NO. DESCRIPTION

SUMMARY
1 PRELIMINARIES
2 DEMOLITION
3 PARTITION
4 DOOR & DOOR FRAME
5 WALL FINISHES
6 CEILING FINISHES
7 FLOOR FINISHES
8 LOGO & SIGNAGE
9 BUILT-IN FURNITURE
10 WINDOW BLIND
11 MISCELLANEOUS
12 ELECTRICAL SYSTEM
13 IT/ AV/SECURITY SYSTEM TRUNKING(Excl. Cabling & faceplates)
14 LIGHTING SYSTEM
15 AIR CONDITIONING SYSTEM
16 FIRE SERVICE SYSTEM
17 PLUMBING&DRAINAGE SYSTEM
18 SECURITY&CCTV SYSTEM
19 IT SYSTEM CABLING AND FACEPLATE INSTALLATION( excluded
equipments)
20 LOOSE AND SYSTEM FURNITURE

1 TO 20 TOTAL: 0.00
BEIJING COMMERCIAL CONSTRUCTION TAX 4.30% -

GRAND TOTAL :

REMARKS:
1 Our price is based on Drawing No.XXXXXXX dated on xxxx-xx-xx

2 Our price does not allow for those items which are not indicated in
our price list.
3 The following items are excluded from our workscope:

Contractor: Client:

Beijing xxxxx Decoration Engineering Co. Ltd. xxxxxxxxx Co., Ltd.

Signed By: Signed By:

Date: Date:

Consultant: 

Consultant's Company Name

Signed By:

Date:
Our refer :
Date : XXXXXXX

TOTAL
CNY¥

0.00
0.00
6,555.00
73,795.00
5,256.00
2,395.00
2,780.00
14,670.00
49,380.00
2,070.00
0.00
120,335.90
7,158.10
4,870.00
47,727.00
1,624.00
20,460.00
0.00
0.00

0.00

0.00 359,076.00
- 16,134.03

RMB: 375,210.03
Ltd.
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

1.00 Preliminaries

1.01 1.00
1.02 1.00
1.03 1.00
1.04 1.00
1.05 1.00
1.06 1.00
1.07 1.00
1.08 1.00
1.09 1.00
1.00
1.00
1.00
1.00
1.00
1.10 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.11 1.00
1.12 1.00

Total:
Remarks:The above price is not consisted of:Any submission fee is other than fit-out construction works/Landlord/Building
management charges/Power upgrade charges/Supervision company fee etc.

第 5 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

2.00 Fit Out Works


2.01 Demolition

2.01.1 sum 1.00 0.00


2.01.2 sum 1.00 0.00
2.01.3 sum 1.00 0.00

Sub Total:

2.02 Partition

2.02.1 sm 1.00 120.00


2.02.2 sm 1.00 140.00
2.02.3 sm 1.00 165.00
2.02.4 sm 1.00 140.00
2.02.5 sm 1.00 230.00
2.02.6 sm 1.00 280.00
2.02.7 sm 1.00 300.00
2.02.8 sm 1.00 480.00
2.02.8 sm 1.00 450.00
2.02.10 sm 1.00 95.00
2.02.11 sm 1.00 20.00
2.02.12 sm 1.00 95.00
2.02.13 sm 1.00 105.00
2.02.14 sm 1.00 130.00
2.02.15 sm 1.00 1600.00
2.02.16 sm 1.00 1950.00
2.02.17 sm 1.00 135.00
2.02.18 sm 1.00 120.00

Sub Total:

2.03 Doors and Frame

2.03.1 nos 1.00 4000.00


2.03.2 nos 1.00 3800.00
2.03.3 nos 1.00 3800.00
2.03.4 nos 1.00 2200.00
2.03.5 nos 1.00 2000.00
2.03.6 nos 1.00 2200.00
2.03.7 nos 1.00 3800.00
2.03.8 nos 1.00 3600.00
2.03.9 nos 1.00 3600.00
2.03.10 set 1.00 400.00
2.03.11 set 1.00 800.00

第 6 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

2.03.12 set 1.00 550.00


2.03.13 set 1.00 1100.00
nos.
2.03.14 1.00 395.00
nos.
2.03.15 1.00 750.00
set
2.03.16 1.00 8000.00
set
2.03.17 1.00 9500.00
2.03.18 set 1.00 3200.00
2.03.19 set 1.00 2500.00
2.03.20 set 1.00 3200.00
2.03.21 set 1.00 5500.00
set
2.03.22 1.00 1200.00
set
2.03.23 1.00 6500.00
set
2.03.24 1.00 1200.00

Sub Total:

2.04 Wall Finishes

sm
2.04.1 1.00 20.00

sm
2.04.2 1.00 25.00
sm
2.04.3 1.00 240.00
sm
2.04.4 1.00 55.00
sm
2.04.5 1.00 55.00
sm
2.04.6 1.00 55.00
sm
2.04.7 1.00 45.00
sm
2.04.8 1.00 200.00
lm
2.04.9 1.00 30.00
2.04.10 lm 1.00 28.00
2.04.11 lm 1.00 70.00
lm
2.04.12 1.00 120.00
lm
2.04.13 1.00 50.00

第 7 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE
lm
2.04.14 1.00 30.00
2.04.15 lm 1.00 28.00
2.04.16 lm 1.00 55.00
sm
2.04.17 1.00 180.00
sm
2.04.18 1.00 550.00
sm
2.04.19 1.00 600.00
lm
2.04.20 1.00 90.00
lm
2.04.21 1.00 120.00
lm
2.04.22 1.00 180.00
lm
2.04.23 1.00 280.00
sm
2.04.24 1.00 650.00
sm
2.04.25 1.00 400.00
sm
2.04.26 1.00 450.00
sm
2.04.27 1.00 250.00
sm
2.04.28 1.00 400.00

Sub Total:

2.05 Ceiling Finishes

2.05.1 sm 1.00 165.00


2.05.2 m 1.00 130.00
sm
2.05.3 1.00 110.00
lm
2.05.4 1.00 125.00
sm
2.05.5 1.00 35.00
sm
2.05.6 1.00 280.00
sm
2.05.7 1.00 450.00
sm
2.05.8 1.00 450.00
sm
2.05.9 1.00 500.00
2.05.10 lm 1.00 150.00

第 8 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

Sub Total:

2.06 Floor Finishes

sm
2.06.1 1.00 195.00
2.06.2 sum 1.00 35.00
sm
2.06.3 1.00 75.00
sm
2.06.4 1.00 150.00
sm
2.06.5 1.00 250.00
sm
2.06.6 1.00 350.00
sm
2.06.7 1.00 230.00
sm
2.06.8 1.00 280.00
sm
2.06.9 1.00 120.00
sm
2.06.10 1.00 280.00
sm
2.06.11 1.00 180.00
sm
2.06.12 1.00 600.00
sm
2.06.13 1.00 35.00

Sub Total:

2.07 Logo & Signage

2.07.1 set 1.00 4500.00


2.07.2 set 1.00 6500.00
2.07.3 nos. 1.00 2000.00
2.07.4 sm 1.00 130.00
2.07.5 sm 1.00 230.00
2.07.6 pair 1.00 100.00
2.07.7 pcs. 1.00 150.00
2.07.8 pcs. 1.00 150.00
2.07.9 pcs. 1.00 130.00
2.07.10 pcs. 1.00 130.00
2.07.11 pcs. 1.00 200.00
2.07.12 pcs. 1.00 450.00

Sub Total:

第 9 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

第 10 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

2.08 Built-In Furniture

2.08.1 lm 1.00 2,000.00


lm

2.08.2 1.00 1850.00

lm
2.08.3 1.00 1250.00
lm
2.08.4 1.00 1450.00
lm
2.08.5 1.00 1250.00
nos.
2.08.6 1.00 2500.00
nos.
2.08.7 1.00 2300.00
lm
2.08.8 1.00 2500.00
lm
2.08.9 1.00 2500.00
lm
2.08.10 1.00 2800.00
lm
2.08.11 1.00 1850.00
lm
2.08.12 1.00 2800.00
lm
2.08.13 1.00 2100.00
lm
2.08.14 1.00 4500.00
lm
2.08.15 1.00 1150.00
lm
2.08.16 1.00 1350.00
2.08.17 nos 1.00 1800.00
2.08.18 nos 1.00 2200.00
nos
2.08.19 1.00 3500.00
2.08.20 nos 1.00 280.00
nos
2.08.21 1.00 6800.00
nos
2.08.22 1.00 650.00

Sub Total:

2.09 Window Blind

第 11 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE
sm
2.09.1 1.00 135.00
sm
2.09.2 1.00 165.00
sm
2.09.3 1.00 95.00
sm
2.09.4 1.00 135.00
sm
2.09.5 1.00 380.00
sm
2.09.6 1.00 420.00
sm
2.09.7 1.00 320.00
sm
2.09.8 1.00 420.00

Sub Total:

2.10 Miscellaneous

2.10.1 sum 1.00 0.00


2.10.2 sum 1.00 0.00
2.10.3 sum 1.00 0.00

Sub Total:

Total:
Remarks:

3.00 Electrical System

3.01 no. 1.00 300.00


3.02 no. 1.00 180.00
3.03 no. 1.00 220.00
3.04 no. 1.00 220.00
3.05 no. 1.00 180.00
3.06 no. 1.00 220.00
3.07 no. 1.00 350.00
3.08
3.08.1 no. 1.00 4500.00
3.08.2 no. 1.00 4800.00
3.08.3 no. 1.00 4800.00
3.08.4 no. 1.00 5200.00
3.08.5 no. 1.00 5200.00
3.08.6 no. 1.00 6000.00
3.08.7 no. 1.00 6500.00

第 12 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

3.08.8 no. 1.00 6800.00


3.08.9 no. 1.00 7000.00
3.08.10 no. 1.00 7500.00
3.08.11 no. 1.00 6800.00
3.09
3.09.1 no. 1.00 4500.00
3.09.2 no. 1.00 4500.00
3.09.3 no. 1.00 4500.00
3.09.4 no. 1.00 4500.00
3.09.5 no. 1.00 4500.00
3.09.6 no. 1.00 4500.00
3.09.7 no. 1.00 4500.00
3.09.8 no. 1.00 4500.00
3.09.9 no. 1.00 4500.00
3.09.10 no. 1.00 4500.00
3.10
3.10.1 lm 1.00 508.00
3.10.2 lm 1.00 328.00
3.10.3 lm 1.00 294.00
3.11
3.11.1 lm 1.00 373.00
3.11.2 lm 1.00 345.00
3.11.3 lm 1.00 310.00
3.11.4 lm 1.00 275.00
3.11.5 lm 1.00 240.00
3.11.6 lm 1.00 205.00
3.11.7 lm 1.00 170.00
3.12
3.12.1 lm 1.00 255.00
3.12.2 lm 1.00 237.00
3.12.3 lm 1.00 203.00
3.12.4 lm 1.00 237.00
3.12.5 lm 1.00 220.00
3.12.6 lm 1.00 192.00
3.12.7 lm 1.00 181.00
3.12.8 lm 1.00 170.00
3.12.9 lm 1.00 150.00
3.12.10 lm 1.00 124.00
3.12.11 lm 1.00 110.00
3.12.12 lm 1.00 110.00
3.12.13 lm 1.00 85.00
3.13
3.13.1 lm 1.00 9.80
3.13.2 lm 1.00 7.90
3.13.3 lm 1.00 5.90
3.14
3.14.1 lm 1.00 4.00

第 13 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

3.14.2 lm 1.00 3.50


3.15
3.15.1 lm 1.00 105.00
3.15.2 lm 1.00 105.00
3.15.3 lm 1.00 75.00
3.15.4 lm 1.00 40.00
3.15.5 lm 1.00 26.00
3.15.6 lm 1.00 18.00
3.15.7 lm 1.00 13.00
3.15.8 lm 1.00 9.00
3.15.9 lm 1.00 5.00
3.15.10 lm 1.00 3.00
3.15.11 lm 1.00 2.00
3.15.12 lm 1.00 1.00
3.15.13 lm 1.00 0.80
3.15.14 lm 1.00 780.00
3.15.15 lm 1.00 570.00
3.15.16 lm 1.00 470.00
3.15.17 lm 1.00 280.00
3.15.18 lm 1.00 180.00
3.15.19 lm 1.00 160.00
3.15.20 lm 1.00 128.00
3.15.21 lm 1.00 95.00
3.15.22 lm 1.00 70.00
3.15.23 lm 1.00 47.00
3.15.24 lm 1.00 30.00

Total:
Remarks:

4.00
IT/ AV/Security System trunking (Excl. Cabling &
faceplates)

4.01 no. 1.00 280.00


4.02 no. 1.00 350.00
4.03 no. 1.00 450.00
4.04 no. 1.00 145.00
4.05 no. 1.00 145.00
4.06 no. 1.00 145.00
4.07 no. 1.00 145.00
4.08 no. 1.00 145.00
4.09
4.09.1 lm 1.00 508.00
4.09.2 lm 1.00 328.00
4.09.3 lm 1.00 294.00
4.10

第 14 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

4.10.1 lm 1.00 373.00


4.10.2 lm 1.00 345.00
4.10.3 lm 1.00 310.00
4.10.4 lm 1.00 275.00
4.10.5 lm 1.00 240.00
4.10.6 lm 1.00 205.00
4.10.7 lm 1.00 170.00
4.11
4.11.1 lm 1.00 255.00
4.11.2 lm 1.00 237.00
4.11.3 lm 1.00 203.00
4.11.4 lm 1.00 237.00
4.11.5 lm 1.00 220.00
4.11.6 lm 1.00 192.00
4.11.7 lm 1.00 181.00
4.11.8 lm 1.00 170.00
4.11.9 lm 1.00 150.00
4.11.10 lm 1.00 124.00
4.11.11 lm 1.00 110.00
4.11.12 lm 1.00 110.00
4.11.13 lm 1.00 85.00
4.12
4.12.1 lm 1.00 9.80
4.12.2 lm 1.00 7.90
4.12.3 lm 1.00 5.90
4.13
4.13.1 lm 1.00 4.00
4.13.2 lm 1.00 3.50

Total:
Remarks:

第 15 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

5.00 Lighting System

5.01 no. 1.00 400.00


5.02 no. 1.00 500.00
no.
5.02 1.00 1100.00
5.03 no. 1.00 350.00
5.04 no. 1.00 250.00
5.05 no. 1.00 250.00
5.06 no. 1.00 450.00
5.07 no. 1.00 230.00
5.08 no. 1.00 150.00
5.09 no. 1.00 450.00
5.10 no. 1.00 420.00
5.11 no. 1.00 150.00
5.12 no. 1.00 170.00

Total:
Remarks:

6.00 Air Conditioning System

6.01 sm 1.00 150.00


6.02
6.02.1 no. 1.00 150.00
6.02.2 no. 1.00 270.00
6.02.3 no. 1.00 0.00
6.02.4 no. 1.00 0.00
6.02.5 no. 1.00 0.00
6.02.6 no. 1.00 540.00
6.02.7 lm 1.00 0.00
6.02.8 lm 1.00 237.00
6.02.9 lm 1.00 0.00
6.02.10 lm 1.00 0.00
6.02.11 lm 1.00 0.00
6.02.12 no. 1.00 90.00
6.03
6.03.1 no. 1.00 0.00
6.03.2 no. 1.00 0.00
6.03.3 no. 1.00 0.00
6.03.4 no. 1.00 0.00
6.03.5 no. 1.00 900.00
6.03.6 no. 1.00 470.00
6.04
6.04.1 no. 1.00 0.00

第 16 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

6.04.2 no. 1.00 200.00


6.04.3 no. 1.00 0.00
6.04.4 no. 1.00 0.00
6.04.5 no. 1.00 0.00
6.05
6.05.1 no. 1.00 0.00
6.05.2 no. 1.00 0.00
6.05.3 no. 1.00 0.00
6.05.4 no. 1.00 0.00
6.05.5 no. 1.00 0.00
6.05.6 no. 1.00 237.00
6.05.7 no. 1.00 0.00
6.05.8 no. 1.00 0.00
6.05.9 no. 1.00 0.00
6.05.10 no. 1.00 360.00
6.06
6.06.1 no. 1.00 540.00
6.06.2 no. 1.00 1130.00
6.06.3 no. 1.00 2930.00
6.06.4 no. 1.00 2030.00
6.06.5 no. 1.00 2710.00
6.06.6 no. 1.00 3610.00
6.07
6.07.1 no. 1.00 0.00
6.07.2 no. 1.00 0.00
6.07.3 no. 1.00 0.00
6.07.4 no. 1.00 141.00
6.07.5 no. 1.00 84.00
6.08
6.08.1 no. 1.00 345.00
6.08.2 no. 1.00 405.00
6.09
6.09.1 no. 1.00 164.00
6.09.2 no. 1.00 175.00
6.10
6.10.1 no. 1.00 79.00
6.10.2 no. 1.00 90.00
6.10.3 no. 1.00 124.00
6.10.4 no. 1.00 158.00
6.10.5 no. 1.00 214.00
6.10.6 no. 1.00 1860.00
6.10.7 no. 1.00 2118.00
6.10.8 no. 1.00 3729.00
6.10.9 no. 1.00 74.00
6.10.10 no. 1.00 0.00
6.10.11 no. 1.00 0.00
6.10.12 no. 1.00 0.00
6.10.13 no. 1.00 0.00

第 17 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

6.10.14 no. 1.00 0.00


6.10.15 no. 1.00 0.00
6.10.16 no. 1.00 0.00
6.10.17 no. 1.00 0.00
6.10.18 no. 1.00 0.00
6.10.19 no. 1.00 0.00
6.10.20 no. 1.00 0.00
6.10.21 no. 1.00 0.00
6.10.22 no. 1.00 0.00
6.11
6.11.1 no. 1.00 2200.00
6.11.2 no. 1.00 2300.00
6.11.3 no. 1.00 0.00
6.11.4 no. 1.00 0.00
6.11.5 no. 1.00 0.00
6.11.6 no. 1.00 2542.00
6.11.7 no. 1.00 2768.00
6.11.8 no. 1.00 0.00
6.11.9 no. 1.00 0.00
6.11.10 no. 1.00 0.00
6.11.11 no. 1.00 508.00
6.12
6.12.1 no. 1.00 5400.00
6.12.2 no. 1.00 1695.00
6.12.3 no. 1.00 3390.00
6.13
6.13.1 no. 1.00 410.00
6.13.2 no. 1.00 200.00
6.13.3 no. 1.00 0.00
6.13.4 no. 1.00 0.00
6.13.5 no. 1.00 0.00
6.13.6 no. 1.00 0.00
6.13.7 no. 1.00 0.00

Total:
Remarks:

7.00 Fire Service System

7.01
7.01.1 no. 1.00 0.00
7.01.2 no. 1.00 0.00
7.02
7.02.1 no. 1.00 0.00
7.02.2 no. 1.00 0.00
7.02.3 no. 1.00 0.00

第 18 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

7.03 sum 1.00 0.00


7.04 sum 1.00 0.00
7.05
7.05.1 no. 1.00 0.00
7.05.2 no. 1.00 0.00
7.06 sum 1.00 0.00
7.07 no. 1.00 0.00
7.08 no. 1.00 0.00
7.09 no. 1.00 0.00
7.10
7.10.1 no. 1.00 696.00
7.10.2 no. 1.00 0.00
7.10.3 no. 1.00 0.00
7.10.4 no. 1.00 928.00
7.10.5 no. 1.00 0.00

Total:
The above estimate is consisted of:Fire sprinkler system/Smoke detection system/Portable fire extinguisher etc.

第 19 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

8.00 Plumbing&Drainage System

8.01 sum 1.00 0.00


8.02 sum 1.00 0.00
8.03 sum 1.00 0.00
8.04 sum 1.00 0.00
8.05 sum 1.00 0.00
8.06 sum 1.00 0.00
8.07 sum 1.00 0.00
8.08 sum 1.00 0.00
8.09 sum 1.00 0.00
8.10 sum 1.00 0.00
8.11 sum 1.00 0.00
8.12
8.12.1 no. 1.00 0.00
8.12.2 no. 1.00 0.00
8.12.3 no. 1.00 0.00
8.12.4 no. 1.00 0.00
8.12.5 no. 1.00 0.00
8.12.6 no. 1.00 0.00
8.12.7 no. 1.00 0.00
8.12.8 no. 1.00 0.00
8.12.9 no. 1.00 0.00
8.13 sum 1.00 0.00
8.14
8.14.1 no. 1.00 5400.00
8.14.2 no. 1.00 0.00
8.15 no. 1.00 11300.00
8.16 no. 1.00 3400.00
8.17 no. 1.00 0.00
8.18 no. 1.00 360.00
8.19 no. 1.00 0.00

Total:
Remarks:

第 20 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

9.00 Security&CCTV System

9.01 set 1.00 0.00


9.02 set 1.00 0.00
9.03 set 1.00 0.00
9.04 set 1.00 0.00
9.05 set 1.00 0.00
9.06 sum 1.00 0.00
9.06.1 set 1.00 0.00
9.06.2 set 1.00 0.00
9.06.3 set 1.00 0.00
9.06.4 set 1.00 0.00
9.06.5 set 1.00 0.00
9.06.6 lm 1.00 0.00
9.06.7 lm 1.00 0.00
9.06.8 sum 1.00 0.00
9.06.9 sum 1.00 0.00

Total:
The above estimate is consisted of:Security system lockset for all main entrance and passage door/CCTV camera for all main IN/OUT
passage

10.00 IT System Cabling and Faceplate


Installation( excluded equipments )

10.01 sum 1.00 0.00


10.02 set 1.00 0.00
10.03 no. 1.00 0.00
10.04 no. 1.00 0.00
10.05 no. 1.00 0.00
10.06 sum 1.00 0.00
10.07 sum 1.00 0.00
10.08 sum 1.00 0.00
10.09 set 1.00 0.00
10.10 set 1.00 0.00
10.11 set 1.00 0.00
10.12 set 1.00 0.00
10.13 set 1.00 0.00
10.14 lm 1.00 0.00
10.15 lm 1.00 0.00
10.16 sum 1.00 0.00

Total:
Remarks

第 21 页,共 40 页
CONSTRUCTION QUOTATION
Beijing XXXXXXX Decoration Engineering Co., Ltd

Project No :
Project Name :XXXXXXXX
Location : XXXXXXXX
NO. DESCRIPTION UNIT QTY RATE

11.00 Loose and System Furniture

11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
11.10
11.11

 Total:
Remarks

 3 TO 11 Total:

Unit rate per m2: RMBxxxx.xx(Excluded AV equipment/IT equipment/PABX/Any works scope beyond interior area)

第 22 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

-
-
-
-
-
-
-
-
-
-
-
-
- RMB1200.00
- excluded
-
- excluded
- excluded
- excluded
- excluded
- excluded
- excluded
- excluded
- excluded
- excluded
- excluded

0.00
mission fee is other than fit-out construction works/Landlord/Building
vision company fee etc.

第 23 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

0.00
0.00
0.00
0.00

0.00

120.00
140.00
165.00
140.00
230.00
280.00
300.00
480.00
450.00
95.00
20.00
95.00
105.00
130.00
1600.00
1950.00
135.00
120.00

6,555.00

4000.00
3800.00
3800.00
2200.00
2000.00
2200.00
3800.00
3600.00
3600.00
400.00
800.00

第 24 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
550.00
1100.00
395.00 DORMA
product
or equivalent

750.00 DORMA
product
or equivalent

8000.00 Hormann'or
product
equivalent

9500.00 Hormann'or
product
equivalent

3200.00
2500.00
3200.00
5500.00
1200.00 DORMA
product
or equivalent

6500.00 DORMA
product
or equivalent

1200.00 DORMA
product
or equivalent

73,795.00

Surface preparation for


20.00 emulsion paint and
wallpaper

25.00 (Material
15 psm)
pc rate = RMB

240.00 (Material
180 psm)
pc rate = RMB

55.00 (Material
35 psm)
pc rate = RMB

55.00 (Material
35 psm)
pc rate = RMB

55.00 (Material
35 psm)
pc rate = RMB

45.00 (Material
20 psm)
pc rate = RMB

200.00 (Material
50 psm)
pc rate = RMB

30.00 (Material
150/pc.)
pc rate = RMB

28.00
70.00
120.00 (Material
450 psm)
pc rate = RMB

50.00 (Material
120 psm)
pc rate = RMB

第 25 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

30.00 (Material
150/pc.)
pc rate = RMB

28.00
55.00
180.00 (Material
120 psm)
pc rate = RMB

550.00 (Material
400 psm)
pc rate = RMB

600.00 (Material
400 psm)
pc rate = RMB

90.00 (Material
150/pc.)
pc rate = RMB

120.00 (Material
150/pc.)
pc rate = RMB

180.00 (Material
450 psm)
pc rate = RMB

280.00 (Material
450 psm)
pc rate = RMB

650.00 (Material
400 psm)
pc rate = RMB

400.00 (Material
150/pc.)
pc rate = RMB

450.00 (Material
300 psm)
pc rate = RMB

250.00 (Material
150/pc.)
pc rate = RMB

400.00 (Material
250 psm)
pc rate = RMB

5,256.00

165.00
130.00
110.00 (Material
50 psm)
pc rate = RMB

125.00 (Material
75 psm)
pc rate = RMB

35.00

280.00 (Material
180 psm)
pc rate = RMB

450.00 (Material
150/pc.)
pc rate = RMB

450.00 (Material
250 psm)
pc rate = RMB

500.00 (Material
300 psm)
pc rate = RMB

150.00

第 26 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

2,395.00

195.00 (Material
150 psm)
pc rate = RMB

35.00
75.00 (Material
50 psm)
pc rate = RMB

150.00 (Material
80 psm)
pc rate = RMB

250.00 (Material
180 psm)
pc rate = RMB

350.00 (Material pc rate = RMB


250.00 psm)

230.00 (Material PC rate 180/m2)

280.00 (Material pc rate = RMB


240.00 psm)

120.00 (Material
80.00 psm)
pc rate = RMB

280.00 (Material PC rate 200/m2)

180.00 (Material PC rate 120/m2)

600.00 (Material
400 psm)
pc rate = RMB

35.00 (Material PC rate 28/m2)

2,780.00

4500.00
6500.00
2000.00
130.00
230.00
100.00
150.00
150.00
130.00
130.00
200.00
450.00

14,670.00

第 27 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

第 28 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

2000.00
(Material pc rate =
Manmade
stoneRMB400/lm,
1850.00
Plastic laminate
RMB 150/pc.)

1250.00 (Material
150/pc.)
pc rate = RMB

1450.00 (Material
150/pc.)
pc rate = RMB

1250.00 (Material
150/pc.)
pc rate = RMB

2500.00 (Material
150/pc.)
pc rate = RMB

2300.00 (Material
150/pc.)
pc rate = RMB

2500.00 (Material
150/pc.)
pc rate = RMB

2500.00 (Material
150/pc.)
pc rate = RMB

2800.00 (Material
150/pc.)
pc rate = RMB

1850.00 (Material
150/pc.)
pc rate = RMB

2800.00 (Material
150/pc.)
pc rate = RMB

2100.00 (Material
150/pc.)
pc rate = RMB

4500.00 (Material
150/pc.)
pc rate = RMB

1150.00 (Material
150/pc.)
pc rate = RMB

1350.00 (Material
150/pc.)
pc rate = RMB

1800.00
2200.00
3500.00 (Material
2800/pc.)
pc rate = RMB

280.00
6800.00 (Material
5800/pc.)
pc rate = RMB

650.00 (Material
500/pc.)
pc rate = RMB

49,380.00

第 29 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

135.00 (Material PC rate 110/m2)

165.00 (Material PC rate 135/m2)

95.00 (Material PC rate 70/m2)

135.00 (Material PC rate 110/m2)

380.00 (Material PC rate 300/m2)

420.00 (Material PC rate 350/m2)

320.00 (Material PC rate 250/m2)

420.00 (Material PC rate 350/m2)

2,070.00

0.00
0.00
0.00

0.00

156,901.00

300.00
180.00
220.00
220.00
180.00
220.00
350.00

4500.00
4800.00
4800.00
5200.00
5200.00
6000.00
6500.00

第 30 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
6800.00
7000.00
7500.00
6800.00

4500.00
4500.00
4500.00
4500.00
4500.00
4500.00
4500.00
4500.00
4500.00
4500.00

508.00
328.00
294.00

373.00
345.00
310.00
275.00
240.00
205.00
170.00

255.00
237.00
203.00
237.00
220.00
192.00
181.00
170.00
150.00
124.00
110.00
110.00
85.00

9.80
7.90
5.90

4.00

第 31 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
3.50

105.00
105.00
75.00
40.00
26.00
18.00
13.00
9.00
5.00
3.00
2.00
1.00
0.80
780.00
570.00
470.00
280.00
180.00
160.00
128.00
95.00
70.00
47.00
30.00

120,335.90

280.00
350.00
450.00
145.00
145.00
145.00
145.00
145.00

508.00
328.00
294.00

第 32 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
373.00
345.00
310.00
275.00
240.00
205.00
170.00

255.00
237.00
203.00
237.00
220.00
192.00
181.00
170.00
150.00
124.00
110.00
110.00
85.00

9.80
7.90
5.90

4.00
3.50

7,158.10

第 33 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

400.00
500.00
1100.00 "Thorn"or
product
equivalent

350.00
250.00
250.00
450.00
230.00
150.00
450.00
420.00
150.00
170.00

4,870.00

150.00

150.00
270.00
0.00
0.00
0.00
540.00
0.00
237.00
0.00
0.00
0.00
90.00

0.00
0.00
0.00
0.00
900.00
470.00

0.00

第 34 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
200.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
237.00
0.00
0.00
0.00
360.00
(local made)
540.00
1130.00
2930.00
2030.00
2710.00
3610.00

0.00
0.00
0.00
141.00
84.00

345.00
405.00

164.00
175.00

79.00
90.00
124.00
158.00
214.00
1860.00
2118.00
3729.00
74.00
0.00
0.00
0.00
0.00

第 35 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2200.00
2300.00
0.00
0.00
0.00
2542.00
2768.00
0.00
0.00
0.00
508.00

5400.00
1695.00
3390.00

410.00
200.00
0.00
0.00
0.00
0.00
0.00

47,727.00

0.00
0.00

0.00
0.00
0.00

第 36 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

696.00
0.00
0.00
928.00
0.00

1,624.00
m/Smoke detection system/Portable fire extinguisher etc.

第 37 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5400.00
0.00
11300.00
3400.00
0.00
360.00
0.00

20,460.00

第 38 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

ckset for all main entrance and passage door/CCTV camera for all main IN/OUT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

第 39 页,共 40 页
STRUCTION QUOTATION

Date : XXXXXXX
NFA m2 XXXXXXX
TOTAL
RMB Remarks

0.00

¥202,175.00

t/IT equipment/PABX/Any works scope beyond interior area)

第 40 页,共 40 页

Potrebbero piacerti anche