Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
First month or initial 200 hours service (only after the first one month)
Change oil in hydraulic tank, replace line filter, clean strainer, clean inside of tank 3-17
Tighten bolts and nuts (especially lug nuts, overhead guard, load backrest operator’s seat mounting bolts and nuts) 3-17
Check before operation items (for details, see “15.1 CHECK BEFORE OPERATION”) 3-17
Check hydraulic cylinders for looseness, deformation, cracking, damage and wear 3-17
Check forks and fork stopper for deformation, cracking, damage and wear 3-18
Check chain and chain wheel for deformation, damage, rust and poor lubrication 3-18
3-13
23. MAINTENANCE SCHEDULE CHART
Check mounting condition of power steering, check for looseness at connections 3-18
Check brake link for play, looseness, damage and wear 3-18
Check brake piping/tubing for damage, leakage, looseness, contact, looseness of brake tubing clips and disconnec-
3-18
tion at fittings
Check clearance between brake drum and lining, check brake for grabbing, dragging or pulling 3-19
Check for oil leakage from transmission and differential cases 3-19
Check oil level in TORQFLOW transmission, add oil as necessary (Do not overfill) 3-19
Check distributor cap (gasoline), distributor inside (IC ignition system) for cracking or damage 3-21
Check clearance of distributor points, check contact surface for roughness 3-21
Change oil in engine oil pan (Gasoline and LPG trucks with TB42 engines) 3-21
Change oil in engine oil pan (Diesel engine trucks with 6D102E engines) 3-23
3-14
23. MAINTENANCE SCHEDULE CHART
Service Items (continued) Page
Check overhead guard, load backrest for deformation, cracking, damage and looseness 3-25
Check operator’s seat mount for looseness and damage; Check LPG cylinder mounting bracket 3-25
Drain water from water separator and replace fuel filter cartridge (diesel engine lift trucks) 3-26
Check, adjust fuel injection timing, check and inspect fuel injection nozzles (diesel) 3-29
Check PCV blow-by gas reduction system for clogging, damage 3-29
Change oil in hydraulic tank, replace hydraulic line filter, clean hydraulic tank strainer, clean inside of hydraulic tank 3-31
3-15
23. MAINTENANCE SCHEDULE CHART
Replace LPG mixer air valve diaphragm, under normal operating conditions. Replace more often in cold or severe
3-31
service applications. Replace O-ring for LPG tank valve.
Replace LPG mixer air valve diaphragm (normal operating conditions). Replace more often in cold or severe
3-31
service applications. Replace O-ring for LPG tank valve.
Check operation of brake master cylinder, check for oil leakage, damage and wear 3-31
Check operation of wheel cylinders, check for oil leakage, damage and wear 3-31
Check operation of brake drum, check for damage and wear 3-31
Check brake adjustment lever and ratchet for wear and damage 3-31
Check brake back plate for deformation and cracking; Check mounting condition 3-32
Check root (base) of forks for cracking (use color check) 3-32
Check roller shaft of loading equipment for cracking and damage 3-32
Replace water separator (diesel); Clean inside of fuel tank (gasoline/LPG and diesel lift trucks) 3-32
Check frame and cross member for cracking and damage 3-32
3-16