Dyson Part, Assembly,Product Approval Process / Flow Chart - Internal distribution (Revision 02)

Prime
Moulder
Contractor

Start Start

New tool / new material /


change of material or
Tool trial. supplier / tool modification /
drawing change, including
add new dimension
Significant Production
Run

Sample 20 shots per Prime con to submit 'ISIR


cavity per colour. package' and all numbered
samples to Dyson
(Refer to Appendix 1, Clause
1.1 and 1.2 for document to
Number all samples with submit)
the mould & cavity
number with a
sequential number
which can be traced to
the dimensional report
data.

Conduct ISIR
measurement &
capability study on all
samples, 20 per cavity.

Submit samples and ISIR


documentation to prime
con.
Moulder to conduct Parts/Assy rejected by
parts/document is rejected
tooling correction. engineering
Prime con to inform moulder

Parts approve by
Engineering
Moulder can start
parts is approved Issue ISIR/approval
End production
Prime con to inform moulder report to prime con
together with signed
approved sample.

produce at moulder plant)


Engineer to trigger Prime
responsibility if the part
con about low PPK
*( Prime con must take up
dimensions to be included
dimensions into QSI
in QSI report
to refect the low PPK
Prime con or moulder require
APPENDIX:

Appendix 1: Appendix 2:
Moulder & Prime Contractor to submit: ISIR approval must comply to engineering drawing (minimum requirement).
1.1 ISIR Package (All):
-Part Submission Warrant (Warrant declaration) 1. Visual inspection:
-ISIR Measurement Documentation (Measurement & Capability) - Colour;
-ISIR Form, Fit and Function - tool impression number;
-Control Plan & QSI - tooling marking i.e. dyson logo, material, recycle logo, etc;
a) Ongoing projects/New SKU/ Current Support Project - include in - Moulding defect i.e. sink mark, dented, fashes, short mould, etc;
ISIR Package - Part appearance i.e. missing feature, burr, sharp edge or drag mark along
b) New Project/ X-Project - Submit separately to Dyson Quality split line, polish or texture surface as per drawing.
-DR/MS/999/99a
-RoHS test report (if applicable, see Compliance section of Form, Fit 2. Fit function:
and Function document) - fit function test to be perform with neighbouring components covering all
variants/tools/impressions
1.2 ISIR Supportive documents(Electronics only) - Main con to submit fit function report along with approval sample.
-Electronics Assembly Initial Inspection Report
-ICT/ MDA testing report 3. Validation:
-ICT Test coverage report - all parts/assembly submitted must at least passed and comply with
-FCT Testing report engineering drawing (min requirement) i.e. EOL, CTQ, special process, etc.
-Certificate of Conformance - supportive document from main con is mandatory or engineer need to
-Soldering joint temperature profile record down any job number for conducted validation on approval notes.
-Indirect Material List (Solder bar, fux, etc)
-Appendix (Drawing assembly, bareboard & etc) 4. Dimensions:
- All critical dimensions on ISIR measurement report must adhere with lates
Tool maker to submit : part drawing. PPK value > 1.67.
1.3 ISIR Package: - No approval to be granted for ISIR parts consisting out spec dimension.
-Part Submission Warrant (Warrant declaration)
-ISIR Measurement Documentation (Measurement & Capability)
ion 02)

Dyson
Engineering

Part Approval job


reviewed by
respective engineer.
(ISIR or Tool)
ISIR PART & ASSY APPROVAL TOOL APPROVAL
Refer to Appendix 2 Refer to Appendix 2

No Visual Inspection Visual Inspection No


PASSED? PASSED? Tool rejected by
engineering

Yes Yes

No Fit function Fit function No


PASSED? PASSED?

Yes Yes

No Validation/EOL
PASSED?
(Applicable for
PASSED?
(Applicable for
ISIR approval)
Yes

No Dimension Dimension No
Inspection Inspection
by PASSED? PASSED?
Tooling
Yes Yes
report to Dyson
y Issue tool approval
Engineering
al Yes Ppk ≥ 1.67? Ppk ≥ 1.67? Yes Tooling approve by
on
ed
e.
No No

LOW PPK APPROVAL WORKFLOW


Refer to Appendix 3

Prime Yes No
Approval from Design Tolerance can be changed No
PK Manager/ ProjectManager/ to improve capability and
luded Project Quality Team Leader get Ppk ≥1.67?

Yes
No

Raise CO to widen the


Refer to appendix 3 Step 4 tolerance
Appendix 3: Appendix 4:
uirement). The Approval Report amendment process can go
Low PPK dimensions approval fow, for 1.00<PPK<1.67 parallel with the ISIR Part & Assy Approval process and
Tool Approval process. Engineers need to ensure that
1. Consult Dyson tooling if tool/process can be corrected. amended Approval Report is obtained before ISIR
approval or Tool approval can be granted.
OR
;
ark along 2. Up-issued parts drawings to widen the tolerance band base on
tolerance stack result. Raise QAP CO.

OR
overing all
3. Create low PPK approval job and assigned it to Design
le. Manager/Project Manager & Project Quality Team Leader.

4. If low PPK approval job rejected, go to first process of


ith Identified tool maker will received drawing ( Refer to tool maker
cess, etc. fow)
eed to
l notes.

with latest

ension.
Dyson Tooling Tool Maker

Start
Tooling Department raise
approval workfow in NPD
Tool trial.
Below actions need to be
done by Tooling :-
1. Assign the job to
Engineering for Tooling Significant Production Run
Approval.
2. Pass the samples 20 shots
to Engineer.
3. Attach the measurement Sample 20 shots per cavity
data into job. per colour.

Number all samples with the


mould & cavity number with
a sequential number which
can be traced to the
dimensional report data.

Conduct ISIR measurement &


capability study on all
samples, 20 per cavity.

Submit ISIR measurement


documentation and all
numbered samples to Dyson
Tooling. Along with tooling
data process sheet
(Refer to Appendix 1, clause
1.3 for document to submit)
1.3 for document to submit)

Inform Tool Maker that the Tool maker to conduct


tooling is rejected. tooling correction.

Tool maker to
Inform Tool Maker on the proceed with
approval. Tooling to close transferring tooling End
job. to moulder.

Review with tooling


whether injection Yes
parameter can be
adjusted/re-process

Yes
Dyson Part, Assembly,Product Approval Process / Flow Chart - Internal distribution (Revision 14)

Prime
Moulder
Contractor

Start Start

New tool / new material /


change of material or
Tool trial. supplier / tool modification /
drawing change, including
add new dimension
Significant Production
Run

Sample 20 shots per Prime con to submit 'ISIR


cavity per colour. package' and all numbered
samples to Dyson
(Refer to Appendix 1, Clause
1.1 and 1.2 for document to
Number all samples with submit)
the mould & cavity
number with a
sequential number
which can be traced to
the dimensional report
data.

Conduct ISIR
measurement &
capability study on all
samples, 20 per cavity.

Submit samples and ISIR


documentation to prime
con.
Moulder to conduct Parts/Assy rejected by
parts/document is rejected
tooling correction. engineering
Prime con to inform moulder

Parts approve by
Engineering
Moulder can start
parts is approved Issue ISIR/approval
End production
Prime con to inform moulder report to prime con
together with signed
approved sample.

produce at moulder plant)


Engineer to trigger Prime
responsibility if the part
Proceed with
con about low PPK
*( Prime con must take up
dimensions to be included
dimensions into QSI
in QSI report
to refect the low PPK
Prime con or moulder require
APPENDIX:

Appendix 1: Appendix 2:
Moulder & Prime Contractor to submit: ISIR approval must comply to engineering drawing (minimum requirement).
1.1 ISIR Package (All):
-Part Submission Warrant (Warrant declaration) 1. Visual inspection:
-ISIR Measurement Documentation (Measurement & Capability) - Colour;
-ISIR Form, Fit and Function - tool impression number;
-Control Plan & QSI - tooling marking i.e. dyson logo, material, recycle logo, etc;
a) Ongoing projects/New SKU/ Current Support Project - include in - Moulding defect i.e. sink mark, dented, fashes, short mould, etc;
ISIR Package - Part appearance i.e. missing feature, burr, sharp edge or drag mark along
b) New Project/ X-Project - Submit separately to Dyson Quality split line, polish or texture surface as per drawing.
-DR/MS/999/99a
-RoHS test report (if applicable, see Compliance section of Form, Fit 2. Fit function:
and Function document) - fit function test to be perform with neighbouring components covering all
variants/tools/impressions
1.2 ISIR Supportive documents(Electronics only) - Main con to submit fit function report along with approval sample.
-Electronics Assembly Initial Inspection Report
-ICT/ MDA testing report 3. Validation:
-ICT Test coverage report - all parts/assembly submitted must at least passed and comply with
-FCT Testing report engineering drawing (min requirement) i.e. EOL, CTQ, special process, etc.
-Certificate of Conformance - supportive document from main con is mandatory or engineer need to
-Soldering joint temperature profile record down any job number for conducted validation on approval notes.
-Indirect Material List (Solder bar, fux, etc)
-Appendix (Drawing assembly, bareboard & etc) 4. Dimensions:
- All critical dimensions on ISIR measurement report must adhere with lates
Tool maker to submit : part drawing. PPK value > 1.67.
1.3 ISIR Package: - No approval to be granted for ISIR parts consisting out spec dimension.
-Part Submission Warrant (Warrant declaration)
-ISIR Measurement Documentation (Measurement & Capability)
ion 14)

Dyson
Engineering

Part Approval job


reviewed by
respective engineer.
(ISIR or Tool)
ISIR PART & ASSY APPROVAL TOOL APPROVAL
Refer to Appendix 2 Refer to Appendix 2

Tool rejected by
engineering

No Visual Inspection Visual Inspection No


PASSED? PASSED?

Yes Yes

No Fit function Fit function No


PASSED? PASSED?

Yes Yes

No Validation/EOL
PASSED?
(Applicable for
PASSED?
(Applicable for
ISIR approval)
Yes

No Dimension Dimension No
Inspection Inspection
by PASSED? PASSED?
Tooling
Yes Yes
report to Dyson
y Issue tool approval
Engineering
al Yes Ppk ≥ 1.67? Ppk ≥ 1.67? Yes Tooling approve by
on
ed
e.
No No

ceed with conditional approval


Submit low PPK report for DYSON APPROVAL PANEL review

Parameter readjust & re submit the report


Appendix 3: Appendix 4:
uirement). The Approval Report amendment process can go
Low PPK dimensions approval fow, for 1.00<PPK<1.67 parallel with the ISIR Part & Assy Approval process and
Tool Approval process. Engineers need to ensure that
1. Consult Dyson tooling if tool/process can be corrected. amended Approval Report is obtained before ISIR
approval or Tool approval can be granted.
OR
;
ark along 2. Up-issued parts drawings to widen the tolerance band base on
tolerance stack result. Raise QAP CO.

OR
overing all
3. Create low PPK approval job and assigned it to Design
le. Manager/Project Manager & Project Quality Team Leader.

4. If low PPK approval job rejected, go to first process of


ith Identified tool maker will received drawing ( Refer to tool maker
cess, etc. fow)
eed to
l notes.

with latest

ension.
Dyson Tooling Tool Maker

Start
Tooling Department raise
approval workfow in NPD
Tool trial.
Below actions need to be
done by Tooling :-
1. Assign the job to
Engineering for Tooling Significant Production Run
Approval.
2. Pass the samples 20 shots
to Engineer.
3. Attach the measurement Sample 20 shots per cavity
data into job. per colour.

Number all samples with the


mould & cavity number with
a sequential number which
can be traced to the
dimensional report data.

Conduct ISIR measurement &


capability study on all
samples, 20 per cavity.

Submit ISIR measurement


documentation and all
numbered samples to Dyson
Tooling. Along with tooling
data process sheet
(Refer to Appendix 1, clause
1.3 for document to submit)
1.3 for document to submit)

Inform Tool Maker that the Tool maker to conduct


tooling is rejected. tooling correction.

Tool maker to
Inform Tool Maker on the proceed with
approval. Tooling to close transferring tooling End
job. to moulder.

Tool modification
OVAL PANEL review
Dyson Part, Assembly,Product Approval Process / Flow Chart - External distribution (Revision 16)
Moulder Prime Contractor Dyson Approvals Dyson Engineering Dyson Approvals Dyson Tooling Tool Maker

Start Start Start

New tool / new material / Tool trial


change of material or supplier /
Tool trial. tool modification / drawing
change, including add new
dimension Significant Production
Run
Significant Production
Run
Sample 20 shots per
cavity per colour.
Sample 20 shots per
cavity per colour.

Number all samples with the mould &


cavity number with a sequential
number which can be traced to the
Number all samples with the mould & dimensional report data.
cavity number with a sequential number
which can be traced to the dimensional
report data.

Conduct ISIR measurement &


capability study on all samples,
Conduct ISIR measurement & 20 per cavity.
capability study on all samples,
20 per cavity.

Submit ISIR measurement documentation and all


Tooling Department numbered samples to Dyson Tooling. Along with
Submit samples and ISIR raise approval workflow tooling data process sheet
documentation to prime con. in NPD (Refer to Appendix 1, clause 1.3 for document to
Prime con to submit 'ISIR package' and all submit)
Appendix 1:
numbered samples to Dyson
(Refer to Appendix 1, Clause 1.1 and 1.2 Moulder & Prime Contractor to submit:
for document to submit) 1.1 ISIR Package (All):
-Part Submission Warrant (Warrant declaration) Below actions need to be done by Tooling :-
-ISIR Measurement Documentation (Measurement & Capability) 1. Assign the job to Engineering for Tooling Approval.
-ISIR Form, Fit and Function 2. Pass the samples 20 shots to Engineer.
-Control Plan & QSI 3. Attach the measurement data into job.
a) Ongoing projects/New SKU/ Current Support Project - include in ISIR Package
b) New Project/ X-Project - Submit separately to Dyson Quality
-DR/MS/999/99a
-RoHS test report (if applicable, see Compliance section of Form, Fit and Function
document)

1.2 ISIR Supportive documents(Electronics only)


-Electronics Assembly Initial Inspection Report
-ICT/ MDA testing report
-ICT Test coverage report
-FCT Testing report
-Certificate of Conformance
-Soldering joint temperature profile
-Indirect Material List (Solder bar, flux, etc)
-Appendix (Drawing assembly, bareboard & etc)

Tool maker to submit :


1.3 ISIR Package:
-Part Submission Warrant (Warrant declaration)
-ISIR Measurement Documentation (Measurement & Capability)

Part Approval job reviewed


by respective engineer.
(ISIR or Tool)

Yes Is this part a


Appendix 4: Notify Safety Approval Safety Critical
The Approval Report amendment process can go parallel with the ISIR Part & SAFETY APPROVAL Engineer Part?
Assy Approval process and Tool Approval process. Engineers need to ensure
that amended Approval Report is obtained before ISIR approval or Tool approval
can be granted. Tool rejected by Inform Tool Maker that the Tool maker to conduct tooling
No engineering tooling is rejected. correction.
No Verify whether part is Yes
comply with Safety
requirement?
ISIR PART & ASSY APPROVAL TOOL APPROVAL
Refer to Appendix 2 Refer to Appendix 2 SAFETY APPROVAL
Appendix 2:
ISIR approval must comply to engineering drawing (minimum requirement).

1. Visual inspection:
- Colour; Visual Visual
- tool impression number; No No
Inspection Inspection Does the change affect
- tooling marking i.e. dyson logo, material, recycle logo, etc; Approvals Report? No
PASSED? PASSED?
- Moulding defect i.e. sink mark, dented, flashes, short mould, etc; 1. Material grade End
- Part appearance i.e. missing feature, burr, sharp edge or drag mark along split Does the change affect 2. Material Supplier
line, polish or texture surface as per drawing. Approvals Report? Yes Yes
1. Material grade
2. Fit function: No 2. Material Supplier
- fit function test to be perform with neighbouring components covering all No Fit function Yes
variants/tools/impressions Fit function No
PASSED? PASSED?
- Main con to submit fit function report along with approval sample.
Amend Approvals Report/inform
3. Validation: Yes safety agencies
- all parts/assembly submitted must at least passed and comply with (Refer to Appendix 4)
engineering drawing (min requirement) i.e. EOL, CTQ, special process, etc. Yes Yes Notify Safety Approval
- supportive document from main con is mandatory or engineer need to record Amend Approvals Report/inform Engineer
down any job number for conducted validation on approval notes. safety agencies
(Refer to Appendix 4) No
Validation/EOL
4. Dimensions:
PASSED?
- All critical dimensions on ISIR measurement report must adhere with latest
(Applicable for
part drawing. PPK value > 1.67.
End ISIR approval)
- No approval to be granted for ISIR parts consisting out spec dimension.

Yes

No
No Dimension Dimension
Inspection Inspection
PASSED? PASSED?

is rejected
Moulder to conduct moulder parts/document Parts/Assy rejected by Yes
tooling correction. Prime con to inform engineering Yes

Yes Tooling approve by


Ppk ≥ Ppk ≥ Yes Inform Tool Maker on the Tool maker to proceed with
Engineering End
1.67? 1.67? Issue tool approval report approval. Tooling to close job. transferring tooling to moulder.
to Dyson Tooling

No
Parts approve by Engineering
approved No
Issue ISIR/approval report to
Moulder can start
End
moulder parts is
production Prime con to inform prime con together with signed
approved sample.

Proceed with conditional approval Tool modification


part produce at moulder plant)
*( Prime con must take up responsibility if the Engineer to trigger
Prime con about low
PPK dimensions into QSI
Prime con or moulder require to reflect the low PPK dimensions to be Submit low PPK report for DYSON APPROVAL PANEL review
included in QSI report

Parameter readjust & re submit the report


Declaration of Banned and Restricted Substances

* Notes:
The attachment works as a reference only.
Retrieve the latest copy of DRMS documents (Form & Procedure) from Dyson Material Team.
PART SUBMISSION WARRANT

Part Number : Part Name :

Configuration No :

(Applicable for Electronics)

Drawing issuance No : Date of submission :

PRIME CONTRACTOR NAME:

ADDRESS:

SUPPLIER NAME:

ADDRESS:

REASON FOR SUBMSSION ( Check at least one)

Initial Submission Change to material

Engineering Supplier or Material source change

Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing

Correction of Discrepancy Parts Produced at Additional Location

Tooling inactive Other - please specify

DECLARATION

I confirm that the samples included in this submission are representative for our parts, and are produced in accordance with
Dyson drawings and specifications. The samples have been produced with the materials specified by Dyson and by using
Dyson allocated tools(where supplied) without additional process steps at production rate of ______/_____hours. I further
confirm that written verification of the compliance is archived and it is available for audit and validation by Dyson and/or its
representatives.

I acknowledge that approval of the sample by Dyson does not remove or alter any obligation we have to Dyson under any
manufacturing or supply agreement or as any waiver by Dyson of its rights, whether under those agreement or otherwise.

Organisation Authorised Signature: Date:___________________________

Print Name: _________________________________________________________ Fax No:_________________________

Title:_______________________________________________________________ Email:__________________________

DYS-QA-DPAP-F-001-01
QUALITY STANDARD INSTRUCTION
Product Level:
SUPPLIER PART NAME
Assembly
MODEL DRAWING NUMBER Part

VISUAL STANDARD 'A', 'B' & 'C' APPLIES TO THIS PART


Variant:
Part Number Description Remarks Colour

Document Revision:
Revision Date Reason of revision Name/ PIC

DYS-QA-DPAP-F-004-01
QSI REF. NUMBER
PAGE
VERIFIED BY
DATE REV:

APPROVED BY
PREPARED BY

Dyson does not accept any responsibility for the suitability of the QSI for the supplier to meet its obligations to Dyson under any
manufacturing or supply agreement

DIMENSIONAL REQUIREMENTS INSPECTION INFORMATION


Grid Ref Dimension Equipment Used INSPECTION STANDARD
SUPPLIER MEASUREMENT
Visual Inspections:

Additional requirement

Finished Parts To Be Conditioned YES / NO


Temperature:______________◦C
Hours ______________
Water content by Mass _____%

INSPECTION STANDARD
For Start-up and IPQC measurement
Cosmetic :
Frequency ________________
Accept /Reject ______________

Dimension (All Dimensions):


Frequency ________________
Accept /Reject ______________

Dimension ¨ (IPQC):
Frequency ________________
Accept /Reject ______________
INSPECTION STANDARD
For Outgoing And Incoming Inspection (OQC & IQC)
Grid Ref Dimension Equipment Used
SUPPLIER OQC/ PRIME CONTRACTOR IQC MEASUREMENT Cosmetic :
Frequency ________________
Accept /Reject ______________
olour
Dimension ¨ :
Frequency ________________
Accept /Reject ______________

NOTE:
e/ PIC Dimension ¨ is including Key characteristic dimension, Low PPK dimension & problematic dimensions based on historical
manufacturing experience.
yson under any

TION
& IQC)

n historical
Key Contact :

Control Plan
EB Date (orig)

PP Date (rev.)

Title : SOP Page:


Supplier / Manufacturer Company Name: Prime Contractor Quality Approval / Date :
Control Plan Number:

Issue :
Product Level: Drawing Number : Supplier / Manufacturer Approval / Date:

Assembly
Part number :
Part

Dyson does not accept any responsibility for the suitability of the control plan for the supplier to meet its obligations to Dyson under any
manufacturing or supply agreement.
Characteristics Methods

Process Name / Machine, Device, Jig, Tool for Sample


Special Char. Class Product / Process Evaluation / Reaction plan
Operation Description Mfg No. Product Process Control Method
Specification / Tolerance Measurement Technique Size Frequency

DYS-QA-DPAP-F-005-01
ISIR Sampling Table

Commodities Volume production run Sample size for measurement Additional requirement
(Volume to support EB)
Plastic Significant Production Run 20 shots per cavity COC, COA
Rubber Min 10 shots 5 shots per cavity NA
Metal Significant Production Run 20 pieces per tool Mill certificate
Hepa Filter Measure 20 shots from 1st spinning
tools
Min 30 shots NA
Pre Filter Measure 5 samples from subsequent
spinning tools
Sintered Parts Significant Production Run 20 pieces NA
Casting Significant Production Run 20 pieces NA
Spring Significant Production Run 20 pieces NA
Wire Looms Significant Production Run 20 pieces NA
Motors Min 350 pieces Motor life test (30 pieces) See motor procedure annex 1.0
Electronic Based on Project requirement plus 20 pcs 20 pcs First Article / Part Submission Warranty/BOM
Assembly
PLGM materials Significant Production Run 10 pieces NA
and Packaging
PVC electrical Min 350 pieces Cable rewind test Flexibility, Friction test data/shore hardness
cables
Product Assembly ISIR required even if child part(s) are under concession.
Details to be noted within Form Fit Function page of ISIR
Significant Production Run 20 pieces submission for the Assembly
ISIR Measurement Docume
Supplier: Dynacast ( S ) Pte Ltd Report Page No. : 1

Part/Assy number: 377287-08/02 Date of submission : 14 Oct 2

Tool number : SH0071 Part/Assy name : LOCK, MET

Drawing Issuance No: Rev 21 Material / Code : 316

Gauge No(s): - Colour / Code : Natur

Used on model: Material supplier : Dynac

Configuration No
Please fill in the red column
GENERAL REQUIREMENTS:

1. Significant Production Run


2. This 20 pieces shots shall be labeled by mold, cavity and samples number. Examp
3. For rubber part, tool to run for 10 shots. Select 5 random shots and labeled by too
4. For Nylon part, part need to be measured 'Dry-as moulded' ( DAM ).
5. All specifications reflected on the drawing have to be measured prior to tool and IS
6. Submission on ( Part PFMEA, Control Plan, QSI, GR&R, RoHS, Mill Certificate, COA
product prior to ISIR.
7. ISIR submission for other material, please refer to 'Sampling Table'.
8. For single boundary dimensions, please leave the upper tolerance or lower toleran

Background:

A. Reason for ISIR submission: or Change in :

B. T-Stage:

Please delete the not applicable boxes in Section A and B

Measurement Data

Impression no : 1 Cavity

1 2 3 4
Lower limit 8.560 3.280 6.760 2.320
Upper limit 8.680 3.360 6.860 2.380
Std Deviation
Mean
Pp #VALUE! #VALUE! #VALUE! #VALUE!
PPU #VALUE! #VALUE! #VALUE! #VALUE!
PPL #VALUE! #VALUE! #VALUE! #VALUE!
Ppk #VALUE! #VALUE! #VALUE! #VALUE!
Measuring Instruments Smarscope Smarscope Smarscope Dial Indicator
Grid REF D1-1 D1-2 D1-3 D3-4
+Tol 0.060 0.040 0.050 0.030
Dimension 8.620 3.320 6.810 2.350
-Tol 0.060 0.040 0.050 0.030
Upper Limit 8.680 Out 3.360 Out 6.860 Out 2.380 Out
Nominal Dimension 8.620 of 3.320 of 6.810 of 2.350 of
Lower Limit 8.560 Spec 3.280 Spec 6.760 Spec 2.320 Spec
S1 0 0 0 0
S2 0 0 0 0
S3 0 0 0 0
S4 0 0 0 0
S5 0 0 0 0
S6 0 0 0 0
S7 0 0 0 0
S8 0 0 0 0
S9 0 0 0 0
S10 0 0 0 0
S11 0 0 0 0
S12 0 0 0 0
S13 0 0 0 0
S14 0 0 0 0
S15 0 0 0 0
S16 0 0 0 0
S17 0 0 0 0
S18 0 0 0 0
S19 0 0 0 0
S20 0 0 0 0
Minimum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Maximum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Average 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Note:
i. All measurement to be done 24 hours after parts have been moulded.
ii. All calculations on this form are generated automatically.
iii. To add further measurements columns copy and paste to the right.
iv. This report is to be sent electronically to Dyson Engineering.

Submitted by: SC Ng

Position: QA Engineer

DYS-QA-DPAP-F-002-02
Documentation Issue 15
of 1

14 Oct 2019

LOCK, METAL ARM

316L

Natural

Dynacast

er. Example; Tool A /Cavity 1 /Sample 1


led by tool number, cavity number and sample number. Example; TA /C1 /S1.

ool and ISIR approvals.


icate, COA, COC, Laboratory test-optional, Regulatory compliance) is required for new

er tolerance blank base on the tolerance given in the drawing.

or Others :

Dimensions
5 6 7 8 9 10
3.490 3.050 2.680 11.090 13.100 13.070
3.590 3.150 2.760 11.230 13.210 13.210
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
MM Dial Indicator MM Smartscope Smartscope
D4-5 C4-6 C4-7 C6-8 C6-8 D2-10
0.000 0.000 0.040 0.070 0.070
3.590 3.150 2.720 11.160 13.140 13.140
0.100 0.100 0.040 0.070 0.040
3.590 Out 3.150 Out 2.760 Out 11.230 Out 13.210 Out 13.210
3.590 of 3.150 of 2.720 of 11.160 of 13.140 of 13.140
3.490 Spec 3.050 Spec 2.680 Spec 11.090 Spec 13.100 Spec 13.070
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
le number. Example; TA /C1 /S1.

egulatory compliance) is required for new

en in the drawing.

10
13.070
13.210
#VALUE!
#VALUE!
#VALUE!
#VALUE!

D2-10
0.070
0.070
Out
of
Spec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.000
0.000
0.000