Tamplet for making Action plan for identified villages under IWMP

programme by PG student of IIM, Indore under


Rural Engagement Programme (REP)
KARONDIYA
Name of Village ..............................

1. Baseline Data
1.1 General Information :-
(Area in Hectare)
Name of Gram Panchayat Block District Total
Village Geographical
Area of
Village
KARONDIYA KARONDIYA BAGLI DEWAS 380

1.2 Land Ownership :-


(Area in Hectare)
Forest Govt. Revenue / Community Private Other Total
Land land
0 71 131 170 380

1.3 Land Use:-


(Area in Hectare)
Status of Agricultural land Wasteland Other Total
(including Govt, area
community and
private)
Rain Irrigated Irrigated Total Current Permanent
fed ( only by (by dug fallow fallow
canals & well &
tanks) Tap)

139 0 55 194 186 0 0 380

1.4 Details of Land Owners:-

Details of families based on land ownership Landles Total


s no. of
Margina Small Medium Large Total familie familie
l familie familie familie familie s s
familie s s s s residin
s g in
village
200 205 300 950 1655 414 2069

1.5 Details of Cultivable land:-


(Area in Hectare)
Crop Name of Area Irrigated Un Total
season the crop (Hectare) (Hectare) irrigated (Hectare)
(Hectare)
Kharif SOYABEAN 116 116 116
MAIZE 40 40 40
GROUNDNUT 10 10 10
Rabi WHEAT 50 50 50
CHANA 40 40 40
ONION 15 15 15
Zayad MOONG DAL 10 10 10
(Summer
Crop)

1.6 Cropping Method:-


(Area in Hectare)
Total Single Crop Double crop Multiple crop
Agricultural
Land
130 130 31 0

2. Demographic details
2.1 Category wise details of families :-
Schedule caste Scheduled Other General Total
tribe backward families
class residing in
village
126 845 606 492 2069

2.2 Social Status :-


BPL families APL families Total families

621 1448 2069

2.3 Category wise demographic details :-


Male Female Total
Scheduled Scheduled Other General Scheduled Scheduled Other General Scheduled Scheduled Other General
caste tribe backward caste tribe backward caste tribe backward
class class class

67 560 400 286 50 285 406 206 126 845 606 492
3. Main source of family income:-

S.no Type of Livelihood No. of families Average


with livelihood income/family/year
activities
1 AGRICULTURE 1448 50000
2 414 20000
LABOUR
3 BUSINESS 207 30000
4 310 100000
SERVICE
4 Details of facilities(Infrastructure) available in
village
S.no Available infrastructure Yes/no
1 School building YES
2 Panchayat Bhawan YES
3 Anganwadi Bhawan YES
4 SHG/Community Building NO
5 Primary Health Center NO
6 CC Road NO
7 Bank NO
8 Post Office NO NO
9 Primary cooperative committee NO
10 Hat Bazar NO
11 Toilets Personal / community YES
12 Other Wells (Personal & Community) YES

5 Main Problems of village


1. Water logging due to existing soil type that does not allow percolation and
destroys crops during excessive rains
.............................................................................
...........................................
2. Soil erosion and loss of soil fertility during heavy rains resulting in land becoming
barren and increasing the need for fertilizers
.............................................................................
...........................................
3. Water scarcity during summers due to reducing ground levels leading to
construction of more number of borewells for irrigation in fields
.............................................................................
...........................................
Seasonal migration by landless villagers to find jobs which is observed during the
4.non harvesting and non sowing periods of farming
.............................................................................
...........................................
5. Excessive use of chemical fertilizers and pesticides due to unawareness about the
ill-effects of these on soil and health
.............................................................................
...........................................
6. Absence of health- care facilities in the village leading to villagers traveling upto 20kms for basic treatments
.......................................................................
.................................................
.......................................................................
......................................................
.......................................................................
.....................................................
6.Water Budget of Village :-

1 Total geographical area of village :- 380 hectare


.......................... hectare
0.908 meter
2 Average rainfall during last 10 years in the village:- ...................
meter

3 Total amount of rain water available in :- 138 hectare meter


...................... hectare meter
the village (1 X 2)
4 Value of runoff coefficient :- 0.06 0.4

5 Total runoff in the village (3 x 4) :-


103 hectare
........................ hectare meter

6 Water impounding capacity in pre existing :-


5.03 hectare
...................... hectare meter
structures in the village
7 Balance runoff (4 - 5) 98 hectare
:- ......................
hectare meter
8 Runoff prevented by proposed works/structures :-
63.9
...................... hectare meter 9 Un-prevented runoff (6 - 7)
34.1 hectare meter 10 Water need in
:- ......................
the village :-
3.3983
1. Human ------------------ hectare meter
4.6290
2. Livestock ------------------ hectare meter
3. Agriculture
68.45
i. Rabi crops ------------------ hectare meter
4.50
ii. Zayad (summer )crops ------------------ hectare meter

80.97
Total water need ______________________ hectare meter
7. Details of proposed watershed development work based on Participatory net planning :-
S.no Owner-ship Area of If Use of surveyed land (Hectare) Main Proposed watershed development work Tentative Expected
of surveyed surveyed private problems Cost (Rs. Outcome
land(forest/ land (ha.) land Agricultural land Non (Soil Soil and Surface Vegetative in Lakh)
Govt/private) then agricultural erosion/ water water/Ground measures
give land scarcity of conservation water
name irrigation conservation
of land Irrigated Un- Fallow Other facility or
owner irrigat land any other)
ed

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Parmanand soil erosion
Private 2 Krishnaji 2 soil erosion Farm bunding Toor cultivation 0.06 conservation
2 Private 13 Ramaji
13 Excessive water Channel for
0.48
proper channeling
Laxman logging diversion of excess water

3 Mojiram
35 Farm bunding soil erosion
Private 35 Bhaagitath soil erosion 0.12 conservation
4 Excessive water
logging
Channel for
diversion
0.6 proper channeling
of excess water

4- Private 4 Suresh
Radhesyam 4 Excessive water
logging
Channel for
diversion 0.03 proper channeling
of excess water

-
-
-
-
Total
1.29
8 Consolidated action plan of proposed watershed development
work :-

S.no Main work Activities Unit Total Total


areas Quantity / Expenditure
Nos
1 Soil 1 Staggered contour Hectare
conservation trench 0
and moisture 2 Continuous contour Hectare
0
conservation trench
3 Farm bunding Hectare 220 28.4 lakhs
4 Loose bolder check Nos 0
5 Gabian structure Nos 0
6CPT Run Mt 0
7 Contour bolder wall Hectare 0
8 Other
2 Surface water 1 Earthen and bolder nala Nos
conservation check 0
and Ground 2 Check dam /stopdam Nos 1 17.6 lakhs
water 3 Farm pond Nos 5 11 lakhs
conservation 4Tank Nos 0
5 Percolation tank Nos 0
6 Bori bandhan Nos 0
7 Percolation pit Nos 0
3 Vegetative 1 Horticulture Hectare
Development development 0
2 Plantation/afforestation Hectare
0
other then horticulture
3 Fodder Development Hectare 0
4 Plantation on farm bund Hectare 0
Total watershed development works 226 57 lakhs
Action Plan map of proposed activities

Village Map

1 Name of the village - Legend


2 Total area of the village -
3 Number of selected work -
4 Expenditure on selected work -