Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Technical Specification
Title:
Revision: 01
Date: 10/10/2014
Prepared by:
Reviewed by:
Approved by:
This document is property of Abeinsa EPC. Its total or partial reproduction is strictly forbidden by any means, as well as its distribution
to third parties without the express written consent of Abeinsa EPC.
If for exceptional reasons, due to specific aspects of the project (eg: project confidential information, legal requirements or local
regulations and/or contractual requirements of the client), there was a need to modify the requirements included in this procedure,
these changes must be properly documented in the quality, environment and health and safety plan of the project, prior approval
from the company headquarters management system department.
The original copy of this document is electronically signed and filed in the document management system of Abeinsa EPC.
Document: 0000-ESP-AEPC-00-61-0002
Page: 2 of 13
First issue.
Based on 0341-ESP-
01 10/10/14 JAVG BJNM JSE
AEPC-00-61-0002
Rev.01 for Xina project
Document: 0000-ESP-AEPC-00-61-0002
Page: 3 of 13
Index:
1 General ........................................................................................................................... 4
3 Scope .............................................................................................................................. 7
Page: 4 of 13
1 General
1.1 Objective
The purpose of this document is to establish the minimum requirements for Non
Destructive Examination (NDE) on all pipe work to be executed by the Contractor (the
company that offers the examination services).
The Contractor shall verify all requirements and detailed specifications indicated in this
document, as it is responsible for fulfilling all activities defined within the scope of
services.
The Contractor shall submit all documents required by this specification, as well as
information required by third parties to perform other work that may be related to the
development of nondestructive testing.
The Contractor shall verify all requirements and detailed specifications indicated in this
specification and / or drawings, and will be ultimately responsible for the assembly and
testing of equipment and / or systems specified to achieve the objective proposed in this
specification.
Nothing stated in this specification exempt the Contractor to perform, in addition to the
specified, analyzes, tests, inspections or activities that Abeinsa EPC considers necessary to
ensure that materials, installation and manpower are satisfactory for the intended purpose
or are required by good practice
The approval by Abeinsa EPC of any drawing, procedure, specification, testing, etc.., No
exempt the Contractor from his responsibility.
This test plan will be binding on the Contractor, and will be include in his Quality Plan.
All documents referenced in this specification, annexes and the documentation attached
in the service offer shall be taken into account.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 5 of 13
The supplier will use the units of the international system (SI) in all calculations and
documents, as well as the scales of the instruments except in the following cases:
The diameters of pipes, fittings and flanges in inches, according with applicable standards.
See:
For the representation of buildings and equipment in the drawings, it shall be taken into
account that the North of the Plant will be located in the upper part of the drawings and
shall coincide with Geographical North.
For the axis of coordinates x, y, z, the plane coordinates (X, Y) U.T.M. shall be used. The
altitude Z shall be defined by absolute height above sea level.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 6 of 13
All Laws, Rules and Officials national regulations (Safety and Health, Environment, etc.)
applicable, as well as others what are expressly indicated, always in the last edition, must
be comply with.
Where there are discrepancies between the different rules, or this specification, apply the
most demanding. Otherwise Abeinsa EPC will decide the applicable standard.
The administrative and safety conditions required by the owner to the suppliers, if any, will
be fulfilled.
The followings standards (without modify the legal requirements to fulfill by the suppliers)
will be applicable:
o ASME Boiler and Pressure Vessel Code. Section VIII. Div 1. Rules for
Construction of Pressure Vessels.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 7 of 13
3 Scope
The scope of this specification is the NDE on all the pipe welds to be installed in the plant,
such as visual, radiography, ultrasonic, eddy current, liquid penetrant, and magnetic
particle methods.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 8 of 13
The Contractor will include in his scope the implementation of the NDE which will be
made as follows:
Extend &
Examination Definition Remarks
acceptance criteria
Visual examination (VT) BPVC, sec. V, art, 9 B31.1 or B31.3
Magnetic particle (MT) BPVC, sec. V, art, 7 B31.1 or B31.3
Liquid penetrant (PT) BPVC, sec. V, art, 6 B31.1 or B31.3
Note 1
Radiography (RT) BPVC, sec. V, art, 2 B31.1 or B31.3
Note 2
Ultrasonic (US) BPVC, sec. V, art, 4 B31.1 or B31.3 Note 3
Note 1: The Contractor must provide a X ray viewer on site, which will be available for
Abeinsa EPC personnel use.
Note 3: The equipment used to perform the ultrasonic examination shall be capable of
recording the UT data to facilitate the analysis by a third party and for the repeatability of
subsequent examinations.
An overall NDE status report will be provided by the Contractor on a weekly basis.
All instrument impulse pipework up to the first Isolation valve shall be tested considering
the same criteria as the main pipe line.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 9 of 13
The type of testing and required percentage by type of service, design pressure and type
of weld is indicated in the following sections.
The referred percentages of NDE will be applied separately to both workshop and on field
welds, not being possible to balance between these. In other words, the same percentage
of NDE will be applied to workshop and on filed welds.
The types and extent of mandatory examinations for welds are specified in the following
table.
Notes:
• For any attachment, reinforcement pad or support welded directly on the pipes,
the percentage and type of NDE to be performed will be the indicated in the table
above like (branch connection) for the corresponding fluid line.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 10 of 13
Note 3: Fillet welds not exceeding 6 mm throat thickness which are used for the
permanent attachment of non pressure retaining parts are exempt from the penetrant or
magnetic particle examination requirements of the above table.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 11 of 13
All longitudinal welds and spiral welds in pipe intended for sustained operation in the
creep range (see paras. 104.1.1 and 123.4, and Table 102.4.7) must receive and pass a
100% volumetric examination (RT or UT) per the applicable material specification or in
accordance with para. 136.4.5 or 136.4.6.
The types and extent of mandatory examinations for welds are specified in the following
table.
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 12 of 13
Notes:
• HTF service is not considered as “Category M Fluid Service” (see B31.3, para.
300.2). HTF service is considered as “Elevated Temperature Fluid Service” (see
B31.3, para. 341.4.4). HTF piping has been designed to avoid “Severe Cyclic
Conditions”. To be checked by the designer.
• P-No. 4 and P-No. 5 materials are not considered. To be checked by the designer.
Golden welds are those that can not be hydrotested for whatever reason. These kinds of
welds have to be approved in advance by Abeinsa EPC for all the cases that can appear on
site. In addition, the Contractor shall make a “control list” for all the golden welds where
at least the following information must appear:
• Isometric reference.
• Diameter.
• Material.
• Weld number.
• Bevel preparation.
• NDE performed.
Additional NDE is required for the golden welds, according to the following list:
This document is the property of Abeinsa EPC. Total or partial reproduction thereof, by any means, as well as distribution
to third parties, without the express written consent of Abeinsa EPC is strictly forbidden.
Document: 0000-ESP-AEPC-00-61-0002
Page: 13 of 13
5 Defective components
In parallel the Contractor shall make a “welder performance summary”, where Abeinsa
EPC can identify, per welder:
• Welder number.
• Welds performed.
• Type of reparation.
When a defect is identified, two additional samples in the same line shall be given the
same type of examination, according to the para. 341.3.4 in ASME B31.3 (although B31.1
being the design code). The extra cost for all the new inspections will be borne by the
Contractor.
The maximum allowed repair rate per welder shall be 5%. For higher values the welder
must be re-homologated on site after Abeinsa EPC approval or directly will be out of
welding works. Repair rates lower than 3% per welder will be considered as a good
practice.