D000001 ANGULDES / ALM051-JSPL

Technical Documentation for


Hot Metal Desulphurisation Project
Jindal Steel Power Corp.Ltd.
Angul Works, Odisha, India

Table of contents
Folder 1 – description
Installation / General information and safety
1. Silo CaO
2. Silo Mg
3. Valve stations
4. Valve station for nozzle rings
5. Injection conveying 1
6. Injection conveying 2
7. Lance lifting device
8. Measuring device for T+S
9. Initial positions
10. Drawing list
11. Shipment list
12. Operation & maintenance
13. General plant description
14. Technical data
15. Maintenance instructions
16. Operation instructions
17. Maintenance schedule
18. Faults - causes and elimination
19. Drawing list

20. P+I diagram+ part list

9E – Layout
9E – Assembly

Folder 2 – Drawings and parts lists


9A – Unloading
9B – Storage


D000001 ANGULDES / ALM051-JSPL

Folder 3 – Drawings and parts lists


9E – Injection conveying

Folder 4 – Drawings and parts lists


9F – Lance Handling
9G – Measuring device T+S
9K - Suction
9N – Gas Supply

Folder 5.1 – Pressure vessel certificates Originals


SERIAL NO 18-2983/1.1
SERIAL NO 18-2983/1.2

Folder 5.2 – Pressure vessel certificates Originals


SERIAL NO 18-2983/2.1
SERIAL NO 18-2983/2.2

Folder 5 – Pressure vessel certificates Copy


SERIAL NO 18-2983/1.1
SERIAL NO 18-2983/1.2
SERIAL NO 18-2983/2.1
SERIAL NO 18-2983/2.2

Folder 6.1 – Supplier’s documents


QAP Certificate

ALMAMET
CERA
EBRO
ELAFLEX
ENDRESS+HAUSER

 
D000001 ANGULDES / ALM051-JSPL

Folder 6.2 – Supplier’s documents


FESTO
FLOWSERVE
GENRAL EASTERN
GESTRA
HERAEUS ELECTRONITE
HEROSE
INFASTAUB
KONECRANES
KROMBACH
LESER
NORGREN
PARKER
RIEGLER
SAMSON
SCHMERSAL
SEW
SICK
SIEMENS
TIMM
TURCK
WIKA

Electrical equipment
See separate electrical documentation

 