301. The temperature of asphalt cement shall not be accepted if the 330.

_____ shall eliminate marks from


delivered to the mixer shall be as deficiency in density is ___b)___. previous rolling.
required to achieve a ___a)___ in the
range of ___b)___, as determined by 317. The compacted pavement shall have 331. In areas too small for the roller a
___c)___. Asphalt cement shall not a thickness tolerances of _____. _____ shall be used to achieve thorough
be used while it is ___d)___ nor compaction.
shall be heated above ___e)___at 318. The asphalt pavement represented by
any time after delivery in the project. the individual core shall not be 332. The density of freshly compacted
accepted if the deficiency in the core material can be determined using a
302. Aggregates for pug mill mixing shall thickness as obtained in accordance properly _____ or other procedure.
be heated, dried and delivered to the with ___a)___ is more than
mixing unit at a temperature within ___b)___. ___c)___ is not permitted. 333. Density determinations made after a
the range ___a)___of the bitumen. period of curing may be determined
Moisture content of the aggregate 319. If the deficiency in the core on samples obtained from compacted
shall not exceed ___b)___ at the thickness is more than ___a)___, material by a _____.
time it is introduced into the mixing additional layer may be permitted in
unit. Moisture content of the mixture order to meet the designed thickness, 334. All compacted densities should be
from drum dryer plants shall not however, the minimum additional converted to dry densities. It is
exceed ___c)___ of the output, as asphalt overlay thickness should be recommended that the average of
determined by ___d)___. dependent on the minimum thickness ___a)___ made in each lot be equal
capacity of asphalt paver but it to or greater than ___b)___ of the six
303. The longitudinal joint in one layer should not be ___b)___ and that laboratory prepared specimens, and
shall offset that in the layer proper construction procedures are that no individual determination be
immediately below approximately followed. lower than ___c)___.
_____; however, the joint in the top
layer shall be at the center line of the 320. The surface will be checked by the 335. The surface of the completed
pavement if the roadway comprises use of a _____ at sites selected by pavement will be checked
two (2) lanes, or at lane lines if the the Engineer. longitudinally and transversely for
roadway is more than two (2) lanes, smoothness with a ___a)___. The
unless otherwise directed. 321. The variation of the surface from the surface shall not vary more than
testing edge of the straight-edge ___b)___ in a 3 m (10 ft.) parallel to
304. The mixture shall be placed at a between any two contacts with the the centerline and not more than
temperature not less than _____ as surface shall not exceed _____. ___c)___in 3 m (10 ft.) at right
measured in the truck just prior to angles to the centerline.
dumping into the spreader. 322. This item shall consist of
constructing Bituminous Surface 336. Sampling of asphalt materials shall
305. When tar is used, the mixture shall Course (Asphalt Cold Mix) prepared be in accordance with the latest
be placed at between _____. in central mixing plant, laid cold, on revision of _____.
the prepared base in accordance with
306. Rolling shall _____, gradually this Specification and in conformity 337. Sampling of mineral aggregate shall
progressing to the crown of the road. with the lines, grades and typical be in accordance with the latest
cross-section shown on the Plans. revision of _____.
307. When paving in echelon or abutting
a previously placed lane, the 323. The _____ shall be composed of 338. Sampling of the asphalt mixture, as
longitudinal joint should be rolled coarse mineral aggregates, fine required by the Engineer, shall be in
first followed by the regular rolling mineral aggregates, mineral fillers accordance with the latest revision of
procedure. On super elevated curves, and chemically bonding bitumen. _____.
the rolling shall _____.
324. Each _____ submitted shall propose 339. _____ will not be permitted as a
308. Rolling shall be continued until definite single value for: method of measurement.
roller marks are eliminated and a
minimum of ___a)___ of the density 1. The percentage of coarse mineral 340. This Item shall consist of a
of the laboratory compacted aggregates passing each specified bituminous stockpile maintenance
specimens prepared in accordance sieve size. mixture composed of aggregate,
with ___b)___ has been obtained. mineral filler, hydrated lime and
2. The percentage of fine mineral bituminous material mixed in a
309. To prevent adhesion of the mixture aggregates passing each specified central plant. The mixture is
to the rollers, the wheels shall be sieve size. stockpiled for immediate or future
_____ or other approved material. maintenance needs.
Excess liquid will not be permitted. 3. The percentage of chemically
bonding bitumen material to be 341. _____ For use within short time after
310. Along forms, curbs, headers, walls added. stockpiling.
and other places not accessible to the
rollers, the mixture shall be 4. The temperature of the mixture 342. _____ For immediate use under hot
thoroughly compacted with _____. delivered on the prepared base of the or moderate weather conditions, or
road. for use within a short time after
311. Samples shall be neatly cut by stockpiling.
___a)___. Each sample shall be at 5. The kind and percentage of
least ___b)___. chemical additive to be used. 343. _____ can be designed for use within
a short time after stockpiling or for
312. At least _____ shall be taken for 6. The kind and percentage of long storage period.
each full day’s operation. mineral filler to be incorporated.
344. The combined aggregate after going
313. If no core samples were taken during 325. The proportioning of Bituminous through the drier, shall have a sand
the day’s operation, core samples Material (item 308) on the basis of equivalent value of _____.
shall be taken from the completed total dry aggregate shall be from
pavement for every _____. ___a)___ when cut back asphalt is 345. The coarse aggregate (item 309)
used and from ___b)___ when shall have a mass percent of wear
314. No acceptance and final payment emulsified asphalt is used. not exceeding _____.
shall be made on completed asphalt
pavement unless core test for 326. Asphalt surface mixture shall not be 346. Slag, if used, shall weigh not less
thickness determination is placed when the surface temperature than _____.
conducted, except for Barangay of the base course is below _____.
Roads where the implementing 347. The amount of bituminous material
office is allowed to waive such test. 327. When the compacted subgrade on (item 309) to be added will be from
True or False? which the asphalt base is to be _____ of total mix.
placed loosely bonded, it shall be
315. The samples obtained will be used to primed with _____ of the type and 348. Upper limit may be raised when
measure the ___a)___ of the grade of asphalt priming material. using _____.
pavement. The same samples will be
used to test the ___b)___ of the 328. The minimum lift thickness shall be 349. This Item shall consist of
compacted pavement by ___c)___. at least _____. constructing a bituminous concrete
surface course composed of
316. The compacted pavement shall have 329. An application of _____ may be aggregates, mineral filler, and
a density equal to, or greater than necessary to prevent mix pick-up by bituminous material mixed in a
___a)___ of the density of a the pneumatic-tired roller. central plant, constructed and laid
laboratory specimen. The asphalt hot on the prepared base in
pavement represented by the cores accordance with this Specification
and in conformity with lines, grades, the end of the sleeve at least 384. Vibrators shall operate at a
thickness and typical crosssection ___b)___from the end of the dowel. frequency of ___a)___ under load at
shown on the Plans. a maximum spacing of ___b)___.
368. Air-entraining admixture shall
350. This Item shall consist of pavement conform to the requirements of 385. Forms shall be of ___a)___, of an
of Portland Cement Concrete, with _____. approved section, and of ___b)___.
or without reinforcement,
constructed on the prepared base in 369. Chemical admixtures, if specified or 386. The base of the forms shall be of
accordance with this Specification permitted, shall conform to the sufficient width to provide necessary
and in conformity with lines, grades, requirements of _____. stability in all directions. The flange
thickness and typical crosssection braces must extend outward on the
shown on the Plans. 370. Fly Ash, if specified or permitted as base to not less than _____.
a mineral admixture and as
351. Only _____ Portland Cement shall ___a)___partial replacement of 387. After the subgrade of base has been
be used unless otherwise provided Portland cement in concrete mix placed and compacted to the
for in the Special Provisions. shall conform to the requirements of required density, the areas which
___b)___. will support the paving machine and
352. However, the use of _____ meeting the grade on which the pavement is
the requirements of AASHTO M 371. _____ should be added only to the to be constructed shall be trimmed to
240/ASTM C 695, Specifications for concrete mix to produce some the proper elevation by means of a
Blended Hydraulic Cement shall be desired modifications to the properly designed machine
allowed, provided that trial mixes properties of concrete where extending the prepared work areas
shall be done and that the mixes necessary, but not as partial compacted at least _____.
meet the concrete strength replacement of cement.
requirements, the AASHTO/ASTM 388. The subgrade or base shall be _____
provisions pertinent to the use of 372. Calcium Chloride/Calcium Nitrate when the concrete is placed.
Portland Pozzolan Type IP shall be shall conform to _____, if specified
adopted. or permitted by the Engineer, as 389. Any roadbed, which at the form line
accelerator. is found below established grade,
353. Portland cement maybe/shall be shall be filled with approved
rejected if: 373. Storage buildings shall have capacity granular materials to grade in lifts of
for storage of a sufficient quantity of _____, and thoroughly rerolled or
354. Samples of Cement shall be obtained cement to allow sampling at least tamped.
in accordance with _____. _____ before the cement is to be
used. 390. The forms shall not deviate from true
355. Fine aggregates used for PCCP shall line bv more than _____ at any
not contain more than ___a)___ of 374. The handling and storing of concrete point.
material passing the 0.075 mm (No. aggregates shall be such as to _____
200 sieve) by washing nor more than or the inclusion of foreign materials. 391. Stockpiles shall be built up in layers
___b)___ each of clay lumps or of not more than _____ in thickness.
shale. 375. It is the intent of this Specification to
require at least _____ of concrete to 392. All washed aggregates and
356. If the fine aggregate is subjected to meet the minimum strength aggregates produced or handled by
five (5) cycles of the sodium sulfate requirements. hydraulic methods, shall be
soundness test, the weighted loss stockpiled or binned for draining at
shall not exceed _____. 376. The Engineer shall determine from least _____ before being batched.
laboratory tests of the materials to be
357. If the fine aggregates are subjected used, the cement content and the 393. When cement is placed in contact
to the _____ for organic impurities proportions of aggregate and water with the aggregates, batches may be
and a color darker than the standard that will produce workable concrete rejected unless mixed within _____
is produced, it shall be rejected. having a slump of ___a)___ if not of such contact.
vibrated or ___b)___ if vibrated.
358. However, when tested for the effect 394. The mixer shall be charged without
of organic impurities of strength of 377. The flexural strength of the concrete loss of cement. Batching shall be so
mortar by AASHTO T 71, the fine beam of not less than ___a)___ when conducted as to result in the weight
aggregate may be used if the relative tested by the third-point method in to each material required within a
strength at 7 and 28 days is _____. accordance with AASHTO T97 or tolerance of ___a)___ for the cement
___b)___when tested by the mid- and ___b)___ for aggregates.
359. The coarse aggregates used for point method in accordance with
PCCP shall not contain more than T177 at fourteen (14) days. 395. The accuracy of measuring the water
___a)___ of material passing the shall be within a range of error of not
0.075 mm (No. 200) sieve, not more 378. The compressive strength of over than _____.
than ___b)___ of clay lumps, nor _____for cores taken at fourteen (14)
more than ___c)___ of soft days and tested in accordance with 396. The volume of the auxiliary tank
fragments. AASHTO T 24. shall be at least _____.

360. If the coarse aggregate is subjected 379. Slump shall be determined using 397. Ready-mixed concrete shall be
to five (5) cycles of the sodium _____. mixed and delivered in accordance
sulfate soundness test, the weighted with requirements of _____, except
loss shall not exceed _____. 380. The designer shall consider the use that the minimum required
of ___a)___ using local materials or revolutions at the mixing speed for
361. The coarse aggregates shall have a specifically modified conventional transit-mixed concrete may be
mass percent of wear not exceeding concrete mixes in base course and in reduced to not less than that
_____. the lower course composite, recommended by the mixer
monolithic concrete pavements using manufacturer.
a minimum of ___b)___ of
362. If the slag is used, its density shall conventional concrete as the surface 398. When mixed at the site or in a
not be less than _____. course. central mixing plant, the mixing time
shall _____, unless mixer
363. _____ shall not be used for tie bars 381. The Contractor shall furnish the performance tests prove adequate
that are to be bent and restraightened Engineer a _____ detailing his mixing of the concrete is a shorter
during construction. production control procedures and time period.
the type and frequency of sampling
364. _____ used for PCCP shall be and testing to insure that the concrete 399. _____ shall be added to the specified
deformed bars. produces complies with the mixing time if timing starts at the
Specifications. instant the skip reaches its maximum
365. Dowels used for PCCP shall be raised positions.
_____. 382. In case of failure of the timing
device, the mixer may be used for 400. Mixing time ends when the
366. Before delivery to the site of work, the balance of the day while it is discharge chute _____.
___a)___ of the length of each dowel being repaired, provided that each
shall be painted with ___b)___ of batch is mixed _____.
approved lead or tar paint.
383. The finishing machine shall be
367. The sleeves for dowel bars shall be equipped with at least _____.
metal of approved design to cover
___a)___of the dowel, with a closed
end, and with a suitable stop to hold