Roof Items:
RFG ARMV Tear off, haul and dispose of comp. shingles RFG VENTCP5 Furnace vent – rain cap and storm collar 5”
RFG ADDRM> Add. Layer of comp shingles, remove & disp PNT VENT Prime & paint roof vent
RFG 300 Laminated - 30 yr. - comp. shingle rfg. - incl. felt RFG FLCH Chimney flashing – average (32” X 36”)
RFG 300S Laminated - 30 yr. - comp. shingle rfg. – w/out felt RFG STEP Step flashing
RFG 240 3 tab - 25 yr. - composition shingle roofing - incl. felt RFG FLL L Flashing
RFG 240S 3 tab - 25 yr. - comp. shingle roofing - w/out felt RFG DRIP Drip edge
RFG FELT15 Roofing felt - 15 lb RFG STEEP Additional charge for steep roof - 7/12 to 9/12 slope
RFG FELT30 Roofing felt – 30 lb RFG HIGH Additional charge for high roof (2 stories or greater)
RFG IWS Ice & water shield ELS DISHRS Satellite system – D&R (N/A on State Farm price lists)
RFG VMTL Valley metal ELS DISHA Satellite system calibrate and re-align
RFG RIDGC Ridge cap – composition shingles RFG LAB Roofer hour (For supervisor hrs, access issues, etc)
RFG ASTR- Asphalt starter – universal starter course RFG SH1/2 Sheathing – plywood – ½” CDX
RFG FLPIPE Flashing - pipe jack LAB LBR General Lab – per hour (For tarping, moving contents, etc.)
RFG VENTT Roof vent - turtle type – Metal CLN LBR Cleaning Technician – per hour
RFG VENTE< Exhaust cap – through roof – up to 4” FEE TIPF Taxes, insurance, permits & fees (Bid item)
Gutter Items:
SFG GUTA Gutter / downspout - aluminum - up to 5" SFG GUTRS Detach and reset Gutter/downspout
SFG GUTG Prime & paint gutter/downspout