SURIA 1000 is a national programme by the Malaysia Building Integrated Photovoltaic (MBIPV) Project funded by the
Government of Malaysia with support from United Nations Development Programme (UNDP), Global Environment
Facility (GEF), Suruhanjaya Tenaga and the private sector. The programme targets at least 1,000 kWp of building
integrated photovoltaic (BIPV) installations at residential and commercial buildings. These BIPV systems will allow the
buildings owners to generate their own electricity from the solar energy.
st
SURIA 1000 operates on a bidding process in which the call for bidding will be open twice a year, starting from 1
December 2006 and will be repeated every six months (every June and December) ending in 2009. The programme is
applicable to all existing and new premises, but limited to grid-connected BIPV applications.
st st
This final call (from 1 July 2009 to 1 December 2009) is applicable to residential houses (min 3 to max 10kWp)
and commercial buildings (min 3 to max 30kWp). The total PV capacity offered in the final call is 340 kWp.
So, why wait? Apply for SURIA 1000 now and you will have the opportunity to generate your own electricity from the
sun, and effectively reduce reliance on conventional electricity from the utility. This will also reduce your electricity bill!
For further information on what BIPV is all about, please browse through our website at www.mbipv.net.my
FOUR (4) EASY STEPS TO PARTICIPATE IN THREE (3) STEPS TO PARTICIPATE IN SURIA 1000
SURIA 1000 PROGRAMME PROGRAMME
Step 1: Read thoroughly this form including the Step 1: Promptly respond to Applicant‘s request, or
Terms & Conditions, Guideline for seek your own clients.
Application (Annex 1) and Procedure &
Flow chart (Annex 2). Step 2: Submit a Project Brief (refer to Page 2) and a
Quotation to the Applicant.
Step 2: Contact any of the Listed PV Service
Providers. Step 3: Once authorized by the Applicant, obtain the
bidding price from the Applicant and submit
Step 3: Obtain a Project Brief and a Quotation the completed application not later than
st
from the PV Service Provider. 1 December 2009 before 5.00 pm to:
Step 4: Once agreed with the Project Brief and The SURIA 1000 Secretariat - MBIPV Project
Quotation, determine the bidding price Pusat Tenaga Malaysia
(Part B-Application form). Authorize the No. 2 Jalan 9/10
PV Service Provider to complete and Persiaran Usahawan
submit the Application on your behalf. 43650 Bandar Baru Bangi
Selangor Darul Ehsan
Disclaimer: PTM/MBIPV reserves the right to change any information provided without prior notice.
Page 1
Information to PV Service Providers
1. Introduction
2. Project information and relevant photographs (as applicable)
3. Overall system description
4. System design and expected energy output calculation
5. System quotation (break down as follows: PV modules, inverter, mounting structures, electrical works and
others such as design cost etc)
i. Price inclusive of tax/duty (PV modules and inverters only). Please specify the tax amount for
these two items.
ii. Price exclusive of tax/duty.
6. Product brochures /technical literature
7. Warranty (to state year of warranty for major equipment) and product certification
Submission Checklist
1. Technical section
2. Financial section
Submission Format
Each submission shall contain a Technical Section and a Financial Section (sealed).
Note: Please have your submission acknowledged by PTM/MBIPV for record purpose.
Page 2
Terms and Conditions of Applications
1. The following provisions are to be deemed notice to the Applicant in so far as they may affect the processing and
approval of the application of the Applicant and shall also be deemed to form part of the conditions of any contract if
any is made with the Applicant or the basis or conditions upon which any approval is made or granted.
2. The Applicant should prior to submitting the Application Form and required documents study the Annexes hereunder
to ensure that his/her application comply with the terms and conditions of these Annexes.
3. The Applicant is to bear all cost and expenses in the preparation of the submission in order to ascertain and satisfy
themselves as to the extent, risk and obligations required on this exercise.
4. PTM/MBIPV is not bound to accept or approve this application and no reasons need to be assigned for any rejection
of this application.
5. The Application Form and the Annexes shall not be detached one from the other and no alteration or deletion (other
than filing up of the blanks) shall be made in any documents attached thereto.
6. The terms and conditions appearing herein and in the Annexes shall not be deemed to be comprehensive or
exhaustive and that PTM/MBIPV may at any time and from time to time supplement or add any reasonable
additional terms and conditions hereto.
7. Should there be any doubt or inconsistencies as to the meaning of any part of the Application Form and the
Annexes or as to anything whatsoever related to the application herein, the Applicant shall before the submission of
the Application Form write to (for required clarifications):
Email: suria1000@mbipv.net.my
8. Nothing in the Application Form and Annexes shall be deemed and or construed as a representation, warranty or
undertaking of any kind in the favour of the Applicant. No misstatement any facts and figures contained herein shall
be deemed to be a misrepresentation or breach of any warranty or undertaking by PTM/MBIPV.
9. The Applicant shall be solely responsible in the selection and appointment of the PV Service Provider. PTM has not
and will not be deemed to warrant in any whatsoever the performance ability or quality of the PV Service Provider.
10. PTM/MBIPV shall be entitled to review the approval of this Application at anytime and from time to time if the
Applicant shall fail, refuse and or neglect to comply with the terms and conditions contained herein or the Annexes.
11. The Application Form and the process thereafter shall be governed by and construed in all respects in accordance
with Malaysian law.
12. The approval of this application is not capable of being transferred or assigned without obtaining the prior written
consent of PTM/MBIPV.
13. All decisions in processing of this Application shall not be capable of being reviewed or appealed against.
Page 3
nd
Form PTM/MBIPV/SURIA/2 amend 2008
Ref No.:
Name:
Mailing address:
Email:
Building status: Existing (year completed _______) New (expected completion year )
Average monthly electricity bill in RM BIPV installed capacity required: _________ kWp
Business address:
Email:
Note: The BIPV system shall only be installed by the Listed PV Service Provider as provided by PTM/MBIPV and shall comply to
MS1837.
Page 4
Section 4: Declaration (By Applicant)
I hereby certify that, to the best of my knowledge, all the information provided in this application is true and
correct.
I have read, understood and agreed to the terms and conditions as per the Guidelines and Requirements for
SURIA 1000 programme.
I hereby agree to participate in the PV monitoring programme carried out by the PV Monitoring Centre.
Name:
I/C No.:
Date: ________________________
Signature:
Name:
I/C No.:
Note: The completed form (Part A only) and Project Brief shall be included in one envelope clearly marked
’Technical Section’.
Signature:
Date:
Verified by:
Signature:
Date:
Information:
The MBIPV Project is a national project funded by the Government of Malaysia and
Global Environment Facility through United Nations Development Programme:
The MBIPV Project objective is to reduce the growth rate of GHG emissions
from fossil fuel fired powered generators by reducing the long term cost of the
BIPV technology. This is achieved through the widespread implementation of
BIPV applications and creation of enabling environments.
Page 5
Form PTM/MBIPV/SURIA/2 nd amd 2008
Ref No.:
Bidding price (Please take note that bidding amount is based on price excluding
duty/taxes).
Bidding price: RM
Ringgit Malaysia:
Ringgit Malaysia:
I hereby certify that, to the best of my knowledge, all the information provided in this application is true and
correct.
I have read, understood and agreed to the terms and conditions as per the Guidelines and Requirements for
SURIA 1000 programme.
Name:
I/C No.:
Note: The completed form (Part B only) shall be included in one envelope clearly marked ‘Financial Section’.
Information:
The MBIPV Project is a national project funded by the Government of Malaysia and
Global Environment Facility through United Nations Development Programme:
The MBIPV Project objective is to reduce the growth rate of GHG emissions
from fossil fuel fired powered generators by reducing the long term cost of the
BIPV technology. This is achieved through the widespread implementation of
BIPV applications and creation of enabling environments.
Page 6
Malaysia Building Integrated Photovoltaic (MBIPV) Project
Page 7
ANNEX 2: Procedure Flow Chart for Application – SURIA 1000 Programme
st st
START Step 1: Application* opens for participation on 1 Dec and 1 June of
each year starting from 2006 to 2009 (forms available from the MBIPV
website at www.mbipv.net.my ).
Step 2: The applicant has to contact and consult any of the Approved
1. APPLICATION PV service provider (the list is available on the MBIPV Project website).
OPEN
Step 3: The applicant/PV service provider has to complete the
application form including the project brief (site location, PV capacity,
BIPV design/technical information and system quotation) and the
bidding price/kWp.
2. CONTACT WITH PV
SERVICE PROVIDER
Each submission shall contain two separately sealed envelopes (clearly
marked with ‘Technical Section’ and ‘Financial Section’ respectively).
The technical section shall contain the Application Form-Part A and the
3. APPLICANT TO COMPLETE AND SUBMIT
project brief. The financial section shall contain the Application Form-
APPLICATION FORM with PROJECT BRIEF AND Part B.
BIDDING PRICE/kWp
Step 4: Applications will close on 1st December 2009 at 5.00 pm.
5. EVALUATION AND Step 6: The selection list shall be endorsed by the Committee and will
SELECTION be deemed final.
6. ENDOSEMENT BY COMMITTEE Step 8: The successful applicants shall be required to appoint his/her
selected PV service provider to fully install and commission the BIPV
system within the specified period from the result announcement date:
i. Existing building/residential house: 12 months.
7. ANNOUNCEMENT OF RESULT ii. New building/residential house: 24 months (further extension only
for reason accepted by and at the discretion of MBIPV Project).
: The successful applicant/PV service provider shall submit application
form for TNB grid–interconnection (as applicable) and a work
8. AWARD AND SIGN LETTER programme to MBIPV Project**.
OF ACCEPTANCE OF OFFER
Step 9: The PV service provider shall activate delivery of equipment,
complete system installation and commissioning (to be witnessed by
MBIPV Project, TNB and PV Monitoring Centre).
9. INSTALLATION AND : The PV service provider shall prepare and submit a commissioning
COMMISSIONING report to MBIPV Project and TNB.
• RETROFIT (12 MONTHS)
• NEW (24 MONTHS) Step 10: The successful applicant has to participate in system
monitoring (for three years through the appointed PV Monitoring
Centre).
10. PARTICIPATE IN MONITORING * To follow the guidelines and requirements for application to the SURIA
(MIN 3 YEARS) PROGRAMMES 1000 programme, available at the MBIPV Project website.
Page 8