Sei sulla pagina 1di 195

ELECTRIC WIRING DIAGRAM

J B741
GHAZI FABRICS Int
3 x JGS 620 GS-N.L
0 1 2 3 4 5 6 7 8 9

This drawing is confidential and proprietary to the General Electric Company.


The wiring diagram includes:
194 sheets.
It may not be used in any form, or reproduced in any manner,
without the express written permission of the General Electric Company.
Copyright, General Electric Company, 2003

GHAZI FABRICS Int


3 x JGS 620 GS-N.L

PAK J B741

Vers.: Date: Rel.: Mod.:

X before manufacture 17-06-2004 ES ..

X after testrun
20-08-04 ES a

X after start up 03.05.2005 ES b

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Cover sheet B741
Project Group
+U Page
1
GHAZI FABRICS Int Wiring diagram
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
VDE 0185 Part 1 / 11.82 - 6.1.2
has to be provided by the Customer.

1 3

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L B741
Project Group
+U Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+U/1 Cover sheet Wiring diagram a,b +U/16 Over view Panels

+U/2 a +U/17 electrical Equipment

+U/3 Diagram index +U/18 Bus diagram

+U/4 Over view groups +U/19 Mimic diagram

+U/5 Protection: Generator +U/20 Load sharing line

+U/6 E-Diagram 11KV, 50Hz a +U/21 Load sharing line

+U/7 Principle electrical overview b +U/22 Over view Software

+U/8 E-Diagram Supply Auxiliaries

+U/9 Potential equalization

+U/10 Module control

+U/11 Door cut out A

+U/12 Master panel

+U/13 Master panel

+U/14 Module interface cubicle

+U/15 Charging unit 60A

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+U Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view groups

+U Over view

+B Part reference list

+G1 Generator 1

+M1 Module interface panel 1

+A1 Module control cubicle 1

+G2 Generator 2

+M2 Module interface panel 2

+A2 Module control cubicle 2

+G3 Generator 3

+M3 Module interface panel 3

+A3 Module control cubicle 3

+IS Master panel

+DF HERMES

+K Terminal diagram and Cable

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view groups B741
Project Group
+U Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Protection: Generator

11
Multi measuring and DIANE Relay Generator
monitoring device
internal

27 Under voltage 49 Windings temperature 50/51 Overload/Short circuit 24 Voltage/Frequency Function

59 Over voltage 53 Excitation voltage low 87G Dif protection G 56 Excitation >

50/51 Overload/Short circuit 32 Reverse power 67N Earth fault

64 Unbalance - Voltage 37 Power <

46 Unbalance - Current P> Power >

40 Failure Excitation 38 Bearing temperature

81 > Over frequency

81 < Under frequency

4 6

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Protection: Generator B741
Project Group
+U Page
5
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Buscoupler 4
TRAFO 1

TRAFO 2
FEDER 1

FEDER 2

FEDER 3

FEDER 4

FEDER 5
75

Synchronisation"D"

11KV/û3:110V/û3
M M M M M M M M M M M 75VA
Option!
11KV/û3:/110V/3 59N
20VA

11kV +/-5%, 50Hz


Distance : ca.1000m
110VDC 110VDC 110VDC 110VDC

52-Gx M M M M 52-G1 M 52-G2 M 52-G3 M


tc=70ms tc=70ms tc=70ms tc=70ms
to=60ms to=60ms to=60ms to=60ms
U < U < U < U < U < U < U <
110VDC 110VDC 110VDC 110VDC 110VDC 110VDC 110VDC

Measurement and Measurement and Measurement and


3 Synchronisation"C" 3 Synchronisation"C" 3 Synchronisation"C"
250/5A a 87G 250/5A a 87G 250/5A a 87G
3x110V/û3 3x110V/û3 3x110V/û3
G G G G 10P10
11kV/û3:/110V/3
10P10 10P10
11kV/û3:/110V/3 11kV/û3:/110V/3
3 3 3 3 15VA 15VA 15VA

3
1x150mmý 1x150mmý 1x150mmý 1x150mmý 1 1 1
50/5A 50/5A 50/5A
10P10 10P10 10P10
XLPE 3x1x150qmm CU XLPE 3x1x150qmm XLPE 3x1x150qmm

flexible single flexible single flexible single


core cable core cable core cable

IN= 198A
G G GE-Jenbacher G
67N 67N 67N
3 3 3
xx/5A 3 scope
10P10 64 250/5A 250/5A 250/5A
Customer Set 15VA 5P10
3 50
5P10
3 50
5P10
3 50
87G 87G 87G
15VA 51 15VA 51 15VA 51
NGR

127 Ohm 250/5A 250/5A 250/5A


30 sec. 1FS5 1FS5 1FS5
xd"=15,5%
20VA 27,59,81,32,53 20VA 27,59,81,32,53 20VA 27,59,81,32,53
46,49,40,64,38 46,49,40,64,38 46,49,40,64,38
NGR: Control and CB by customer kWh,kVarh kWh,kVarh kWh,kVarh

Generator 1-3
11000V +/-5% 50Hz
3047kW Cos Phi=1
3022kW Cos Phi=0,8
Note: Alternator CB with
-closing coil
-opening coil
-undervoltage coil

5 7

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L E-Diagram B741
Project Group
+U Page
6
GHAZI FABRICS Int 11KV, 50Hz
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

NEW SYSTEM -GE JENBACHER

Load Take off

CB1 CB2 CB3

OLD SYSTEM M M M

11KV, 50Hz Distance : ca.1000m

11KV/110V/SQ3,75VA

M M M M M M M M M M M

11KV/110V/SQ3,20VA

GEJ
1000KVA

1000KVA
G G G G G G G
3 3 3 3 3 3 3
Coupler 1

Coupler 2

Coupler 3

Coupler 4
Feeder 1

Feeder 2

Feeder 3

Feeder 4

Feeder 5
Trafo 1

Trafo 2
NGR
NGR: Control and CB by customer

6 8

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Principle electrical overview
Project
B741 Group
+U Page
7
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

11KV busbar

xxxkVA
11KV/0,4kV
Dyn11

+52-LT6
M
I >
I >>

400V Busbar

..V DC

Delivery M
50A 50A 50A 80A 80A 60A 25A

Customer
el. interlocked
Auxiliaries U <

G
3 from the customer

32A 32A 32A 50A 50A 50A 16A

Delivery
Module interface cubicle 1

Module interface cubicle 2

Module interface cubicle 3


Module control panel 1

Module control panel 2

Module control panel 3

Master panel

Jenbacher DG-SET
400V +/-5% 50Hz
....kW Cos Phi=1

Supply
Auxiliaries
3x 400/230V 50Hz

7 9

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L E-Diagram B741
Project Group
+U Page
8
GHAZI FABRICS Int Supply Auxiliaries
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\U Suffix


U
0 1 2 3 4 5 6 7 8 9

Gas train
Pipe: -Exhaust gas
11KV Pipe: -water
...

Engine 620 + M G
3 ~
XS

50 mmý 10 mmý 50 mmý

Frame Frame

50 mmý
4

Potential equalization
-IFL 4
+ IS + A

XS
XS
Potential equalization

Potential equalization
-IFL 111

-IFL 3
111 3

10 mmý 10 mmý 50 mmý 16 mmý

Potential compensation bar

*according *
VDE 0100 Teil 540
(IEC 364-5-54)

8 10

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Potential equalization B741
Project Group
+U Page
9
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

3x
Module control panel Positioning:

1 A2 Synchronicing device

1 8
2 A15 D I A N E

3 S3 Service selector switch

4 S4 Demand selector switch

5 S5 Synchronisation selector switch


2

6 S7 Generator circuit breaker "off"

7 M1 Panel fan

8 A5 Dif protection relay

3 4 5
Side wall

Side wall

Door hings: right

Cable entry at the bottom

5
Colour:
RITTAL TS
(HxBxT) 2000x800x600 Panel RAL7032
Base: 200mm Base RAL7020

Terminal strip

-X, -XH, -XS Protection: IP40


9 11

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Module control B741
Project Group
+U Page
10
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Module control panel


Switch to lock

36
7

260

36
15

580
49
1000

139
34
1035

66
DIANE XT

198
1975

232
245

345

395

445

545

Fan 255
4,5

117
250

234
223

117
790

223

10 12

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Door cut out A B741
Project Group
+U Page
11
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

1x
Master Panel Positioning:
1 S3 Island operation Selector switch: Release BLACK OUT START

2 S4 Selector switch:"Speed" - "Power Control"

3 S5 Push button Emergency stop

4 M1 Panel fan

5 .. Mimic diagram

6 S6 Reset / lamp test

G G G G G G

1 2

3
Side wall

Side wall

Door hings: right

Cable entry at the bottom

4
Colour:
RITTAL TS
(HxBxT) 2000x800x600 Panel RAL7032
Base: 200mm Base RAL7020

Terminal strip

-X, -XH, -XS Protection: IP40

11 13

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Master panel B741
Project Group
+U Page
12
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Master panel

510

Switch/
Emergency stop off Push button
910

Switch to lock
1000

36
3
1035

7
G G G G G G 22,5

13

36
15
1975

345

395

445
750

4,5

117

234
223
250

117
790

223

12 14

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Master panel B741
Project Group
+U Page
13
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

1 +M1-A1 cooling system

2 +M1-S12 Push button Emergency stop

SK 3302.100
RITTAL AK 1652
HxBxT=1200x1200x400mm

330
é:15 (2x)

Colour: RAL7032

300

450
Protection: IP43

Switch/
300 Emergency stop
2 Push button
é: 8 (4x)

3
22,5

13
cooling system

Terminal strip

532
-X, -XH, -XS

262

Cable entry at the bottom

13 15

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Module interface cubicle B741
Project Group
+U Page
14
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Charging unit 60A

1... Volt meter

2... Ammeter

3... off-on

Front view Side view View from bottom side

600

1 2
Cooling fin

Pg13,5
Pg21

Pg29
760

330 70 70

600

Colour: RAL7032
RITTAL AE 1376

Weight: 95 kg

Lock: double key bit


350
Protection: IP21

Door opening angle 180ø

14 16

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Charging unit 60A B741
Project Group
+U Page
15
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

800 800 800 800

+IS +A1 +A2 +A3


600
2000

Side wall

Side wall

Side wall

Side wall

Side wall

Side wall

Side wall

Side wall
200

Delivery Delivery Delivery Delivery


Unit Unit Unit Unit

Cable entry at the bottom Installation in aircond.


control room
15 17

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Panels B741
Project Group
+U Page
16
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9
1) +M. Module interface panel

Positioning 2) .. .

Connection 3) +M.-M Preheating pump

Potential equalization
Layout plan: Customers side
4) +M.-E./E. Heating elements

5) .. ..
6) +M.-M Prelubrication oil pump 400V

Cu-Seil 50 qmm
7) +M.-M Prelubrication oil pump 24V

Cabel entry 8) +M.-G Ignition system IQ


Generator
9) .. ..
10) +M.-M./M. Starter motor

4 11) +M.-G Battery

12) +M.-M Engine jacket water pump

13) +M.-S Exhaust gas backpressure


25 20 26 19 7 6
14) .. Regulator valve:Oil 2.Step
40 33
28 17 15) +M.-B Converter Jacket water pressure

34
Generator
16) +M.-B Jacket water temperature PT100
32 Engine
37 38 11kV 17) +M-B.-B. Cylinder temperature NiCrNi

18) .. .
19) +M.-B Converter Oil pressure
39
20) +M.-B Oil temperature PT100
13 30
17 28 21) .. .
14 16 31
35 22) .. .
23) .. .

3 4 12 15 10 8 24) .. .
Frame 1 Frame 2 25) +M.-Y Oil refill valve

26) +M.-A Oil level monitoring low/high

27) .. .
1 11 28) +M.-B Knocking detectors

29) .. .

+M1
30) +M.-B Pick up Speed

31) +M.-Y./Y. Turbo bypass valve

32) +M.-B Actuator

33) +M.-B Pick up Ignition

34) +M.-B Pick up Ignition

35) +M.-B Pick up Ignition

36) .. .
37) +M.-B Fuel mixture temperature PT100

38) +M.-M Air-gas mixer

39) +M.-B Water return temperature

40) +M.-B Converter Supercharge pressure

41)

16 18

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L electrical Equipment B741
Project Group
+U Page
17
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Twisted pair cable

max: 100m
Customer

DFš-Central unit DFš-Central unit 202


Customer
203

ETHERNET Connection Modem Connection Telephone Telephone


RJ 45 Plug
connection connection

Modem
HERMES +IS
Customer Customer
Master Panel
RS232
PC
HUB DIANE
WIN

Monteur
L= ca. 10m
Ethernet Patch yellow/

Ethernet

Ethernet
yellow

yellow
Patch

Patch
IC
DIANE.XT Ignition
+A1 9xx

CAN
L= ca. 50m

Multi measuring

+M1
and monitoring device

MMU KLS
98
Ehternet crossover

CAN

EX 484 EX 481
DIANE.XT DIANE.XT
P10 P20
+A2 +A3
L= ca. 50m

red Ehternet crossover red

17 19

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Bus diagram B741
Project Group
+U Page
18
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
RELEASE CLOSING COUPLER 4 OPENING FAILURE G-CB CUSTOMER SET CB CLOSED

COUPLER 4 AB 1 AB 2 AB 3

CLOSED CLOSED CLOSED CLOSED

3 x 11KV

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

MODUL 1 MODUL 2 MODUL 3 MODUL 4 MODUL 5 MODUL 6

G1 G2 G3 G4 G5 G6
OPERATION OPERATION OPERATION OPERATION OPERATION OPERATION
0 1 2 3 4 5 6 7 8 9

Island operation:
DIANE Load sharing line

CUSTOMER System GE - Jenbacher


eg.: WOODWARD
Module control panel 1 Module control panel 2 Module control panel 3

CUSTOMER
ENGINES

Load sharing line

0-5V/
4-20mA

0-20mA

mA Signal

19 21

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Load sharing line B741
Project Group
+U Page
20
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Load sharing line

Analog Output Analog Output Analog Output

4-16mA = 0-100%P 4-16mA = 0-100%P 4-16mA = 0-100%P

10 mA 10 mA 16 mA
Power Actual value Power Actual value Power Actual value

-XS

Load sharing line

-XS

12 mA 12 mA 12 mA
Power Set point Power Set point Power Set point

Analog Input Analog Input Analog Input

Module 1 Module 2 Module 3

10mA < 12mA = P 10mA < 12mA = P 16mA > 12mA = P

20 22

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Load sharing line B741
Project Group
+U Page
21
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view Software DIA.NE WIN:


Serverfunctions

File:

Module control
B741 DIA.NE WIN - DEFAULT V1.0.x

Generate application(s)

J- Number: B741

Server: 1

Number of engines 3

Start

DIANE WIN
B741W_A_01

21 +B/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Software B741
Project Group
+U Page
22
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Designation of the components:Circuit diagram-Technical diagram

Die Nummern in der Bauteilzuordnung


beziehen sich auf die Nummern in der
Schnittstellenliste JB741 4410 00
und technischem Schema JB741 00 03

The numbers in the part reference list


are in relation with the numbers in
the Interface-list J B741 4410 00
and the Technical schema JB741 00 03

.. .. .. ..
Modification No. Vers. Date Name

+U/22 2

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Part reference list B741
Project Group
+B Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+B/1 Part reference list

+B/2 Diagram index

+B/3 Over view Interfaces

+B/4 Designation of the components

+B/5 Designation of the components

+B/6 Designation of the components

+B/7 Designation of the components

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+B Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

IFL No. Page IFL No. Page IFL No. Page IFL No. Page IFL No. Page

-SSL1 +G1/4.2 -SSL83 +A1/42.4


-SSL2 +G1/4.2 -SSL84 +A1/42.5
-SSL3 +A1/13.8 -SSL110 +IS/5.0
-SSL4 +G1/4.0 -SSL111 +IS/6.8
-SSL6 +A1/12.0 -SSL120 +A1/38.4
-SSL7 +M1/5.0 -SSL120 +IS/15.1
-SSL10 +A1/11.3 -SSL123 +IS/23.2
-SSL11 +A1/9.3 -SSL125 +IS/21.7
-SSL12 +A1/9.3 -SSL127 +IS/23.3
-SSL13 +A1/7.3 -SSL132 +IS/21.5
-SSL14 +A1/40.0 -SSL133 +IS/21.6
-SSL15 +A1/41.1 -SSL138 +IS/12.8
-SSL17 +A1/40.1 -SSL143.1 +IS/21.1
-SSL18 +A1/39.0 -SSL143.2 +IS/21.1
-SSL19 +A1/41.2 -SSL143.3 +IS/21.2
-SSL20 +A1/40.2 -SSL143.4 +IS/21.3
-SSL21 +A1/40.2 -SSL144 +IS/21.4
-SSL22 +A1/40.3 -SSL146 +IS/22.1
-SSL23 +A1/39.2 -SSL147 +IS/22.2
-SSL24 +A1/41.2 -SSL148 +IS/22.3
-SSL25 +A1/41.3 -SSL149 +IS/23.3
-SSL26 +A1/41.4 -SSL151 +IS/23.4
-SSL29 +A1/18.2 -SSL153 +IS/22.4
-SSL30 +A1/40.4 -SSL202 +DF/3.5
-SSL32 +A1/39.5 -SSL203 +DF/3.4
-SSL35 +A1/39.5 -SSLx1 +IS/22.5
-SSL43 +A1/41.6 -SSLx2 +IS/22.5
-SSL50 +A1/41.5
-SSL73 +A1/42.6
-SSL75 +A1/5.2
-SSL77 +A1/41.8
-SSL78 +A1/36.6
-SSL79 +A1/36.8
-SSL80 +A1/42.1
-SSL81 +A1/42.2

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Interfaces B741
Project Group
+B Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Abbrevation Page Number in el. Denomination Comment


wiring diagram

Actuator +M1/26.0 +M1-B31 Actuator (actuating drive)


Battery +M1/12.1 +M1-G4 Battery
Battery +M1/12.1 +M1-G3 Battery
Battery +M1/12.1 +M1-G2 Battery
Battery +M1/12.1 +M1-G5 Battery
Generator +G1/4.2 +G1-G1 Generator
KD +M1/42.4 +M1-B35 Knock sensor
KD +M1/42.4 +M1-B36 Knock sensor
KD +M1/42.4 +M1-B42 Knock sensor
KD +M1/42.4 +M1-B43 Knock sensor
KD +M1/42.4 +M1-B37 Knock sensor
KD +M1/42.4 +M1-B38 Knock sensor
KD +M1/42.4 +M1-B41 Knock sensor
KD +M1/42.4 +M1-B34 Knock sensor
KD +M1/42.4 +M1-B39 Knock sensor
KD +M1/42.4 +M1-B40 Knock sensor
KD +M1/42.8 +M1-B50 Knock sensor
KD +M1/42.8 +M1-B52 Knock sensor
KD +M1/42.8 +M1-B48 Knock sensor
KD +M1/42.8 +M1-B49 Knock sensor
KD +M1/42.8 +M1-B51 Knock sensor
KD +M1/42.8 +M1-B44 Knock sensor
KD +M1/42.8 +M1-B46 Knock sensor
KD +M1/42.8 +M1-B45 Knock sensor
KD +M1/42.8 +M1-B47 Knock sensor
KD +M1/42.8 +M1-B53 Knock sensor
KLS98 +M1/42.0 +M1-A24 Antiknock control
LS5 +M1/27.1 +M1-S3 Level switch Engine oil level in engine oil pan

NBE +M1/11.7 +M1-G1 Battery charger


NHW1 +M1/7.5 +M1-E1 Heating unit
NHW1 +M1/7.7 +M1-E2 Heating unit
NMS +M1/12.0 +M1-M6 Starter
NMS +M1/12.2 +M1-M8 Starter
NPO6 +M1/12.1 +M1-M7 Engine oil pump Engine oil pre-lubrication pump

NPO6 +M1/12.7 +M1-M9 Engine oil pump Engine oil pre-lubrication pump

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Designation of the B741
Project Group
+B Page
4
GHAZI FABRICS Int components
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Abbrevation Page Number in el. Denomination Comment


wiring diagram

NPW1 +M1/8.2 +M1-M2 Water pump Electrical engine cooling water pump

NPW4 +M1/10.1 +M1-M4 Water pump Engine cooling water preheating

NPW5 +A1/12.7 +A1-M2 Water pump Low-temperature circuit

NRV3 +M1/9.1 +M1-M3 Fan Flushing the Exhaust gas manifold

NSD +A1/14.1 +A1-M3 Fuel-gas compressor


NUP1 +M1/27.5 +M1-S5 Pressure control Exhaust-gas back pressure

NUP2 +A1/19.3 +A1-B1 Pressure control Fuel-gas compressor

NUP3 +M1/28.3 +M1-S7 Pressure control Gas pressure max. (gas pressure control system 1)

NUP5 +M1/28.2 +M1-S6 Pressure control Gas pressure min. (gas pressure control system 1)

NUP7 +M1/16.5 +M1-B3 Pressure control Charge pressure (mixture pressure p2')

NUP8 +M1/16.3 +M1-B2 Pressure control Engine cooling-water pressure

NUP9 +M1/16.2 +M1-B1 Pressure control Engine oil pressure

NUP10 +A1/25.8 +A1-S6 Pressure control Low-temperature circuit

NUP13 +M1/29.1 +M1-S9 Pressure control Pre-chamber gas pressure min.

NUT1 +M1/19.2 +M1-B8 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/19.4 +M1-B9 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/19.6 +M1-B10 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/19.8 +M1-B11 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/20.2 +M1-B12 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/20.4 +M1-B13 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/20.6 +M1-B14 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/20.8 +M1-B15 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/21.2 +M1-B16 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/21.4 +M1-B17 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/21.6 +M1-B18 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/21.8 +M1-B19 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/22.2 +M1-B20 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/22.4 +M1-B21 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/22.6 +M1-B22 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/22.8 +M1-B23 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/23.2 +M1-B24 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/23.4 +M1-B25 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/23.6 +M1-B26 Temperature control Exhaust gas outlet cylinder head

NUT1 +M1/23.8 +M1-B27 Temperature control Exhaust gas outlet cylinder head

NUT2 +M1/24.1 +M1-B28 Temperature control Mixture temperature t2'

4 6

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Designation of the B741
Project Group
+B Page
5
GHAZI FABRICS Int components
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Abbrevation Page Number in el. Denomination Comment


wiring diagram

NUT3 +G1/5.6 +G1-G1-B7 Temperature control Generator-bearing temperature

NUT3 +G1/5.7 +G1-G1-B8 Temperature control Generator-bearing temperature

NUT4 +G1/5.1 +G1-G1-B1 Temperature control Generator-coil temperature

NUT4 +G1/5.2 +G1-G1-B2 Temperature control Generator-coil temperature

NUT4 +G1/5.3 +G1-G1-B3 Temperature control Generator-coil temperature

NUT4 +G1/5.4 +G1-G1-B4 Temperature control Generator-coil temperature

NUT4 +G1/5.5 +G1-G1-B5 Temperature control Generator-coil temperature

NUT4 +G1/5.6 +G1-G1-B6 Temperature control Generator-coil temperature

NUT6 +M1/24.5 +M1-B30 Temperature control Engine cooling water temperature

NUT7 +M1/24.3 +M1-B29 Temperature control Engine oil temperature

NUT9 +M1/28.6 +M1-S8 Temperature control Low-temperature circuit

NUT12 +M1/37.4 +M1-B32 Temperature control Return temperature (hot water circuit)

NUT13 +M1/18.3 +M1-B6 Temperature control After exhaust-gas turbocharger

NUT13 +M1/18.4 +M1-B7 Temperature control After exhaust-gas turbocharger

NUT24 +M1/9.8 +M1-S2 Temperature control Flushing the Exhaust gas manifold

NUT31 +M1/17.7 +M1-B5 Temperature control Intake air temperature

NVA +M1/39.1 +M1-Y6 Electrical control valve Exhaust-gas turbocharger bypass system

NVA +M1/39.4 +M1-Y7 Electrical control valve Exhaust-gas turbocharger bypass system

NVA +M1/39.6 +M1-Y8 Electrical control valve Exhaust-gas turbocharger bypass system

NVC5 +M1/9.6 +M1-S1 Exhaust-gas valve Flushing the Exhaust gas manifold

NVC5 +M1/10.4 +M1-M5 Exhaust-gas valve Flushing the Exhaust gas manifold

NVD3 +M1/38.3 +M1-M10 Fuel gas regulator Gas mixer

NVD3 +M1/38.6 +M1-M11 Fuel gas regulator Gas mixer

PDS3 +M1/27.4 +M1-S4 Differential-pressure switch Pre-chamber gas

QC1 +A1/35.3 +A1-B4 Volumeter Gas pressure control system 1

QC1 +A1/35.5 +A1-B5 Volumeter Gas pressure control system 1

SOV1 +A1/14.5 +A1-Y1 Solenoid valve Start-up relief valve fuel-gas compressor

SOV2 +M1/37.3 +M1-Y5 Solenoid valve Automatic topping up of engine oil

SOV3 +M1/36.1 +M1-Y2 Solenoid valve Gas valve gas pressure control system 1

SOV7 +A1/14.7 +A1-Y2 Solenoid valve Before fuel-gas compressor

SOV7 +A1/14.8 +A1-Y3 Solenoid valve Before fuel-gas compressor

SOV8 +M1/36.2 +M1-Y3 Solenoid valve Pre-combustion chamber gas line

SOV8 +M1/36.3 +M1-Y4 Solenoid valve Pre-combustion chamber gas line

ST1 +M1/42.2 +M1-B33 Pickup Crankshaft

ST1 +M1/43.6 +M1-B54 Pickup Crankshaft

5 7

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Designation of the B741
Project Group
+B Page
6
GHAZI FABRICS Int components
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Abbrevation Page Number in el. Denomination Comment


wiring diagram

ST1 +M1/43.7 +M1-B55 Pickup Crankshaft

ST2 +M1/43.8 +M1-B56 Pickup Camshaft

Zcndung +M1/43.0 +M1-G8 Ignition


dia.ne +A1/34.1 +A1-A15 Engine Management System - dia.ne

6 +G1/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Designation of the B741
Project Group
+B Page
7
GHAZI FABRICS Int components
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Generator +G1

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
.. .. .. ..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+B/7 2

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Generator +G1 B741
Project Group
+ G1 Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+G1/1 Generator +G1

+G1/2 Diagram index

+G1/3 Over view Terminal strips

+G1/4 Generator

+G1/5 Windings temperature Bearing temperature

+G1/6 Generator

+G1/7 Terminals Generator +G1

+G1/8 Terminals A Terminal strip +G1

+G1/9 Terminals C Terminal strip +G1

+G1/10 Terminals S Terminal strip +G1

+G1/11 Terminals S Terminal strip +G1

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ G1 Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Terminal strips: Monitoring: Generator

+G1-X.
Terminals LS-Generator Windings temperature:

Terminal strip general


warn: 140øC
Generator +G1
Shut down: 145øC

Terminal strip-X=Terminals Bearing A:


Generator +G1

warn: 85øC
Terminal strip-X[A]=Terminals A
Terminal strip +G1 Shut down: 90øC

Terminal strip-X[C]=Terminals C
Terminal strip +G1 Bearing B:

warn: 75øC
Terminal strip-X[S]=Terminals S
Terminal strip +G1
Shut down: 80øC

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Terminal strips B741
Project Group
+ G1 Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

50mmý-Cu-Seil Engine Frame


Frame Grounding screw
Grounding screw
Generator base

Power connection Generator voltage Time overcurrent protection Measurement -G1


5.0
6.0
250/5A -T1 5P10,15VA 250/5A -T2 1FS5,15VA 3778kVA
cosphi=0,8
U1 U2 11KV
50 Hz
Generator
S2 S1 S2 S1
V1 V2

S2 S1 S2 S1
W1 W2

S2 S1 S2 S1

IN = 198A, 11KV ,50Hz

Grounding screw -X[S] DX2 DY2 DZ2 DZ1 DY1 DX1 MX2 MY2 MZ2 MZ1 MY1 MX1
Terminal box

-X PE N N U V W

Alternator power cable:


ONLY FEXIBLE SINGLE CORE CABLE!
Cross section According TI 1100-0112

+A1/10.1/ lPL3/1

+A1/10.1/ lPL2/1

+A1/10.1/ lPL1/1

+A1/7.0/ lL1/1

+A1/7.0/ lL2/1

+A1/7.1/ lL3/1
+A1/10.1/ kP/1

+A1/7.1/ k/1
are permitted!
H07V-K 70mmý

U V W

-SSL4 -SSL2 -SSL1

4 2 1

Potential -IFL 2 -IFL 1


equalization Service grounding Power connection

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Generator
Project
B741 Group
+ G1 Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Generator Terminal box

-G1
4.2
Generator
-B1 -B2 -B3 -B4 -B5 -B6 -B7 -B8

140/145øC 140/145øC 140/145øC 140/145øc 140/145øC 140/145øC 85/90øC 75/80øC


Pt 100 Pt 100 Pt 100 Pt 100 Pt 100 Pt 100 Pt 100 Pt 100
NUT4 NUT4 NUT4 NUT4 NUT4 NUT4 NUT3 NUT3

-X[S] AU3 AU2 AU1 AV3 AV2 AV1 AW3 AW2 AW1 AU6 AU5 AU4 AV6 AV5 AV4 AW6 AW5 AW4 AP3 AP2 AP1 AP6 AP5 AP4
M190 YSLCY-JZ 12x1,5mmý

1 2 3 4 5 6 7 8 9 10
+M1/24.8/ WTU1/1

+M1/24.7/ WTU3/1

+M1/25.2/ WTV1/1

+M1/25.2/ WTV3/1

+M1/25.4/ WTW1/1

+M1/25.3/ WTW3/1

+M1/25.6/ LTA1/1

+M1/25.5/ LTA3/1

+M1/25.8/ LTB1/1

+M1/25.7/ LTB3/1

+M1/25.8/ LTBS/1
temperature

temperature

temperature

temperature

temperature

temperature

temperature

temperature
Windings

Windings

Windings

Windings

Windings

Windings

Bearing

Bearing
Spare

Spare

Spare
in U

in V

in W

in U

in V

in W

in A

in B
4 6

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Windings temperature
Project
B741 Group
+ G1 Page
5
GHAZI FABRICS Int Bearing temperature
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


5

Modific.
0

4.2
-G1

Generator

Date
Excitation voltage M198 YSLCY-OZ 2x1,5mmý

+M1/17.6/ UE/1

1
-X[S] E+
+M1/17.6/ UE-/1

Name Norm
Date
2

Print
E-

Desig.
1

+M1/17.6/ UES/1

Deexcitation M199 YSLY-JZ 5x1,5mmý

+M1/40.3/ ENT1/1

-X[A] 9

17.Mai.2005
08.Jul.2004
+M1/40.4/ ENT2/1

Eberharter St.
2
-X[C] 21
+M1/40.4/ ENT3/1
2

3
-X[A] 12
+M1/40.4/ ENT4/1

DIR: J:\..\
4
Monitoring:Diode
-X[C] 22 23
remove: Jumper
24

M201 YSLCY-OZ 2x1,5mmý


Adjustment Voltage

GHAZI FABRICS Int


+M1/40.2/ Rs/1

3 x JGS 620 GS-N.L


1
25
3

+M1/40.3/ Rt/1

2
26

+M1/40.3/ R2S/1
1000ê,2W :ñ5%

M196 YSLY-JZ 5x1,5mmý


Cos-Phi-Controller
+M1/40.1/ CB1/1

1
27

+M1/40.1/ CB2/1
2
28
4

Selection SY
+M1/40.6/ SYA1/1
3
34

+M1/40.7/ SYA2/1
4
35

M195 YSLCY-OZ 2x1,5mmý


Generator Terminal box

Cos-Phi-Set point External


+M1/40.5/ BLP/1
1
29

+M1/40.5/ BL/1
2kê,2W
5

2
30

+M1/40.6/ BLS/1

M6B YSLY-OZ 2x1,5mmý

Generator
Voltage matching
+M1/40.8/ GPFL1/1 Mains 0V
31

+M1/40.8/ GPFL2/1 100V


32
6

400V
33
7

Suffix
Project
B741
8

Group
+ G1

Anti condensation heater M200 YSLY-OZ 2x2,5mmý


500W
50Hz
230V
-E1

Page

+M1/5.2/ GLGH/1
1
9

+M1/5.2/ GNGH/1
2

6
-X[S] RR1 RR2

7
0 1 2 3 4 5 6 7 8 9

Page

/4.2

/4.2

/4.2

/4.2

/4.3

/4.3
Device / Function

-IFL 2 Service grounding

-IFL 1 Power connection


Terminal strip

+G1-X

Jumpers

PE N N U V W
Terminal

N U V W

+G1 +G1
-SSL2 -SSL1

6 8

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ G1 Page
7
GHAZI FABRICS Int Generator +G1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/6.1

/6.2
Device / Function
+G1-X[A]
Terminal strip

Deexcitation

Jumpers

9 12
Terminal

+M1
70
-X

7 9

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals A B741
Project Group
+ G1 Page
8
GHAZI FABRICS Int Terminal strip +G1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/6.2

/6.2

/6.2

/6.3

/6.3

/6.3

/6.4

/6.4

/6.5

/6.5

/6.6

/6.6

/6.6

/6.4

/6.4
Device / Function

Cos-Phi-Set point External


+G1-X[C]

Adjustment Voltage

Cos-Phi-Controller
Terminal strip

Monitoring:Diode

Voltage matching
Deexcitation

Selection SY
=

=
Jumpers

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Terminal

+M1 +M1 +M1 +M1 +M1 +M1


71 650 651 56 57 653 654 727 728 58 59
-X -XS -X -XS -XH -X

8 10

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals C B741
Project Group
+ G1 Page
9
GHAZI FABRICS Int Terminal strip +G1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


9
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+G1-X[S]

Device / Function Page

Name Norm
Date
Excitation voltage /6.1

Print
E+

Desig.
1

-B4
+M1
= /6.1

E-

17.Mai.2005
08.Jul.2004
-XS
+M1

Eberharter St.
Windings temperature in U /5.1

632
= /5.1
2

= /5.1

AU3 AU2 AU1

DIR: J:\..\
630
Windings temperature in V /5.2

636
= /5.2

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
= /5.2

AV3 AV2 AV1


3

634
Windings temperature in W /5.3

639
= /5.3

= /5.3

637
Windings temperature in U Spare /5.4
4

= /5.4

= /5.4

Windings temperature in V Spare /5.5

= /5.5

= /5.5
5

Windings temperature in W Spare /5.6

= /5.6

Terminals S
= /5.6

Bearing temperature in A /5.6

642
= /5.7
6

Terminal strip +G1


= /5.7
AW3 AW2 AW1 AU6 AU5 AU4 AV6 AV5 AV4 AW6 AW5 AW4 AP3 AP2 AP1

640

Bearing temperature in B /5.7


645

= /5.8

= /5.8
7

643

Time overcurrent protection /4.5

= /4.6
Suffix
AP6 AP5 AP4 DX2 DY2

Project

+A1-W7.A YSLY-JZ 5x2.5mmý


-XH
+A1

Generator current
B741

= /4.6
DZ2

1
738
8

Group

2
= /4.6
DZ1

737

+ G1

= /4.6
DY1

3
736

Page

= /4.6
DX1

4
9

735

10
11
0 1 2 3 4 5 6 7 8 9

Page

/4.7

/4.7

/4.7

/4.7

/4.8

/4.8

/6.9

/6.9
Device / Function

Anti condensation heater


+G1-X[S]
Terminal strip

Measurement

Jumpers

MX2 MY2 MZ2 MZ1 MY1 MX1 RR1 RR2


Terminal
+A1-W4.A YSLY-JZ 5x2.5mmý
Generator current
1

+M1
+A1-XH 730 731 732 733 924 N
-XH

10 +M1/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals S B741
Project Group
+ G1 Page
11
GHAZI FABRICS Int Terminal strip +G1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Module interface +M1

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
.. .. .. ..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+G1/11 2

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Module interface +M1 B741
Project Group
+ M1 Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+M1/1 Module interface +M1 a +M1/16 Analog Inputs

+M1/2 Diagram index +M1/17 Analog Inputs

+M1/3 Diagram index +M1/18 Analog Inputs

+M1/4 Over view Terminal strips +M1/19 Analog Inputs

+M1/5 Supply a +M1/20 Analog Inputs

+M1/6 Earthing/Grounding +M1/21 Analog Inputs

+M1/7 Preheating +M1/22 Analog Inputs

+M1/8 Engine jacket water pump +M1/23 Analog Inputs

+M1/9 24V DC Scavenging flap +M1/24 Analog Inputs

+M1/10 DC-AC Converter a +M1/25 Analog Inputs

+M1/11 Prelubrication 24VDC Charging unit +M1/26 Analog Outputs

+M1/12 2 Starter motor 24VDC Charging unit a +M1/27 Digital Inputs

+M1/13 Distribution 24VDC a +M1/28 Digital Inputs a

+M1/14 Over view modules a +M1/29 Digital Inputs

+M1/15 Slot address Over view +M1/30 Digital Inputs

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ M1 Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+M1/31 Digital Outputs +M1/46 Terminals general +M1

+M1/32 Digital Outputs +M1/47 Terminals general +M1

+M1/33 Digital Outputs +M1/48 Terminals general +M1

+M1/34 Digital Outputs +M1/49 Terminals general +M1

+M1/35 1 Gas train +M1/50 Terminals Auxiliaries +M1

+M1/36 Gas valves +M1/51 Terminals Auxiliaries +M1

+M1/37 Emergency stop-off-Push button Return water temp. +M1/52 Terminals Shielded cable +M1

+M1/38 2 Air-gas mixer +M1/53 Terminals Shielded cable +M1

+M1/39 Turbo bypass valves

+M1/40 Interfaces to the Generator a

+M1/41 CAN Bus

+M1/42 Knock monitoring

+M1/43 Ignition system

+M1/44 Ignition coils

+M1/45 Terminals general +M1

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ M1 Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view: Terminal strips

+M1-X Wiring colours


in panel:
Terminal strip general

Module interface panel +M1

AC :
+M1-XH Outside wire : black

Protective wire : green/yellow


Terminal strip Auxiliaries

Function ground : transparent


Module interface panel +M1

N-Leiter : light blue


+M1-XS
DC :
Terminal strip Shielded cable
Plus : red
Module interface panel +M1
Minus : brown

Terminal strip-X=Terminals
Control : white
general +M1

Voltage free contacts : black


Terminal strip-XH=Terminals
Auxiliaries +M1
Thermo compensation cable : + green

Terminal strip-XS=Terminals - white


Shielded cable +M1

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Terminal strips B741
Project Group
+ M1 Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

L1/7.0
L2/7.0
L3/7.0

-Q1 1 3 5
2 23 13 21
-F2
1 24 14 22
C-6A
28.4 28.4
104128
In=12A 2 4 6
3RV1021
-4AA10
374559
VORW.
3
-K12
10mmý
31.1
4

-XH 924

11.8/ L1LG

11.8/ L2LG

11.9/ L3LG
GLGH/1
+G1/6.9

Generator Charging unit


Anti condensation 400/230V 50 Hz
heater

PELG/11.9
NLG/11.9
1 3 5 23 +G1/6.9 2
-F1 GNGH/1 -K1
2 4 6 24 MT 10
C-50A
28.4 230VAC
215090
116699
BACK-UP -XH N
SCHUTZ
BEACHTEN N/7.0
PE/6.0
704

705

706

-XH N PE

L1 L2 L3 N PE

-SSL7

-IFL 7
Supply 3x400/231V,50Hz,50A 1 3
29.5
6 7
10.6
8 11
10.7

4 6

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Supply B741
Project Group
+ M1 Page
5
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Mit SS gekennzeichnete Klemme ist


Schirmerdung mittels Schirmschiene
am Schrankeintritt !

Mit E gekennzeichnete Klemmen


sind blanke Erdungsklemmen !

With SS indicated terminal is


grounding of the shield with Shield bar
at the panel entry !

With E indicated Terminals are


uninsulated earth terminals !

Earthing Passive Parts

all Connections as short as possible

5.9/PE PE/7.0
Panel
Mounting plate
Panel Frame
Panel

tr
-XS E E -XH PE PE -XS PE
10mmý
2,5mmý 2,5mmý 2,5mmý 2,5mmý
tr tr tr tr ge/gn ge/gn ge/gn ge/gn
2,5mmý 10mmý 2,5mmý
Cubicle bracket
IPE/1
+A1/13.9
*) *)
E/BR tr
14.2
Engine management system

10mmý
*) all
Connections
as short
PE Mounting plate

as possible

PE Door bottom

PE Door bottom

Equipotential
Engine Frame
Door bottom
Shield bar

Door top

PE Panel

5 7

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Earthing/Grounding B741
Project Group
+ M1 Page
6
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

5.9/L1 L1/8.1
5.9/L2 L2/8.1
5.9/L3 L3/8.1

2 23 2 4 6
-F3 -F4
1 24 1 3 5
C-13A C-20A
28.4
181234 200822

4mmý

1 3 5
-K3
7.2
2 4 6

2,5mmý 2,5mmý
24
-K13
31.2
21

A1 3 5 4 L
-K3
A2 L PE
230 VAC
*
3RT1026-1AP00 PE
374507 -X1
N
118595
N
-A1
350W/230V
SK3302100
-XH N PE 371709 -XH N PE

5.9/N N/8.1
6.8/PE PE/8.1
Socket cooling system

-XH 907 908 909 N PE 910 911 912 N PE

M103 YSLY-JZ 5x2.5mmý M104 YSLY-JZ 5x2.5mmý

-E1 U V W N PE -E2 U V W N PE
6kW 6kW
110øC 11 21 31 110øC 11 21 31
NHW1 NHW1

12 22 32 12 22 32

1 2
7.5
3 4
7.5
5 6
7.5
Heating elements Heating elements

6 8

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Preheating
Project
B741 Group
+ M1 Page
7
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

7.8/L1 L1/9.0
7.8/L2 L2/9.0
7.8/L3 L3/9.0

-Q3 1 3 5

In=15,2A 2 4 6
3RV1021
-4BA10
374560

2,5qmm
34
-K28
33.7
31

A1 1 3 5
-K4 SP-/9.0
230 VAC A2 2 4 6 SP+/9.0
3RT1026-1AP00 Current - Relay
374507
A3 A1 11
Adjustment:
14
I=8A

-F5 RMMKWP2/27.6
353606
7.8/N N/9.0
7.8/PE PE/9.0

-XH 913 914 915 PE

M105 YSLY-JZ 4x6mmý

U V W

-M2 M PE

3
7,5kW
2870Upm
~
NPW1

Engine jacket water pump


1 2
8.2
3 4
8.2
5 6
8.2

7 9

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Engine jacket water pump B741
Project Group
+ M1 Page
8
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

8.4/L1
8.4/L2
8.4/L3 L3/10.0
8.4/N N/10.0

-Q4 1 3 5

In=1,4A 2 4 6
3RV1011
-1AA10
374544

OAS= Limit switch open


1 3 5
-K31
CAS= Limit switch closed
34.3
2 4 6

8.4/SP- SP-/10.6
8.4/SP+ SP+/10.6
SPKZU/29.3
SPKAUF/29.2
Current - Relay
SPKST/29.4
A3 A1 11
Adjustment:

M125 YSLY-OZ 4x1,5mmý

M127 YSLY-OZ 2x1,5mmý


14
I=1A

-F6
353606 RMSPUELV/29.6

8.4/PE PE/10.0

-XH 936 937 938 PE -X 220 221 222 223 224 225
M123 YSLY-JZ
4x1,5mmý

U V W 1 5 7 6 15 16 1
-S2
-M3 M PE
-S1 80øC 2

CAS

OAS
3
0,58kW
1,4A
~ NVC5
NUT24

NRV3

Failure

closed
Flap

Flap
open
fan Scavenging

Signals Flap:
Ventilation

Temperature
Scavenging

Signal 0 =

Signal 1 =

Signal 1 =

Scavenging
8 10

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L 24V DC Scavenging flap B741
Project Group
+ M1 Page
9
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

9.5/L3
9.5/N

2 WR+/13.4
-F7 WR-/13.4
1
C-6A
104128 -A2
+ -
24VDC
230VAC 24V DC
400VA
352158

230V AC

Time delay

yellow/green
9.8/SP+ SP+/13.3
Zeit Dipschalter

brown

blue
1s

3 7 3 7 7 8 10s
-K5 -K6 -K1
10.6 10.7 5.3
1 6 1 6 6 11

VORW.
EIN closed on

1 3 3
-K12 -K30 -K29 2 B1 2 B1
31.1
2
34.2
1
34.1
1
-K5 -K6
MT 10 1" MT 10 1"
350960 350960
+316457 +316457

9.3/PE 9.8/SP- SP-/13.3


Funktion Time

CODE "E" 1 sec.


-XH 906 905 PE -XH 939 940 941 PE
M101 YSLY-JZ M124 YSLY-JZ
3x1.5mmý 4x1,5mmý

33 35 2 E
closed CT/LS

OT/LS

L N PE -M5
open

230V,50Hz
-M4
270W 2,6A
245W IP68
NPW4 NVC5

Preheating pump Scavenging flap

1 3 1 3
10.1 10.4

6 7 6 7
10.2 10.4

9 11

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L DC-AC Converter B741
Project Group
+ M1 Page
10
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

10mmý

86
10mmý -K7
280861 85

-V1

BAT1/28.6

L1LG/5.4

L2LG/5.5

L3LG/5.5

PELG/5.5
M1-/13.0

M1+/13.0

NLG/5.4
-X E 31 31 30 30 30 -XH 921 922 923 N PE

-F8
10mmý 2A
117782

brown

12.8/ STR+

12.8/ STR-
12.8/ STR

M110 YSLY 5x1,5mmý


brown 2x10mmý

red 2x10mmý
-G1 4 4 3 3 1 2 3 N PE
NBE
284083

EBG
PUFFER IN=60A
18Ah/Un=27.2V F: 63A

Charging unit 24 VDC Supply


Charging unit

Shield bar 2A Battery


Under voltage

30 87
12.5 Nominal current: 60A

Nominal loading: 26,8V

Boost charge : 28,2V Manual charging : 28,8V

10 12

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Prelubrication 24VDC
Project
B741 Group
+ M1 Page
11
GHAZI FABRICS Int Charging unit
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\M1 Suffix


M1
0 1 2 3 4 5 6 7 8 9

STR+/11.5
-G2 -G4
87
200Ah,Pb 200Ah,Pb
Battery Battery
-K7
318936 318936 11.6
30
Start relay
+ - + - 10mmý
STR-/11.5
-G3 -G5
200Ah,Pb
+ - + -
200Ah,Pb -K16 30 -K15 30
Battery Battery
318936 318936 31.4 31.4
Battery cables

Battery cables

Battery cables
87 .87a 87 .87a
-W3.A NSGAF™U

-W4.A NSGAF™U

-W5.A NSGAF™U

-W6.A NSGAF™U
4mmý STR/11.5
1x120mmý

1x120mmý

1x120mmý

1x120mmý
Battery
cables

2 23 2 23
-F9 -F10
1 24 1 24
Screw C-6A C-50A
104128 181128
-W1 + Cu 40x10 -W2 - M12x30
Frame
14 14
-K18 -K32
31.6 34.5
11 11

H07V-K -X 42 40 41 -X 43
150mmý 150mmý 50mmý
150mmý 1,5mmý 4mmý 4mmý 10mmý 10mmý

Prelubrication oil pump


white black black red brown
1,5mmý
-M6 Starter motor 1
-M8 Starter motor 2

Starter motor 1

Starter motor 2
15kW 15kW white
NMS NMS
30 50 31 30 50 31

25mmý 4mmý 25mmý 4mmý

red black brown black

-A3
Fa. Rittal
AE 1035/200
300x200x155
TN: 118668
Base 42 40 41 Base 40 43
+ - + -
A K A K
1
1 13
13
-V2 -V3
-Q6 14
14 85 85
90A
-Q5 -K8 324331 -K9
2
90A 2 86 86
280861 280861
324331
87 87
-K8 -K9
12.4 12.9
30 30

10mmý 10mmý 10mmý 10mmý

red + - brown 30 87 red + - brown 30 87


12.1 12.6

Prelubrication oil pump


Prelubrication oil pump
-M7 -M9
24VDC 24VDC
1.5kW 1.5kW
11 NPO6 NPO6 13

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L 2 Starter motor 24VDC B741
Project Group
+ M1 Page
12
GHAZI FABRICS Int Charging unit
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\M1 Suffix


M1
0 1 2 3 4 5 6 7 8 9

DOPPELDIODE 4mmý 4mmý 4mmý 4mmý 4mmý 4mmý


DSEI 2X61
AUF MONTAGE- 1 1 23 1 23 1 23 1 1 23
PLATTE -F11 -F12 -F13 -F14 -F15 -F16
MONTIEREN 2 2 24 2 24 2 24 2 2 24
C-6A C-20A C-6A C-16A C-16A C-25A
28.4 28.4 28.4 28.4
104128 181226 104128 104132 104132 104138

24VDC Supply A1

24VDC Mxx - Mxx


4mmý

-W8.A YSLY-JZ

-W9.A YSLY-JZ
4mmý 4mmý 4mmý

-V4 -X 32
3
DSEI 2X61 -K23

5x4mmý

5x4mmý
225211 + Base
32.4
1
-X 33 33 34 34
1,5mmý

M1+ MST+ M+ HE+ BR+ GE+ SP+ WR+ GASV+ ZD+ HZ+ BP+ L+/11 L+/12 M+/21 M+/22
11.8 35.0 27.0 17.5 14.1 42.1 10.7 10.5 36.1 43.2 26.1 39.1 +A1/15.0 +A1/15.1 13.9 13.9
in the Charging unit

Measuring transducer

Module control panel


Monitoring: Current
Charging unit

Turbo bypass valve

Module interface
DC/AC Converter
Engine control

Butterfly flap
Anti knock
regulation

Gas valves

Ignition 1
Processor
Fuse

PPS

11.7 35.0 27.0 17.5 14.1 42.1 10.7 10.5 36.1 43.2 26.1 39.1 +A1/15.0 +A1/15.1 13.9 13.9

M1- MST- M- HE- BR- GE- SP- WR- GASV- ZD- HZ- BP- L-/11 L-/12 M-/21 M-/22

1,5mmý
-X 31 31 31 31
- Base

= Terminal 31

-X 62 31
24V-Distribution
M108 YSLY-JZ

2x1.5mmý

M+/21/13.9

M+/22/13.9

M-/21/13.9

M-/22/13.9
-Y1
SOV13

BYPASS: 34 34 31 31
Valve

+M2-X1

12 14

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Distribution 24VDC
Project
B741 Group
+ M1 Page
13
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-A4 -A5 -A6 -A7


361926 348948 348948 348948

EX 481 AF 104 AF 104 AF 104


Modul 1 Modul 2 Modul 3
Mounting rail

P20
0 0
E 2 E 2
C 4 C 4
A
8
6 A
8
6 AI774 AI774 AT664 AT664 AT664 AT664 AT664 AT664 AT324 AT324 AO352
-X2
361927
ETHERNET
mA IN mA IN NICRNI NICRNI NICRNI NICRNI NICRNI NICRNI PT100 PT100 mA OUT
+ -
1 2 3 4
Delivery GE Jenbacher

red

X X X X X X X X X X X
-W10.A Ethernet

-X3 -X6 -X7 -X8 -X9 -X12 -X13 -X14 -X15 -X16 -X17
-F17 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81 7TB712.81
110630 378577 378577 378577 378577 378577 378577 378577 378577 378577 378577 378577
-XS 500

Fuse -A8
0,2A 375850

DM 465 DM 465
+A1/16.1/ BUS/1

37.4/ AKRL+

6.1/ E/BR
13.2/ BR+

13.2/ BR-

16.0/ AK+

16.0/ AK-

Modul 4&5 Modul 6&7

-X4 -X10
Module control panel
7TB718.81 7TB718.81
377997 377997

X1 X DI X1 X DI

X2 X DO X2 X DO

-X5 -X11
7TB718.81 7TB718.81
377997 377997
13 15

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view modules B741
Project Group
+ M1 Page
14
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
14

Modific.
0

Date
Name Norm
Date

Print
Desig.
1

27.0
-A21
OUTPUT INPUT
X2 X1
IA1 3 A_VORW OMAX 3 IE1
IA9 11 A_GAS1 F_GAS1 11 IE9
IA2 4 A_VORWH OELV 4 IE2

17.Mai.2005
08.Jul.2004
IA10 12 GASV1 GDMI1 12 IE10
IA3 5 OELV_AUF OMIN 5 IE3

Eberharter St.
IA11 13 A_ENTR GDMA1 13 IE11
IA4 6 A_STRT P_DIFF 6 IE4
IA12 14 BP_V SIFA_I 14 IE12
2

IA5 7 ZUEND ABGD 7 IE5


IA13 15 A_COSPHI STBM 15 IE13

DIR: J:\..\
IA6 8 VSP_24 RM_MKWP 8 IE6
IA14 16 BWS_HA GKWT_2 16 IE14
Modul 4&5

IA7 9 GM1_ZU UEDZ 9 IE7


IA15 17 UW_EIN ST_ACT 17 IE15
IA8 10 GM1_AUF RUHE 10 IE8
IA16 18 LSHK ZIB 18 IE16

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

Schnittlinie
29.0
-A22

OUTPUT INPUT
X2 X1
IA17 3 VKDMI 3 IE17
IA25 11 SPKAUF 11 IE25
IA18 4 SPK_AUF 4 IE18
12 12
4

IA26 SPKZU IE26


IA19 5 SPK_ZU 5 IE19
IA27 13 SPUELV 13 IE27
IA20 6 SPKST 6 IE20
IA28 14 14 IE28
IA21 7 SPG_VSP 7 IE21
IA29 15 VSP_400 15 IE29
IA22 8 VKGV 8
RM_SPUELV IE22
IA30 16 16 IE30
Modul 6&7

IA23 9 A_MKWP MCP_TEMP9 IE23


IA31 17 GM2_ZU 17 IE31
IA24 10 10
VWP_PDIFF IE24
5

IA32 18 GM2_AUF 18 IE32

Schnittlinie
6

Slot address Over view


7

Suffix
Project
B741
8

Group
Page
+ M1
9

15
16
0 1 2 3 4 5 6 7 8 9

Oil pressure Jacket water pressure Supercharge pressure Mixer position

14.2/AK+ AK+/17.0

-XS 500 E SS 500 E SS 500 E SS

GMP1/38.3
M121 YSLCY-0Z

M122 YSLCY-OZ

M117 YSLCY-OZ
3x0,75mmý

3x0,75mmý

3x1,5mmý
1 2 3 1 2 3 1 2 3

+ 1 2 E + 1 2 E + 1 2 E

-B1 I -B2 I -B3 I


0-10bar 0-2,5bar 0,3 bis
=4-20mA P =4-20mA P +4,5bar P
NUP9 NUP8 =4-20mA
NUP7

14.2/AK- AK-/17.0

-A9 + SCH + SCH + SCH + SCH


348939 1 2 3 4 5 6 7 8 9 10 11 12

I13 I14 I15 I16

ANALOG INPUT B&R 2003 Modul 1 Type AI 774 Analog input 0-20mA
Slot 1

15 17

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
16
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Intake air temperature

AK+/38.3
16.8/AK+

Gas Mixer 2 Position Excitation


voltage 1 2
Generator
SS
-A11 4-20 mA

UE-/1/+G1/6.1

UES/1/+G1/6.1
RTM81

UE/1/+G1/6.1
127716 0-120øC

GMP2/38.3
A A A

HE+/13.2

HE-/13.2
-XS 8 7 6

M15 YSLY-JZ
4x1,5mmý
SS

1 2
1 2 3
12 10 E
9 8
A

-B4 -B5
A: 4-20mA E: 0-100V NUT31
HE 501
237474

16.8/AK-

-A10 + SCH + SCH + SCH + SCH


348939 1 2 3 4 5 6 7 8 9 10 11 12

I17 I18 I19 I20

ANALOG INPUT B&R 2003 Modul 1 Type AI 774 Analog input 0-20mA
Slot 2

16 18

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs
Project
B741 Group
+ M1 Page
17
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Exhaust gas temperature


after Turbo

-B6 -B7
NUT13 NUT13

+ - + -

NICRNIGE NICRNIGE
2x0,5mmý 2x0,5mmý

gn ws gn ws

SS

-A12 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I21 I22 I23 I24

ANALOG INPUT B&R 2003 Modul 1 Type AT 664 Analog input Thermo couple K
Slot 3

17 19

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
18
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Cylinder : 1 2 3 4

-B8 -B9 -B10 -B11


NUT1 NUT1 NUT1 NUT1

+ - + - + - + -
M150 NICRNIGE 2x0,5mmý

M151 NICRNIGE 2x0,5mmý

M152 NICRNIGE 2x0,5mmý

M153 NICRNIGE 2x0,5mmý


gn ws gn ws gn ws gn ws

SS SS SS SS

-A13 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I25 I26 I27 I28

ANALOG INPUT B&R 2003 Modul 1 Type AT 664 Analog input Thermo couple K
Slot 4

18 20

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
19
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Cylinder :

5 6 7 8

-B12 -B13 -B14 -B15


NUT1 NUT1 NUT1 NUT1

+ - + - + - + -
M154 NICRNIGE 2x0,5mmý

M155 NICRNIGE 2x0,5mmý

M156 NICRNIGE 2x0,5mmý

M157 NICRNIGE 2x0,5mmý


gn ws gn ws gn ws gn ws

SS SS SS SS

-A14 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I29 I30 I31 I32

ANALOG INPUT B&R 2003 Modul 2 Type AT 664 Analog input Thermo couple K
Slot 1

19 21

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
20
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Cylinder :

9 10 11 12

-B16 -B17 -B18 -B19


NUT1 NUT1 NUT1 NUT1

+ - + - + - + -
M158 NICRNIGE 2x0,5mmý

M159 NICRNIGE 2x0,5mmý

M160 NICRNIGE 2x0,5mmý

M161 NICRNIGE 2x0,5mmý


gn ws gn ws gn ws gn ws

SS SS SS SS

-A15 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I33 I34 I35 I36

ANALOG INPUT B&R 2003 Modul 2 Type AT 664 Analog input Thermo couple K
Slot 2

20 22

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
21
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Cylinder :

13 14 15 16

-B20 -B21 -B22 -B23


NUT1 NUT1 NUT1 NUT1

+ - + - + - + -
M162 NICRNIGE 2x0,5mmý

M163 NICRNIGE 2x0,5mmý

M164 NICRNIGE 2x0,5mmý

M165 NICRNIGE 2x0,5mmý


gn ws gn ws gn ws gn ws

SS SS SS SS

-A16 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I37 I38 I39 I40

ANALOG INPUT B&R 2003 Modul 2 Type AT 664 Analog input Thermo couple K
Slot 3

21 23

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
22
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Cylinder :

17 18 19 20

-B24 -B25 -B26 -B27


NUT1 NUT1 NUT1 NUT1

+ - + - + - + -
M166 NICRNIGE 2x0,5mmý

M167 NICRNIGE 2x0,5mmý

M168 NICRNIGE 2x0,5mmý

M169 NICRNIGE 2x0,5mmý


gn ws gn ws gn ws gn ws

SS SS SS SS

-A17 + SCH + SCH + SCH + SCH


280684 1 2 3 4 5 6 7 8 9 10 11 12

I41 I42 I43 I44

ANALOG INPUT B&R 2003 Modul 2 Type AT 664 Analog input Thermo couple K
Slot 4

22 24

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ M1 Page
23
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Fuel mixture temperature Oil temperature Engine jacket Generator


water temperature
Windings
temperature
Phase U
-B28 -B29 -B30
NUT2 NUT7 NUT6

Pt 100 Pt 100 Pt 100

WTU3/1/+G1/5.1

WTU1/1/+G1/5.1
M118 YSLCY-OZ 3x0,25mmý

M119 YSLCY-OZ 3x0,25mmý

M120 YSLCY-OZ 3x0,25mmý


WS1/25.1
white

white

white
red

red

red

red

red

red
SS SS SS -XS 630 632

WS2/25.1

-A18
348940 1 2 3 4 5 6 7 8 9 10 11 12

I45 I46 I47 I48

ANALOG INPUT B&R 2003 Modul 3 Type AT 324 Analog input PT100
Slot 1

23 25

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs
Project
B741 Group
+ M1 Page
24
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Windings temperature Windings temperature Bearing temperature A Bearing temperature B


Phase V Phase W

WTV3/1/+G1/5.2

WTV1/1/+G1/5.2

WTW3/1/+G1/5.3

WTW1/1/+G1/5.3

LTA3/1/+G1/5.7

LTA1/1/+G1/5.6

LTB3/1/+G1/5.8

LTB1/1/+G1/5.7

LTBS/1/+G1/5.8
24.8/WS1

-XS 634 636 -XS 637 639 -XS 640 642 -XS 643 645 SS

24.8/WS2

-A19
348940 1 2 3 4 5 6 7 8 9 10 11 12

I49 I50 I51 I52

ANALOG INPUT B&R 2003 Modul 3 Type AT 324 Analog input PT100
Slot 2

24 26

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs
Project
B741 Group
+ M1 Page
25
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

ANALOG OUTPUT B&R 2003 Modul 3 Type AO 352 Analog output 0-20mA
Slot 3

O3 O4
high. Burden: 400ê high. Burden: 400ê

-A20 1 2 3
U I
4 5 6
U I
280685 + SCH + SCH

ST_ACT/28.7
* ... TA 1502-0065
HZ+/13.6

HZ-/13.6

SS

39.8/ TB+

39.8/ TB-

39.8/ TBS
3 3
-K34 -K17
43.4 31.5
1 1
ZIB ZUEND *

-A25 18 19 21 20 9 11 7 8 5 10
369160
+ - SpD Stp +mA -mA Shld ERR
24VDC

PANDAROS
22 23
CU-01

PDC40.6-06-S1
Drive-

Drive+

Heinzmann

FbR FbM FbC Shld


24 25 17 16 15 14
M189 YSLCY 3x0,75mmý
M188 YSLCY 2x1,5mmý

Cable harness:

----------
BR2 +
Cable harness

BR3: Tl.Nr.: 234658


BR6: Tl.Nr.: 234666

1 2 1 2 3
SS SS

-B31 Turbo bypass valves


Actuator B C D A E

25 27

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Outputs B741
Project Group
+ M1 Page
26
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

13.2/M+ M+/28.0
13.2/M- M-/28.0

M114 YSLY-OZ 2x1,5mmý

M134 YSLY-OZ 2x1,5mmý


+A1/23.9 +A1/23.9

Emergency stop

Emergency stop
NOSI1/1 NOSI2/1

-X 150 -X 151
A2 86
-K10 -K11 K
PT A1376147 85
328577 A
-X 50 -X 88 -X 84 -V6
M138 YSLY-JZ 5x1.5mmý

UW
+ 24 24
1 -K25 -K10
-S3 32.7 27.7
4 4 21 21
LS5
-S4 -S5
1 NUP1 1
4 3 2 0,4 bar
PDS3 ZIB 1
MAX OL MIN 22 9
328336 -K21 -K34
32.3 43.4
21 11

RMMKWP2/8.4
-X 51 52 53 -X 89 -X 85

GSTR1
A 35.1

-V5 K
24

-R1 -R2 -R3 -R4 -R5 21

1.5kê 1.5kê 1.5kê 1.5kê 1.5kê .22


1W 1W 1W 1W 1W -K35
43.6

-A21
15.1
28.0
31.0 1 2 3 4 5 6 7 8 9 10
32.0
X1
348933 - + IE1 IE2 IE3 IE4 IE5 IE6 IE7 IE8

DIGITAL INPUT B&R 2003 Modul 4&5 Type DM 465 Part 1 / 4

OMAX OELV OMIN P_DIFF ABGD RM_MKWP UEDZ RUHE


Oil level Engine high. Refill oil Oil level Engine low. Pre Exhaust gas Feed back Over speed Fail safe
Shut down Shut down chamber: backpressure high. Engine jacket water pump loop Loop
Difference pressure
high

11 14 30 87
31.4 36.1
21 24
27.8
31 34
31.5

26 28

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ M1 Page
27
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

27.9/M+ M+/29.0
27.9/M- M-/29.0

-W20.A YSLY-OZ 2x1,5mmý

-W21.A YSLY-OZ 2x1,5mmý

M107 YSLY-OZ 2x1,5mmý


23
-F2

Gas pressure high


5.3

Gas pressure low


24
RL

BAT1/11.8
13
-Q1
5.5
14
LADUNG
-X 104 -X 106 -X 120

23
-F14
13.6
24
GASV

2 1 12 14 A2 A1 4 7
24 -K34
35.2 -S6 -S7 -F16 -S8 26.3
24VDC 43.4
FGAS1 NUP5 3 NUP3 3 13.9 50øC 1 ST_ACT 6
23 NUT9 ZDG 1
50mbar ...mbar QUERV 11
-X 105 -X 107
-F18
23
-F1 DUA
52C742 -X 121
5.1 24VDC
24
EINSP 385280

-R8 -R9
-V7 23
104383
-F3 Us:1,0xUn 1,5kê 1,5kê
1W 1W
7.2
24 Us: 24V
VORWP dU = 10%
23
-F12 Achtung:
-R6 -R7 13.4
24
Widerstand
1,5kê 1,5kê VORWP auf Plus 24VDC!
1W 1W

23
-F13
13.5
24

-A21
27.0
11 12 13 14 15 16 17 18
X1
IE9 IE10 IE11 IE12 IE13 IE14 IE15 IE16

DIGITAL INPUT B&R 2003 Modul 4&5 Type DM 465 Part 2 / 4

F_GAS1 GDMI1 GDMA1 SIFA_I STBM GKWT_2 ST_ACT ZIB


Gassafety device 1 Gas pressure low Gas pressure high Circuit breaker Battery Under Temperature high: Failure Ignition
Gas train 1 Gas train 1 tripped voltage Inter cooling water 2 Actuator in Operation

1 min

27 29

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs B741
Project Group
+ M1 Page
28
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

28.9/M+ M+/30.0
28.9/M- M-/30.0

M26 YSLY-OZ 2x1,5mmý


-W24.A YSLY-OZ 2x1,5mmý
-X 108

Gas pressure low

-X 122

3 2
-K1
-S11
5.3
1 150mbar 1
4 PDSxxx
4 999999
-S10
-S9 50øC 5
2,5 bar 1 127021
NUP13
9.8 9.8 9.8 9.2
-X 123
SPKAUF SPKZU SPKST RMSPUELV

-X 109

-R10 -R11 -R12 -R13


1,5Kê 1,5kê 1,5kê 1,5kê
1W 1W 1W 1W

-A22
15.3
30.0
33.0 1 2 3 4 5 6 7 8 9 10
34.0
X1
348933 - + IE17 IE18 IE19 IE20 IE21 IE22 IE23 IE24

DIGITAL INPUT B&R 2003 Modul 6&7 Type DM 465 Part 1 / 4

VKDMI SPK_AUF SPK_ZU SPKST SPG_VSP RM_SPUELV MCP_TEMP VWP_PDIFF


Pre Flap Flap Failure: Voltage Failure failure air Preheating pump: OK
chamber Scavenging Scavenging Flap Prelubrecation oil pump Ventilation fan condition device
Gas pressure low. open closed Scavenging Scavenging

W1193 W1194

28 30

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ M1 Page
29
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

29.9/M+ M+/31.0
29.9/M- M-/31.0

-A22
29.0
11 12 13 14 15 16 17 18
X1
IE25 IE26 IE27 IE28 IE29 IE30 IE31 IE32

DIGITAL INPUT B&R 2003 Modul 6&7 Type DM 465 Part 2 / 4

Spare Spare Spare Spare Spare

29 31

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs B741
Project Group
+ M1 Page
30
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 4&5 Type DM 465 Part 3 / 4

-A21 - + IA1 IA2 IA3 IA4 IA5 IA6 IA7 IA8


27.0
1 2 X2 3 4 5 6 7 8 9 10

14 34
-K10 -K10
27.7 27.7
11 31

GM1 GM2
38.3 38.4

85
-K15
376147 86

A1 A1 A1 85 2 A1
-K12 -K13 -K14 -K16 -K17 -K18
24 VDC A2 PT A2 PT A2 376147 86 MT 10 PT A2
328577 328577 350960 328577
3RT1016
-2BB41
374524
30.9/M+ M+/32.0
30.9/M- M-/32.0

A_VORW A_VORWH OELV_AUF A_STRT ZUEND VSP_24 GM1_ZU GM1_AUF


Preheating pump Preheating Oil refill Start relay Ignition Prelubrecation Air-gas mixer P 1
on valve oil pump
on

24VDC

.87a .87a
1 2 21 24 21 24 30 87 30 87 1 3 11 14
10.1 7.2 37.3 12.5 12.4 26.1 12.4
3 4 5 6
5.2 43.3

30 32

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ M1 Page
31
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 4&5 Type DM 465 Part 4 / 4

-A21 IA9 IA10 IA11 IA12 IA13 IA14 IA15 IA16


27.0
X2 11 12 13 14 15 16 17 18

A1
-K21
PT A2
328577

A1 85 A1 2 A1 A1 A1
-K19 -K20 -K22 -K23 -K24 -K25 -K26
PT A2 376147 86 PT A2 MT 10 PT A2 PT A2 PT A2
328577 328577 350960 328577 328577 328577

31.8/M+ M+/33.0
31.8/M- M-/33.0

A_GAS1 GASV1 A_ENTR BP_V A_COSPHI BWS_HA UW_EIN LSHK


Demand Gas valves on Deexcitation Valve Cos Phi- Reset Jump out Release:
Gassafety device 1 Gas train 1 Controller:on Ignition Monitoring U-Controller
LS

21 24 30 87 21 22 21 22 1 3 21 24 21 24 21 24
35.1 36.1 27.7 40.3 13.5 40.1 27.7 40.6
31 32
40.4

31 33

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ M1 Page
32
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 6&7 Type DM 465 Part 3 / 4

-A22 - + IA17 IA18 IA19 IA20 IA21 IA22 IA23 IA24


29.0
1 2 X2 3 4 5 6 7 8 9 10

85 A1
-K27 -K28
376147 86 PT A2
328577

32.9/M+ M+/38.3
32.9/M- M-/34.0

VKGV A_MKWP
Pre Engine jacket
chamber Gas valve water pump

30 87 31 34
36.2 8.2

32 34

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ M1 Page
33
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 6&7 Type DM 465 Part 4 / 4

-A22 IA25 IA26 IA27 IA28 IA29 IA30 IA31 IA32


29.0
X2 11 12 13 14 15 16 17 18

8 8
-K30 -K29
34.2 34.1
11 11

GM3 GM4
38.5 38.6

2 2 A1 A1
-K29 -K30 -K31 -K32
MT 10 MT 10 24 VDC A2 PT A2
350960 350960 328577
3RT1016
-2BB41
374524

33.9/M- M-/38.3

SPKAUF SPKZU SPUELV VSP_400 GM2_ZU GM2_AUF


Flap Flap Ventilation Prelubrecation Air-gas mixer P 2
Scavenging Scavenging fan Scavenging oil pump
open close on

400VAC

1 3 1 3 1 2 11 14
10.4 10.3 9.1 12.9
8 11 8 11 3 4
34.2 34.1 9.1
5 6
9.1

33 35

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ M1 Page
34
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

13.1/MST+ MST+/37.2
13.1/MST- MST-/37.2
27.9/GSTR1

86
-K33
376147 85

ANF.
GDKG
24
-K19
-W25.A YSLY-JZ

Release
32.1
21 Gassafety device
Gas train

FGAS1
4x1,5mmý

-X 100 31 101 28.1

-F18 + - B S
Gassafety device
GSTR dicht

VSP 504
GSTR leck

Fa Dungs
DK1

VPS 504 Fa. Dungs

30 87
36.1
Gassafety device 1

34 36

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L 1 Gas train B741
Project Group
+ M1 Page
35
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

13.5/GASV+

2,5mmý

Fail safe loop


87
-K11
27.8
30

2,5mmý
FREIGABE
GDKG 87
-K33
35.2
30

NWG 2,5mmý 2,5mmý


GASVENT.
VORKAMMER-
AUF 87 87
-K20 -K27 GASVENT.
32.2 33.6 AUF
30 30

2,5mmý 2,5mmý

13.5/GASV-

-X 31 35 35 37 31 37 31
-W36.A YSLY-OZ

-W37.A YSLY-OZ
-W30.A YSLY-JZ

Pre chamber
gas valve1

Pre chamber
gas valve 2
Gas valve

2x2,5mmý

2x2,5mmý
4x2,5mmý

1 2 3

V1 V2

-Y2 -Y3 -Y4


SOV3 SOV8 SOV8

Gas valves Pre chamber


Gas 1 gas valves

35 37

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Gas valves B741
Project Group
+ M1 Page
36
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

35.4/MST+ MST+/39.1
35.4/MST- MST-/39.1

+A1/38.1
14.2/AKRL+
NOT1
1 2

Oil refill SS
-A26 4-20 mA
valve
-X 154 RTM81
on 127716 0-120øC

A A A
-XS 8 7 6
24
-K14
21 13 31.3
21
-S12
117987 22 14

Emergency stop-Push button


M139 YSLY-OZ 2x1.5mmý

Module interface

-W15.A YSLCY-JZ

Water inlet
M15 YSLY-JZ
-X 155
- Base

4x1,5mmý
4x1,5mmý
-XS 501 31 SS

PT100:
-X 54 31

NOT2
+A1/38.1 1 2

-B32

+A1/18.8/ RLTP+

+A1/18.8/ RLTP-

+A1/18.8/ RLTPS
1 2 3
NUT12

-Y5
40W
SOV2

Water return Temperature

Emergency stop Oil valve

36 38

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Emergency stop-off-Push button B741
Project Group
+ M1 Page
37
GHAZI FABRICS Int Return water temp.
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

31.7 31.8 34.7 34.8

GM1 GM2 GM3 GM4

-G6 zu auf -G7 zu auf


EN-SM 2 1 EN-SM 2 1
391976 391976
3 7 4 5 6 8
3 7 4 5 6 8 10 9 11 12 10 9 11 12

33.9/M+
34.9/M-

-X 92 93 94 95 96 97 98 99

16.8/GMP1
17.4/GMP2
17.8/AK+

-XS 500 SS -XS 500 SS

M147 YSLCY-OZ M149 YSLCY-OZ


2x1,5mmý 2x1,5mmý

-X18 90 91 92 93 94 95 96 97 98 99 100 101


Klemmbox
356792

5 6 1 2 3 4 1 2 3 4 5 6
YSLY-JZ YSLY-JZ
7x1,5mmý 7x1,5mmý
yellow

yellow
white

black

white

black
red

red
-M10 IN OUT E 1 2 3 4 1 2 3 4 IN OUT E
-M11
4-20mA + - + - 4-20mA
NVD3 NVD3
mA mA
Pos Pos
M M
= =

GM1_ZU GM1_AUF GM2_ZU GM2_AUF


Air-gas mixer P 1 Air-gas mixer P 2

37 39

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L 2 Air-gas mixer B741
Project Group
+ M1 Page
38
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

37.6/MST+ MST+/42.1
37.6/MST- MST-/42.1

-A23
V17153-21 + -
CONTRANS I
254224 gn
1 2
+
- +
14 15
5 4

TB+/26.6
TB-/26.6
TBS/26.6

13.7/BP-
13.7/BP+

*: *: *:
-X 90 91 91a -XS 502 503 -X 90 91 91b -XS 503 504 -X 90 91 91c -XS 505 507
SS SS SS
M182 YSLCY-OZ 2x0,75mmý

M185 YSLCY-OZ 2x0,75mmý

M187 YSLCY-OZ 2x0,75mmý


M181 YSLY-OZ 3x1,5mmý

M184 YSLY-OZ 2x1,5mmý

M186 YSLY-OZ 2x1,5mmý


*:
POSITION
SIGNAL:
4-20mA

4-20mA

4-20mA
0,5V => 10%
1 2 3 2 1 1 2 3 2 1 1 2 3 2 1 4,5V => 90%
orange

orange

orange
black

white

black

white

black

white
blue

blue

blue
red

red

red
-Y6 A B F E D C -Y7 A B F E D C -Y8 A B F E D C
FLOW TECH FLOW TECH FLOW TECH
NVA NVA NVA
257515 257515 257515

Supply Position Supply Position Supply Position


Turbo bypass valve 1 Turbo bypass valve 1 Turbo bypass valve 2 Turbo bypass valve 2 Turbo bypass valve 3 Turbo bypass valve 3

38 40

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Turbo bypass valves B741
Project Group
+ M1 Page
39
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

GPFL1/1/+G1/6.6

GPFL2/1/+G1/6.6
ENT1/1/+G1/6.1

ENT2/1/+G1/6.2

ENT3/1/+G1/6.2

ENT4/1/+G1/6.2

SYA1/1/+G1/6.4

SYA2/1/+G1/6.4
CB1/1/+G1/6.4

CB2/1/+G1/6.4

R2S/1/+G1/6.3

BLP/1/+G1/6.5

BLS/1/+G1/6.5
Rs/1/+G1/6.3

Rt/1/+G1/6.3

BL/1/+G1/6.5

-W6.B YSLY-OZ 2x1,5mmý


Voltage matching
-X 56 57 -XS 650 651 -X 70 71 72 73 -XS 653 654 -X 58 59 -XH 727 728

SS SS
24 22 32 24
-K24 -K22 -K22 -K26
32.5 32.3 32.3 32.8
21 21 31 21

-R14 -R15

+A1/5.6/ PFL1/1

+A1/5.7/ PFL2/1
1000 ê 2 kê
2W 2W

Achtung: Bei LS-Generatoren


bitte die Originalpotis,
welche im Generator beigepackt
sind verwenden.
110V AC
Adjustment Voltage

Adjustment Cos-Phi
Controller: on

Deexcitation

U-Controller
Cos Phi-

Release:

Voltage matching
39 41

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces to the Generator
Project
B741 Group
+ M1 Page
40
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Terminals - CAN Bus:Typ "Wago 281"

660

661

662

-XS H G L SS SS -XS SS SS
Cable harness

Cable harness
yellow/

yellow/
brown/

green/

brown/

white/

green/

brown/

white/

green/

brown/

green/
-G8
43.0
+A1/8.6/ CANH/1

+A1/8.6/ CANG/1

+A1/8.6/ CANL/1

+A1/8.6/ CANS/1

Zcndung

CAN H 7

CAN L 2
120ê

GND 3
Cable channel

1
2
3
4
5
6
7
8
9
CAN-BUS KLS 98 Ignition

40 42

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L CAN Bus B741
Project Group
+ M1 Page
41
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-A24
KLS98
358224 LED 24 V KLS 98
LED CAM 1,6A tr INTERFACE II 3,15A tr

LED TRIGGER

SUPPLY CAM TRG KLS Pick


24V up

G/0 V
24V

7 V
G

G
Camshaft
Supply

yellow

yellow
blue

pink

grey

blue

pink

grey
SS SS

red

red
LiYY 8x0,75mmý LiYY 8x0,75mmý
Cable harness Cable harness

-B34

10
-B44

20
KLS98
KD
43.9/ ZPIS

43.9/ ZPI3

43.9/ ZPI2
13.3/ GE+

13.3/ GE-

KD

KLS98
* *
-B35
-B45

19
9
KD
KD

-B36
-B46

18
8

KLS98
KD
KD

KLS98
* *
-B37
-B47

17
7
KD
KD

Cable channel

Cable channel
-B38
-B48

16
6

KLS98
KD
KD

KLS98
39.9/MST+
* *
39.9/MST-
Tl.Nr.: 199126

-B39
-B49

15
5

KD
KD
Cable harness

-B40
-B50

14
4

KLS98

KD
KD

KLS98
-XS 506 31 32
SS
* *
-B41
-B51

13
3

KD
KD

sw bl br -B42
-B52

12
2

KLS98

KD
KD

KLS98
Pick up
* * .. Code *
-B43
-B33 -B53

11
1

KD
Speed ST1
Cylinder left KD Cylinder right
41 43

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Knock monitoring B741
Project Group
+ M1 Page
42
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Passiv Passiv Aktiv


Index Index Index

164 Teeth 1 Tooth 1 Tooth

Speed 90 Degree 120 Degree

Crankshaft Crankshaft Camshaft

ZPI2/42.2
ZPI3/42.2
ZPIS/42.1
n>:1750 RPM

13.6/ZD+ Reset
13.6/ZD-

5 2 A1
-K17
-K34 -K35

Pick up

Pick up

Pick up
31.5
6 10 A2
-B54 -B55 -B56
MT PT ST1 ST1 ST2
ZšND. 350960 328577
ANF.

-X 64 31 65 66 67 68
M130 YSLY-JZ

M131 YSLY-JZ
3x2,5mmý

5x1,5mmý

1 2 3 4

WS
BR

WS
BR

BR
SW
BL
-G8 L+ L- GND CA P Start + - S
Sensor GND

Permissive

41.8
Contact A

+TRIGGER

-TRIGGER
SHIELD

+RESET

-RESET
SHIELD

MPUPWR

SHIELD
CAM+
CAM-
44.1
+ 4-20mA

- 4-20mA

Shield
+24 VDC

Zcndung

Trip 1

Trip 2
Start
GND

SUB-D
Part 1/2 Ignition box
RS 232
IC 920
yellow/green 2,5mmý
Ignition

Engine Frame
1 3 24
26.1
6 7 21 .22
28.8 27.7
9 11
27.8

42 44

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Ignition system
Project
B741 Group
+ M1 Page
43
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-G8
43.0
Zcndung
Part 2/2

Plug 17 poles Plug 14 poles

Ground

Ground
Coil

Coil
M F J C G K E B H D A N N J C G A D I F B H E M

Monitor Monitor

F + + E
- -
10 20

J + + H
- -
9 19

C + + B
- -
8 18

G + + F
- -
7 17

K + + I
- -
6 16

E + + D
- -
5 15

B + + A
- -
4 14

H + + G
- -
3 13

D + + C
- -
2 12

A + + J
- -
1 11

Plug at: IC / AIC Plug at: IC / AIC


Firing order:1-14-4-18-8-12-2-15-5-20-10-17-7-13-3-19-9-16-6-11
43 45

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Ignition coils B741
Project Group
+ M1 Page
44
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
44
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-X

Device / Function Page

Name Norm
Date
E
Shield bar /11.7

Print
Desig.
1

Charging unit 24 VDC /11.7

31

4
= /11.7

31

-G1
+M1
= /11.7

30

17.Mai.2005
08.Jul.2004

Eberharter St.
= /11.8

30

3
2A Battery Under voltage /11.8

30
2

DIR: J:\..\
+M1-W8.A YSLY-JZ 5x4mmý

-X
+A1
24VDC Supply A1
Module control panel /13.8

31
1

31
= /13.8

31
2

GHAZI FABRICS Int


31

3 x JGS 620 GS-N.L


3

+M1-W9.A YSLY-JZ 5x4mmý


24VDC Mxx - Mxx
Module interface /13.9

31
1

31
= /13.9

31
2

31

-X1
+M2
+M1-W30.A YSLY-JZ 4x2.5mmý
Gas valve
31 Gas valves Gas 1 /36.1

1
1
4

= /36.1
35

2
2

-Y2
+M1
V1
= /36.2
35

3
3

V2
5

+M1-W36.A YSLY-OZ 2x2.5mmý


Pre chamber gas valve1
Pre chamber gas valves /36.2
37

= /36.3
31

Terminals
-Y3
+M1

general +M1
+M1-W37.A YSLY-OZ 2x2.5mmý
Pre chamber gas valve 2
= /36.3
37

= /36.3
31

2
6

-Y4
+M1
+ Base /13.1
32

+M1-W8.A YSLY-JZ 5x4mmý


-X
+A1

24VDC Supply A1
Module control panel /13.8
33

3
33

= /13.8
33

4
33
7

+M1-W9.A YSLY-JZ 5x4mmý


24VDC Mxx - Mxx
Module interface /13.9
34

3
34

= /13.9
34

Suffix

4
Project
34

-X1
+M2

Prelubrication oil pump /12.4


42

B741

Starter motor 1 /12.4


40

Starter motor 2 /12.5


41
8

Group

= /12.9
43

Page
+ M1
9

45
46
45
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-X

-S3
+M1
Device / Function Page

Name Norm
Date
Oil level Engine high. Shut down /27.1

Print
50

Desig.
4
1

17.Mai.2005
08.Jul.2004

Eberharter St.
3
2

DIR: J:\..\
GHAZI FABRICS Int
3 x JGS 620 GS-N.L
3

2
= /27.1

51
Refill oil /27.2

52
Oil level Engine low. Shut down /27.3

53
Oil valve /37.3

54
31 = /37.3
4

-Y5
+M1
+G1
-X[C]
Cos Phi-Controller: on /40.1
56

27
= /40.1
57
5

28
Release: U-Controller /40.6
58

34
= /40.7
59

Terminals
35

general +M1
BYPASS: /13.5
62

= /13.5
31

-Y1
+M1
6

+24 VDC /43.2


64

L+

-G8
+M1
GND /43.3
31

L-

Sensor GND /43.3


65

-G8
+M1

Contact A /43.3
66
7

GND CA

Permissive Start /43.4


67

Suffix
Project
-G8
+M1
P Start

B741

Trip 1 /43.6
68
8

-G8
+M1

Group
+ M1
+G1
-X[A]

Deexcitation /40.3
70

Page
9

46
47
0 1 2 3 4 5 6 7 8 9

Page

/40.4

/40.4

/40.4

/27.5

/27.5

/27.4

/27.4

/39.1

/39.1

/39.2

/39.4

/39.4

/39.4

/39.6

/39.6

/39.6

/38.4

/38.4

/38.4

/38.4

/38.5

/38.5

/38.5
Pre chamber: Difference pressure
Exhaust gas backpressure high.

Supply Turbo bypass valve 1

Supply Turbo bypass valve 2

Supply Turbo bypass valve 3


Device / Function

Air-gas mixer P 1

Air-gas mixer P 2
Terminal strip

+M1-X

Deexcitation

high
=

=
Jumpers

71 72 73 84 85 88 89 90 91 91a 90 91 91b 90 91 91c 92 93 94 95 96 97 98


Terminal

4 4 A B F A B F A B F 92 93 94 95 96 97 98
+G1-X[C] 21
+G1
12
+G1
22 +M1 +M1
-X[A] -X[C]
-S5 1
-S4 1 +M1 +M1 +M1 +M1 +M1 +M1 +M1 +M1 +M1 +M1
-Y6 -Y7 -Y8 -X18 -X18 -X18 -X18 -X18 -X18 -X18

46 48

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ M1 Page
47
GHAZI FABRICS Int general +M1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


47
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-X

Device / Function Page

Name Norm
Date
Air-gas mixer P 2 /38.6

Print
99

Desig.
1

+M1
99

-X18
+M1-W25.A YSLY-JZ 4x1.5mmý
Gas train
Gassafety device 1 /35.1

+
100
1

= /35.1

31

-
2

17.Mai.2005
08.Jul.2004
+M1
-F18

Eberharter St.
= /35.1

B
101
3
2

-S6
+M1
+M1-W20.A YSLY-OZ 2x1.5mmý

DIR: J:\..\
Gas pressure low
Gas pressure low Gas train 1 /28.2

3
2
1

= /28.2

104 105
2

GHAZI FABRICS Int


-S7
+M1

3 x JGS 620 GS-N.L


3

+M1-W21.A YSLY-OZ 2x1.5mmý


Gas pressure high
Gas pressure high Gas train 1 /28.3

3
1
1

= /28.3

106 107
2

-S9
+M1
+M1-W24.A YSLY-OZ 2x1.5mmý
Gas pressure low
Pre chamber Gas pressure low. /29.1

1
4
1
4

= /29.1
108 109

-S8
+M1
Temperature high: Inter cooling /28.6

1
4
water 2
= /28.6
120 121
5

+M1
-S11

Terminals
general +M1
MCP_TEMP /29.8

1
2
= /29.8
122 123
6

+A1-W81.A YSLY-JZ 5x2.5mmý

-X
+A1 Safety loop
Emergency stop /27.7
150

1
150

= /27.9
151

2
151

= /37.1
154

3
7

154

= /37.1
Suffix
155

4
Project
155

B741
8

Group
Page
+ M1
9

48
49
0 1 2 3 4 5 6 7 8 9

Page

/9.6

/9.6

/9.7

/9.7

/9.8

/9.8
Device / Function

Signals Flap: Scavenging

Temperature Scavenging
Terminal strip

+M1-X

Jumpers

220 221 222 223 224 225


Terminal

1 5 7 6 15 16 1
+M1
+M1 -S2 2
-S1
CAS

OAS

48 50

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ M1 Page
49
GHAZI FABRICS Int general +M1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


49
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-XH

Device / Function Page

Name Norm
Date
N
Socket /7.3

Print
Desig.
1

N
cooling system /7.4

PE Mounting plate /6.5

PE
PE Panel /6.5

PE

17.Mai.2005
08.Jul.2004

Eberharter St.
Socket /7.3

PE
cooling system /7.4

PE
2

/5.0

DIR: J:\..\
L1
-IFL 7 Supply 3x400/231V,50Hz,50A /5.0

L2
= /5.1

704 705 706

+M1
L3

-SSL7
N
= /5.1

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
= /5.1

PE
3

PE
+M1-W6.B YSLY-OZ 2x1.5mmý

-XH
+A1
Voltage matching
Voltage matching /40.8

727
1

727
4

+G1
-X[C]
= /40.8
728

32

-M4
+M1
Preheating pump /10.1

L
= /10.2

N
906 905
5

= /10.2
PE

PE
Heating elements /7.5

Terminals
= /7.5

V
= /7.5

W
907 908 909

Auxiliaries +M1
-E1
+M1
N

= /7.6
N
6

= /7.6
PE

PE

= /7.7
U

= /7.7
V

= /7.8
W
910 911 912
7

-E2
+M1
N

= /7.8
N

= /7.8
PE

Suffix
Project
PE

+M1

B741

Engine jacket water pump /8.2


U

-M2 3

= /8.2
M
V
8

Group

= /8.2
W
913 914 915

PE

= /8.3
PE

Page
+ M1
9

50
51
0 1 2 3 4 5 6 7 8 9

Page

/11.8

/11.8

/11.9

/11.9

/11.9

/10.4

/10.4

/10.4

/10.4
/5.2

/5.2

/9.1

/9.1

/9.1

/9.1
Generator Anti condensation heater
Device / Function

Ventilation fan Scavenging


Supply Charging unit
Terminal strip

+M1-XH

Scavenging flap
=

=
Jumpers

921 922 923 N PE 924 N 936 937 938 PE 939 940 941 PE
Terminal

1 2 3 N PE U V W 33 35 2 E
+G1
RR1 RR2
M
-X[S]
closed CT/LS

OT/LS

+M1 PE +M1
+M1 -M3 3 -M5
-G1 ~
open

50 52

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ M1 Page
51
GHAZI FABRICS Int Auxiliaries +M1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


51
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-XS

Device / Function Page

Name Norm
Date
E
Engine management system /6.1

Print
Desig.
1

E
Shield bar /6.1
+A1-W13.C H07V-K 1x10mmý

-XS
+A1
Potential equalization
Equipotential /6.8

PE
PE

PE

17.Mai.2005
08.Jul.2004
A
8

Eberharter St.
Intake air temperature /17.7

-B5
+M1
A
7
= /17.7

2
2

A
6
= /17.7

DIR: J:\..\
A
8
Water return Temperature /37.4

+M1
-B32
A
7
= /37.4

2
A
6
= /37.4

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

+A1-W33.A CAN-BUSKABEL 4x

-XS
+A1
Delivery GE Jenbacher

H
1
CAN-BUS /41.0

H
G
2
= /41.0

G
L
3
= /41.0

L
Fuse 0,2A /14.2

500

-B1
+M1
4

Oil pressure /16.2

1
500

I
E

= /16.2

P
-B2
+M1
5

Jacket water pressure /16.3

1
500

I
E

= /16.4

Terminals
P
-B3
+M1
6

Shielded cable +M1


Supercharge pressure /16.5
1
500

I
E

= /16.6
E

Air-gas mixer P 1 /38.3


500
7

+M1
90

-X18

Air-gas mixer P 2 /38.6


Suffix
500

Project
+M1
-X18
100

B741

+M1-W15.A YSLCY-JZ 4x1.5mmý


-XS
+A1

PT100:
Water return Temperature /37.5
501

1
8

501

Group

= /37.6
31

2
31

+ M1

Position Turbo bypass valve 1 /39.2


E

Page
-Y6
+M1

= /39.2
D
502 503
9

52
53
52
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+M1-XS

Device / Function Page

Name Norm
Date
Position Turbo bypass valve 2 /39.5

Print
E

Desig.
1

-Y7
+M1
= /39.5

D
503 504
Position Turbo bypass valve 3 /39.7

17.Mai.2005
08.Jul.2004
-Y8
+M1

Eberharter St.
= /39.7

D
505 507
2

Pick up /42.2

506

DIR: J:\..\
+M1
-B33
= /42.2

31
= /42.3

32

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

+G1
-X[S]
Windings temperature Phase U /24.7

630

AU1
= /24.8

632

AU3
634 Windings temperature Phase V /25.2
4

AV1
= /25.2
636

AV3
Windings temperature Phase W /25.3
637

AW1
5

= /25.4
639

AW3

Terminals
Bearing temperature A /25.5
640

AP1
= /25.6
642
6

Shielded cable +M1


AP3

Bearing temperature B /25.7


643

AP4

= /25.8
645

AP6
7

Suffix
Project
+G1
-X[C]

Adjustment Voltage /40.2


25

B741

= /40.3
26

Adjustment Cos-Phi /40.5


8

29

Group

= /40.5
30

KLS 98 /41.2
+ M1

= /41.2

= /41.2
650 651 653 654 660 661 662

Page
9

53
+A1/1
0 1 2 3 4 5 6 7 8 9

Module control panel +A1

Parameters for the operation All Cables between the


of GE Jenbacher Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
GE Jenbacher

Lightning Protection-Potential
Compensation according to
.. .. .. ..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+M1/53 2

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Module control panel +A1 B741
Project Group
+ A1 Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+A1/1 Module control panel +A1 a,b +A1/16 Over view modules

+A1/2 Diagram index +A1/17 Slot address Over view

+A1/3 Diagram index +A1/18 Analog Inputs

+A1/4 Over view Terminal strips +A1/19 Analog Inputs

+A1/5 Voltage selection a +A1/20 Analog Inputs

+A1/6 Synchronising device +A1/21 Analog Outputs b

+A1/7 Multi measuring and monitoring device +A1/22 Digital Inputs

+A1/8 Multi measuring and monitoring device +A1/23 Digital Inputs

+A1/9 Ground fault a +A1/24 Digital Inputs

+A1/10 Over current +A1/25 Digital Inputs a,b

+A1/11 Dif protection relay +A1/26 Digital Inputs

+A1/12 Supply +A1/27 Digital Inputs a,b

+A1/13 Earthing/Grounding +A1/28 Digital Outputs

+A1/14 Pre chamber Gas compressor b +A1/29 Digital Outputs a

+A1/15 Distribution 24VDC +A1/30 Digital Outputs

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ A1 Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+A1/31 Digital Outputs +A1/46 Terminals general +A1

+A1/32 Digital Outputs b +A1/47 Terminals Auxiliaries +A1

+A1/33 Digital Outputs +A1/48 Terminals Auxiliaries +A1

+A1/34 Powerpanel 250 +A1/49 Terminals Shielded cable +A1

+A1/35 F/I Converter gas counter b +A1/50 Terminals Shielded cable +A1

+A1/36 Control Generator circuit breaker a

+A1/37 Signals IS --> A

+A1/38 Emergency stop

+A1/39 Interfaces to the Customers

+A1/40 Report signals

+A1/41 Interfaces from the customer a,b

+A1/42 Interfaces Generator circuit breaker b

+A1/43 Terminals general +A1

+A1/44 Terminals general +A1

+A1/45 Terminals general +A1

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ A1 Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view Terminal strips

+A1-X Wiring colours in panel:

Terminal strip general

AC :
Module control panel +A1
Outside wire : black

+A1-XH
Protective wire : green/yellow

Terminal strip Auxiliaries


Function ground : transparent

Module control panel +A1


Neutral wire : light blue

+A1-XS
Terminal strip Shielded cable
DC :
Plus : red
Module control panel +A1

Minus : brown

Terminal strip-X=Terminals
Control : white
general +A1

Terminal strip-XH=Terminals
Auxiliaries +A1 Voltage free contacts : black

Thermo compensation cable : + green


Terminal strip-XS=Terminals
Shielded cable +A1
- white

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Terminal strips B741
Project Group
+ A1 Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

5.4/PROZ+ PROZ+/5.1
5.4/PROZ- PROZ-/5.1
24.5

U>< Selection Busbar

D/L1/6.2
-A1 D/L2/6.2
100/110V A1 A2 AS S1 110% Ur 12 11 14 121% Ur
Pilz
S3UM RS
U>< 0,55 tr 0,55 tr
370481
MR S2
L1 L2 L3 N Y1 Y2 Y3 3 7
AR 80% Ur 88% Ur -K12
30.1
1 6

-T1

100
110
120
20VA
0
31 32 33 34

298453
1 2 3 4 5
0

110
120
231
400
-F1
117782
-XH 727 728
-F2
117782

-F3

+M1/40.8/ PFL1/1

+M1/40.8/ PFL2/1
117782 2A 2A 2A
Ri = 91,2kê
713

714

715

-XH

Bcrde = 0,1W
L1 L2 L3

-SSL75

75

-IFL 75
Busbar voltage

3x11KV/110V/1,73, 50VA
Generator
Voltage matching

4 6

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Voltage selection B741
Project Group
+ A1 Page
5
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

15.6/SY+

15.6/SY-

GS-EIN 29.4

-K43
22 FGSYIMP
42.1
21

-A2
2 7 4 1 3 8 11 18 19 14
404596

Adjustment:

ready for operation SY Pulse

SPM-D1040
kpr = 240
+df = 0,2 Hz
-df = 0,2 Hz
IP54
dU = 4V
Speed Voltage
( mit Spannungsabgleich NEWAGE )
Generator Bar
ANZUGSZEIT = gem„á Schaltereigenzeit

9 10 12 13 15
20 21 23 24
24VDC 24VDC

up down up down

25.5/ SC+/1

25.6/ SC-/1

36.2/ SYIMP
C/L1

C/L2

D/L1

D/L2
7.5/

7.6/

5.7/

5.7/

Selection Generator Selection Busbar Speed matching SY-Pulse GCB

5 7

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Synchronising device B741
Project Group
+ A1 Page
6
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-A3
8.1
402872
3
1A
7 11
Multi measuring and monitoring device

Generator Generator voltage


current

N L1 L2 L3
Part 1/2
5A
2 6 10 1 5 9 14 16 18 20
2,5mmý
-W4.A YSLY-JZ 5x2,5mmý

-F4
Generator current

117782

-F5
117782

-F6 2A 2A 2A
117782
730

731

732

733

716

717

718

-XH -XH N

N L1 L2 L3
+G1/4.7/ lL1/1

+G1/4.7/ lL2/1

+G1/4.7/ lL3/1

C/L1

C/L2
+G1/4.7/ k/1

-SSL13
13
6.1/

6.1/
-IFL 13
Generator voltage

3x11KV/110V/1,73
E-SY

250/5A

6 8

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Multi measuring and monitoring device B741
Project Group
+ A1 Page
7
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

15.4/AST+/1 AST+/9.1

LE+/18.3

LE-/18.3
LES/18.3
15.4/AST-/1 AST-/9.1

0-20mA =
Frame
-...kW bis +...kW
Panel

tr
2,5mmý

-A3 + - + -
7.0 38
ma
39 37 36 Part 2/2 13

Supply

I> IN Generator power

U< U> U ASYM I ASYM 1Pulse=...kWh CAN


I>>
H L GND
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 40 41 42 43 44

gelb
CANMMU/H/34.7
grcn
CANMMU/L/34.7
braun
CANMMU/G/34.7
15.4/PROZ1+/1 PROZ+/22.0
CANMMU/S/34.7

Delivery GE Jenbacher
-W33.A CAN-BUSKABEL
40.4/ KR6

Tl.Nr.: 301044
Adjustment:

I> = 1,05xIN tv = 5s -XS H L G SS


I>> = 2,5xIN, tv = 300ms
In> = 30%IN, tv = 1s
U< = 0,9xUN, tv = 10s
U> = 1,2xUN, tv = 4s
Uasy = 4% tv = 3s
Iasy = 30% tv = 3s
-Q = 0,32xPn tv = 1s

+M1/41.0/ CANH/1

+M1/41.0/ CANL/1

+M1/41.0/ CANG/1

+M1/41.0/ CANS/1
f> = 110% tv = 10s
f< = 80% tv = 2s
A1
-K1
PT A2
328577

15.4/PROZ1-/1 PROZ-/22.0

21 24
26.4
31 34
29.6

7
CAN-BUS 9

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Multi measuring and monitoring device B741
Project Group
+ A1 Page
8
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Ohne šberschreiten der Erdspannungseinstellung erfolgt


keine Erdschlussrichtungsausl”sung!

without Function 1 ON
without Function 2
ADJUSTMENT: without Function 3
without Function 4
IE> 0,12 Sin-Cos 5
tIE> 0,2sek Frequency Hz 50/60 6
UE> 10V Zeithysterese 1s/10s 7
tUE> 2 sek Zeithysterese 1s/100s 8

-A18
XI1-E-R-5 Ground fault
304918
KONTAKTE
IN BETRIEB
OHNE ST™RUNG
IE> UE>
TRIP TRIP
Bcrde 0,1VA
Input: 5A + -

IE1

IE2
Ue

Un
12 11 14 22 21 24 A1 A2

-R1 EVR

751

752
5,6kê -XH 27.8
7W
333626
EV
-XH 749 750 27.7

-SSL11

Ue Un -SSL11
intensidad
toroideal
-SSL12
50/5A
0-30V 10P10
20VA 2
-K49
MT 10
350960

8.4/AST+ AST+/10.1
8.4/AST- AST-/10.1

1 3
36.5
5 6
36.4
9 11
29.6

8 10

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Ground fault B741
Project Group
+ A1 Page
9
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

--> In gen = 198A


Trip characteristic:
Adjustment:
Normal - invers
I> 198A x 1,05 = 207A--> 4,15
tI> 1sek ON
I>> 198A x 2,5 -> 9,9
tI>> 0,3sek
1 2 3 4 5 6 7 8

-A4
XI1-I Over current relay
235356

I> I>>
TRIP TRIP
Bcrde 0,1VA
+ -
1S2

2S2

3S2

3S1

2S1

1S1
Input: 5A 12 11 14 22 21 24 A1 A2

2,5mmý
-W7.A YSLY-JZ 5x2,5mmý
Generator current

KONTAKTE
lDL1/1/11.1
IN BETRIEB
lDL2/1/11.1
2,5mmý

OHNE ST™RUNG
lDL3/1/11.1
kD/1/11.1
735

736

737

738

-XH

+G1/4.6/lPL1/1
+G1/4.6/lPL2/1
+G1/4.6/lPL3/1 2
+G1/4.6/kP/1 -K2
Generator current MT 10
350960

9.8/AST+ AST+/11.1
9.8/AST- AST-/11.1

250/5A
5P10

1 4
36.4
6 7
26.4
9 11
36.5

9 11

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over current B741
Project Group
+ A1 Page
10
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

L1 L1 U Generator
S2 S1 S2 S1 Starpoint
L2

L3
S2 S1
L2

L3
G V

W
S2 S1

S2 S1 S2 S1

Adjustment: Id1 = 20%


Id2 = 30%

S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1

-A5
Dif protection relay
Leonhard
ESDR 4 ESDR 4

Monitoring on
284905

Stator current Transformer current dI> dI>


Monitoring

+24VDC
trip Warning
<0,15VA <0,15VA

0VDC
31 33 35 32 34 36 25 27 29 26 28 30 4 5 6 12 10 11 7 8 13 14 15 19
Input: 5A

Kontakte
2,5mmý

2,5mmý

in Betrieb
ohne St”rung
1S1

2S1

3S1

1S2

2S2

3S2
S2

S1
745

746

747

748

-XH

1S2 2S2 3S2 S1

DIF
10.5/kD/1
25.1
10.5/lDL1/1
-SSL10
10.5/lDL2/1
10 2
10.5/lDL3/1
-K3
IFL 10 10
Stator current MT
Current 350960

10.9/AST+ AST+/18.1
10.9/AST- AST-/18.1

3 x 250/5A 3 x 250/5A

1 3
36.5
5 6
36.5

10 12

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Dif protection relay B741
Project Group
+ A1 Page
11
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

L1/14.0
L2/14.0
L3/14.0

-Q1 1 3 5
1 13 21
-F8
2 14 22
C-13A
23.5
181234
In=8,2A 2 4 6
3RV1011
-1JA10
6mmý (ó32A) 374557

5 5
-S1 -S2
10øC 3 30øC 4
127021 127021

Socket
L
1 3 5 1 3 5
-K10
-F7 PE 28.8
2 4 6 -X1 2 4 6
C-32A
116466 118595
BACK-UP N

SCHUTZ
Base
BEACHTEN

N/14.0

Fuel mixture cooling


PE/13.0

-W10.C YSLY-JZ

water pump
4x2,5mmý
-XH 700 701 702 PE N N N N -XH N PE -XH 950 951 952 PE

L N PE L N

L1 L2 L3 PE N
-E1 -M1 U V W PE

-SSL6
200W
166533
41W
SK 3325 -M2 M
123858 3
4kW
NPW5 ~
6

-IFL 6 Fuel mixture cooling water pump


Supply 3x400/231V,50Hz,32A
Panel heating

Supply Module control panel


11 13

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Supply B741
Project Group
+ A1 Page
12
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

SCHIRMSCHIENEN UND KLEMMLEISTEN-HUTPROFILSCHIENEN


GUT LEITEND MIT MONTAGEPLATTE VERBUNDEN

Mit SS gekennzeichnete Klemme ist With SS indicated terminal is


Schirmerdung mittels Schirmschiene grounding of the shield with Shield bar
am Schrankeintritt ! at the panel entry !

Mit E gekennzeichnete Klemmen With E indicated Terminals are


sind blanke Erdungsklemmen ! uninsulated earth terminals !

*) all Connections as short as possible **) Connection as short as possible

( possible contact clip)

Potential equalization
12.9/PE PE/14.0

Side wall Frame Panel

-W13.C H07V-K
-XS E -XH PE -XS PE -XS PE

10mmý
H07V-K
10mmý 10mmý 2,5mmý 2,5mmý 10mmý

tr ge/gn ge/gn tr ge/gn ge/gn

3
E/BR *) *) *) *) *) *) *) *) *) *) IPE/1
16.2 -SSL3 +M1/6.8
Mounting plate **) **)
Door right bottom
Door left bottom

Module interface
Separation wall

Separation wall
Mounting plate

Door right top


Mounting rail

Door left top

Outlet blades

Equipotential
equalization
Back wall

Side wall

Back wall

Potential
-IFL 3
Roof

Roof

12 14

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Earthing/Grounding B741
Project Group
+ A1 Page
13
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

12.9/L1
12.9/L2
12.9/L3

-Q2 1 3 5
13 21 1 3 5 23 1 23
-F15 -F9
14 22 2 4 6 24 2 24
C-6A C-6A
27.2 27.2 27.2
104139 104128
In=11,5A 2 4 6
3RV1021
-4AA10
374559

24
-K21 34
32.1
-K21
21 32.1
31
Ventilation fan for Compressor

A1
1 3 5 3 7 9 24 2 3 3
-K4 -K24 -K4 -K22 -K5 -K23
A2
-K5
14.4 32.4 230 VAC 32.2 14.6 32.3
2 4 6 1 6 11 21 MT 10 1 1
A-ENTL
3RT1025-1AP00 116699

Pre chamber Compressor


374505
12.9/N

Cooling water valve


13.9/PE

Ventilation valve

Pre chamber gas


-W47.C YSLY-JZ

Gas compressor

-W52.C YSLY-JZ

-W48.C YSLY-JZ

-W49.C YSLY-JZ

-W50.C YSLY-JZ
valves before
Compressor
4x2,5mmý

4x1,5mmý

3x1,5mmý

3x1,5mmý

3x1,5mmý
-XH 916 917 918 PE -XH 922 923 924 PE -XH 919 N PE -XH 920 N PE -XH 921 N PE

L N PE L N PE L N PE
U V W PE U V W PE

-M3 M -M4 M
3 3
5,5kW
NSD ~ 68W, 017A
~ -Y1 -Y2 -Y3

Klemmen bitte selber festlegen! SOV1 SOV7 SOV7

Pre Ventilation valve Pre chamber gas valves before Pre chamber gas compresso
chamber Compressor cooling water valve
Ventilation fan for Compressor
Gas compressor

0 V : open
1 2 230 V :14.7 1
closed 3
14.1
3 4
14.1
5 6
14.1

13 15

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Pre chamber Gas compressor
Project
B741 Group
+ A1 Page
14
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

4mmý 4mmý 4mmý 4mmý 4mmý

-W70.A YSLY-JZ 5x2,5mmý


1 1 1
-F10 -F11 -F12
2 2 6,3A fl 2
C-6A C-16A 117783
104128 104132

Supply 24VDC +IS


4mmý 2,5mmý

-X 32

+ Base

-X 33 33 -X 33 33

-X 428

L+/11 L+/12 IS+/11 IS+/12 PROZ1+/1 AST+/1 BR+ SY+ MST+ VISU+
+M1/13.8 +M1/13.8 +IS/7.0 +IS/7.1 8.1 8.3 16.1 6.0 35.3 34.2
Island mode control panel

Synchronisation
Module interface

Module control

Visualisation
Gas Counter
Processor
Supply

Spare
PPS
- Base

+M1/13.8 +M1/13.8 +IS/7.0 +IS/7.1 8.1 8.3 16.2 6.0 35.3 34.2

L-/11 L-/12 IS-/11 IS-/12 PROZ1-/1 AST-/1 BR- SY- MST- VISU-

-X 31 31 E 31 31
-X 429

6mmý/ó150mm 4mmý

Distribution 24 VDC

14 16

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Distribution 24VDC B741
Project Group
+ A1 Page
15
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-A6 -A7
362129 348948

EX 484 AF 104 DM 465 DM 465


Modul 1 Modul 2&3 Modul 4&5
Mounting rail

1 0
3 4 0 0
E 2 E 2
C 4 C 4 -X7 -X11
7TB718.81 7TB718.81
A
8
6 A
8
6 AI774 AI774 AI774 AO352 377997 377997

-X2
361927 X1 X DI X1 X DI
1 2
+ - mA IN mA IN mA IN mA OUT
1 2 3 4
X2 X DO X2 X DO

-X8 -X12
7TB718.81 7TB718.81
377997 377997

Blechwinkel
X X X X
13.0/ E/BR
red

-X3 -X4 -X5 -X6


7TB712.81 7TB712.81 7TB712.81 7TB712.81
378577 378577 378577 378577 -A8
375850

-F13 DM 465
300288
-XS 500 Modul 6&7
Fuse
0,2A
34.6/ PP200

+M1/14.1/ BUS/1

15.5/ BR+

15.5/ BR-

18.1/ AK+

18.1/ AK-

-X9
7TB718.81
377997

X1 X DI

X2 X DO
DIANE Module
interface

-X10
7TB718.81
377997

15 17

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view modules B741
Project Group
+ A1 Page
16
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
16

Modific.
22.0
-A41
0

OUTPUT INPUT
X2 X1

Date
A1 3 A_SSTA BWS_H 3 E1
A9 11 FG_HBT 11 E9
A2 4 A_SSTW BWS_A 4 E2
A10 12 F_BLO 12 E10
A3 5 A_USP NS_EIN 5 E3
A11 13 FG_ERST 13 E11
A4 6 A_AGFD GS_EIN 6 E4

Name Norm
Date
A12 14 FG_SYIMP PARALLEL14 E12

Print
Desig.
1

A5 7 BTRB 7 E5
A13 15 A_DREHZ RM_GKP 15 E13
A6 8 BERZLT 8 E6
A14 16 SY_LFG ST_K 16 E14

Modul 2&3
A7 9 ANFHBT AWS_F 9 E7
A15 17 A_GSAUS 17 E15
A8 10 AWS_E 10 E8

17.Mai.2005
08.Jul.2004
A16 18 SIS 18 E16

Eberharter St.
2

Schnittlinie

DIR: J:\..\
24.0
-A51
OUTPUT INPUT
X2 X1
A17 3 A_SYANW ANF 3 E17
A25 11 DIFF 11 E25

GHAZI FABRICS Int


A18 4 FG_GS 4 E18

3 x JGS 620 GS-N.L


A26 12 AB_AUS 12 E26
3

A19 5 SY SWS_H 5 E19


A27 13 LAST_AB HBT_SCH 13 E27
A20 6 S_AUS_GS SWS_A 6 E20
A28 14 14 E28
A21 7 GS_AES SPG_OK 7 E21
A29 15 SynchNH 15 E29
A22 8 RUN GALV 8 E22
A30 16 SynchNL 16 E30
Modul 4&5

A23 9 GAL 9 E23


A31 17 HUPE SynchAnf17 E31
A24 10 AB_GS BAL 10 E24
A32 18 ROLL GKWD 18 E32
4

Schnittlinie
26.0
-A61

OUTPUT INPUT
X2 X1
5

A33 3 A_VKGV 3 E33


A41 11 GAS_IMP 11 E41
A34 4 ENTL_V GS_AUS 4 E34
A42 12 ST_COMP 12 E42
A35 5 COMP_KWV GS_SCHW 5 E35
A43 13 OELC_MIN13 E43
A36 6
-K24:2 ULKS 6 E36
A44 14 WRT_COMP14 E44
A37 7 MGS_AUS 7 E37
A45 15 15 E45
A38 8 NGR_EIN 8 E38
6

A46 16 16 E46
Modul 6&7

A39 9 AUEB 9 E39


A47 17 ERD_V 17 E47

Slot address Over view


A40 10 10 E40
A48 18 ERD_R 18 E48

Schnittlinie
7

Suffix
Project
B741
8

Group
Page
+ A1
9

17
18
0 1 2 3 4 5 6 7 8 9

11.8/AST+ AST+/36.0
11.8/AST- AST-/36.0
16.2/AK- AK-/19.1
16.2/AK+ AK+/19.1

-A10

RLTP+/+M1/37.5
V17153-21 + -
CONTRANS I
254224 gn

RLTP-/+M1/37.6
1 2

RLTPS/+M1/37.6
- +
14 15 5 4

0 - 20mA =
-xxKW - 0 + xxxkW Load sharing line

SS
-XS 600 601
Active

LTL+/21.5

LTL-/21.5

LTLS/21.5
power
+
LE+/8.1
-SSL29 LE-/8.1
LES/8.2
-XS 501 31 SS

-IFL 29
Generator active power

29

-A9 + SCH + SCH + SCH + SCH


348939 1 2 3 4 5 6 7 8 9 10 11 12

I1 I2 I3 I4

LasttIn

ANALOG INPUT B&R 2003 Modul 1 Type AI 774 Analog input 0-20mA
Slot 1

Water return Temperature

17 19

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ A1 Page
18
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

18.9/AK- AK-/20.0
18.9/AK+ AK+/20.0

-XS 500 581 E


SS

-W142.A YSLCY-OZ 3x1,5mmý


Gas pressure
Pre chamber
1 2 3

+ 1 2 E

-B1 I
0-10bar
=4-20mA P
NUP2

-A11 + SCH + SCH + SCH + SCH


348939 1 2 3 4 5 6 7 8 9 10 11 12

I5 I6 I7 I8

ANALOG INPUT B&R 2003 Modul 1 Type AI 774 Analog input 0-20mA
Slot 2

Pre chamber Gas pressure

18 20

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ A1 Page
19
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Gas Temperature Gas Pressure

-XS E

1 2

-XS 500 -XS 501 502 503 SS


SS
4-20 mA
19.9/AK+ -A13
RTM81
0-120øC
amount natural gas

3x1,5mmý Gas pressure


A A A
-XS 8 7 6

-W23.A YSLCY-OZ
0-20mA =50 - 999,9m3/h
-W22.A YSLCY-OZ

GDG+/35.4

GDG-/35.4

GDGS/35.5
3x1,5mmý
Gastemp
PT100

+ 1 2 E

-B2 1 2 3 -B3 I
TT1
0,3-4,5bar
=4-20mA P
PT2

19.9/AK-

-A12 + SCH + SCH + SCH + SCH


348939 1 2 3 4 5 6 7 8 9 10 11 12

I9 I10 I11 I12

ANALOG INPUT B&R 2003 Modul 1 Type AI 774 Analog input 0-20mA
Slot 3

19 21

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Inputs B741
Project Group
+ A1 Page
20
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

ANALOG OUTPUT B&R 2003 Modul 1 Type AO 352 Analog output 0-20mA
Slot 4 LasttOut

O1 O2
high. Burden: 400ê high. Burden: 400ê

-A14 1 2 3
U I
4 5 6
U I
280685 + SCH + SCH

Load sharing line

18.6/LTL+
18.6/LTL-
18.6/LTLS

3 7
-K17
30.6
1 6
RUN SS

-XS 576 577

SS

-W72.A YSLCY-OZ 2x0,75mmý

Load sharing line

LTLS/1/+IS/12.1
LTL-/1/+IS/12.1
LTL+/1/+IS/12.1

Load sharing line

4-16mA=0-100%P
GASN

20 22

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Analog Outputs B741
Project Group
+ A1 Page
21
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

8.4/PROZ+ PROZ+/23.0
8.4/PROZ- PROZ-/23.0

Automatic
Manual

remote
off

off
internal jumped internal jumped

on
2 4 2 4
14 34
-S3 -K31 -K43 -S4
1 3 37.5 42.1 1 3
CG8-A240 11 31 CG8-A210

Automatic
Manual

remote

on
254372 254371

-A41
17.0
23.0
28.0 X1 1 2 3 4 5 6 7 8 9 10
29.0
348933 - + E1 E2 E3 E4 E5 E6 E7 E8

DIGITAL INPUT B&R 2003 Modul 2&3 Type DM 465 Part 1 / 4

BWS_H BWS_A NS_EIN GS_EIN AWS_F AWS_E


Service selector Service selector Mains circuit breaker Generator Demand Demand
switch Manual switch Automatic closed Switch Selector switch Selector switch
closed remote on

21 23

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
22
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

22.9/PROZ+ PROZ+/24.0

NOT+/38.2
22.9/PROZ- PROZ-/24.0
Emergency stop/
Safety loop-

A-USP
7 A2
-K7
-K6 K
28.3

-W81.A YSLY-JZ 5x2,5mmý


37.2 37.1 6 215392 A1

FBLO FG_ERST

-X 150 151

Safety loop
14
-K34 24 13 14 24
41.1
-K30 -Q1 -K38 -K29
11 37.4 12.8 41.4 37.3
21 14 11 21

+M1/27.7/ NOSI1/1

+M1/27.9/ NOSI2/1
Emergency stop

22
-K32
38.2
21

-A41
22.0
X1 11 12 13 14 15 16 17 18

E9 E10 E11 E12 E13 E14 E15 E16

DIGITAL INPUT B&R 2003 Modul 2&3 Type DM 465 Part 2 / 4

FG_HBT F_BLO FG_ERST PARALLEL RM_GKP ST_K A_GSAUS SIS


Release Release Start Release min. one other CB Failure Fuel mixture Failure GCB off Emergency
Auxiliaries BLACK OUT START is closed cooling water pump Cooling circuit stop Safety loop

11 14
29.6

22 24

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
23
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

23.9/PROZ+ PROZ+/25.0
23.9/PROZ- PROZ-/25.0

Automatic
Manual
internal jumped

off
5.4
4 2 U><
-S5
3 1
A210EG

Automatic
Manual
254371 14 24 24
-K35 -K36 -K37
41.2 41.3 41.4
11 21 21

14
-K33
41.1
11

-A51
17.2
25.0
30.0 X1 1 2 3 4 5 6 7 8 9 10
31.0
348933 - + E17 E18 E19 E20 E21 E22 E23 E24

DIGITAL INPUT B&R 2003 Modul 4&5 Type DM 465 Part 1 / 4

ANF SWS_H SWS_A SPG_OK GALV GAL BAL


Demand SY-Selector SY-Selector Busbar voltage Gas Gas Fire alarm
Module switch switch O.K. alarm alarm
Manual Automatic (20% UEG) (40% UEG)

23 25

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
24
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

24.9/PROZ+ PROZ+/26.0
24.9/PROZ- PROZ-/26.0

-W92.A YSLY-OZ 2x1,5mmý


Intercooler water
pressure min.
-X 32

14 14
-K39 -K40
41.6 41.7 3
11 11
-S6
NUP10 1

11.4
6.4 6.4
DIF -X 319
SC+/1 SC-/1

-R1
1.5kê
1W

-A51
24.0
X1 11 12 13 14 15 16 17 18

E25 E26 E27 E28 E29 E30 E31 E32

DIGITAL INPUT B&R 2003 Modul 4&5 Type DM 465 Part 2 / 4

DIFF AB_AUS HBT_SCH SynchNH SynchNL SynchAnf GKWD


Dif protection Speed Speed Activation Intercooler water
Feeder open Auxiliaries CB
tripped up down Synchline Pressure low.
closed

24 26

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
25
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

25.9/PROZ+ PROZ+/27.0
25.9/PROZ- PROZ-/27.0

(on)

off
0
3 2
3 24 24 24
-K44 -K46 -K47 -S7 -K48
42.2 42.3 42.4 254374 4 1 42.5
1 21 21 21
A789

Jumper
remove
36.0
24 AUEB1
-K1
8.1
21

7
-K2
10.2
6

-A61
17.5
27.0
32.0 X1 1 2 3 4 5 6 7 8 9 10
33.0
348933 - + E33 E34 E35 E36 E37 E38 E39 E40

DIGITAL INPUT B&R 2003 Modul 6&7 Type DM 465 Part 1 / 4

GS_AUS GS_SCHW ULKS MGS_AUS NGR_EIN AUEB


Spare Generator circuit Generator Overload Manual NGR_CB closed Output
GCB
breaker open Short circuit Generator circuit monitoring
C.B. racked in
breaker
open

25 27

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
26
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

26.9/PROZ+ PROZ+/28.0
26.9/PROZ- PROZ-/28.0

-W94.A YSLY-OZ 2x2,5mmý


Oil level low
TKE/ES

Compressor
14.12.04

-X 262 1 0 = Compressor on
-S8 1 = Compressor maintenance
2

13
35.7/ NF1

-Q2
14.1
14

4
-S8
LS 1

23
-F9
NF2/35.7

14.4
24

-X 263
9.5 9.4

23
EV EVR
-F15
14.3
24
-R2
1.5kê
1W

-A61
26.0
X1 11 12 13 14 15 16 17 18

E41 E42 E43 E44 E45 E46 E47 E48

DIGITAL INPUT B&R 2003 Modul 6&7 Type DM 465 Part 2 / 4

GAS_IMP ST_COMP OELC_MIN WRT_COMP ERD_V ERD_R


low frequency Failure Oil level low Prechamber Spare Spare
cas counter Pre chamber Pre chamber gas compressor Ground fault Ground fault
gas Compressor gas Compressor in maintenance Voltage directed
iv CB is open! if CB is closed
A.....,Prior 3
A.....
con parada del compressor de gas! in UASY
Prior 3

26 28

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Inputs
Project
B741 Group
+ A1 Page
27
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 2&3 Type DM 465 Part 3 / 4

-A41 - + A1 A2 A3 A4 A5 A6 A7 A8
22.0
1 2 X2 3 4 5 6 7 8 9 10

KR4 KR5 KR2 KR3 KR1


40.2 40.3 40.1 40.2 40.0

2 2 A1 A1
-K7 -K8 -K9 -K10
MT 10 MT 10 PT A2 24 VDC A2
350960 350960 328577
3RT1017
-2BB41
374525
27.9/PROZ+ PROZ+/29.0
27.9/PROZ- PROZ-/29.0

A_SSTA A_SSTW A_USP A_AGFD BTRB BERZLT ANFHBT


Collective trouble Collective trouble Under voltage Module demanded Operation ready Demand Spare
Shut down warn trip coil Automatic remote Auxiliaries

1 3 1 3 11 14 1 2
36.5 36.8 39.0 12.7
6 7 6 7 41 44 3 4
23.9 36.8 39.1 12.7
9 11 5 6
36.8 12.7

27 29

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
28
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 2&3 Type DM 465 Part 4 / 4

-A41 A9 A10 A11 A12 A13 A14 A15 A16


22.0
X2 11 12 13 14 15 16 17 18

14
-K6
23.9
11

šL-REL.
34
-K1
8.1
31

9
-K49
9.4
11

FGSYIMP 360UPM
6.4 37.7

2
-K11
MT 10
350960

28.8/PROZ+ PROZ+/30.0
28.8/PROZ- PROZ-/30.0

FG_SYIMP A_DREHZ SY_LFG


Release Synchronising
SY - Pulse Load release

1 3
36.3
6 7
36.5
8 11
36.3

28 30

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
29
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 4&5 Type DM 465 Part 3 / 4

-A51 - + A17 A18 A19 A20 A21 A22 A23 A24


24.0
1 2 X2 3 4 5 6 7 8 9 10

-V1 -V2
104383 104383

GS/AES AB/GS
36.2 36.1

2 2 A1 A1 2 2
-K12 -K13 -K14 -K15 -K16 -K17
MT 10 MT 10 PT A2 PT A2 MT 10 MT 10
350960 350960 328577 328577 350960 350960

29.9/PROZ+ PROZ+/31.0
29.9/PROZ- PROZ-/31.0

A_SYANW FG_GS SY S_AUS_GS GS_AES RUN AB_GS


Selection Release Release SY opening failure Generator Software Spare Switch off
synchronisation Generator Generator Generator circuit runs Generator
circuit breaker circuit breaker circuit breaker breaker Automatic circuit breaker
First closing

1 3 11 14 11 14 1 3 1 3
5.6 36.1 36.2 39.5 21.6
6 7 6 7 6 7
5.7 37.8 21.6
9 11
36.2

29 31

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
30
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 4&5 Type DM 465 Part 4 / 4

-A51 A25 A26 A27 A28 A29 A30 A31 A32


24.0
X2 11 12 13 14 15 16 17 18

2 A1 A1
-K18 -K19 -K20
MT 10 PT A2 PT A2
350960 328577 328577

30.8/PROZ+ PROZ+/32.0
30.8/PROZ- PROZ-/32.0

LAST_AB HUPE ROLL


load shedding Activation Activation
>95%- Pn Horn Rotation lamp

1 3 11 14 11 14
39.5 38.8 38.7

30 32

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
31
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 6&7 Type DM 465 Part 3 / 4

-A61 - + A33 A34 A35 A36 A37 A38 A39 A40


26.0
1 2 X2 3 4 5 6 7 8 9 10

A1 A1 2 2
-K21 -K22 -K23 -K24
PT A2 PT A2 MT 10 MT 10
328577 328577 350960 350960

31.9/PROZ+ PROZ+/33.0
31.9/PROZ- PROZ-/33.0

A_VKGV ENTL_V COMP_KWV COMP_FAN


Pre Relieve valve Pre chamber gas compressor Ventilation fan Spare Spare Spare Spare
chamber Gas cooling water valve for Compressor
compressor

21 24 21 24 1 3 1 3
14.4 14.5 14.8 14.3
31 34 6 7
14.6 14.3
9 11
14.3

31 33

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
32
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

DIGITAL OUTPUT B&R 2003 Modul 6&7 Type DM 465 Part 4 / 4

-A61 A41 A42 A43 A44 A45 A46 A47 A48


26.0
X2 11 12 13 14 15 16 17 18

32.9/PROZ+
32.9/PROZ-

Spare Spare Spare Spare Spare Spare Spare Spare

32 34

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Digital Outputs
Project
B741 Group
+ A1 Page
33
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

-A15
dia.ne
373180

SYNC

ACOP

HORN
OFF

-A17
-A16 3IF787.9
374327
32MB Flash
373204 zum MMU
gelb
2,5mmý tr 1 CAN H 1 CANMMU/H/8.7
directly at
the Door

braun
2 GND 2 CANMMU/G/8.7
grcn
+ VISU+/15.8 3 CAN L 3 CANMMU/L/8.7

120ê
4 Shield 4 CANMMU/S/8.7
- VISU-/15.8
Housing

PE

Engine Number: 0
E 2
x16 C 4 0 CAN
1 = 0B A 6
2 = 0C 8
3 = 0D 0
E 2
4 = 0E
5 = 0F x1 C 4 1
RS 232 6 = 10 A 6
fcr PG 7 = 11 8
8 = 12
9 = 13
10 = 14 0
E 2

Ethernet
x16 C 4 0 POWERLINK
0 A 6
E 2 8
Ethernet 389587, 30m x16 C 4 0
E 2
0
Ethernet 389574, 10m A 6
8 x1 C 4
yellow
CAN
IF 787
A 6
DIANEXT/1 8
0
+DF/4.1 E 2 Ethernet 389577, 3m

x1 C 4 cross over red

SLOT 1
A 6
8 PP200/16.1

33 35

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Powerpanel 250
Project
B741 Group
+ A1 Page
34
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Supply Gas flow


F/I Converter

0-20mA = 50 - 999,9 m3/h


Parameterwert 000.1

15.7/MST+

GDG+/20.6

GDG-/20.6

GDGS/20.6
15.7/MST-

-A18 16 17 18 11 12 5 4 6
KFU-FSSP-1.D
339223 L+ I+/U+ I- U-

L-
230V

115V

Namur +

Namur -
N

mA oder V
24V DC
DC-3-Sensor
Drehgeber
F/I Converter NF1/27.1
9 8 7 15 14 13
NF2/27.1

SS SS
-XS 595 596 -XS 597 598
-W47.A YSLCY-OZ 2x1,5mmý

-W48.A YSLCY-OZ 2x1,5mmý


Pulse

Pulse
ws

br

gn

ge

gr

rs
-B4 3 5 -B5 1 2
Q250 DN80 Q250 DN80
QC1 QC1
E1 E2 PCM
Kupplungsdose
HF-Impuls NF-Impuls

Counter Gas-HF Counter Gas - NF

2593.07 Impulse/m3 1 Imp/mü

34 36

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L F/I Converter B741
Project Group
+ A1 Page
35
GHAZI FABRICS Int gas counter
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

18.9/AST+ AST+/37.0

USP
6.7
9 5 3
SYIMP -K44 -K7
42.2 28.3
11 6 1
3
-K8
28.4
1
30.8 -V3 3 8 7
-K11
AB/GS 6
9 29.6
1 11 6 -K8
-K12 28.4
30.1 7
11

Release 9
SY -K3
5 3 -K8
28.4
11.4 11
9 14 6 1
DIFF
-K42 -K15 30.5
42.0
11
30.3
11 GS/AES 3 3 3
First
-K49
5 3 -K26 -K27 -K28
closing 36.3 36.3 36.5
9.4 1 1 1
Automatic 6 1
ERD
6 6 6
26.7/AUEB1
I> -K26 -K27 -K28
3 5 4 9 36.3 36.3 36.5
-K25 -K2 7 7 7

36.1 10.2
1 6 1 11 9 9 9
-K26 -K27 -K28
36.3 36.3 36.5
11 11 11

-X 420 421 422 423 424 425

Release
14
-K14
30.2
11

-SSL78 -SSL78 -SSL79

2 2 2 2 -IFL 78 -IFL 78 -IFL 79


-K25 -K26 -K27 -K28 GCB on GCB Shunt trip GCB Under voltage trip
MT 10 MT 10 MT 10 MT 10 coil coil
350960 350960 350960 350960

78 78 79

18.9/AST- AST-/37.0

Command:
Generator contactor
on/off Note:
CB Opening time: <60ms

CB Closing time: <70ms


1 3 1 3 1 3 1 3
36.3 36.6 36.7 36.8
5 6 6 7 6 7 6 7
36.3 36.6 36.7 36.8
9 11 9 11 9 11
36.6 36.7 36.8
Voltage for VCB is 110V DC

35 37

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Control Generator circuit breaker B741
Project Group
+ A1 Page
36
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

36.9/AST+ AST+/38.0

-F14
44 9 7 44
2A
117782
-K42 -K45 -K16 -K48
-X 241 42.0 42.2 30.4 42.5
41 11 6 41

NOT1/1
-W90.A YSLY-JZ 25x1,5mmý

+IS/15.4

29.5
Signals +IS

+IS/15.4 +IS/8.2 +IS/13.1 +IS/13.2 +IS/13.0 +IS/13.1 360UPM


NOT2/1 FG_BLO1 FBLO1 GSAUS/1 A_GSEIN1 NSEIN/1

-X 230 231 232 233 234 235

-X 242 243 244 245 246 249

NOT3 FG_ERST FBLO


38.4 23.3 23.2

+IS/14.1/ BTRB1/1
+IS/16.1/ GSE1/1

+IS/16.2/ GSA1/1

+IS/16.3/ STGS/1

+IS/14.1/ NGR2/1

+IS/14.1/ SYR3/1
A1 A1 A1
-K29 -K30 -K31 K

Generator circuit breaker off


A2 A2 A2

Generator circuit breaker on


PT PT 215392
328577 328577

36.9/AST- AST-/38.0

Emergency stop Release Blockade Release Start all GCB open other GCB closed Power regulation

NGR CB closed
GCB opening
Operation

failure
21 24 21 24 11 14
23.7 23.4 22.3

36 38

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Signals
Project
B741 Group
+ A1 Page
37
GHAZI FABRICS Int IS --> A
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

37.9/AST+ AST+/41.0

37.1

NOT3

-X 50

-IFL 39
Emergency 14 14
stop External -K20 -K19
31.8 31.7
11 11

39

-SSL120

-X 154
-X 51
-W81.A YSLY-JZ 5x2,5mmý

+M1/37.1/NOT1
+M1/37.1/NOT2

-W109.A YSLY-OZ 2x,5mmý

-W110.A YSLY-OZ 2x,5mmý


Emergency stop
Module interface
-X 155

14
-K41
41.7

Rotation lamp
11
FM

34
-K37
41.4
31 Fire alarm
-X 281 283

Horn
34 Gas
-K36 -H1 -H2
alarm 40%
41.3
31 from customer
A1
-K32 NOT+ -X 282 284
A2 23.8
PT
328577

37.9/AST- AST-/40.0

Emergency stop Rotation lamp Horn

21 22
23.8
41 44
39.2

37 39

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Emergency stop B741
Project Group
+ A1 Page
38
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

14 44 44 3 3
-K9 -K9 -K32 -K18 -K16
28.7 28.7 38.2 31.3 30.4
11 41 41 1 1

-X 400 401 402 403 404 405 436 437 438 439

-SSL18 -SSL18 -SSL23 -SSL32 -SSL35

Generator circuit breaker


Demand Auxiliaries

opening failure
Emergency stop

load shedding
-IFL 18

-IFL 23

-IFL 32

-IFL 35
18 23 32 35

Max. contact load: 24VDC,5A


230VAC,5A

38 40

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces to the Customers B741
Project Group
+ A1 Page
39
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
39
-IFL 14
-X

Modific.
ready for Automatic demand
0
KR1/28.6

14
12-KR1

A1
K
11-KR1

Date
-KR1
215392
AST-/38.9

-SSL14
A2
14-KR1

-IFL 17
Module demanded -X

KR2/28.4

17
12-KR2

Name Norm
Date

Print
A1

Desig.
1

K
11-KR2

-KR2
215392

-SSL17
A2
14-KR2

-IFL 20
Operation / Engine runs -X

17.Mai.2005
08.Jul.2004
KR3/28.5

20
12-KR3

Eberharter St.
A1
K
11-KR3

-KR3
215392

-SSL20
2

A2

14-KR3

DIR: J:\..\
-IFL 21
Collective trouble shut down -X

KR4/28.1

21
12-KR4
A1

K
11-KR4
-KR4
215392

-SSL21

GHAZI FABRICS Int


A2

14-KR4

3 x JGS 620 GS-N.L


Max. contact load: 24VDC, 50mA
3

-IFL 22
Collective trouble warn -X

KR5/28.2

22
12-KR5
A1

K
11-KR5
-KR5
215392

-SSL22
A2

14-KR5

-IFL 30
Generator Energy -X
4

30
12-KR6 KR6/8.4
A1

K
11-KR6
-KR6
215392

AST-/41.0
-SSL30
A2

14-KR6
5

Report signals
6
7

Suffix
Project
B741
8

Group
Page
+ A1
9

40
41
0 1 2 3 4 5 6 7 8 9

38.9/AST+ AST+/42.0

from customer
switch
-X 300 304 324 326 328 330 332 334 338

1
-SSL15 -SSL19 -SSL24 -SSL25 -SSL26 -SSL50 -SSL43 -SSL50 -SSL77
-S9
2

-S9 -S10 -S11 -S12 -S13 -S14 -S15 -S16 -S17

-X 301 305 325 327 329 331 333 335 339

A1 A1 A1 A1 A1 A1 A1 A1 A1
-K33 K -K34 K -K35 K -K36 -K37 -K38 K -K39 K -K40 K -K41 K

215392 A2 215392 A2 215392 A2 PT A2 PT A2 215392 A2 215392 A2 215392 A2 215392 A2


215392 328577

40.4/AST- AST-/42.0

Auxiliaries Switch closed


Failure Cooling circuit
Release Auxiliaries

Earthing isolator
Generator closed
Gas prealarm

Feeder open
Fire alarm
Gas alarm
-IFL 15

-IFL 19

-IFL 24

-IFL 25

-IFL 26

-IFL 50

-IFL 34

-IFL 77
Demand

IFL 43

11 14 11 14 11 14 21 24 21 24 11 14 11 14 11 14 11 14
24.1 23.1 24.6 24.7 24.8 23.6 25.2 25.3 38.2
31 34 31 34
38.2 38.2

40 42

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces from the customer
Project
B741 Group
+ A1 Page
41
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

41.8/AST+

-X 340 342 344 346 348

-SSL80 -SSL81 -SSL83 -SSL84 -SSL73

-S18 -S19 -S20 -S21 -S22

-X 341 343 345 347 349

2 A1 2 2 A1 A1 A1
-K42 -K43 -K44 -K45 -K46 -K47 -K48
MT 10 PT A2 MT 10 MT 10 PT A2 PT A2 PT A2
350960 328577 350960 350960 328577 328577 328577

41.8/AST-

GCB failure (50/51, 87G, 64)


GCB C.B. racked in
Generator circuit

Generator circuit

NGR CB closed
-IFL 80

breaker

-IFL 81

breaker

-IFL 83

-IFL 84

-IFL 73
closed

open

Status: Status: Status: Status: Status:

9 11 21 22 1 3 9 11 21 24 21 24 21 24
36.1 6.2 26.2 37.7 26.3 26.4 26.6
41 44 31 34 5 6 41 44
37.6 22.4 36.3 37.8
9 11
36.3

41 43

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ A1 Page
42
GHAZI FABRICS Int Generator circuit breaker
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


42
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-X

Device / Function Page


+M1-W8.A YSLY-JZ 5x4mmý

-X
+M1
24VDC Supply A1

Name Norm
Date
Module interface /15.0

Print
31
1

Desig.
1

31
= /15.1

31
2

31
E
- Base /15.1

17.Mai.2005
08.Jul.2004
+A1-W70.A YSLY-JZ 5x2.5mmý

-X1
+IS
Supply 24VDC +IS

Eberharter St.
Supply Island mode control panel /15.2

31
1

31
= /15.3

31
2
2

31
+ Base /15.4

32

DIR: J:\..\
-S6
+A1
+A1-W92.A YSLY-OZ 2x1.5mmý
Intercooler water pressure
Intercooler water Pressure low. /25.8

32

1
3
1
min.

= /25.8

319
2

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

+M1-W8.A YSLY-JZ 5x4mmý

-X
+M1
24VDC Supply A1
Module interface /15.0

33
3

33
= /15.1

33
4

33
+A1-W70.A YSLY-JZ 5x2.5mmý

-X1
+IS
Supply 24VDC +IS
3 33 Supply Island mode control panel /15.2
4

33
= /15.3
33

33

+A1
-SSL120
-IFL 39 Emergency stop External /38.4
50
5

= /38.4
51

+A1-W81.A YSLY-JZ 5x2.5mmý

Terminals
-X
+M1
Safety loop

general +A1
1
Emergency stop/Safety loop- /23.9
150

150
= /23.9
151

2
6

151

Emergency stop Module interface /38.2


154

3
154

4
= /38.2
155

155
7

Suffix

+A1-W90.A YSLY-JZ 25x1.5mmý


Project
-X1
+IS

Signals +IS
Generator circuit breaker on /37.6
230

1
230

B741

Generator circuit breaker off /37.7


231

2
8

231

Group

Operation /37.7
232

3
+ A1
232

GCB opening failure /37.8


233

4
Page
233
9

43
44
43
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-X

Device / Function Page


+A1-W90.A YSLY-JZ 25x1.5mmý
Signals +IS

Name Norm
Date
NGR CB closed /37.8

Print
234
5

Desig.
1

+IS-X1 234
= /37.9

235
6

235

17.Mai.2005
08.Jul.2004

Eberharter St.
Emergency stop /37.1

241
7

241
2

= /37.1

242
8

DIR: J:\..\
242
Release Blockade /37.1

243
9

243

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Release Start /37.2

244
10
3

244
all GCB open /37.3

245
11

245
other GCB closed /37.4

246
12

246
4

Power regulation /37.5


249

13

249
-S8
+A1
+A1-W94.A YSLY-OZ 2x2.5mmý
Oil level low Compressor
Oil level low Pre chamber gas /27.3

1
4
1
5

Compressor
= /27.3
262 263

+A1-W109.A YSLY-OZ 2x0.5mmý

Terminals
-H1
+A1
Rotation lamp

general +A1
1
Rotation lamp /38.7

= /38.7
281 282
6

-H2
+A1
+A1-W110.A YSLY-OZ 2x0.5mmý
Horn
Horn /38.8
283

= /38.8
284

-S9
+A1

-IFL 15 Demand /41.1


7

= /41.1
300 301

Suffix
Project
+A1
-S10

-IFL 19 Release Auxiliaries /41.1


B741

= /41.1
304 305
8

+A1
-S11

Group

-IFL 24 Gas prealarm /41.2

= /41.2
324 325

+ A1
+A1
-S12

-IFL 25 Gas alarm /41.3


Page

= /41.3
326 327
9

44
45
44
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-X

Device / Function Page

+A1
-S13

Name Norm
Date
-IFL 26 Fire alarm /41.4

Print
Desig.
1

= /41.4

328 329

+A1
-S14
-IFL 50 Failure Cooling circuit /41.4

17.Mai.2005
08.Jul.2004

Eberharter St.
= /41.4

330 331
2

+A1
-S15
IFL 43 Feeder open /41.6

DIR: J:\..\
= /41.6

332 333

+A1
-S16
-IFL 34 Auxiliaries Switch closed /41.7

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
= /41.7

334 335
3

+A1
-S17
-IFL 77 Earthing isolator Generator /41.7
closed
= /41.7

338 339

+A1
-S18
-IFL 80 Generator circuit breaker /42.0
4

closed
= /42.0
340 341

+A1
-S19
-IFL 81 Generator circuit breaker /42.2
open
= /42.2
342 343
5

+A1
-S20
-IFL 83 GCB C.B. racked in /42.3

= /42.3
344 345

Terminals
general +A1
+A1
-S21
-IFL 84 GCB failure (50/51, 87G, 64)
/42.4

= /42.4
346 347
6

+A1
-S22
-IFL 73 NGR CB closed /42.5

= /42.5

-IFL 18 Demand Auxiliaries /39.0


+A1

= /39.0
348 349 400 401
7

-SSL18

= /39.1
Suffix
Project
+A1

= /39.1
402 403

-SSL18

B741

-IFL 23 Emergency stop /39.2


8

Group
+A1

= /39.2
404 405

-SSL23

+ A1

-IFL 78 GCB on /36.6


+A1

= /36.6
420 421

Page
-SSL78
9

45
46
45
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-X

Device / Function Page

Name Norm
Date
-IFL 78 GCB Shunt trip coil /36.7

Print
Desig.
1

+A1
= /36.7

422 423

-SSL78
-IFL 79 GCB Under voltage trip coil /36.8

17.Mai.2005
08.Jul.2004
+A1

Eberharter St.
= /36.8

-SSL79
+ Base /15.7
2

= /15.7

DIR: J:\..\
-IFL 32 load shedding /39.5

+A1
= /39.5

424 425 428 429 436 437

-SSL32

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
-IFL 35 opening failure Generator /39.5
3

circuit breaker

+A1
= /39.6

438 439

-SSL35
-IFL 14 ready for Automatic demand /40.0

12-KR1
= /40.0

+A1
11-KR1

-SSL14
= /40.0
4

14-KR1

-IFL 17 Module demanded /40.1


12-KR2

= /40.1

+A1
11-KR2

-SSL17
= /40.1
14-KR2
5

-IFL 20 Operation / Engine runs /40.2


12-KR3

= /40.2

Terminals
+A1
11-KR3

-SSL20

general +A1
= /40.2
14-KR3

-IFL 21 Collective trouble shut down


/40.2
6

12-KR4

= /40.3
+A1
11-KR4

-SSL21 = /40.3
14-KR4

-IFL 22 Collective trouble warn /40.3


12-KR5

= /40.3
7

+A1
11-KR5

-SSL22

= /40.4
14-KR5

Suffix
Project

-IFL 30 Generator Energy /40.4


12-KR6

B741

= /40.4
+A1
11-KR6

-SSL30

= /40.4
8

14-KR6

Group
Page
+ A1
9

46
47
46
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-XH

Device / Function Page

Name Norm
Date
N
Panel heating /12.4

Print
Desig.
1

= /12.4

PE
Mounting plate /13.2

PE
-IFL 6 Supply 3x400/231V,50Hz,32A /12.0

17.Mai.2005
08.Jul.2004
L1

Eberharter St.
= /12.0

L2
= /12.1

700 701 702


2

+A1
L3

-SSL6
= /12.1

PE

DIR: J:\..\
PE
N
= /12.1

N
N
Base /12.1

N
= /12.1

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
N
= /12.1
3

-IFL 75 Busbar voltage /5.2

L1
= /5.2

+A1
L2

-SSL75
= /5.2

713 714 715

L3
-IFL 13 Generator voltage /7.3
4

L1
= /7.3

L2

+A1
= /7.4
716 717 718

-SSL13
L3
N

Generator voltage /7.3

N
5

+M1-W6.B YSLY-OZ 2x1.5mmý

-XH
+M1
Voltage matching
Generator Voltage matching /5.6
727

727

Terminals
2
= /5.7
728

728

Auxiliaries +A1
6

+A1-W4.A YSLY-JZ 5x2.5mmý


+G1
-X[S]

Generator current
Generator current /7.0
730

1
MX2

2
= /7.0
731

MY2
7

= /7.1
732

3
MZ2

Suffix
Project

= /7.1
733

4
MZ1

B741

+A1-W7.A YSLY-JZ 5x2.5mmý


Generator current
= /10.1
735

4
8

DX1

Group

= /10.1
736

3
+ A1
DY1

= /10.1
737

2
Page
DZ1
9

47
48
47
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-XH

Device / Function Page


+A1-W7.A YSLY-JZ 5x2.5mmý
Generator current

Name Norm
Date
Generator current /10.1

Print
738
1

Desig.
1

+G1-X[S] DZ2
IFL 10 Current /11.3

= /11.3

17.Mai.2005
08.Jul.2004
+A1

Eberharter St.
= /11.3

-SSL10
= /11.3

745 746 747 748


2

1S2 2S2 3S2 S1

DIR: J:\..\
/9.3

Ue

+A1
/9.3

749 750

-SSL12
Un

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
-SSL11 intensidad toroideal /9.3
3

+A1
= /9.4

751 752

-SSL11
+A1-W47.C YSLY-JZ 4x2.5mmý
Gas compressor

-M3
+A1
Pre chamber Gas compressor /14.1

U
1

3
= /14.1

M
V
2

~
= /14.1

W
3 916 917 918
4

= /14.1
PE

PE

PE
+A1-W48.C YSLY-JZ 3x1.5mmý
Ventilation valve
Ventilation valve /14.5

L
919

1
N

= /14.6

N
2

-Y1
+A1
5

= /14.6
PE

PE

PE
+A1-W49.C YSLY-JZ 3x1.5mmý

Terminals
Pre chamber gas valves
Pre chamber gas valves before /14.7

L
1
920

before Compressor
Compressor
N

= /14.7

N
2

Auxiliaries +A1
-Y2
+A1
6

= /14.8
PE

PE
PE

+A1-W50.C YSLY-JZ 3x1.5mmý


Pre chamber Compressor
Pre chamber gas compressor cooling /14.8
L
921

1
Cooling water valve
water valve
N

= /14.9
N

2
-Y3
+A1
7

= /14.9
PE

PE
PE

Suffix

+A1-W52.C YSLY-JZ 4x1.5mmý


Project

Ventilation fan for


-M4
+A1

Ventilation fan for Compressor /14.3


U

1
Compressor
3

B741

= /14.3
M
V

2
~

= /14.3
W
922 923 924

3
8

Group

= /14.3
PE

PE
PE

+A1-W10.C YSLY-JZ 4x2.5mmý


+ A1

Fuel mixture cooling water


-M2
+A1

Panel heating /12.7


U

1
pump
3

Fuel mixture cooling water pump /12.7


M
V

2
Page
~

= /12.7
W
950 951 952

3
9

48

= /12.8
PE

PE
PE

49
48
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+A1-XS

Device / Function Page


+A1-W13.C H07V-K 1x10mmý

-XS
+M1
Potential equalization

Name Norm
Date
Equipotential Module interface /13.9

Print
PE
PE

Desig.
1

PE
+A1-W22.A YSLCY-OZ 3x1.5mmý
Gastemp PT100

A
8
Gas Temperature /20.1

1
1

-B2
+A1
A
7
= /20.2

2
2

17.Mai.2005
08.Jul.2004
A
6

Eberharter St.
= /20.2

3
3

E
Mounting rail /13.0
2

DIR: J:\..\
-XS
+A1
E
Gas Pressure /20.4

503
+A1-W33.A CAN-BUSKABEL 4x

GHAZI FABRICS Int


-XS
+M1
Delivery GE Jenbacher

3 x JGS 620 GS-N.L


H
1
CAN-BUS /8.6

H
3

L
3
= /8.6

L
G
2
= /8.6

G
-IFL 3 Potential equalization /13.8

PE

+A1
-SSL3
500 Fuse 0,2A /16.2
4

-B1
+A1
+A1-W142.A YSLCY-OZ 3x1.5mmý
Gas pressure Pre chamber
Pre chamber Gas pressure /19.3

1
1

I
= /19.4

2
500 581

P
E

= /19.4

E
3
5

-XS
+A1
/20.1
500

Terminals
500
-B3
+A1
+A1-W23.A YSLCY-OZ 3x1.5mmý
Gas pressure
Gas Pressure /20.3
1
1
6

Shielded cable +A1


I = /20.4
2

P = /20.4
E
501 502 503

+M1-W15.A YSLCY-JZ 4x1.5mmý


-XS
+M1

PT100:
Water return Temperature /18.8
501

1
7

501

= /18.8
31

Suffix

2
Project
31

B741
8

+A1-W72.A YSLCY-OZ 2x0.75mmý


+IS
-XS1

Group

Load sharing line


1
Load sharing line /21.6
576

576

+ A1

= /21.6
577

2
577

+A1-W47.A YSLCY-OZ 2x1.5mmý


Page

Pulse
Counter Gas-HF /35.3
3

1
9

-B4
+A1

49

= /35.4
5
595 596

2
50
0 1 2 3 4 5 6 7 8 9

Page

/35.5

/35.6

/18.2

/18.2
-IFL 29 Generator active power
Device / Function
Terminal strip

Counter Gas - NF
+A1-XS

Jumpers

597 598 600 601


Terminal
+A1-W48.A YSLCY-OZ 2x1.5mmý
Pulse
1

1 2
+

+A1 +A1
-B5 -SSL29

49 +IS/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ A1 Page
50
GHAZI FABRICS Int Shielded cable +A1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Island mode control panel +IS


(prepared for max. 6 JENBACHER engines!)

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+A1/50 2

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Island mode control panel +IS B741
Project Group
+ IS Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+IS/1 Island mode control panel +IS a,b +IS/16 Interfaces from +A

+IS/2 Diagram index +IS/17 Interfaces from +A

+IS/3 Diagram index +IS/18 Signals

+IS/4 Over view Terminal strips +IS/19 Led's Mimic diagram

+IS/5 Supply +IS/20 Led's Mimic diagram a

+IS/6 Earthing/Grounding +IS/21 Interfaces from the customer

+IS/7 Distribution 24VDC +IS/22 Interfaces from the customer b

+IS/8 Selector switch BLACK OUT START b +IS/23 Interfaces to the Customers b

+IS/9 GCB-Signals +IS/24 Inselbetriebswahlschalter a,b

+IS/10 GCB-Signals +IS/25 Terminals general +IS

+IS/11 SPEED - POWER PARALLEL MODE b +IS/26 Terminals general +IS

+IS/12 Load sharing line a +IS/27 Terminals general +IS

+IS/13 Signals to +A b +IS/28 Terminals general +IS for +A1

+IS/14 Signals to +A a +IS/29 Terminals general +IS for +A2

+IS/15 Emergency stop +IS/30 Terminals general +IS for +A3

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ IS Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+IS/31 Terminals general +IS for +A4

+IS/32 Terminals general +IS for +A5

+IS/33 Terminals general +IS for +A6

+IS/34 +IS-XH

+IS/35 +IS-XS

+IS/36 Terminals Shielded cable +IS for +A1

+IS/37 Terminals Shielded cable +IS for +A2

+IS/38 Terminals Shielded cable +IS for +A3

+IS/39 Terminals Shielded cable +IS for +A4

+IS/40 Terminals Shielded cable +IS for +A5

+IS/41 Terminals Shielded cable +IS for +A6

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ IS Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view Terminal strips

+IS-X. Wiring colours in panel:

Module 1-n

Terminal strip general


AC :
Island mode control panel +IS Outside wire : black
Terminal strip-X=Terminals
general +IS Protective wire : green/yellow
Terminal strip-X=Terminals
general +IS
Function ground : transparent
Terminal strip-X1=Terminals
general +IS for +A1
Neutral wire : light blue
Terminal strip-XS1=Terminals
Shielded cable +IS for +A1

Terminal strip-X2=Terminals
general +IS for +A2
DC :
Terminal strip-XS2=Terminals
Shielded cable +IS for +A2 Plus : red

Terminal strip-X3=Terminals
general +IS for +A3 Minus : brown

Terminal strip-XS3=Terminals
Shielded cable +IS for +A3 Control : white

Terminal strip-X4=Terminals
general +IS for +A4

Terminal strip-XS4=Terminals
Shielded cable +IS for +A4 Voltage free contacts : black
Terminal strip-X5=Terminals
general +IS for +A5
Thermo compensation cable : + green
Terminal strip-XS5=Terminals
Shielded cable +IS for +A5
- white
Terminal strip-X6=Terminals
general +IS for +A6

Terminal strip-XS6=Terminals
Shielded cable +IS for +A6
3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view Terminal strips B741
Project Group
+ IS Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

5 5
-S1 -S2
10øC 3 30øC 4
127021 127021

Socket
L
1
-F1 PE
2 -X1
C-13A
181234 118595
BACK-UP N

SCHUTZ
Base
BEACHTEN

PE/6.0

-XH 700 PE N N N N -XH N PE

L N PE L N

L1 PE N
-E1 -M1
200W 41W
116533 SK 3325
-SSL110 123858

110

-IFL 110
Supply 3x400/231V,50Hz,32A
Panel heating

Supply Module control panel


4 6

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Supply B741
Project Group
+ IS Page
5
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

SCHIRMSCHIENEN UND KLEMMLEISTEN-HUTPROFILSCHIENEN


GUT LEITEND MIT MONTAGEPLATTE VERBUNDEN

Mit SS gekennzeichnete Klemme ist With SS indicated terminal is


Schirmerdung mittels Schirmschiene grounding of the shield with Shield bar
am Schrankeintritt ! at the panel entry !

Mit E gekennzeichnete Klemmen With E indicated Terminals are


sind blanke Erdungsklemmen ! uninsulated earth terminals !

*) all Connections as short as possible **) Connection as short as possible

( possible contact clip)

5.9/PE

Side wall Frame Panel

-XH PE -XS PE

H07V-K
10mmý 2,5mmý 2,5mmý 10mmý

ge/gn ge/gn tr ge/gn

111
*) *) *) *) *) *) *) *) *) *)

Potential equalization
-SSL111
Mounting plate **) **)
Door right bottom
Door left bottom

Separation wall

Separation wall
Mounting plate

Door right top

Door left top

Outlet blades
Back wall

Side wall

Back wall

-IFL 111
Roof

Roof

5 7

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Earthing/Grounding B741
Project Group
+ IS Page
6
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

4mmý
4mmý 4mmý

-V1 -V2 -V3


DSEI 2X61 DSEI 2X61 DSEI 2X61 2
225211 225211 225211
-F2
1
C-6A
104128

-X 32

+Base
-X1 33 33 -X2 33 33 -X3 33 33 -X4 33 33 -X5 33 33 -X6 33 33
+A1/15.2/ IS+/11

+A1/15.3/ IS+/12

IS+/21

IS+/22

IS+/31

IS+/32

IS+/41

IS+/42

IS+/51

IS+/52

IS+/61

IS+/62
MOD1/1 IS+
+DF/3.1 8.0
Supply A1 - IS

Supply A2 - IS

Supply A3 - IS

Supply A4 - IS

Supply A5 - IS

Supply A6 - IS

Gas/Brand
Data communication
IS-/11/+A1/15.2

IS-/12/+A1/15.3

IS-/21

IS-/22

IS-/31

IS-/32

IS-/41

IS-/42

IS-/51

IS-/52

IS-/61

IS-/62
8.0

IS-
+DF/3.1

-X1 31 31 -X2 31 31 -X3 31 31 -X4 31 31 -X5 31 31 -X6 31 31 MOD2/1 -X E

4mmý/ó150mm

-X 31
4mmý

-Base

6 8

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Distribution 24VDC B741
Project Group
+ IS Page
7
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

7.8/IS+ IS+/9.0

34
-K42
LOAD SHED
21.7
31 0 = NO ENGINE SELECTED FOR BLACK OUT START (Release for customer)
32 1 = ENGINE No 1 SELECTED FOR BLACK OUT START
-K40
NS-ON
21.5
31 2 2 = ENGINE No 2 SELECTED FOR BLACK OUT START
1 3
3 = ENGINE No 3 SELECTED FOR BLACK OUT START
42
-K8
11.1
Summe GS-ON 4 = ENGINE No 4 SELECTED FOR BLACK OUT START
41 0 4
5 = ENGINE No 5 SELECTED FOR BLACK OUT START
6 = ENGINE No 6 SELECTED FOR BLACK OUT START
44
-K32 5
Summe GS-OFF
18.1
41 6

2 2 2 2 2 2 2
-S3
1 5 9 13 3 7 11
274528

0 1 2 3 4 5 6

-X1 243 -X2 243 -X3 243 -X4 243 -X5 243 -X6 243
+A1/37.1/ FG_BLO1

FG_BLO2

FG_BLO3

FG_BLO4

FG_BLO5

FG_BLO6
A1
-K1
PT A2
MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
328577

7.8/IS- IS-/9.0

41 44
23.3

RELEASE FOR START OF FIRST ENGINE IN BLACK OUT


Release Customer Engine
for Black Start

7 9

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Selector switch
Project
B741 Group
+ IS Page
8
GHAZI FABRICS Int BLACK OUT START
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

8.8/IS+ IS+/11.0

34
-K41
GRID CB OFF
21.6
31
VGCB/10.0
34 34 34 34
-K14 -K17 -K20 -K23
16.1 16.4 16.6 17.1
31 31 31 31
GS1 GS2 GS3 GS4

-V4 -V5 -V6 -V7 -V8 -V9 -V10 -V11 -V12 -V13 -V14 -V15 -V16 -V17 -V18 -V19 -V20 -V21 -V22 -V23
104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383

VG1/10.1

VG2/10.1

VG3/10.1

VG4/10.1

VG5/10.1

VG6/10.1

A1 A1 A1 A1
-K2 -K3 -K4 -K5
PT A2 PT A2 PT A2 PT A2
328577 328577 328577 328577

8.8/IS- IS-/10.0
one other GCB on

one other GCB on

one other GCB on

one other GCB on


PARALLEL to GS1

PARALLEL to GS2

PARALLEL to GS3

PARALLEL to GS4
GS1

GS2

GS3

GS4
21 24 21 24 21 24 21 24
13.0 13.2 13.4 13.5
31 34
13.6

8 10

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L GCB-Signals B741
Project Group
+ IS Page
9
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

9.9/VGCB
34 34 34
-K26 -K29 -K9
17.4 17.6 11.4
31 31 31
GS5 GS6 DG

-V24 -V25 -V26 -V27 -V28 -V29 -V30 -V31 -V32 -V33 -V34 -V35 -V36 -V37 -V38 -V39
104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383 104383

9.9/VG1

9.9/VG2

9.9/VG3

9.9/VG4

9.9/VG5

9.9/VG6

A1 A1
-K6 -K7
PT A2 PT A2
328577 328577

9.9/IS- IS-/11.0
one other GCB on

one other GCB on


PARALLEL to GS5

PARALLEL to GS6
GS5

GS6

21 24 21 24
13.7 13.8
31 34 31 34
13.7 13.9

9 11

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L GCB-Signals B741
Project Group
+ IS Page
10
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

9.9/IS+ IS+/12.6
0
1

44 1
-K46
-S4
22.4 24
41 A200 2 -K9
294648
11.4
21

14
-K46
22.4
14 14 14 14 11
44 44 44 44 44 44 -K35 -K36 -K37 -K38
-K14 -K17 -K20 -K23 -K26 -K29 21.1 21.1 21.2 21.3
16.1 16.4 16.6 17.1 17.4 17.6 11 11 11 11
41 41 41 41 41 41
44
-K9 CUSTOMER
11.4 CB CLOSED
41
14
-K8
11.1
44 11
-K41
21.6
12 41
-K39
21.4
11

DG/ON/20.5

A1 A1 A1 A1
-K8 -K9 -K10 -K11
PT A2 PT A2 PT A2 PT A2
328577 328577 328577 328577

10.9/IS- IS-/12.6

one GCB -on


Customer CB. closed 0 = SPEED CONTROL - with load sharing mode Parallel function
GG to DG-Set
1 = POWER CONTROL

11 14 21 24 21 24 21 24
11.8 11.8 13.1 12.7
21 24 31 34 31 34
22.5 10.6 12.7
41 42 41 44
8.1 11.7

10 12

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L SPEED - POWER B741
Project Group
+ IS Page
11
GHAZI FABRICS Int PARALLEL MODE
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Load sharing line Load sharing line Load sharing line Load sharing lineLoad sharing line Load sharing line
Module 1 Module 2 Module 3 Module 4 Module 5 Module 6

*... Woodward : 50ê


-XS1 576 577 -XS2 576 577 -XS3 576 577 -XS4 576 577 -XS5 576 577 -XS6 576 577 24 34
SS SS SS SS SS SS -K11
11.8
21 31

R2
+A1/21.6/ LTL+/1

+A1/21.6/ LTL-/1

+A1/21.6/ LTLS/1

LTL+/2

LTL-/2

LTLS/2

LTL+/3

LTL-/3

LTLS/3

LTL+/4

LTL-/4

LTLS/4

LTL+/5

LTL-/5

LTLS/5

LTL+/6

LTL-/6

LTLS/6
100 Ohm Adjustments
1

-R1 IN

100ê DIP1: 3 ON
2 10 Gang
118626 OUT
3
DIP2: 3 ON
5 ON
6 ON

-A1 + -
7 9 on /off
MCR-U/UI-DCI

10 9 8 7 6 5 4 3 2 1
on /off

24VDC
DIP1 OUT: 0 - 20mA DIP2

1 2 3 4 5 6 7 8
IN OUT
256161
ZERO SPAN

Nullpunkt Endwert
Abgleich Abgleich

+ - IN: 0 - 5V
10 11 gn 1 2
+ -

11.9/IS+ IS+/13.0 -XS 576 577


SS
11.9/IS- IS-/15.0

+ - SS

-SSL138

138

-IFL138
Load sharing line

11 13

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Load sharing line
Project
B741 Group
+ IS Page
12
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
b
12

Modific.
0

12.7/IS+

Date
other GCB ON

9.1
-K2

-X1
+A1/37.4/ A_GSEIN1

21
24

246
11.7
-K10
+A1/37.5/ NSEIN/1

Name Norm
Date

Print
21
24
Power regulation

Desig.
1

249
18.5
21.5

ST_GS
NS-ON

-K34
-K40

21.6
NS-OFF
-K41
Release Start
+A1/37.2/ FBLO1

21
22
21
24
21
22

244

17.Mai.2005
08.Jul.2004
18.1
GSAUS
-K32

Eberharter St.
all GCB OPEN +A1/37.3/ GSAUS/1
21
24

245
2

9.3
-K3

-X2
other GCB ON A_GSEIN2

DIR: J:\..\
21
24

246
NSEIN/2
Power regulation

249

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Release Start
FBLO2
3

244
GSAUS/2
all GCB OPEN
9.5
-K4

245 -X3
A_GSEIN3
other GCB ON
21
24

246
4

NSEIN/3
Power regulation
249

Release Start
FBLO3
244

GSAUS/3
all GCB OPEN
5

9.7
-K5

245 -X4

A_GSEIN4
21
24

other GCB ON
246
9.7
-K5

NSEIN/4
31
34

Power regulation

Signals to +A
249

Release Start
FBLO4
6

244

GSAUS/4
all GCB OPEN
10.1
-K6

245 -X5

A_GSEIN5
21
24

other GCB ON
246
10.1
-K6
7

NSEIN/5
31
34

Power regulation
249

Suffix

Release Start
Project

FBLO5
244

B741

GSAUS/5
all GCB OPEN
8

10.3
-K7

Group
245 -X6

A_GSEIN6
21
24

other GCB ON
246

+ IS
10.3
-K7

NSEIN/6
31
34

Power regulation
249

Page

Release Start
FBLO6
9

244

13

GSAUS/6
IS+/14.0

all GCB OPEN


245

14
a
13

Modific.
0

13.9/IS+

Date
Operation 1

-X1
+A1/37.7/ BTRB1/1 BTR1/19.1

232
NGR CB closed +A1/37.8/ NGR2/1

Name Norm
Date

Print
Desig.
1

234
+A1/37.9/ SYR3/1

235

17.Mai.2005
08.Jul.2004
Operation 1

Eberharter St.
-X2
BTRB1/2 BTR2/19.2
2

232
NGR CB closed NGR2/2

DIR: J:\..\
234
SYR3/2
235

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

Operation 1
-X3

BTRB1/3 BTR3/19.4
232

NGR CB closed
NGR2/3
234

SYR3/3
4

235

Operation 1
-X4

BTRB1/4 BTR4/19.5
232

NGR CB closed NGR2/4


234
5

Spare SYR3/4
235

Operation 1

Signals to +A
-X5

BTRB1/5 BTR5/19.6
232
6

NGR CB closed NGR2/5


234

Spare
SYR3/5
235
7

Operation 1
-X6

BTRB1/6 BTR6/20.1
Suffix
Project
232

NGR CB closed NGR2/6


B741
234
8

SYR3/6
Spare
Group
235

Page
+ IS
9

14
IS+/15.0

15
0 1 2 3 4 5 6 7 8 9

14.9/IS+ IS+/16.0

+A1/37.1

NOT1/1 NOT1/2 NOT1/3 NOT1/4 NOT1/5 NOT1/6


-F3
117782 2A
-X 57
-X 50 -X1 241 -X2 241 -X3 241 -X4 241 -X5 241 -X6 241

*)
-IFL 120
24 34 44 14 24 34
Emergency -K12 -K12 -K12 -K12 -K13 -K13
stop External 15.2 15.2 15.2 15.2 15.3 15.3
-X 58 21 31 41 11 21 31
120

-X1 242 -X2 242 -X3 242 -X4 242 -X5 242 -X6 242
*)
-SSL120

-X 51
NOT2/1 NOT2/2 NOT2/3 NOT2/4 NOT2/5 NOT2/6
+A1/37.1

21 13
-S5
117987 22 14

-X 53

*)
*) if used - open bridge!

-X 54

-X 55

*)

-X 56 A1 A1
-K12 -K13
PT A2 PT A2
328577 328577

12.7/IS- IS-/16.0

Emergency stop
stop Module 1

stop Module 2

stop Module 3

stop Module 4

stop Module 5

stop Module 6
Emergency

Emergency

Emergency

Emergency

Emergency

Emergency
11 14 21 24
15.6 15.7
21 24 31 34
15.4 15.8
31 34 41 44
15.5 23.2
41 44
15.6

14 16

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Emergency stop
Project
B741 Group
+ IS Page
15
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

15.8/IS+ IS+/17.0

GSE1/1/+A1/37.6

GSA1/1/+A1/37.7

STGS/1/+A1/37.8

GSE1/2

GSA1/2

STGS/2

GSE1/3

GSA1/3

STGS/3
-X1 230 -X1 231 -X1 233 -X2 230 -X2 231 -X2 233 -X3 230 -X3 231 -X3 233

GS1 GS2 GS3


19.2 19.3 19.4

A1 A1 A1 A1 A1 A1 A1 A1 A1
-K14 -K15 K -K16 K -K17 -K18 K -K19 K -K20 -K21 K -K22 K

PT A2 215392 A2 215392 A2 PT A2 215392 A2 215392 A2 PT A2 215392 A2 215392 A2


328577 328577 328577

15.8/IS- IS-/17.0
opening failure

opening failure

opening failure
GCB 1_off

GCB 2_off

GCB 3_off
GCB 1_on

GCB 2_on

GCB 3_on
31 34 11 14 11 14 31 34 11 14 11 14 31 34 11 14 11 14
9.1 18.1 18.5 9.3 18.1 18.6 9.5 18.1 18.6
41 44 41 44 41 44
11.1 11.1 11.2

15 17

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ IS Page
16
GHAZI FABRICS Int from +A
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

16.9/IS+ IS+/18.0

GSE1/4

GSA1/4

STGS/4

GSE1/5

GSA1/5

STGS/5

GSE1/6

GSA1/6

STGS/6
-X4 230 -X4 231 -X4 233 -X5 230 -X5 231 -X5 233 -X6 230 -X6 231 -X6 233

GS4 GS5 GS6


19.5 19.7 20.2

A1 A1 A1 A1 A1 A1 A1 A1 A1
-K23 -K24 K -K25 K -K26 -K27 K -K28 K -K29 -K30 K -K31 K

PT A2 215392 A2 215392 A2 PT A2 215392 A2 215392 A2 PT A2 215392 A2 215392 A2


328577 328577 328577

16.9/IS- IS-/18.0
opening failure

opening failure

opening failure
GCB 4_off

GCB 5_off

GCB 6_off
GCB 4_on

GCB 5_on

GCB 6_on
31 34 11 14 11 14 31 34 11 14 11 14 31 34 11 14 11 14
9.7 18.1 18.7 10.1 18.1 18.7 10.4 18.1 18.8
41 44 41 44 41 44
11.2 11.3 11.4

16 18

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ IS Page
17
GHAZI FABRICS Int from +A
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

17.9/IS+ IS+/19.1

14
-K15
16.2
11

14
-K18
16.4
11

14
-K21
16.7
11 34 34 34 14 14 14 14 14 14
-K43 -K44 -K45 -K16 -K19 -K22 -K25 -K28 -K31
22.1 22.2 22.3 16.3 16.5 16.8 17.3 17.5 17.8
14 31 31 31 11 11 11 11 11 11
-K24
17.2
11

14
-K27
17.4
11

14
-K30
17.7
11

2 A1 2
-K32 -K33 -K34
PT 10 PT A2 PT 10
328577 328577 328577

17.9/IS- IS-/19.1

opening failure GCB


all CB open
Load Take off CB closed

11 14 11 14
23.3 23.4
21 24 21 22
13.2 13.1
31 34 41 44
20.4 20.5
41 44
8.1

17 19

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Signals B741
Project
a Group
+ IS Page
18
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
18

Modific.
0

Date
18.9/IS-
18.9/IS+

-V40

Name Norm
Date

Print
Desig.
1

-H1
green
Operation/Engine runs - Module 1
BTR1/14.1

2
1

17.Mai.2005
08.Jul.2004
-H2
green
Generator circuit breaker on - Module 1

Eberharter St.
GS1/16.1

4
3
2

DIR: J:\..\
-H3
green
Operation/Engine runs - Module 2
BTR2/14.2

6
5

GHAZI FABRICS Int


-H4
green

3 x JGS 620 GS-N.L


Generator circuit breaker on - Module 2
GS2/16.4
3

8
7

-H5
green
Operation/Engine runs - Module 3
BTR3/14.3
9

10
4

-H6
green

Generator circuit breaker on - Module 3


GS3/16.6
12
11

-H7
green

Operation/Engine runs - Module 4


BTR4/14.4
14
13
5

-H8
green

Generator circuit breaker on - Module 4


GS4/17.1
16
15

-H9
green

Operation/Engine runs - Module 5


BTR5/14.6
6

18
17

Led's Mimic diagram


green
-H10

Generator circuit breaker on - Module 5


17.4

GS5

20
19
7

19.8
-S6
white
14
13

Suffix
56ê
-R2

Project

Reset / Lamp test


22
21

B741
23,24
8

Group
19.7
-S6

test
Lamp
14
13

+ IS
Reset

Page
9

IS-/20.1
IS+/20.1

LT4/20.8

19
20
0 1 2 3 4 5 6 7 8 9

19.9/IS+ IS+/21.0

34 34 44 44 44 44
-K46 -K32 -K34 -K43 -K44 -K45
22.4 18.1 18.5 22.1 22.2 22.3
31 31 41 41 41 41

14.7 17.6 11.5

BTR6 GS6 DG/ON

-V41
1 3 5 7 9 11 13 15 17 19 21

LT4/19.9
23,24

2 4 6 8 10 12 14 16 18 20 22

-H11 -H12 -H13 -H19 -H14 -H15 -H16 -H17 -H18


green green green green green red green green green

19.9/IS- IS-/21.0
Generator circuit breaker on - Module 6
Operation/Engine runs - Module 6

Customer Power Plant on

Load take off CB 1 ON

Load take off CB 2 ON

Load take off CB 3 ON


Buscoupler 4 Closed

ReleaseBuscoupler 4

opening failure GCB

19 21

a Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Led's Mimic diagram B741
Project Group
+ IS Page
20
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

20.8/IS+ IS+/22.0

-X 504 -X 506 -X 508 -X 510 -X 512 -X 516 -X 518 -X 520

143 143 143 143 144 132 133 125

-SSL143.1 -SSL143.2 -SSL143.3 -SSL143.4 -SSL144 -SSL132 -SSL133 -SSL125

-X 505 -X 507 -X 509 -X 511 -X 513 -X 517 -X 519 -X 521

A1 A1 A1 A1 A1 A1 A1 A1
-K35 K -K36 K -K37 K -K38 K -K39 -K40 -K41 -K42
215392 A2 215392 A2 215392 A2 215392 A2 PT A2 PT A2 PT A2 PT A2
328577 328577 328577 328577

20.8/IS- IS-/22.0

are open

is shedd
Mains circuit breaker off
Mains circuit breaker on
ALL Customer DG-SET CB

Load
Customer CB 1 closed

Customer CB 2 closed

Customer CB 3 closed

Customer CB 4 closed

START_out_Start
-IFL 143.1

-IFL 143.2

-IFL 143.3

-IFL 143.4

BLACK OUT
-IFL 132

-IFL 133

-IFL 125
-IFL144

Release
11 14 11 14 11 14 11 14 11 12 21 22 21 24 31 34
11.4 11.5 11.5 11.6 11.4 13.1 13.1 8.1
31 32 31 34
8.1 9.1
41 44
11.7

20 22

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ IS Page
21
GHAZI FABRICS Int from the customer
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

21.9/IS+

24
-K8
11.1
21

-X 530
-X 522 -X 524 -X 526 -X 528

146 147 148 153


-SSLx1
-X 531

-X 410
-SSL146 -SSL147 -SSL148 -SSL153

-X 523 -X 525 -X 527 -X 529

-SSLx2
-X 411

A1 A1 A1 A1 A1
-K43 -K44 -K45 -K46 -K47
PT A2 PT A2 PT A2 PT A2 PT A2
328577 328577 328577 328577 328577

21.9/IS-
Load Take Off CB. 1 on

Load Take Off CB. 2 on

Load Take Off CB. 3 on

Buscoupler 4 Closed
-IFL 146

-IFL 147

-IFL 148

-IFL 153

31 34 31 34 31 34 11 14 11 14
18.2 18.3 18.3 11.7 23.5
41 44 41 44 41 44 31 34
20.6 20.7 20.7 20.4
41 44
11.4

21 23

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ IS Page
22
GHAZI FABRICS Int from the customer
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

44 44 14 14 14
-K13 -K1 -K32 -K34 -K47
15.3 8.1 18.1 18.5 22.5
41 41 11 11 11

-X 400 401 -X 402 403 -X 404 405 -X 406 407 -X 408 409

-SSL123 -SSL127
Release BLACK OUT START for Customer
-SSL149 -SSL151
Emergency stop to the Customer

Release Buscoupler 4

GCB

to Main ACB o f MCC


opening failure

close signal
-IFL 123

-IFL 127

-IFL 149

-IFL 151

123 127 149 151

Max. contact load: 24VDC,5A


230VAC,5A

22 24

b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Interfaces B741
Project Group
+ IS Page
23
GHAZI FABRICS Int to the Customers
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

SPEED - POWER MODE

POWER
Standardschild : Freigabe Insel

A
SPEED

3X
6X

0
0
Schild : 45.5 x 45.5 mm

Compressor Maint.
Feeder/Eng. Trip
Coll. Shutdown
SchriftgrӇe : 3,5 mm

4
RELEASE ENGINE

3X
3X

3X
5
2

6
1

23 25

a,b Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Inselbetriebswahlschalter B741
Project Group
+ IS Page
24
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
24
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X

Device / Function Page

Name Norm
Date
E
SY-E-Minus /7.8

Print
Desig.
1

-Base /7.8

31
+Base /7.8

32

+IS
-SSL120
-IFL 120 Emergency stop External /15.1

50

17.Mai.2005
08.Jul.2004

Eberharter St.
= /15.1

51

-
+IS
= /15.1

53
2

= /15.1

54

DIR: J:\..\
= /15.1

55
= /15.1

56

-
+IS
= /15.2

57

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
3

+IS
-K12
= /15.2

58

A1
-IFL 123 Emergency stop to the /23.2
Customer

+IS
400 401 = /23.2
4

-SSL123
-IFL 127 Release BLACK OUT /23.3
START_out_Start for Customer

+IS
= /23.3
402 403

-SSL127
-IFL 149 Release Buscoupler 4 /23.3
5

+IS
= /23.4
404 405

-SSL149

Terminals
general +IS
-IFL 151 opening failure GCB /23.4

+IS
= /23.4

-SSL151
close signal to Main ACB o f MCC /23.5
6

= /23.5

+IS
-SSLx2
-IFL 153 Buscoupler 4 Closed /22.5

= /22.5
406 407 408 409 410 411
7

+IS
-SSL143.1

-IFL 143.1 Customer CB 1 closed /21.1


Suffix
Project

= /21.1
504 505

B741
8

Group
+IS
-SSL143.2

-IFL 143.2 Customer CB 2 closed /21.1


+ IS

= /21.1
506 507

Page
9

25
26
25
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X

Device / Function Page

+IS
-SSL143.3

Name Norm
Date
-IFL 143.3 Customer CB 3 closed /21.2

Print
Desig.
1

= /21.2

508 509

17.Mai.2005
08.Jul.2004

Eberharter St.
+IS
-SSL143.4
-IFL 143.4 Customer CB 4 closed /21.3
2

= /21.3

510 511

DIR: J:\..\
+IS
-SSL144
-IFL144 ALL Customer DG-SET CB are /21.4

GHAZI FABRICS Int


open

3 x JGS 620 GS-N.L


= /21.4

512 513
3

+IS
-SSL132
-IFL 132 Mains circuit breaker on /21.5

= /21.5

516 517
4

+IS
-SSL133
-IFL 133 Mains circuit breaker off /21.6

= /21.6
518 519
5

+IS
-SSL125
-IFL 125 Release BLACK OUT /21.7
START_out_Start Load is shedd
= /21.7
520 521

Terminals
general +IS
+IS
-SSL146
-IFL 146 Load Take Off CB. 1 on /22.1
6

= /22.1
522 523

+IS
-SSL147

-IFL 147 Load Take Off CB. 2 on /22.2

= /22.2
524 525
7

Suffix
Project
+IS
-SSL148

-IFL 148 Load Take Off CB. 3 on /22.3


B741

= /22.3
526 527
8

Group
+IS
-SSL153

-IFL 153 Buscoupler 4 Closed /22.4


+ IS

= /22.4
528 529

Page
9

26
27
0 1 2 3 4 5 6 7 8 9

Page

/22.5

/22.5
-IFL 153 Buscoupler 4 Closed
Device / Function
Terminal strip

+IS-X

Jumpers

530 531
Terminal

+IS
26
-SSLx1 28

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
27
GHAZI FABRICS Int general +IS
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


27
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X1

Device / Function Page


+A1-W70.A YSLY-JZ 5x2.5mmý

-X
+A1
Supply 24VDC +IS

Name Norm
Date
Supply A1 - IS /7.0

Print
31
1

Desig.
1

31
= /7.1

31
2

31
= /7.0

33
3

33
= /7.1

33
4

17.Mai.2005
08.Jul.2004
33

Eberharter St.
+A1-W90.A YSLY-JZ 25x1.5mmý
Signals +IS
1
/16.1

230
2

230

DIR: J:\..\
GCB 1_on /16.2

231
2

231
Operation 1 /14.1

232
3

GHAZI FABRICS Int


232

3 x JGS 620 GS-N.L


3

4
GCB 1_off /16.3

233

233
NGR CB closed /14.1

234
5

234
6 235 = /14.1
4

235
7
Emergency stop Module 1 /15.4
241

241
= /15.4
242

242
5

/8.2
243

243

Terminals
10
Release Start /13.1
244

244
all GCB OPEN /13.2
245

11
6

general +IS for +A1


245

other GCB ON /13.0


246

12
246

13
Power regulation /13.1
249

249
7

Suffix
Project
B741
8

Group
Page
+ IS
9

28
29
28
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X2

Device / Function Page

Name Norm
Date
Supply A2 - IS /7.1

Print
31

Desig.
1

= /7.2

31
= /7.1

33
= /7.2

33

17.Mai.2005
08.Jul.2004

Eberharter St.
opening failure /16.4

GCB 2_on /16.4


2

Operation 1 /14.2

DIR: J:\..\
GCB 2_off /16.5

NGR CB closed /14.2

= /14.3

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Emergency stop Module 2 /15.5
3

= /15.5

MODUL 1 /8.3

Release Start /13.3

all GCB OPEN /13.3

other GCB ON /13.2


4

Power regulation /13.3


230 231 232 233 234 235 241 242 243 244 245 246 249
5

Terminals
6

general +IS for +A2


7

Suffix
Project
B741
8

Group
Page
+ IS
9

29
30
29
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X3

Device / Function Page

Name Norm
Date
Supply A3 - IS /7.2

Print
31

Desig.
1

= /7.2

31
= /7.2

33
= /7.2

33

17.Mai.2005
08.Jul.2004

Eberharter St.
opening failure /16.6

GCB 3_on /16.7


2

Operation 1 /14.3

DIR: J:\..\
GCB 3_off /16.8

NGR CB closed /14.4

= /14.4

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Emergency stop Module 3 /15.6
3

= /15.6

MODUL 2 /8.4

Release Start /13.4

all GCB OPEN /13.5

other GCB ON /13.4


4

Power regulation /13.4


230 231 232 233 234 235 241 242 243 244 245 246 249
5

Terminals
6

general +IS for +A3


7

Suffix
Project
B741
8

Group
Page
+ IS
9

30
31
0 1 2 3 4 5 6 7 8 9

Page

/17.1

/17.2

/14.4

/17.3

/14.5

/14.5

/15.6

/15.6

/13.6

/13.6

/13.5

/13.6
/7.3

/7.3

/7.3

/7.3

/8.5
Device / Function

Emergency stop Module 4


Terminal strip

Power regulation
+IS-X4

Supply A4 - IS

NGR CB closed

Release Start

other GCB ON
Operation 1

GCB 4_off
GCB 4_on

MODUL 3
Spare
=

Jumpers =

31 31 33 33 230 231 232 233 234 235 241 242 243 244 245 246 249
Terminal

30 32

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
31
GHAZI FABRICS Int general +IS for +A4
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


31
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X5

Device / Function Page

Name Norm
Date
Supply A5 - IS /7.4

Print
31

Desig.
1

= /7.4

31
= /7.4

33
= /7.4

33

17.Mai.2005
08.Jul.2004

Eberharter St.
opening failure /17.4

GCB 5_on /17.4


2

Operation 1 /14.6

DIR: J:\..\
GCB 5_off /17.5

NGR CB closed /14.6

Spare /14.6

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Emergency stop Module 5 /15.7
3

= /15.7

MODUL 4 /8.6

Release Start /13.7

all GCB OPEN /13.8

other GCB ON /13.7


4

Power regulation /13.7


230 231 232 233 234 235 241 242 243 244 245 246 249
5

Terminals
6

general +IS for +A5


7

Suffix
Project
B741
8

Group
Page
+ IS
9

32
33
32
Terminal strip

Modific.
0

Jumpers

Terminal

Date
+IS-X6

Device / Function Page

Name Norm
Date
Supply A6 - IS /7.5

Print
31

Desig.
1

= /7.5

31
= /7.5

33
= /7.5

33

17.Mai.2005
08.Jul.2004

Eberharter St.
opening failure /17.6

GCB 6_on /17.7


2

Operation 1 /14.7

DIR: J:\..\
GCB 6_off /17.8

NGR CB closed /14.8

Spare /14.8

GHAZI FABRICS Int


3 x JGS 620 GS-N.L
Emergency stop Module 6 /15.8
3

= /15.8

MODUL 5 /8.7

Release Start /13.9

all GCB OPEN /13.9

other GCB ON /13.8


4

Power regulation /13.9


230 231 232 233 234 235 241 242 243 244 245 246 249
5

Terminals
6

general +IS for +A6


7

Suffix
Project
B741
8

Group
Page
+ IS
9

33
34
0 1 2 3 4 5 6 7 8 9

Page

/5.4

/5.4

/6.2

-IFL 110 Supply 3x400/231V,50Hz,32A /5.0

/5.0

/5.1

/5.1

/5.1

/5.1
Device / Function
Terminal strip

+IS-XH

Mounting plate
Panel heating

Base
=

Jumpers

N PE PE 700 PE N N N N
Terminal

L1 PE N

+IS
-SSL110

33 35

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L +IS-XH B741
Project Group
+ IS Page
34
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Page

/12.8

/12.8
/6.8
-IFL 111 Potential equalization
Device / Function

-IFL138 Load sharing line


Terminal strip

+IS-XS

Jumpers

PE 576 577
Terminal

+ -

+IS +IS
-SSL111 -SSL138

34 36

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L +IS-XS B741
Project Group
+ IS Page
35
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Page

/12.1

/12.1
Device / Function

Load sharing line Module 1


+IS-XS1
Terminal strip

Jumpers

576 577
Terminal
+A1-W72.A YSLCY-OZ 2x0.75mmý
Load sharing line
1

+A1
576 577
-XS

35 37

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
36
GHAZI FABRICS Int Shielded cable +IS for +A1
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/12.2

/12.2
Device / Function

Load sharing line Module 2


+IS-XS2
Terminal strip

Jumpers

576 577
Terminal

36 38

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
37
GHAZI FABRICS Int Shielded cable +IS for +A2
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/12.3

/12.3
Device / Function

Load sharing line Module 3


+IS-XS3
Terminal strip

Jumpers

576 577
Terminal

37 39

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
38
GHAZI FABRICS Int Shielded cable +IS for +A3
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/12.4

/12.4
Device / Function

Load sharing line Module 4


+IS-XS4
Terminal strip

Jumpers

576 577
Terminal

38 40

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
39
GHAZI FABRICS Int Shielded cable +IS for +A4
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/12.4

/12.5
Device / Function

Load sharing line Module 5


+IS-XS5
Terminal strip

Jumpers

576 577
Terminal

39 41

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
40
GHAZI FABRICS Int Shielded cable +IS for +A5
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Page

/12.5

/12.5
Device / Function

Load sharing line Module 6


+IS-XS6
Terminal strip

Jumpers

576 577
Terminal

40 +DF/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminals B741
Project Group
+ IS Page
41
GHAZI FABRICS Int Shielded cable +IS for +A6
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

HERMES +DF

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
.. .. .. ..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+IS/41 2

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L HERMES +DF B741
Project Group
+ DF Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+DF/1 HERMES +DF

+DF/2 Diagram index

+DF/3 DIANE WIN SERVER 1

+DF/4 HUB

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+ DF Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Modem
+DF-A2 +DF-A3
337334 360105

+DF-A1 SLOT 1 SLOT 2


324163
Phone

DIANE WIN SERVER

twisted pair
RJ11

ETHERNET
RJ45 Line
Ethernet RJ11

+ + - - E

4.0/HUBP
4.0/HUBM

tr
2,5mmý Ethernet 389569, 1m
+DF-F1
6,3A tr yellow
117783
DIANEWIN1
+IS/7.6/ MOD1/1

+IS/7.6/ MOD2/1

Frame
4.4/

Limit of delivery
GE Jenbacher

Telephone
connection
at the customer

-SSL203

-SSL202
203

-->DFš Central unit 202

2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L DIANE WIN SERVER 1 B741
Project Group
+ DF Page
3
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

3.0/HUBP
3.0/HUBM

+DF-A4 *
B&R Position of the
+DF-X1
HUB 8-fach
369543 MID switch HUB 361927
1 2 3 4

+ -
-W171.A Ethernet

-W172.A Ethernet

-W173.A Ethernet
Ethernet Ethernet Ethernet Ethernet
Delivery GEJ

Delivery GEJ

Delivery GEJ
1 2 3 4

DIANEXT/1 DIANEXT/2 DIANEXT/3


+A1/34.2

Ethernet Ethernet Ethernet Ethernet

5 6 7 8

Monteur
DIANEWIN1
3.3

DIANE WIN

Channel 1 tr
2,5mmý

MIDX/MID
Frame

3 +K/1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L HUB B741
Project Group
+ DF Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Terminal diagram and Cable

Parameters for the operation All Cables between the


of Jenbacher AG-Engines Switchboards and the Engine
acc. TI.Nr.: 1100-0110 have to be in flexible mode.

Protection against electric shock hazard


( Grounding, Potential Compensation )
has to be provided by the Customer at

Modifications of Design Installation according to local Standards !


At states of Delivery the Installation is
prepared for Protection Connection to
reserved. Zero Potential to ™VE-EN1 and Current
Overload Protection in TN-Network
to VDE 0100, Part 410.

The Numbers in the circles are in


No. Relation with the Numbers in the
Interface-List JB741 4410 00

This Wiring Diagram is designed with


a CAE-System.
Modifications will be occupied by
Jenbacher AG

Lightning Protection-Potential
Compensation according to
.. .. .. ..
VDE 0185 Part 1 / 11.82 - 6.1.2
Modification No. Vers. Date Name has to be provided by the Customer.

+DF/4 2

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Terminal diagram and Cable B741
Project Group
+K Page
1
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Diagram index

Page Denomination Modifications Page Denomination Modifications

+K/1 Terminal diagram and Cable

+K/2 Diagram index

+K/3 Requirements for Cabling

+K/4 Cable with DIANE

+K/5 Over view cables

+K/6 Over view cables

1 3

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Diagram index B741
Project Group
+K Page
2
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Requirements ACCORDING TA.NO.: 1000-0505

for Cabling Cable groups:


TI-No.:1000-0505
CU1 Cable group A :Shielded analog cables

Cables unshielded AC/DC ó60 V

Cables shielded AC/DC ó230 V

L1 L3
CU2 Cable group B :Cables unshielded AC/DC >60 V, ó230 V

L2 L1
CU3 Cable group C :Cables unshielded AC/DC >230 V, ó1 kV

L3 L2
Cables shielded AC >230 V, ó1 kV

PEN PEN Bus cables must be laid separately !


l/3 l/3 l/3

CU3 Cable group "C"

D=Cable diameter Power cabel for 400V

Cable: Diameter:

L3 L1 L2 L3 PEN
NYY 1x 70mmý 17mm
NYY 1x 95mmý 19mm
L1 L2 L2 L3 L3 L1 L1 L2 PEN PEN
NYY 1x120mmý 20mm
NYY 1x150mmý 22mm
Metallic cable tray
NYY 1x185mmý 25mm
NYY 1x240mmý 27mm
2cm 2xD 2xD 2xD 2xD 2xD 2xD 2xD 2xD 2xD 2cm

Cable group CU3-"C" Cable group CU2-"B" Cable group CU1-"A" Data bus cable

(REMOTEBUS,...)

Metallic cable tray

>100mm >100mm >100mm


2 4

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Requirements B741
Project Group
+K Page
3
GHAZI FABRICS Int for Cabling
Print 17.Mai.2005

Modific. Date Name Norm DIR: J:\..\ Suffix


0 1 2 3 4 5 6 7 8 9

Cable Jenbacher AG

Cable Jenbacher AG
Electric wiring diagram
VDE / IEC

NYSLY”-OZ SiHF
YSLY-OZ HO5 VV-F.X..
VDE 250 Silikon

NYSLY”-JZ SiHF
YSLY-JZ HO5 VV-F.G..
VDE 250 Silikon

NYSLCY”-OZ
YSLCY-OZ VDE 250

NYSLCY”-JZ
YSLCY-JZ VDE 250

NYY 1x185 rm NYY 1x185 rm


NYY
0,6/1KV-VDE 271 0,6/1KV -VDE 271

H07RNF
H07RNF VDE 0282

H07V-K
H07V-K VDE 0281

NICRNI-gesch. 90 N ...
fcr Thermoelemente DIN IEC 584

NSGAF™U-3kV NSGAF™U-3kV

NYY 0,6/1KV

see Technical specification


Cable for Cable according Generator-Manufacturer
Middle voltage generator
of the control
(>1kV) f.e. SIEMENS PROTOLON-NTMCGCW™U

B741 4440 00 Part 4

3 5

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Cable with DIANE B741
Project Group
+K Page
4
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view cables


Cable Type Wire mmý from to Comment Page

+M1-W3.A NSGAF™U 1 120 +M1-G2 +M1-W1 Battery cables +M1/12.0


+M1-W4.A NSGAF™U 1 120 +M1-G3 +M1-W1 Battery cables +M1/12.0
+M1-W5.A NSGAF™U 1 120 +M1-G5 +M1-W2 Battery cables +M1/12.1
+M1-W6.A NSGAF™U 1 120 +M1-G4 +M1-W2 Battery cables +M1/12.2
+M1-W6.B YSLY-OZ 2 1.5 +M1-XH +A1-XH Voltage matching +M1/40.7
+M1-W8.A YSLY-JZ 5/PE 4 +M1-X +A1-X 24VDC Supply A1 +M1/13.7
+M1-W9.A YSLY-JZ 5/PE 4 +M1-X +M2-X1 24VDC Mxx - Mxx +M1/13.8
+M1-W10.A Ethernet 8+SS - -A4 +A1-A6 Delivery GE Jenbacher +M1/14.0
+M1-W15.A YSLCY-JZ 4/PE+SS 1.5 +M1-XS +A1-XS PT100: +M1/37.5
+M1-W20.A YSLY-OZ 2 1.5 +M1-X +M1-S6 Gas pressure low +M1/28.2
+M1-W21.A YSLY-OZ 2 1.5 +M1-X +M1-S7 Gas pressure high +M1/28.3
+M1-W24.A YSLY-OZ 2 1.5 +M1-X +M1-S9 Gas pressure low +M1/29.1
+M1-W25.A YSLY-JZ 4/PE 1.5 +M1-X +M1-F18 Gas train +M1/35.0
+M1-W30.A YSLY-JZ 4/PE 2.5 +M1-X +M1-Y2 Gas valve +M1/36.1
+M1-W36.A YSLY-OZ 2 2.5 +M1-X +M1-Y3 Pre chamber gas valve1 +M1/36.2
+M1-W37.A YSLY-OZ 2 2.5 +M1-X +M1-Y4 Pre chamber gas valve 2 +M1/36.3
+A1-W4.A YSLY-JZ 5/PE 2.5 +G1-X[S] +A1-XH Generator current +A1/7.0
+A1-W7.A YSLY-JZ 5/PE 2.5 +G1-X[S] +A1-XH Generator current +A1/10.0
+A1-W10.C YSLY-JZ 4/PE 2.5 +A1-XH +A1-M2 +A1/12.7
Fuel mixture cooling water pump
+A1-W13.C H07V-K 1/PE 10 +M1-XS +A1-XS Potential equalization +A1/13.8
+A1-W22.A YSLCY-OZ 3+SS 1.5 +A1-XS +A1-B2 Gastemp PT100 +A1/20.1
+A1-W23.A YSLCY-OZ 3+SS 1.5 +A1-XS +A1-B3 Gas pressure +A1/20.3
+A1-W33.A CAN-BUSKABEL 4+SS - +M1-XS +A1-XS Delivery GE Jenbacher +A1/8.5
+A1-W47.A YSLCY-OZ 2+SS 1.5 +A1-XS +A1-B4 Pulse +A1/35.3
+A1-W47.C YSLY-JZ 4/PE 2.5 +A1-XH +A1-M3 Gas compressor +A1/14.0
+A1-W48.A YSLCY-OZ 2+SS 1.5 +A1-XS +A1-B5 Pulse +A1/35.5
+A1-W48.C YSLY-JZ 3/PE 1.5 +A1-XH +A1-Y1 Ventilation valve +A1/14.5
+A1-W49.C YSLY-JZ 3/PE 1.5 +A1-XH +A1-Y2 Pre chamber gas valves before+A1/14.6
Compressor
+A1-W50.C YSLY-JZ 3/PE 1.5 +A1-XH +A1-Y3 +A1/14.8
Pre chamber Compressor Cooling water valve
+A1-W52.C YSLY-JZ 4/PE 1.5 +A1-XH +A1-M4 +A1/14.2
Ventilation fan for Compressor
+A1-W70.A YSLY-JZ 5/PE 2.5 +A1-X +IS-X1 Supply 24VDC +IS +A1/15.2
+A1-W72.A YSLCY-OZ 2+SS 0.75 +A1-XS +IS-XS1 Load sharing line +A1/21.5
+A1-W81.A YSLY-JZ 5/PE 2.5 +M1-X +A1-X Safety loop +A1/23.8
+A1-W90.A YSLY-JZ 25/PE 1.5 +A1-X +IS-X1 Signals +IS +A1/37.0
+A1-W92.A YSLY-OZ 2 1.5 +A1-X +A1-S6 +A1/25.8
Intercooler water pressure min.

4 6

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view cables B741
Project Group
+K Page
5
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix
0 1 2 3 4 5 6 7 8 9

Over view cables


Cable Type Wire mmý from to Comment Page

+A1-W94.A YSLY-OZ 2 2.5 +A1-X +A1-S8 Oil level low Compressor +A1/27.3
+A1-W109.A YSLY-OZ 2 0.5 +A1-X +A1-H1 Rotation lamp +A1/38.7
+A1-W110.A YSLY-OZ 2 0.5 +A1-X +A1-H2 Horn +A1/38.8
+A1-W142.A YSLCY-OZ 3+SS 1.5 +A1-XS +A1-B1 Gas pressure Pre chamber +A1/19.3
+DF-W171.A Ethernet 8+SS - +A1-A15 +DF-A4 Delivery GEJ +DF/4.1

Date 08.Jul.2004

Desig. Eberharter St.


3 x JGS 620 GS-N.L Over view cables B741
Project Group
+K Page
6
Print 17.Mai.2005
GHAZI FABRICS Int
Modific. Date Name Norm DIR: J:\..\ Suffix

Potrebbero piacerti anche