Daily Health, Safety, Environmental

Coordination Report
Date of Inspection: 11-Sep-19 2nd Shift (6:00 am to 5:00 pm)

Location / Work Area: Zone - 1 # HSE Staff / Personne 5+1


# QD-SBG Manpower: 250 # Subcontractor: 25 Total # Manpower: 275

KEY PERSONNEL
# LIST OF WORK ACTIVITIES IN THE AREA
# POSITION NAME CONTACT#
1 Zone Manager Md Salem 70466823 1 Steel fixing for Trench & Road panel

2 Construction Manager Mohd. Moafi Nabhan 30322972 2 Scaffold Erection and Dismantling

3 Site Technical Support Mohammed Fawzy 33717339 3 Lifting and Shifting of materials

Khaled Tarek 30355442 4 Material arrangement at east elevation storage area


4 Site Engineer's
Engr. Omair 30403993 5 Kerb Stone, Crash barriers and Interlock works.
Temporary Works
5 Sharif 30299921 6 Surface Preparation and wall painting
Representative:
6 Post Pouring and Surface Bala 77854665 7 Concrete infilling works at Seg 14
7 Prepartion Finishing Thamizh 30607654 8 Fabrication of Manhole Shutter formworks

8 MEP Site Engineer Tariq Jamal 66410687 9 Cement block instralltion at Substation 1

9 Lifting Works: Sefrin Xavier 33705245 10 Steel bending / cutting works at east elevation workshop

10 Scaffold Coordinator: Sukumar 33468959 11 MEP works - S/C Omega and S/C Jediah

11 Dewatering Coordinator: Kabbany 77494241 12 Excavation in Segment 17, A1-8 and D5 area for MEP works

12 Backfilling Sudeesh 77383369 13 Anti - Carbonation Paint

13 Others 14
s
Remarks: Remarks:

Prepared by: Verified by:


Aravindhan Ganesan Mark Melaya /Giles
Contractor HSE in charge Signature HSE Supervising Consultant Signature
NOTE: This form shall be submitted together with the Daily HSE Observation Report at the end of every shift.