Name of the Project :

Particulars of work OCTOBER NOVEMBER DECEMBER JANUARY


Week1 Week2 Week3 Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3
CIVIL WORKS
1) Terrace parapet wall+balcony
2) Exterior plaster ROUGH COAT

3) Duct concrete + plaster


4) Septic tank + soak pit final
5) Compound wall with plaster
6) Mud levelling in compound
7) W/P of toilets and terrace TOILETS CHAJJAS TERRACE

8) PCC filling + W/P


9) Masonry of stilt floor rooms

ROOF FABRICATION
1) Framework/ tiles/ w/p FRAME W/P TILES

PLUMBING/ SANITARY
1) Laying of pipes W/C, DIVERTER, W/B, 3/4" CONCEALED TOILET+FLOOR+DUCT+PIPES CHAMBERS
OHWT PURCHASE
2) OHWT/ ST / SP connection
3) Sanitary ware/ bath fittings
4) Water meter+ commissioning

ELECTRICAL
1) Wiring EXTERIOR / GARDEN INTER

2) Switches
3) Fixing of lights, fixtures
4) Commissioning

CONCRETE PARDI BALUSTER


BALCONY BALUSTER (TERRACE)
BALUSTER
FF & SF CONCRETE PARDI

WINDOWS

DOORS
FRAME
1) Stilt door SHUTTER

2) FF main door SHUTTER

3) Other doors

TILING WORKS
1) All rooms + kitchen counters
2) Terrace
3) Pavers
4) Stilt floor

INSPECTION PROVISION
SOLAR HEATER

GRILLS- WINDOWS+ GATES + LADDER LADDER/ OHWT GATE

EXTERIOIR PAINTING

INTERIOR PAINTING
1) Scrapping + primer + 1 coat
2) Final coat

S.S RAILINGS

SECURITY GUARD APPT

OCCUPANCY CERTIFICATE

STILT ROOMS

STILT CANOPY

KITCHEN CABINETS
LIVING ROOM SHELVES
DINING SHELVES
STAIRCASE GLASS PANELS
JANUARY FEBRUARY MARCH APRIL MAY JUNE
Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3 Week4 Week1 Week2 Week3

SANITARY WARE STILT ROOMS

COMMISSIONING

/ GARDEN INTERIOR

SHUTTER FRENCH POLICH MELAMINE

SHUTTER FRENCH POLICH MELAMINE

STILT TOILET

STILT TOILET/ CARETAKER

GATES

STILT ROOM

STILT ROOM
JUNE
Week4