Sei sulla pagina 1di 23

PROJECT NAME: PROPOSED 2 STOREY RESIDENCE

PROJECT LOCATION: BRGY. MARCELO GREEN, PARANAQUE CITY


SUBJECT: BILL OF MATERIALS VS ACTUAL QUANTITIES

ITEM DESCRIPTION BOM UNIT ACTUAL QTY

1. MASONRY WORKS
A. GROUND FLOOR
100mm CHB 158 pcs. 1044
150mm CHB 295 pcs. 1195
Portland Cement 37 bags 157
Sand 0 cu.m. 17.36
10mm dia. X 6.00m Deformed bar 24 pcs. 146
#16 G.I. Tie wire 0.5 kgs. 4.07

B. SECOND FLOOR
100mm CHB 1396 pcs. 1268
150mm CHB 1771 pcs. 1723
Portland cement 259 bags 214
Sand 26.29 cu.m. 23.67
10mm dia. X 6.00m Deformed bar 168 pcs. 194
#16 G.I. Tie wire 3.75 kgs. 5.44

C. ROOF
150mm CHB 348 pcs. 374
Portland cement 29 bags 29
Sand 2.89 cu.m. 3.16
10mm dia. X 6.00m Deformed bar 19 pcs. 25
#16 G.I. Tie wire 0.5 kgs. 0.68

2. CONCRETING WORKS
A. F1 (8 UNITS)
Portland cement 58 bags 58
Sand 3.6 cu.m. 3.6
Gravel 7.2 cu.m. 7.2
16mm dia. X 6.00m Deformed bar 40 pcs. 40
#16 G.I. Tie wire 4.75 kgs. 4.53

B. F2 (15 UNITS)
Portland cement 61 bags 61
Sand 3.78 cu.m. 3.78
Gravel 7.56 cu.m. 7.56
16mm dia. X 6.00m Deformed bar 54 pcs. 54
#16 G.I. Tie wire 7 kgs. 8.49
C. C1
Portland cement 80 bags 100
Sand 4.95 cu.m. 6.23
Gravel 9.9 cu.m. 12.46
10mm dia. X 6.00m Deformed bar 180 pcs. 198
16mm dia. X 6.00m Deformed bar 138 pcs. 171
#16 G.I. Tie wire 30.5 kgs. 33.55

D. C2
Portland cement 60 bags 30
Sand 3.71 cu.m. 1.85
Gravel 7.42 cu.m. 3.69
10mm dia. X 6.00m Deformed bar 160 pcs. 52
16mm dia. X 6.00m Deformed bar 99 pcs. 48
#16 G.I. Tie wire 21.75 kgs. 7.07

E. WF
Portland cement 7 bags 8
Sand 0.39 cu.m. 0.5
Gravel 0.78 cu.m. 0.99
10mm dia. X 6.00m Deformed bar 8 pcs. 8
#16 G.I. Tie wire 0.75 kgs. 0.75

F. SLAB ON FILL
Portland cement 247 bags 243
Sand 17.6 cu.m. 17.31
Gravel 35.2 cu.m. 34.62
12mm dia. X 6.00m Deformed bar 294 pcs. 282
#16 G.I. Tie wire 12.5 kgs. 11.99

G. B-1
Portland cement 69 bags 69
Sand 4.26 cu.m. 4.29
Gravel 8.52 cu.m. 8.59
10mm dia. X 6.00m Deformed bar 114 pcs. 128
16mm dia. X 6.00m Deformed bar 110 pcs. 108
#16 G.I. Tie wire 18.75 kgs. 21.05

H. B-2
Portland cement 17 bags 41
Sand 1.04 cu.m. 2.54
Gravel 2.08 cu.m. 5.08
10mm dia. X 6.00m Deformed bar 30 pcs. 51
16mm dia. X 6.00m Deformed bar 28 pcs. 56
#16 G.I. Tie wire 5.25 kgs. 8.93

I. SLAB
Portland cement 143 bags 134
Sand 8.9 cu.m. 8.34
Gravel 17.8 cu.m. 16.68
12mm dia. X 6.00m Deformed bar 463 pcs. 394
#16 G.I. Tie wire 39.5 kgs. 29.02

J. RB-1
Portland cement 95 bags 99
Sand 5.93 cu.m. 6.14
Gravel 11.86 cu.m. 12.29
10mm dia. X 6.00m Deformed bar 152 pcs. 154
16mm dia. X 6.00m Deformed bar 150 pcs. 156
#16 G.I. Tie wire 25.5 kgs. 25.84

K. RB-2
Portland cement 13 bags 23
Sand 0.81 cu.m. 1.4
Gravel 1.62 cu.m. 2.8
10mm dia. X 6.00m Deformed bar 34 pcs. 51
16mm dia. X 6.00m Deformed bar 24 pcs. 30
#16 G.I. Tie wire 4.25 kgs. 6.38

L. STAIRS (NO DIMENSIONS)


Portland cement 29 bags ----
Sand 1.8 cu.m. ----
Gravel 3.6 cu.m. ----
10mm dia. X 6.00m Deformed bar 34 pcs. ----
12mm dia. X 6.00m Deformed bar 25 pcs. ----
#16 G.I. Tie wire 4 kgs. ----

3. STEEL WORKS
A. T-1 (6 UNITS)
6.0mm X 50 X 50 X 6.0m Angle bar (TC) 27 pcs. 27
3.0mm X 40 X 40 X 6.0m Angle bar (WM) 52 pcs. 50
6.0mm X 50 X 50 X 6.0m Angle bar (KP) 6 pcs. 3
6.0mm X 50 X 50 X 6.0m Angle bar (BC) 27 pcs. 24
6.0mm X 50 X 50 X 6.0m Angle bar (Shelf) 5 pcs. 8
Welding rod 9 kgs. 9

B. T-2 (4 UNITS)
6.0mm X 50 X 50 X 6.0m Angle bar (TC) 9 pcs. 9
3.0mm X 40 X 40 X 6.0m Angle bar (WM) 14 pcs. 13
6.0mm X 50 X 50 X 6.0m Angle bar (KP) 2 pcs. 2
6.0mm X 50 X 50 X 6.0m Angle bar (BC) 9 pcs. 8
6.0mm X 50 X 50 X 6.0m Angle bar (Shelf) 2 pcs. 2
Welding rod 3 kgs. 3

C. PURLINS
2.0mm X 50 X 100 X 6.0m Channel (Purlins) 82 pcs. 64
10mm dia. X 6.00m Round bar (Sag rod) 20 pcs. 23
6.0mm X 50 X 50 X 6.0m Angle bar (Cleats) 2 pcs. ----
Welding rod 11.25 kgs. 8.78

4. TINSMITHRY
#0.40mm Long span 374 lm. ----
#0.40mm Gutter 8 pcs. ----
#0.40mm Flashing 30 pcs. ----
GA# 24 X 8 Plain G.I. sheet (Inside gutter) 8 pcs. ----
GA# 24 X 8 Plain G.I. sheet (Flashing) 9 pcs. ----
Teckscrew 3000 pcs. ----
Blind rivet 150 pcs. ----
3" dia. PVC elbow 30 pcs. ----
3" dia. X 10 PVC pipe (Sch. 40) 23 pcs. ----
Vulca seal 1 gal. ----
Solvent cement (400 cc) 4 cans ----

5. CARPENTRY
A. GROUND FLOOR
2 X 4 X 12 S4S Tanguile KD (Kitchen) 2 pcs. ----
2 X 4 X 10 S4S Tanguile KD (Kitchen) 2 pcs. ----
2 X 4 X 8 S4S Tanguile KD (Kitchen) 5 pcs. ----
3/4" thk. Plywood (Ktchen, Pantry & Closet) 32 pcs. ----
1/2 X 2 X 12 S2S (Strip) 14 pcs. ----

B. SECOND FLOOR
1 X 12 X 20 S4S Tanguile KD (FB) 7 pcs. ----
1 X 12 X 18 S4S Tanguile KD (FB) 1 pcs. ----
1 X 12 X 14 S4S Tanguile KD (FB) 2 pcs. ----
1 X 12 X 12 S4S Tanguile KD (FB) 3 pcs. ----
1 X 12 X 10 S4S Tanguile KD (FB) 2 pcs. ----
3/4" thk. Plywood (Closet) 18 pcs. ----
1/2 X 2 X 12 S2S (Strip) 18 pcs. ----

6. HARDWARE
A. GROUND FLOOR
Asstd. Nail 20 kgs. ----
Stickwell 4 pints ----
Washington hinge 96 pcs. ----
Roller catches 96 pcs. ----
Steel handle 4" 48 pcs. ----

B. SECOND FLOOR
Asstd. Nail 30 kgs. ----
Stickwell 4 pints ----
Washington hinge 64 pcs. ----
Roller catches 64 pcs. ----
Steel handle 4" 32 pcs. ----
7. FABRICATED MATERIALS
A. DOORS
1.60m X 2.40m Double Panel Door (Swing 1 sets 1
type) w/ 2X6 Jamb and accessories (D-1)
3.00m X 2.40m Sliding UPVC Door (D-2) 2 sets 2
0.80m X 2.40m Panel Door (Swing type) w/ 3 sets 3
2X4 Jamb and accessories (D-3)

0.60m X 2.10m Flush Door (Swing type) w/ 1 sets 1


2X4 Jamb and accessories (D-4)

0.80m X 2.10m Flush Door (Double Swing 1 sets 1


type) w/ 2X4 Jamb (D-5)

0.80m X 2.10m Flush Door (Swing type) w/ 2 sets 2


2X3 Jamb and accessories (D-6)

0.60m X 2.10m Flush Door PVC (Swing type) 2 sets 2


w/ 2X4 Jamb and accessories (D-7)

0.80m X 2.10m Panel Door (Swing type) w/


4 sets 4
2X4 Jamb and accessories (D-8)

0.60m X 2.10m Flush Door (Swing type) w/ 1 sets 1


2X4 Jamb and accessories (D-10)
0.80m X 2.10m Flush Door (Sliding type) w/ 1 sets 1
2X3 Jamb and accessories (D-11)

B. WINDOWS
2.40m X 2.40m w/ 6mm thk. Bronze glass on 1 sets 1
UPVC Sliding window framing (W1)

1.95m X 2.40m w/ 6mm thk. Bronze glass on 2 sets 2


UPVC Fixed window framing (W2)

1.50m X 1.80m w/ 6mm thk. Bronze glass on 2 sets 2


UPVC Sliding window framing (W3)

2.40m X 1.50m w/ 6mm thk. Bronze glass on 3 sets 3


UPVC Sliding window framing (W4)

0.60m X 0.90m w/ 6mm thk. Bronze glass on 1 sets 1


UPVC Awning window framing (W5)

1.20m X 1.50m w/ 6mm thk. Bronze glass on 3 sets 3


UPVC Sliding window framing (W6)

0.60m X 1.20m w/ 6mm thk. Bronze glass on 2 sets 2


UPVC Awning window framing (W7)

1.20m X 1.20m w/ 6mm thk. Bronze glass on 2 sets 2


UPVC Sliding window framing (W8)

1.80m X 1.20m w/ 6mm thk. Bronze glass on 2 sets 2


UPVC Sliding/Awning window framing (W9)

2.40m X 1.20m w/ 6mm thk. Bronze glass on 7 sets 7


UPVC Sliding window framing (W10)
0.60m X 0.60m w/ 6mm thk. Bronze glass on 1 sets 1
UPVC Awning window framing (W11)

1.20m X 1.80m w/ 6mm thk. Bronze glass on 1 sets 1


UPVC Fixed window framing (W12)

2.40m X 1.80m w/ 6mm thk. Bronze glass on 1 sets 1


UPVC Fixed window framing (W13)

8. CEILINGS
A. GROUND FLOOR
4.5mm thk. Hardiflex on metal Furrings 10.35 sq.m. ----
12mm thk. Gypsum board on metal furrings 171.25 sq.m. 166.78

B. SECOND FLOOR
4.5mm thk. Hardiflex on metal furrings 14.46 sq.m. ----
12mm thk. Gypsum board on metal furrings 192.28 sq.m. 178.97
PVC Panels 65.3 sq.m. ----

9. FORMWORKS & SCAFFOLDINGS


1/2" thk. Plywood (Kitchen) 92 pcs. ----
Coco lumber 11000 pcs. ----
Asstd. Nail 40 kgs. ----

10. INSTALLATION OF STEEL RAILING


Steel railing 1 lot ----

11. FLOOR FINISH


A. GROUND FLOOR
600mm X 600mm Granite floor tiles 244 pcs. ----
Laminated wood planks 55 boxes ----
400mm X 400mm Ceramic floor tiles 219 pcs. ----
Portland cement 40 bags ----
Sand 5.65 cu.m. ----
Groute (2 kgs.) 90 bags ----

B. SECOND FLOOR
Laminated wood planks 81 boxes ----
#10 Pebble wash-out 75 cans ----
Portland cement 53 bags ----
Sand 5.08 cu.m. ----

C. STAIRS
50mm X 300mm Wood planks floor 17 pcs. ----
Nozzing 20 pcs. ----

12. TILEWORKS
A. GROUND FLOOR
300mm X 300mm Ceramic floor tiles 68 pcs. ----
200mm X 300mm Ceramic wall tiles 570 pcs. ----
Adhesive (5 kgs.) 26 bags ----
Groute (2 kgs.) 17 bags ----

B. SECOND FLOOR
300mm X 300mm Ceramic floor tiles 161 pcs. ----
200mm X 300mm Ceramic wall tiles 892 pcs. ----
Adhesive (5 kgs.) 65 bags ----
Groute (2 kgs.) 41 bags ----

13. INSTALLATION OF KITCHEN COUNTER TOP


25mm x 600mm Synthetic granite slab 140 pcs. ----

14. CATCH BASIN


Catch basin w/ drainage line 17 units ----

15. SEPTIC VAULT


Septic vault 1 unit ----

16. PLUMBING
Plumbing 1 lot ----

17. ELECTRICAL
Electrical 1 lot ----

18. INSTALLATION OF INSULATION


Insulation 1 lot ----

19. GRAVEL BEDDING


Gravel bedding 1 lot ----

20. PAINTING
Painting 1 lot ----
DIFFERENCE

-886
-900
-120
-17.36
-122
-3.57

128
48
45
2.62
-26
-1.69

-26
0
-0.27
-6
-0.18

0
0
0
0
0.22

0
0
0
0
-1.49
-20
-1.28
-2.56
-18
-33
-3.05

30
1.86
3.73
108
51
14.68

-1
-0.11
-0.21
0
0

4
0.29
0.58
12
0.51

0
-0.03
-0.07
-14
2
-2.3

-24
-1.5
-3
-21
-28
-3.68

9
0.56
1.12
69
10.48

-4
-0.21
-0.43
-2
-6
-0.34

-10
-0.59
-1.18
-17
-6
-2.13

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0
2
3
3
-3
0

0
1
0
1
0
0

18
-3
#VALUE!
2.47

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0

0
0

#VALUE!
4.47

#VALUE!
13.31
#VALUE!

#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!
TITLE PROPOSED 2 STOREY RESIDENCE
LOCATION BRGY. MARCELO GREEN, PARANAQUE CITY

LABOR COST

ESTIMATED
SCOPE OF WORK UNITS UNIT COST TOTAL COST
QUANTITY

MASONRY WORKS
A. GROUND FLOOR
CHB Laying 203.50 sq.m. 144.00 29,304.00
CHB Plastering 407.00 sq.m. 144.00 58,608.00
B. SECOND FLOOR
CHB Laying 217.83 sq.m. 144.00 31,367.52
CHB Plastering 435.66 sq.m. 144.00 62,735.04
C. ROOF
CHB Laying 33.84 sq.m. 144.00 4,872.96
CHB Plastering 67.68 sq.m. 144.00 9,745.92
SUB-TOTAL 196,633.44

CONCRETING WORKS
A. F1 (8 UNITS)
Formworks 19.20 sq.m. 240.00 4,608.00
Rebars 379.26 kgs. 4.50 1,706.67
Concreting 7.20 cu.m. 145.00 1,044.00
B. F2 (15 UNITS)
Formworks 25.20 sq.m. 240.00 6,048.00
Rebars 512.00 kgs. 4.50 2,304.00
Concreting 7.56 cu.m. 145.00 1,096.20
C. C1 (19 UNITS)
Formworks 186.96 sq.m. 240.00 44,870.40
Rebars 2,354.67 kgs. 4.50 10,596.02
Concreting 12.46 cu.m. 145.00 1,807.28
D. C2 (4 UNITS)
Formworks 45.92 sq.m. 240.00 11,020.80
Rebars 647.70 kgs. 4.50 2,914.65
Concreting 3.69 cu.m. 145.00 535.05
E. WF
Formworks 4.97 sq.m. 240.00 1,192.80
Rebars 29.63 kgs. 4.50 133.34
Concreting 1.00 cu.m. 145.00 144.28
F. SLAB ON FILL
Formworks 10.71 sq.m. 240.00 2,570.88
Rebars 1,504.00 kgs. 4.50 6,768.00
Concreting 34.62 cu.m. 145.00 5,020.48
G. B1
Formworks 107.34 sq.m. 240.00 25,760.40
Rebars 1,498.07 kgs. 4.50 6,741.32
Concreting 8.59 cu.m. 145.00 1,245.12
H. B2
Formworks 50.78 sq.m. 240.00 12,187.20
Rebars 719.85 kgs. 4.50 3,239.33
Concreting 5.08 cu.m. 145.00 736.31
I. SLAB
Formworks 172.02 sq.m. 240.00 41,285.28
Rebars 2,101.33 kgs. 4.50 9,455.99
Concreting 16.68 cu.m. 145.00 2,418.60
J. RB-1
Formworks 153.60 sq.m. 240.00 36,864.48
Rebars 2,049.48 kgs. 4.50 9,222.66
Concreting 12.29 cu.m. 145.00 1,781.76
K. RB-2
Formworks 19.42 sq.m. 240.00 4,661.04
Rebars 473.33 kgs. 4.50 2,129.99
Concreting 2.80 cu.m. 145.00 405.57
SUB-TOTAL 262,515.86

CEILING WORKS
A. GROUND FLOOR
Hardiflex 10.35 sq.m. 250.00 2,587.50
Gypsum board 171.25 sq.m. 250.00 42,812.50
B. SECOND FLOOR
Hardiflex 14.46 sq.m. 250.00 3,615.00
Gypsum board 192.98 sq.m. 250.00 48,245.00
PVC panels 65.30 sq.m. 250.00 16,325.00
SUB-TOTAL 113,585.00

FLOOR FINISH
A. GROUND FLOOR
600X600mm Granite tiles 87.84 sq.m. - -
400X400mm Ceramic tiles 35.04 sq.m. - -
SUB-TOTAL -

TILE WORKS
A. GROUND FLOOR
300X300mm Ceramic floor tiles 6.12 sq.m. - -
200X300mm Ceramic wall tiles 34.20 sq.m. - -
B. SECOND FLOOR
300X300mm Ceramic floor tiles 14.49 sq.m. - -
200X300mm Ceramic wall tiles 53.52 sq.m. - -
SUB-TOTAL -

GRAND TOTAL 572,734.30


TITLE PROPOSED 2 STOREY RESIDENCE
LOCATION BRGY. MARCELO GREEN, PARANAQUE CITY

MASONRY WORKS

GROUND FLOOR OPENINGS


W H
EXTERIOR WALLS HEIGHT 3.3 D1 1.6 2.4
PERIMETER 48.53 D2 3 2.4
AREA 160.149 D3 0.8 2.4
OPENINGS 51.54 D4 0.6 2.1
A-O 108.609 D5 0.8 2.1
CHB 6" 1195 pcs. D6 0.8 2.1
D7 0.6 2.1
INTERIOR WALLS HEIGHT 3.3 D8 0.8 2.1
PERIMETER 32.99 D10 0.6 2.1
AREA 108.867 D11 0.8 2.1
OPENINGS 13.98
A-O 94.887
CHB 4" 1044 pcs. W1 2.4 2.4
W2 1.95 2.4
CEMENT 157 bags W3 1.5 1.8
SAND 17.364 cu.m. W4 2.4 1.5
6m rebars 146 pcs. W5 0.6 0.9
TIE WIRE 4.070 kgs. W6 1.2 1.5
W7 0.6 1.2
W8 1.2 1.2
SECOND FLOOR W9 1.8 1.2
W10 2.4 1.2
EXTERIOR WALLS HEIGHT 2.8 W11 0.6 0.6
PERIMETER 74.65 W12 1.2 1.8
AREA 209.02 W13 2.4 1.8
OPENINGS 52.44
A-O 156.58
CHB 6" 1723 pcs.

INTERIOR WALLS HEIGHT 2.8


PERIMETER 44.46
AREA 124.488
OPENINGS 9.24
A-O 115.248
CHB 4" 1268 pcs.

CEMENT 214 bags


SAND 23.665 cu.m.
6m rebars 194 pcs.
TIE WIRE 5.437 kgs.

ROOF

MAIN HOUSE HEIGHT 0.5


PERIMETER 49.46
AREA 24.73
OPENINGS 0
A-O 24.73
CHB 6" 273 pcs.

SERVANT'S HEIGHT 0.3


PERIMETER 30.36
AREA 9.108
OPENINGS 0
A-O 9.108
CHB 6" 101 pcs.

CEMENT 29 bags
SAND 3.160 cu.m.
6m rebars 25 pcs.
TIE WIRE 0.677 kgs.
NINGS
O
3.84
7.2
1.92
1.26
1.68
1.68
1.26
1.68
1.26
1.68

5.76
4.68
2.7
3.6
0.54
1.8
0.72
1.44
2.16
2.88
0.36
2.16
4.32
TITLE PROPOSED 2 STOREY RESIDENCE
LOCATION BRGY. MARCELO GREEN, PARANAQUE CITY

CONCRETING WORKS

STRUC F1 STRUC F2
QTY 8 UNITS QTY 15 UNITS
B 1.5 m. B 1.2 m.
W 1.5 m. W 1.2 m.
H 0.4 m. H 0.35 m.
VOLUME 0.9 cu.m. VOLUME 0.504 cu.m.
TOTAL 7.2 cu.m. TOTAL 7.56 cu.m.

CEMENT 58 bags CEMENT 61 bags


SAND 3.60 cu.m. SAND 3.78 cu.m.
GRAVEL 7.20 cu.m. GRAVEL 7.56 cu.m.
6m rebars 40 pcs. 6m rebars 54 pcs.
TIE WIRE 4.53 kgs. TIE WIRE 8.49 kgs.

STRUC C1 STRUC C2
QTY 19 UNITS QTY 4 UNITS
B 0.2 m. B 0.25 m.
W 0.4 m. W 0.45 m.
H 8.2 m. H 8.2 m.
VOLUME 0.656 cu.m. VOLUME 0.9225 cu.m.
TOTAL 12.464 cu.m. TOTAL 3.69 cu.m.

CEMENT 100 bags CEMENT 30 bags


SAND 6.23 cu.m. SAND 1.85 cu.m.
GRAVEL 12.46 cu.m. GRAVEL 3.69 cu.m.
Ties 198 pcs. Ties 52 pcs.
Main bars 171 pcs. Main bars 48 pcs.
TIE WIRE 33.55 kgs. TIE WIRE 7.07 kgs.

STRUC WF STRUC SLAB ON FILL


QTY 1 UNITS QTY 1 UNITS
L 12.432 m.
AREA 173.12 sq.m.
W 0.4 m.
H 0.2 m. H 0.2 m.
VOLUME 0.995 cu.m. VOLUME 34.624 cu.m.
TOTAL 0.995 cu.m. TOTAL 34.624 cu.m.
CEMENT 8 bags CEMENT 243 bags
SAND 0.50 cu.m. SAND 17.31 cu.m.
GRAVEL 0.99 cu.m. GRAVEL 34.62 cu.m.
6m rebars 8 pcs. 6m rebars 282 pcs.
TIE WIRE 0.75 kgs. TIE WIRE 11.99 kgs.

STRUC B1 STRUC B2
QTY 1 UNITS QTY 1 UNITS
TOTAL L 107.335 m. TOTAL L 40.624 m.
W 0.2 m. W 0.25 m.
H 0.4 m. H 0.5 m.
VOLUME 8.587 cu.m. VOLUME 5.078 cu.m.
TOTAL 8.587 cu.m. TOTAL 5.078 cu.m.

CEMENT 69 bags CEMENT 41 bags


SAND 4.29 cu.m. SAND 2.54 cu.m.
GRAVEL 8.59 cu.m. GRAVEL 5.08 cu.m.
Stirrups 128 pcs. Stirrups 51 pcs.
Main bars 108 pcs. Main bars 56 pcs.
TIE WIRE 21.05 kgs. TIE WIRE 8.93 kgs.

STRUC RB1 STRUC RB2


QTY 1 UNITS QTY 1 UNITS
TOTAL L 153.602 m. TOTAL L 15.537 m.
W 0.2 m. W 0.45 m.
H 0.4 m. H 0.4 m.
VOLUME 12.288 cu.m. VOLUME 2.797 cu.m.
TOTAL 12.288 cu.m. TOTAL 2.797 cu.m.

CEMENT 99 bags CEMENT 23 bags


SAND 6.14 cu.m. SAND 1.40 cu.m.
GRAVEL 12.29 cu.m. GRAVEL 2.80 cu.m.
Stirrups 154 pcs. Stirrups 51 pcs.
Main bars 156 pcs. Main bars 30 pcs.
TIE WIRE 25.84 kgs. TIE WIRE 6.38 kgs.

STRUC SLAB STRUC STAIRS


QTY 1 UNITS QTY 17 UNITS
AREA 166.782 sq.m. AREA 0.063 sq.m.

H 0.1 m. H 1 m.
VOLUME 16.6782 cu.m. VOLUME 0.063 cu.m.
TOTAL 16.6782 cu.m. TOTAL 1.539 cu.m.

CEMENT 134 bags CEMENT 13 bags


SAND 8.34 cu.m. SAND 0.77 cu.m.
GRAVEL 16.68 cu.m. GRAVEL 1.54 cu.m.
6m rebars 394 pcs. 6m rebars 1 pcs.
TIE WIRE 29.02 kgs. TIE WIRE 0.01 kgs.

Potrebbero piacerti anche