sub total = Rp. 86,127.30

100,000.00 = Rp. 67,100.00


120,000.00 = Rp. 97,200.00
- = Rp. -
- = Rp. -
Sub total = Rp. 164,300.00
Total Upah dan Bahan = Rp. 250,427.30

0.1 m'
0.2 m'
0.6 m'
0.012 m³

1 m³ / Vol. 1 bh Bata Ringan


bh
Rp 9,278.40
56,400.00 = Rp. 8,798.40
210,000.00 = Rp. 5,040.00
Sub total = Rp. 13,838.40

100,000.00 = Rp. 30,000.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 48,000.00
Total Upah dan Bahan = Rp. 61,838.40

56,400.00 = Rp. 8,939.40


210,000.00 = Rp. 2,520.00
Sub total = Rp. 11,459.40

100,000.00 = Rp. 30,000.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 48,000.00
Total Upah dan Bahan = Rp. 59,459.40

56,400.00 = Rp. 4,582.50


Sub total = Rp. 4,582.50

100,000.00 = Rp. 20,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 32,000.00
Total Upah dan Bahan = Rp. 36,582.50

56,400.00 = Rp. 5,640.00


Sub total = Rp. 5,640.00

100,000.00 = Rp. 5,000.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 29,000.00
Total Upah dan Bahan = Rp. 34,640.00

3,313,700.00 = Rp. 3,645,070.00


9,100.00 = Rp. 136,500.00
22,100.00 = Rp. 66,300.00
Sub total = Rp. 3,847,870.00

100,000.00 = Rp. 670,000.00


120,000.00 = Rp. 2,412,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 3,082,000.00
Total Upah dan Bahan = Rp. 6,929,870.00

3,313,700.00 = Rp. 39,764.40


22,100.00 = Rp. 3,315.00
Sub total = Rp. 43,079.40

100,000.00 = Rp. 10,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 22,000.00
Total Upah dan Bahan = Rp. 65,079.40
16,600.00 = Rp. 24,700.80
13,900.00 = Rp. 31,024.80
500.00 = Rp. 19,000.00
3,900.00 = Rp. 6,240.00
7,000.00 = Rp. 37,800.00
- = Rp. -
Sub total = Rp. 118,765.60

100,000.00 = Rp. 20,000.00


120,000.00 = Rp. 54,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 74,000.00
Total Upah dan Bahan = Rp. 192,765.60

13,300.00 = Rp. 15,295.00


Sub total = Rp. 15,295.00

100,000.00 = Rp. 6,000.00


120,000.00 = Rp. 7,200.00
- = Rp. -
- = Rp. -
Sub total = Rp. 13,200.00
Total Upah dan Bahan = Rp. 28,495.00

26,000.00 = Rp. 10,400.00


7,200.00 = Rp. 2,160.00
49,800.00 = Rp. 1,992.00
Sub total = Rp. 14,552.00

55,300.00 = Rp. 9,401.00


Sub total = Rp. 9,401.00

100,000.00 = Rp. 4,000.00


120,000.00 = Rp. 2,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 6,400.00
Total Upah dan Bahan = Rp. 30,353.00
40,400.00 = Rp. 42,420.00
22,100.00 = Rp. 221.00
9,100.00 = Rp. 4,550.00
Sub total = Rp. 47,191.00

100,000.00 = Rp. 15,000.00


120,000.00 = Rp. 36,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 51,000.00
Total Upah dan Bahan = Rp. 98,191.00

5,800.00 = Rp. 145,000.00


Sub total = Rp. 145,000.00

100,000.00 = Rp. 15,000.00


120,000.00 = Rp. 9,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 24,000.00
Total Upah dan Bahan = Rp. 169,000.00
36-2002 Analisa Biaya Konstruksi Bangunan Gedung )

83,400.00 = Rp. 62,550.00


27,700.00 = Rp. 3,324.00
Sub total = Rp. 65,874.00

100,000.00 = Rp. 14,000.00


120,000.00 = Rp. 8,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 22,400.00
Total Upah dan Bahan = Rp. 88,274.00
5,600.00 = Rp. 28,000.00
56,400.00 = Rp. 11,280.00
210,000.00 = Rp. 6,720.00
Sub total = Rp. 46,000.00

100,000.00 = Rp. 40,000.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 64,000.00
Total Upah dan Bahan = Rp. 110,000.00

22,300.00 = Rp. 24,530.00


5,800.00 = Rp. 14,500.00
52,400.00 = Rp. 2,620.00
Sub total = Rp. 41,650.00

100,000.00 = Rp. 10,000.00


120,000.00 = Rp. 6,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 16,000.00
Total Upah dan Bahan = Rp. 57,650.00

40,400.00 = Rp. 42,420.00


22,100.00 = Rp. 221.00
9,100.00 = Rp. 4,550.00
Sub total = Rp. 47,191.00

100,000.00 = Rp. 15,000.00


120,000.00 = Rp. 36,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 51,000.00
Total Upah dan Bahan = Rp. 98,191.00

7,700.00 = Rp. 21,175.00


500.00 = Rp. 2,000.00
Sub total = Rp. 23,175.00

100,000.00 = Rp. 25,000.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 43,000.00
Total Upah dan Bahan = Rp. 66,175.00
16 A.4.5.1.7 )

78,500.00 = Rp. 28,574.00


500.00 = Rp. 6,000.00
Sub total = Rp. 34,574.00

100,000.00 = Rp. 25,000.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 43,000.00
Total Upah dan Bahan = Rp. 77,574.00

19,900.00 = Rp. 20,895.00


22,100.00 = Rp. 221.00
Sub total = Rp. 21,116.00

100,000.00 = Rp. 5,000.00


120,000.00 = Rp. 6,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 11,000.00
Total Upah dan Bahan = Rp. 32,116.00
ja / Bedding(SNI 2016 ; B.01.a Tipe 1)

56,400.00 = Rp. 282,000.00


210,000.00 = Rp. 109,620.00
265,100.00 = Rp. 228,516.20
Sub total = Rp. 620,136.20

100,000.00 = Rp. 132,000.00


120,000.00 = Rp. 26,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 158,400.00
Total Upah dan Bahan = Rp. 778,536.20

12,900.00 = Rp. 85,527.00


56,400.00 = Rp. 13,818.00
13,300.00 = Rp. 7,980.00
210,000.00 = Rp. 9,450.00
Sub total = Rp. 116,775.00

100,000.00 = Rp. 24,000.00


120,000.00 = Rp. 14,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 38,400.00
Total Upah dan Bahan = Rp. 155,175.00
apis Cat Penutup) ( A.4.7.1.10 )

22,100.00 = Rp. 2,210.00


75,200.00 = Rp. 7,520.00
75,200.00 = Rp. 19,552.00
Sub total = Rp. 29,282.00

100,000.00 = Rp. 2,000.00


120,000.00 = Rp. 7,560.00
- = Rp. -
- = Rp. -
Sub total = Rp. 9,560.00
Total Upah dan Bahan = Rp. 38,842.00

95,000.00 = Rp. 9,500.00


75,200.00 = Rp. 12,032.00
11,100.00 = Rp. 5,550.00
27,700.00 = Rp. 277.00
Sub total = Rp. 27,359.00

100,000.00 = Rp. 20,000.00


120,000.00 = Rp. 36,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 56,000.00
Total Upah dan Bahan = Rp. 83,359.00
s Cat Penutup) ( A.4.7.1.4 )

38,700.00 = Rp. 7,740.00


38,700.00 = Rp. 5,805.00
65,200.00 = Rp. 11,084.00
65,200.00 = Rp. 16,952.00
22,100.00 = Rp. 221.00
49,800.00 = Rp. 1,494.00
11,100.00 = Rp. 2,220.00
Sub total = Rp. 45,516.00

100,000.00 = Rp. 7,000.00


120,000.00 = Rp. 1,080.00
- = Rp. -
- = Rp. -
Sub total = Rp. 8,080.00
Total Upah dan Bahan = Rp. 53,596.00

165,700.00 = Rp. 182,270.00


56,400.00 = Rp. 16,567.50
210,000.00 = Rp. 7,350.00
Sub total = Rp. 206,187.50

100,000.00 = Rp. 70,000.00


120,000.00 = Rp. 42,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 112,000.00
Total Upah dan Bahan = Rp. 318,187.50

110,500.00 = Rp. 121,550.00


500.00 = Rp. 1,000.00
40,900.00 = Rp. 2,454.00
Sub total = Rp. 125,004.00
100,000.00 = Rp. 4,300.00
120,000.00 = Rp. 5,160.00
- = Rp. -
- = Rp. -
Sub total = Rp. 9,460.00
Total Upah dan Bahan = Rp. 134,464.00
1,656,900.00 = Rp. 1,656,900.00
Sub total = Rp. 1,656,900.00

100,000.00 = Rp. 20,000.00


120,000.00 = Rp. 75,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 95,000.00
Total Upah dan Bahan = Rp. 1,751,900.00

40,900.00 = Rp. 40,900.00


Sub total = Rp. 40,900.00

100,000.00 = Rp. 1,500.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 19,500.00
Total Upah dan Bahan = Rp. 60,400.00
63,600.00 = Rp. 63,600.00
Sub total = Rp. 63,600.00

100,000.00 = Rp. 1,500.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 19,500.00
Total Upah dan Bahan = Rp. 83,100.00

497,100.00 = Rp. 497,100.00


Sub total = Rp. 497,100.00

100,000.00 = Rp. 5,000.00


120,000.00 = Rp. 60,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 65,000.00
Total Upah dan Bahan = Rp. 562,100.00

176,800.00 = Rp. 777,920.00


12,200.00 = Rp. 9,760.00
500.00 = Rp. 8,000.00
2,800.00 = Rp. 12,320.00
40,900.00 = Rp. 11,043.00
Sub total = Rp. 819,043.00

100,000.00 = Rp. 8,500.00


120,000.00 = Rp. 10,200.00
- = Rp. -
- = Rp. -
Sub total = Rp. 18,700.00
Total Upah dan Bahan = Rp. 837,743.00

121,500.00 = Rp. 133,650.00


40,900.00 = Rp. 2,045.00
Sub total = Rp. 135,695.00

100,000.00 = Rp. 1,500.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 19,500.00
Total Upah dan Bahan = Rp. 155,195.00
27,700.00 = Rp. 27,700.00
Sub total = Rp. 27,700.00

100,000.00 = Rp. 1,500.00


120,000.00 = Rp. 18,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 19,500.00
Total Upah dan Bahan = Rp. 47,200.00

23,200.00 = Rp. 23,200.00


Sub total = Rp. 23,200.00

100,000.00 = Rp. 1,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 13,000.00
Total Upah dan Bahan = Rp. 36,200.00

22,700.00 = Rp. 22,700.00


Sub total = Rp. 22,700.00

100,000.00 = Rp. 1,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 13,000.00
Total Upah dan Bahan = Rp. 35,700.00

121,500.00 = Rp. 121,500.00


Sub total = Rp. 121,500.00

100,000.00 = Rp. 2,500.00


120,000.00 = Rp. 30,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 32,500.00
Total Upah dan Bahan = Rp. 154,000.00
21,100.00 = Rp. 21,100.00
5,700.00 = Rp. 28,500.00
5,200.00 = Rp. 28,600.00
3,900.00 = Rp. 19,500.00
3,600.00 = Rp. 3,600.00
29,900.00 = Rp. 29,900.00
22,100.00 = Rp. 17,680.00
56,400.00 = Rp. 2,326.50
900.00 = Rp. 4,500.00
Sub total = Rp. 155,706.50

100,000.00 = Rp. 15,000.00


120,000.00 = Rp. 60,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 75,000.00
Total Upah dan Bahan = Rp. 230,706.50

98,400.00 = Rp. 98,400.00


Sub total = Rp. 98,400.00

100,000.00 = Rp. 500.00


120,000.00 = Rp. 2,400.00
- = Rp. -
- = Rp. -
Sub total = Rp. 2,900.00
Total Upah dan Bahan = Rp. 101,300.00

5,700.00 = Rp. 28,500.00


3,900.00 = Rp. 7,800.00
70,300.00 = Rp. 70,300.00
3,600.00 = Rp. 3,600.00
Sub total = Rp. 110,200.00

100,000.00 = Rp. 500.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 24,500.00
Total Upah dan Bahan = Rp. 134,700.00
100,000.00 = Rp. 60,000.00
0.00 = Rp. 0.00
Sub total = Rp. 60,000.00

30,000.00 = Rp. 1,500.00


35,000.00 = Rp. 1,750.00
Sub total = Rp. 3,250.00
Total Upah = Rp. 63,250.00

27,700.00 = Rp. 33,240.00


= Rp. 11,634.00
Sub total = Rp. 44,874.00

100,000.00 = Rp. 500.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 24,500.00
Total Upah dan Bahan = Rp. 69,374.00

303,800.00 = Rp. 303,800.00


56,400.00 = Rp. 8,460.00
210,000.00 = Rp. 2,100.00
Sub total = Rp. 314,360.00

100,000.00 = Rp. 500.00


120,000.00 = Rp. 48,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 48,500.00
Total Upah dan Bahan = Rp. 362,860.00

372,300.00 = Rp. 372,300.00


372,300.00 = Rp. 44,676.00
Sub total = Rp. 416,976.00

100,000.00 = Rp. 30,000.00


120,000.00 = Rp. 54,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 84,000.00
Total Upah dan Bahan = Rp. 500,976.00

38,700.00 = Rp. 38,700.00


Sub total = Rp. 38,700.00

100,000.00 = Rp. 1,000.00


120,000.00 = Rp. 12,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 13,000.00
Total Upah dan Bahan = Rp. 51,700.00

18,800.00 = Rp. 22,560.00


18,800.00 = Rp. 7,896.00
Sub total = Rp. 30,456.00

100,000.00 = Rp. 3,600.00


120,000.00 = Rp. 7,200.00
- = Rp. -
- = Rp. -
Sub total = Rp. 10,800.00
Total Upah dan Bahan = Rp. 41,256.00

39,800.00 = Rp. 39,800.00


6,100.00 = Rp. 152.50
Sub total = Rp. 39,952.50

100,000.00 = Rp. 1,000.00


120,000.00 = Rp. 48,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 49,000.00
Total Upah dan Bahan = Rp. 88,952.50

38,700.00 = Rp. 38,700.00


Sub total = Rp. 38,700.00

100,000.00 = Rp. 10,000.00


120,000.00 = Rp. 24,000.00
- = Rp. -
- = Rp. -
Sub total = Rp. 34,000.00
Total Upah dan Bahan = Rp. 72,700.00
Kabupaten : Sidoarjo
Kecamatan : Tulangan
Desa : Punten

1. Pekerjaan Galian
A.

B.

2. Pekerjaan Urugan
A.

B.

3. Pekerjaan Beton Kontruksi Bawah


A.
A'.
4. Pekerjaan Kolom
A.

A'.
5. Pekerjaan Balok
A.

D.

A'.
Jenis Kegiatan
Take Of Sheet Lokasi
Luas
Perhitungan : Kebutuhan :
Perhitungan Vol. Galian Analisa Galian Tanah
Galian Pondasi Sloof 12x20 cm Volume = 0.399
Panjang = 10.60 m'
Lebar = 0.12 m' 1) Kebutuhan Tenaga kerja
Tinggi = 0.10 m' -Pekerja = 0.750
Volume = PxLxT = 0.299
= 0.127 m³

Galian Pondasi Rollag Bata


Panjang = 6.18 m'
Lebar = 0.22 m'
Tinggi = 0.10 m'
Kebutuhan = 2.00 bh
Volume = PxLxT
= 0.272 m³

Tot. Volume = 0.399 m³

Perhitungan Vol. Urugan Analisa Urugan


Urugan Bawah Sloof 12x20 cm Volume = 11.026
Panjang = 10.60 m'
Lebar = 0.12 m' 1) Kebutuhan Tenaga kerja
Tinggi = 0.05 m' -Pekerja = 0.300
Volume = PxLxT = 3.308
= 0.064 m³
2) Kebutuhan Bahan
-Pasir Urug = 1.200
Urugan Peninggian Lantai = 13.231
Panjang = 8.70 m'
Lebar = 6.30 m'
Tinggi = 0.20 m'
Volume = PxLxT
= 10.962 m³

Tot. Vol. Urugan


Volume = 11.026 m³

Volume Beton camp. 1 : 2 : 3 Analisa Beton camp. 1 : 2 : 3


Volume Beton Sloof 12x20 cm Volume Beton Sloof 12x20 cm
Panjang = 10.60 m'
Lebar = 0.12 m'
Tinggi = 0.20 m' 1. Kebutuhan Bahan :
Volume = PxLxT a. Koral : = 0.744
= 0.254 m³ = 0.189

Tot. Volume = 0.254 m³ b. Semen Gresik @ zak


= 5.675
= 1.444

c. Pasir Pasang :
= 0.618
= 0.157

2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.056

b. Pekerja = 1.320
= 0.336

Kebutuhan Pembesian Analisa Pembesian dengan Besi Beton Po


Kebutuhan Besi Sloof Kebutuhan Besi Sloof
Tulangan : (isi 4 batang)
Panjang = 10.60 m'
Isi = 4 btg
Ø12" = 42.40 m' 3. Kebutuhan Besi
- Besi Beton = 1.050
Sengkang (jarak) 0.150 m' = 58.380
Kebutuhan Sengkang - Kawat Beton = 0.015
= 70.67 bh 71.00 bh = 0.834
P. Sengkang = 0.12 x 2 sisi 0.240
L. Sengkang = 0.20 x 2 sisi 0.400 4. KebutuhanTenaga Perakitan Besi
P. Tot. 1 Sengkang 0.640 a. Tukang = 0.007
Tot. Keb. Sengkang Ø8" = 45.44 m' = 0.389
Pembesian dia D 13 mm brt = 1,04 kg/m
Pembesian dia = 12 mm brt = 0,888 kg/m b. Pekerja = 0.007
Pembesian dia = 10 mm brt = 0,617 kg/m = 0.389
Pembesian dia = 8 mm brt = 0,395 kg/m
Pembesian dia = 6 mm brt = 0,222 kg/m
Ø12 = 37.651 kg
Ø8 = 17.949 kg

Total = 55.600 kg

Perhitungan Besi setelah Koef. m¹ ljr


Ø12 = 39.53 44.520 3.71
Ø8 = 18.85 47.712 3.98
Tot. Kg Besi = 55.600 m³

Perhitungan Tot Besi setelah Koef. m¹ ljr


Ø12 = 39.53 44.520 3.71
Ø8 = 18.85 47.712 3.98

Volume Beton camp. 1 : 2 : 3 Analisa Beton camp. 1 : 2 : 3


Volume Beton Kolom 12x12 cm
Tinggi = 3.60 m' Volume Beton Kolom 12x12 cm
Lebar = 0.12 m'
Panjang = 0.12 m'
Jumlah = 4.00 bh 1. Kebutuhan Bahan :
Volume = P x L x T x Kebutuhan a. Koral : = 0.744
= 0.207 m³ = 0.154

Tot. Volume = 0.207 m³ b. Semen Gresik @ zak


= 5.675
= 1.177

c. Pasir Pasang :
= 0.618
= 0.128

2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.046

b. Pekerja = 1.320
= 0.274

Kebutuhan Pembesian Analisa Pembesian dengan Besi Beton Po


Kebutuhan Besi Kolom 12X12 cm 0
Tulangan : (isi 4 batang) Kebutuhan Besi Kolom 12X12 cm
Tinggi = 3.60 m'
Isi : 4 btg
Ø12" = 14.40 m' 3. Kebutuhan Besi
- Besi Beton = 1.050
Sengkang (jarak) 0.150 m' = 72.818
Kebutuhan Sengkang - Kawat Beton = 0.015
= 24.00 bh 24.00 bh = 1.040
P. Sengkang = 0.120 x 2 sisi 0.240
L. Sengkang = 0.120 x 2 sisi 0.240 4. KebutuhanTenaga Perakitan Besi
P. Tot. 1 Sengkang 0.480 a. Tukang = 0.007
Tot. Keb. Sengkang Ø8" = 11.52 = 0.485
Pembesian dia D 13 mm brt = 1,04 kg/m
Pembesian dia = 12 mm brt = 0,888 kg/m b. Pekerja = 0.007
Pembesian dia = 10 mm brt = 0,617 kg/m = 0.485
Pembesian dia = 8 mm brt = 0,395 kg/m
Pembesian dia = 6 mm brt = 0,222 kg/m
Ø12 = 12.79 kg
Ø8 = 4.55 kg

Total 1 unit = 17.338 kg

Kebutuhan Kolom = 4.00 unit


= 69.350 kg

Perhitungan Tot Besi setelah Koef. m¹ ljr


Ø12 = 53.71 60.480 5.04
Ø8 = 19.11 48.384 4.03

Tot. Kg Besi = 69.350 m³

Perhitungan Tot Besi setelah Koef. m¹ ljr


Ø12 = 53.71 60.480 5.04
Ø8 = 19.11 30.975 2.58

Volume Beton camp. 1 : 2 : 3 Analisa Beton camp. 1 : 2 : 3


Volume Beton Ring Balok 12x15 cm
Tinggi = 0.15 m' Volume Beton Ring Balok 12x15 cm
Lebar = 0.12 m'
Panjang = 10.60 m' Volume Beton Gewel 12x12 cm
Jumlah = 1.00 bh
Volume = P x L x T x Kebutuhan
= 0.191 m³ 1. Kebutuhan Bahan :
a. Koral : = 0.744
Volume Beton Gewel 12x12 cm = 0.235
Tinggi = 0.12 m'
Lebar = 0.12 m' b. Semen Gresik @ zak
Panjang = 8.66 m' = 5.675
Jumlah = 1.00 bh = 1.790
Volume = P x L x T x Kebutuhan
= 0.125 m³ c. Pasir Pasang :
= 0.618
Tot. Volume = 0.316 m³ = 0.195

2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.069

b. Pekerja = 1.320
= 0.416

Kebutuhan Pembesian Analisa Pembesian dengan Besi Beton Po


Kebutuhan Besi Ring Balok 12x20 cm
Tulangan : (isi 4 batang) Kebutuhan Besi Ring Balok 12x20 cm
Panjang = 10.60 m'
Isi : 4 btg Kebutuhan Besi Balok Gewel 12x12 cm
Ø12" = 42.40 m'
:
:
:
Kebutuhan :
Analisa Galian Tanah

x 0.40
OH

Analisa Urugan

x 11.026
OH

x 11.026

lisa Beton camp. 1 : 2 : 3


0.254 m³
0.254 m³
x 0.25

x 0.25
zak

x 0.25

x 0.25
OH

x 0.25
OH

sian dengan Besi Beton Polos / Ulir


55.6 kg

55.6 kg

x 55.60
kg
x 55.60
kg

x 55.60
OH

x 55.60
OH
lisa Beton camp. 1 : 2 : 3

0.20736 m³
0.207 m³

x 0.207

x 0.207
zak

x 0.207

x 0.207
OH

x 0.207
OH

sian dengan Besi Beton Polos / Ulir


0 kg
69.3504 kg
69.3504 kg

x 69.350
kg
x 69.350
kg

x 69.350
OH

x 69.350
OH
lisa Beton camp. 1 : 2 : 3

0.19 m³

0.12 m³
0.316 m³

x 0.316

x 0.316
zak

x 0.316

x 0.316
OH

x 0.316
OH

sian dengan Besi Beton Polos / Ulir


kg
52.80 kg
kg
41.76 kg
94.55 kg
RENCANA KEGIATAN BIAYA (RAB)
PEMBANGUNAN GEDUNG PKK
TAHUN ANGGARAN 2019

Bidang : Pembangunan Desa


Kegiatan : Rehab Gedung PKK
Sumber Dana : Dana Desa
Output :

No. Kode Rekening URAIAN

1 2 3
1. Pekerjaan Tanah
1.1 Pek. Galian Tanah Biasa
1.2 Pek. Urugan Pasir Urug
3. Pekerjaan Struktur Gedung
3.1 Pekerjaan Sloof
Luas Bekisting Bidang Sloof
Kebutuhan Besi Sloof
Volume Beton Sloof 12x20 cm
3.2 Pekerjaan Kolom 12x12 cm
Luas Bekisting Bidang Kolom 12x12 cm
Kebutuhan Besi Kolom 12X12 cm
Volume Beton Kolom 12x12 cm
3.3 Pekerjaan Ring Balok
Luas Bekisting Bidang Ring Balok 12x120 cm
Kebutuhan Besi Ring Balok 12x20 cm
Volume Beton Ring Balok 12x15 cm
3.4 Pekerjaan Gewel
Luas Bekisiting Bidang Gewel 12x12 cm
Kebutuhan Besi Balok Gewel 12x12 cm
Volume Beton Gewel 12x12 cm
4. Pekerjaan Pasangan Dinding
4.1 Pek. Pasangan Bata Merah
4.2 Pek. Plesteran 1 : 4 Tebal 15 mm
4.3 Pek. Acian
5. Pekerjaan Penutup Atap
5.1 Pek. Pasangan Kaso + Reng
5.2 Pek. Pasang genteng bubung ex. Karangpilang
6. Pekerjaan Plafond
6.1 Pek. Pasangan Rangka Plafond Hollow
6.2 Pek. Pasangan Penutup Plafond Gypsumboard 120 x 240
7. Pekerjaan Penutup Dinding & Lantai
7.1 Pekerjaan Pasangan Lantai Kerja / Bedding
8.1 Pek. Pemasangan Pintu Kayu Kuputarung (P1)
8.2 Pek. Pemasangan Jendela Kayu Single (J1)
8.3 Pek. Pemasangan Jendela Kayu Double (J2)
9. Pekerjaan Instalasi Listrik
9.1 Pek. Instalasi titik lampu
9.2 Pek. Pasang lampu
9.3 Pek. Pasang Instalasi Stop kontak
10. Pekerjaan Tambahan
10.2 Pek. Pemasangan Loster Beton
11. BOP
11.1 Biaya Operasional

Sumber Dana

Disetujui/Mengesahkan Telah Verifikasi


Kepala Desa Punten Sek. Desa Punten

........................... ...........................
NA KEGIATAN BIAYA (RAB)
ANGUNAN GEDUNG PKK
UN ANGGARAN 2019

Satuan Harga Satuan Jumlah Total


N Volume (Rp.) (Rp.)

4 5 6 7

0.40 m³ 75,000 29,934


11.03 m³ 180,000 1,984,608

4.24 m² 146,994 623,252


55.60 kg 14,052 781,263
0.25 m³ 805,484 204,915

6.91 m² 249,517 1,724,658


69.35 kg 14,052 974,477
0.21 m³ 805,484 167,025

3.18 m² 146,994 467,439


52.80 kg 14,052 741,856
0.19 m³ 805,484 153,686

2.08 m² 146,994 305,511


41.76 kg 14,052 586,750
0.12 m³ 805,484 100,447

43.10 m² 116,245 5,010,683


73.16 m² 61,838 4,524,036
73.16 m² 36,583 2,676,339

67.35 m² 65,079 4,382,902


6.30 m¹ 110,000 693,000

57.06 m² 66,175 3,775,886


57.06 m² 77,574 4,426,303

2.90 m³ 778,536 2,256,198


1.00 unit 2,319,600 2,319,600
2.00 unit 497,100 994,200
2.00 unit 662,800 1,325,600
-
5.00 unit 230,707 1,153,533
5.00 unit 101,300 506,500
1.00 unit 134,700 134,700
-
7.00 bh 38,700 270,900
-
1.00 Ls 200,000 200,000

TOTAL BIAYA 43,496,202


Dibulatkan 43,496,000

Punten , ....................................2019
fikasi Dibuat Oleh :
unten Pelaksana Kegiatan

.......... ...........................
REKAPITULASI UPAH & BAHAN
PEMBANGUNAN GEDUNG PKK
TAHUN ANGGARAN 2019

Bidang : Pembangunan Desa


Kegiatan : Rehab Gedung PKK
Sumber Dana : Dana Desa
Output :
Volume
No. Kode Rekening URAIAN Dari
Total Anggaran

1 2 3 4
1. BAHAN
1.1 Pasir Urug 13.00 13.00
1.2 Pasir Pasang 6.00 6.00
1.3 Portland Cement 50.00 50.00
1.4 Kayu Kelas III 0.70 0.70
1.5 Paku 5 cm - 12 cm 20.00 20.00
1.6 Balok Kayu Kelas II 0.81 0.81
1.7 Balok Kayu Kelas III 0.10 0.10
1.8 Plywood t : 9 mm 2.50 2.50
1.9 Kayu Dolken 14.00 14.00
1.10 Besi Beton 230.00 230.00
1.11 Kawat Beton 3.00 3.00
1.12 Koral 3.00 3.00
1.13 Bata Merah 3,000.00 3,000.00
1.14 Baut Screw Drive 900.00 900.00
1.15 Genteng Bubungan 31.50 31.50
1.16 Hollow 4 x 4 157.00 157.00
1.17 Gypsumboard 120 x 240 20.00 20.00
1.18 Saklar Tunggal ex. Broco 5.00 5.00
1.19 Kabel NYA 1 x 2,5 ex. Supreme 30.00 30.00
1.20 Kabel NYA 1 x 1,5 ex. Supreme 28.00 28.00
1.21 Pipa Pralon 5/8 27.00 27.00
1.22 T Doos Pvc 6.00 6.00
1.23 Fiting Plafond ex. Broco 5.00 5.00
1.24 Klem Pipa 5/8 25.00 25.00
1.25 Lampu 5.00 5.00
1.26 Stop Kontak ex. Broco 1.00 1.00
1.27 Loster Kayu 7.00 7.00
1.28 Pintu Kayu Kuputarung (P1) 1.00 1.00
1.30 Jendela Kayu Single (J1) 2.00 2.00
1.31 Jendela Kayu Double (J1) 2.00 2.00

S
2. UPAH
2.1 Pekerja 35.00 35.00
2.2 Tukang 35.00 35.00
S
3. BOP
3.1. Papan Proyek 1.00 1.00
3.2. Prasasti 1.00 1.00
3.3. Honor TPK 1.00 1.00
S
Sumber Dana

Disetujui/Mengesahkan Telah Verifikasi


Kepala Desa Punten Sek. Desa Punten

........................... ...............................
Harga Satuan
Satuan Jumlah Total (Rp.)
(Rp.)

5 6 7

m³ 125,000 1,625,000
m³ 210,000 1,260,000
zak 55,000 2,750,000
m³ 1,270,000 893,963
kg 22,000 440,000
m³ 3,313,700 2,678,013
m³ 1,270,300 131,705
lbr 132,600 331,500
btg 9,400 131,600
kg 11,600 2,668,000
kg 22,100 66,300
m³ 265,100 795,300
bh 700 2,100,000
bh 500 450,000
bh 5,600 176,400
m¹ 7,700 1,208,900
lbr 78,500 1,570,000
bh 21,100 105,500
m¹ 5,700 171,000
m¹ 5,200 145,600
m¹ 3,900 105,300
bh 3,600 21,600
bh 25,000 125,000
bh 900 22,500
unit 95,000 475,000
unit 56,000 56,000
unit 38,700 270,900
unit -
unit 400,000 800,000
unit -

Sub Total 1) 21,575,081

OH 110,000 3,850,000
OH 125,000 4,375,000
Sub Total 2) 8,225,000

unit 200,000 200,000


unit -
Ls -
Sub Total 4) 200,000
TOTAL BIAYA 30,000,081
Dibulatkan 30,000,000

Punten, ....................................2019
Dibuat Oleh :
Pelaksana Kegiatan

...........................
REKAPITULASI REKAPITULASI ANGGARAN & BIAYA ( RAB )
PEMBANGUNAN GEDUNG PKK

Kegiatan : Pembangunan Desa


Sumber Dana : Dana Desa
Output :

NO URAIAN PEKERJAAN

1 2

I Pembangunan Gedung PKK

Total
Jumlah Dibulatkan

Punten ,………………...........
Menyetujui Diverifikasi Oleh
Kepala Desa Punten Seksdes Punten

........................... ...........................
BIAYA ( RAB )

JUMLAH
(Rp.)
3

43,496,202

Total 43,496,202
Jumlah Dibulatkan 43,496,000