PRODUCTION COSTS
Required Production Shifts per Year Shifts/Yr 1,000
Total Cost per Year $/Yr 5,000,000
Number of changeovers per week #/Wk 2
Length of each changeover Hrs/Chg 2.0
Number of people per changeover #/Chg 1.0
Annual changeover cost $/Yr 8,571
Service Calls per year #/Yr 10
Avg Total Cost per Service Call $/Call 1,500
Annual Cost of Service Calls $/Yr 15,000 Using Your COST Calculator
Total Costs 5,023,571 1) Fill in the shaded YELLOW boxes with actual data OR assumptions
SAVINGS 2) The values entered into the shaded boxes under the SAVINGS heading should be
Unplanned Equipment Downtime - AFTER training % 4.0% better' than those entered above or you MAY see a NEGATIVE ROI
Rejected / defective product - AFTER training % 4.0%
Actual vs targeted speed - AFTER training % 96.0% 3) The calculated values (NO yellow shading) change automatically,
Line Efficiency AFTER training % 88.5% including the final ROI
Change in Efficiency % 3.5%
Output per shift AFTER training Lbs/Shift 10,374 4) Do NOT enter data into any cells other than those with YELLOW shading
Required Production Shifts per Year AFTER training #/Yr 964
Total Cost per Year $/Yr 4,819,602
Production Savings $/Yr 180,398
Investments
Capital -1,000,000
Training -20,795
Net Annual Cash Flow -1,020,795 196,839 204,712 212,901 221,417 230,274 239,484 249,064 259,026 269,387 280,163 236,327
Sum Cash Flows -1,020,795 -823,956 -619,244 -406,343 -184,926 45,347 284,832 533,896 792,922 1,062,310 1,342,473
Discount Rate 8%
NPV $487,188
IRR 18%
Payback 4.32