Table of Content
Introduction .............................................................................................................................................. 1
Conclusion .............................................................................................................................................. 15
Appendix................................................................................................................................................... A
Appendix 1.1 ......................................................................................................................................... A
Appendix 1.2 ......................................................................................................................................... A
Appendix 1.3 ......................................................................................................................................... B
IDENTIFIED ENVIRONMENTAL & SOCIAL IMPACTS AND MITIGATION ACTIONS .............................. B
Environmental Impacts ................................................................................................................. B
Social Impacts ................................................................................................................................ C
Calculation of Environmental and Social Impact Value (EIV)............................................................ C
Appendix 2.1 ......................................................................................................................................... D
Appendix 2.1.1 - 50-year flood level in Colombo............................................................................. D
Appendix 2.1.2 - Topographical Survey Map .................................................................................... E
Appendix 2.1.3 – Colombo flood detention areas .............................................................................F
Appendix 2.2 ......................................................................................................................................... G
Appendix 2.2.1 - Colombo Zoning map............................................................................................. G
iv
GROUP 24 – FINAL REPORT (PART 2)
References .................................................................................................................................................a
1
GROUP 24 – FINAL REPORT (PART 2)
Introduction
Green building is a practice of increasing the efficiency of a building and their various consumptions
and of reducing impacts on the environment and social background. As for the records the growth and
development of the community has cause serious negative impacts to the surrounding environment.
One of the responsible sectors of the consumption of resources are manufacturing, design,
construction and operation of buildings. Following data will provide a proper vision of how the
construction industry has been influenced in the matter of sustainability.
As leading education institute in Sri Lanka, Sri Lanka Institute of Information Technology has a vision to
the future to provide a comfortable and proper education background to the students who comes
there from around the country. One of the major plans is to construct a Hostel building which will
provide accommodation to five hundred students who are planning and currently educating. For the
planning and decision-making processes with reference to green building concept we use GREENSL®
RATING SYSTEM which is developed by the Green Building Council Sri Lanka. By the use of GREENSL®
RATING SYSTEM the new hostel building will be set for performance standards to certify the operations
and maintenance are done in a healthy, durable and affordable environmentally sound manner.
In the design of the hostel building following aspects where addressed in a more sophisticated manner
which will be discussed throughout the entire report.
2
GROUP 24 – FINAL REPORT (PART 2)
Criteria 1 – Management
Credit 1.3.2 Environment Management System (Complying with ISO 14001) (Point 1)
As Contractor we have valid ISO 14001 Environmental Management System (EMS) accreditation prior
to the project.
3
GROUP 24 – FINAL REPORT (PART 2)
Criteria 2 - SUSTAINABLE SITES
Credit 2.1– Site Selection (5 points)
Selected land is not an agricultural land and further its elevation is not lower than 1.5m above the
elevation of the 50-year flood level. (Refer appendix 2.1.1 and 2.1.2). land is not near to the costal. The
proposed land is not specifically identified as habitat for any species threatened or endangered species
by the Department of Wildlife Conservation – Ministry of Environment. Land is within the specified
distance of any wetland as defined by Central Environmental Authority. (Refer Appendix 2.1.3).
proposed land was not public parkland and furthermore its SLIIT property. Considering all the above-
mentioned facts site selection can achieve all the green points according to Green SL codes.
➢ As a requirement of UDA Traffic impact assessment will be carried out before construct the
parking area for further upgrades.
Option 3
Use an open-grid pavement system for the parking lot area.
Hence for a water efficient landscaping, can choose the plantations with reference to its potential
rainfall and climate temperature requirement. As for the rainfall data the Malabe area can be divided
into a Tropical climate zone. Hence for landscaping purposes flora such as are Orchids, Banana plants,
Bamboo, Fuchsia, Hibiscus, Trumpet vine, Passionflower will be used.
The building orientation will be helpful for more considerations accordance with the drawings. And
also in the design the ventilation also will be covered by providing proper windows and openings. The
design of the openings and floor heights are shown in appendix 4.1. (The dimensions were shown in
architectural drawings)
The energy saving expected value is 186.03kWh with reference to ASHRAE/IESNA Standard 90.1-2004
which is shown in appendix 4.2. Following are the credits that are obtained with reference to the above-
mentioned code.
7
GROUP 24 – FINAL REPORT (PART 2)
• Building Mass (Using light weight material such as “Hollow Core Panels” to reduce the dead load
and to provide faster construction to save energy. And also, the building walls will be constructed
with hollow core blocks to provide a thermal resistivity in warmer days. The typical wall core
thermal resistivity calculation is shown in appendix 4.3)
• Building Orientation.
• Natural Ventilation.
• Daylight and other lightening controls.
Mainly in here divert construction and demolition debris from landfills and incinerators, redirect
recyclables back to manufacturing process and redirect reusable materials to appropriate sites. Mainly
recycle will be done in the construction process. As a contractor records like receipts of recyclable and
waste diversion pickups, etc. will be maintained through the process and until end of the construction.
The most common recyclable materials in the project are concrete, wood, metal and cardboard. These
materials typically make up 70 to 95 percent of the discarded material at a residential or commercial
site. They are often discarded but are actually valuable commodities that can be recycled into new
products or used in many new ways. When perceived as waste, disposal of C&D materials (during
construction) is often viewed as simply part of the cost of doing business, and recycling and reusing
these materials are sometimes overlooked as management options. Recycling can benefit a
construction business’s bottom line, and it benefits the environment. (Refer Appendix 5.2)
In here, can reclaim brick from demolition contractors, then resells them. Three types of reclaimed
brick products:
• Thin Brick: Bricks are sliced and used as tile for walls, floors and walks.
• Common Brick: The company sells a variety of these bricks, which are the most common.
• Paving Brick: These bricks are meant for paving streets and sidewalks. The type of bricks is
always changing based on supply.
Will be able to disposal C&D materials wastes resources and landfill space and results in pollution when
new building materials are manufactured in their place. Deconstruction can be applied on a number of
levels to salvage usable materials and significantly cut waste and reduce disposal. This can range from
reusing an entire structure or foundation, to select assemblies and systems, to the careful removal of
specific materials or items for reuse.
9
GROUP 24 – FINAL REPORT (PART 2)
While complete deconstruction is the preferred and most sustainable method for removing or
renovating a structure, it is not always possible due to the type of building or its components. According
to the Department of Housing and Urban Development, highly deconstruct able buildings contain
specialty materials with high resale value. These include items such as hardwood flooring, multi-paned
windows, architectural moldings, and unique doors or plumbing/electrical material fixtures. Having
high-quality brick-laid construction with low-quality mortar. This construction allows for relatively easy
break-up and cleaning are structurally sound. Buildings with less rotted and decayed materials
maximize the potential for deconstruction. For the proposed hostel project do not meet one or more
of these criteria, partial deconstruction is an excellent option. In these cases, a combination of
deconstruction and demolition can be used.
• post-consumer
• pre-consumer
In the project recycling content is defined in accordance with ISO 14021 “Environmental Labeling and
Declarations – Environmental Supplier Declarations (Type II Environmental Label)”. A distinction is
made between post-consumer and pre-consumer recycling. Post-consumer materials are waste from
hostel building, (who are end-users of the products) that can no longer be used for their intended
purpose. This includes recycled material from the supply chain. In here pre-consumer materials are
separated from the waste stream in the manufacturing process. It does not include the reuse of
materials from post-processing, regrinding or scrap, which are generated during a technical process
and can be re-used in the same process.
In here we are going to Products sourced from manufacturers with self-declared reports are valued as
one half (1/2) of a product for credit achievement.
As second option, use products that meet at least one of the responsible extraction criteria below for
at least 25%, by cost, of the total value of permanently installed building products in the project.
Extended producer responsibility by Products purchased from a manufacturer (producer) that
participates in an extended producer responsibility program or is directly responsible for extended
producer responsibility. Products meeting extended producer responsibility criteria are valued at 50%
of their cost for the purposes of credit achievement calculation for our proposed hostel design.
For credit achievement calculation will take in to account, products sourced (extracted, manufactured,
and purchased) within 100 miles (160 km) of the project site are valued at 200% of their base
contributing cost. For credit achievement calculation, the base contributing cost of individual products
compliant with multiple responsible extraction criteria is not permitted to exceed 100% its total actual
cost (before regional multipliers) and double counting of single product components compliant with
multiple responsible extraction criteria is not permitted and in no case, is a product permitted to
contribute more than 200% of its total actual cost.
So, decide that structure and enclosure materials may not constitute more than 30% of the value of
compliant building products. Projects with significant amounts of structural and enclosure materials
may exceed the 30% limit by calculating an alternative structure and enclosure limit according to out
hostel project details.
In the pre-designs check to see which certified wood products are readily and locally available and work
these into the hostel building design and check which forest certify cation is acceptable. This will
depend upon the green building rating system in our project is following (many have adopted an
inclusive approach). In the design also focus on big-ticket items that can contribute to multiple credits
or Where dealing with large volume of a certain type of wood product (e.g., framing lumber).
Designs are mainly focusing in the price in Malabea area that available certified wood to determine
whether a rating system credit can be achieved or Weigh the value of using certified wood against the
use of local wood that has other environmental merits. If we need we are going to do a life cycle
assessment to determine the best option for the building project.
11
GROUP 24 – FINAL REPORT (PART 2)
In the building for mechanically ventilated space heat recovery ventilation system is used. By using a
HRV it will provide fresh air and improved the climate control of the building and it will save energy by
reducing heating requirements.
For naturally ventilated spaces we will use on the windows and ducts will be used for naturally
ventilated spaces. In our design we mainly focus to reduce the areas from mechanically ventilation.
Design steps for naturally ventilation system were given in the appendix 6.2.1.
12
GROUP 24 – FINAL REPORT (PART 2)
In the design the shape of our building is h type which offers many rooms that can let light in from two
sides. (Refer Appendix 6.9)
Provide the design and project the opportunity to be award point of exceptional performance required
by the GREEN SL R rating system.
To ensure the buildings and developments address the aspects of maintaining and improving the public
health and social wellbeing. The social benefits of sustainable design are related to improvements in
the quality of life, health, and well-being. These benefits can be realized at different levels – buildings,
the community, and society in general. At a building level, research on the human benefits of
sustainable design has centered on three primary topics: health, comfort, and satisfaction. So, mainly
focus about these 3 points in the design when considering about public health and safety.
14
GROUP 24 – FINAL REPORT (PART 2)
Our Hostel Building designed considering the health benefits of an urban lifestyle shall possess the
following characteristics;
Potential Technologies & Strategies which are going to use in the design.
During design and planning should have the holistic approach, considering residences rural and campus
regulations.
Conclusion
Construction of a hostel building is one of the leading future innovative plans of Sri Lanka Institute of
Information Technology. The project is evaluated environmentally and socially in the background of
GREENSL® RATING SYSTEM which is now a great challenge for the future construction and planning
industry. The report focuses on eight (8) different criteria where the necessary credit points were
achieved. With reference to GREENSL® RATING SYSTEM the designed SLIIT hostel building has obtain
seventy (70) credits which is in a final scale of one hundred and five (105). With reference to the
cumulative sum of credit points, the SLIIT hostel building can be awarded according to the PLATINUM
state based on the certification of GREENSL® RATING SYSTEM.
A
GROUP 24 – FINAL REPORT (PART 2)
Appendix
Appendix 1.1
Appendix 1.2
B
GROUP 24 – FINAL REPORT (PART 2)
Appendix 1.3
IDENTIFIED ENVIRONMENTAL & SOCIAL IMPACTS AND MITIGATION ACTIONS
Environmental Impacts
1. Impacts due to increased noise -
According to the site selection the site is located right next to the junction of isurupura road. So, in the
process of construction the noise generated will cause a huge problem. Noise associated with
construction includes all demolition and site preparation then after the construction is completed due
to accommodation of students, there could be a generation of noise.
The proposed development will see a complete change in the landscape of the Project site, transforming
it from a rural albeit disturbed landscape into a large institutional facility (Hostel). But this is not a huge
impact compared with other areas of the given layout because this edge area consists only with a huge
Jack tree and few grown grasses.
Potential air quality impacts from the construction works of the project would mainly be related to
construction dust from site formation, foundation works, excavation, and improvement works in the
construction.
The major waste types generated by the construction activities will include construction and demolition
materials from site clearance, site formation works, foundation works, retaining walls and slope works,
building construction and superstructure works, and road improvement works; chemical waste from
maintenance and servicing of construction plant and equipment and general refuse from the workforce.
Then after the construction in the operational phase there are several sources of waste generation
which includes sewer also.
5. Transport implications –
Due to construction work traffic generating in the New Kandy Road will be increased. But our proposed
land location is at the end of SLIIT premises and hence vehicles coming from the New Kandy Road have
other alternative roods via Isurupura Road to reduce the traffic.
6. Flooding –
In the SLIIT premises the ability to get flooding is very less and this affect can be neglected while
considering the past flooding data.
7. Water quality –
Water quality in Malabe are is good and even the water table is near to the surface. Furthermore, still
in the SLIIT also use the spring water to drink and obviously proposed building also can apply this
method.
C
GROUP 24 – FINAL REPORT (PART 2)
Social Impacts
1. Air quality –
Air quality is one of the main problems generated to the social environment in the area. But we can
minimize it by using a safety net and by wetting the dusty road ways in the site, concreting roadways
etc. Furthermore, we will be able to use environmentally friendly equipment with higher fuel efficiency
or equipped with air pollution control devices to minimize the exhausted emissions. Furthermore,
avoiding vehicle and equipment left running unnecessarily, maintaining handling areas in a dust free
state as far as practicable. Establishing and enforcing appropriate speed limits over all unpaved surfaces,
travelling on existing and paved tracks wherever possible. Avoiding open burning of solid waste through
segregation and recycling and through disposal according to a solid waste management plan.
2. Health impacts –
Maintain good working environment inside the working area and even placed safety audits.
Furthermore, diseases like dengue will also be able to control by keeping the site in a proper manner.
To avoid the additional noise generated by the hostel premises we will provide certain rules to students
by not allowing them to use any social activities outside the building.
Appendix 2.1
Appendix 2.1.1 - 50-year flood level in Colombo
E
GROUP 24 – FINAL REPORT (PART 2)
Appendix 3.2
M
GROUP 24 – FINAL REPORT (PART 2)
Appendix 4.1
N
GROUP 24 – FINAL REPORT (PART 2)
Appendix 4.2
O
GROUP 24 – FINAL REPORT (PART 2)
Appendix 4.3
P
GROUP 24 – FINAL REPORT (PART 2)
Appendix 4.4
Q
GROUP 24 – FINAL REPORT (PART 2)
Appendix 5.2
Recycling of waste
Energy recovery
Disposal
R
GROUP 24 – FINAL REPORT (PART 2)
S
GROUP 24 – FINAL REPORT (PART 2)
T
GROUP 24 – FINAL REPORT (PART 2)
U
GROUP 24 – FINAL REPORT (PART 2)
Appendix 6.1
Appendix 6.2
V
GROUP 24 – FINAL REPORT (PART 2)
Appendix 6.2.1
Appendix 6.4
VOC For Paints
W
GROUP 24 – FINAL REPORT (PART 2)
Appendix 6.9
a
GROUP 24 – FINAL REPORT (PART 2)
References
• Anon., 2015. GREENSL® RATING SYSTEM. s.l.:Green Building Council Sri Lanka.
• Mahanama, P., n.d. Flood risk zone mapping of Kelani River basin in North of Colombo City, s.l.: