RISK ASSESSMENT RA1


Initial X
Review

Details of risk assessment including location/description of activity or equipment to be assessed: Reference (to completed by H&S):
110 Volt equipment (Submersible pump, Alligator saw on TRU’s, transformers, cable reels, fast boil kettle 110 Volt Equipment
Relaed risk assessments:

Date of assessment: 18/04/2016 Version No: 01 Date for review: 18/04/2019

Pre-control Residual risk RA2 for


HAZARD
Risk Risk risk rating rating further
Product/Activity/ Risk/Consequence Control measures in use
No. Groups* controls
Plant/Equipment L S R L S R (Yes/No)
1 Storage Impact injury ABC 2 3 6 Storage in appliances in accordance with 1 3 3 No
Musculoskeletal injury service stowage policy L
Equipment stored in approved service
location
Equipment stored as per fire store weight
limits on appliances
2 Manual handling of Impact injury ABC 2 3 6 Manual handling training for all staff 1 3 3 No
equipment Musculoskeletal injury Regular familiarisation of equipment L
Sprains and Strains through station based training plan
Full PPE including safety shoes/boots

3 Use of equipment and Explosion A 3 5 15 Staff trained in use of equipment 1 5 5 No


locations used i.e. Drowning Regular familiarisation of equipment L
flammable Impact injury through station based training plan
atmosphere/near Musculoskeletal injury Environmental considerations to form part
water/trip hazard/burns Sprains and strains of pre-deployment assessment
from kettle Slips, trips and falls Full PPE to be worn when using all 110 volt
Burns and scalds equipment

*Risk Groups: A: Uniformed operational staff B: Uniformed non-operational staff C: Support staff D: Outside contractors/visitors E: Members of the public F: Vehicles/equipment G: Building/infrastructure H: Environment

Page 1 of 2
05_06
RISK ASSESSMENT RA1
Continuation Sheet

Pre-control Residual RA2 for


HAZARD
Risk Risk risk rating risk rating further
Product/Activity/ Risk/Consequence Control measures in use
No. Groups* controls
Plant/Equipment L S R L S R (Yes/No)
4 Electric shock from 110 volt Death ABC 2 5 10 PAT testing of all 110 Volt equipment 1 5 5 No
equipment (defective Burns and scalds Regular maintenance and testing in line L
equipment) with standard testing routines
Replacement programme for all
equipment as per service policy
5 Exposure to water Death ABC 3 5 15 Staff trained in use of equipment 1 5 5 No
Burns and scalds Regular familiarisation of equipment L
through station based training plan
Environmental considerations to form
part of pre-deployment assessment
Full PPE to be worn
6 Noise and vibration Hearing impairment ABC 3 4 12 Staff trained in use of equipment 1 4 4 No
Vibration injury Regular familiarisation of equipment L
through station based training plan
Full PPE to be worn (ear plugs/defenders
when using saw)
7 Inserting/Replacing/Removing Cuts and contusions ABC 2 4 8 Alligator saw unplugged prior to 1 4 4 No
saw blade (alligator saw on Contact with moving parts inserting/replacing/removing blade L
TRU’s) Full PPE (gloves) to be worn when
inserting/replacing/removing blade
Training given to staff on
inserting/replacing/removing blades

Assessor (name): N Howell Signature: Date: 18/04/2016


Safety representative (name): S Oakman Signature: Date: 25/04/2016
Manager (name): M Rist Signature: Date: 25/04/2016
H&S Team verifier (name): W Frampton Signature: Date: 25/04/2016

*Risk Groups: A: Uniformed operational staff B: Uniformed non-operational staff C: Support staff D: Outside contractors/visitors E: Members of the public F: Vehicles/equipment G: Building/infrastructure H: Environment