PLANNING OF ORGANIC WASTE TREATMENT FACILITY IN 3R (REDUCE,

REUSE, RECYCLE) WASTE TREATMENT PLACE (TPS)


CICADAS MARKET, BANDUNG CITY
Mifta Khola Arofih1 dan Tri Padmi2
Departement of Environmental Infrastructure Engineering
Faculty of Civil and Environmental Engineering, Bandung Institute of Technology,
Jl. Let. Jend. Purn. Dr. (HC) Mashudi No.1, Sayang, Jatinangor
Bandung District 45363
1mifta.olla@students.itb.ac.id and 2tripadmi@ftsl.itb.ac.id

01 INTRODUCTION 02 EKSISTING CONDITION


General Overview Location : 6º54’38.66” LS , 107º38’38.73” BT,
3R TPS Babakan Surabaya Village, Kiaracondong Sub-
(gerai-arsitek.com)
region, Bandung City
The population of resident in The government’s strategy is Land slope = 0-2%
Bandung City increases every through decentralization efforts to Topography = ±695 mdpl
year. So, that waste transported the development of waste Area of TPS = 520 m2
to landfill also increased. transfer station (TPS) into a
Household
reduce, reuse, recycle (3R) waste solid waste
treatment place (TPS) Service
(69,9%)
Market,
Area Non-
The process of moving waste mall,store,
household
garden,
is done manually by trowing solid waste
sweep street
waste from the collection (16,42%)
vehicle into the container
Hasn’t done the There are no sewage 03 DESIGN PARAMETER
principle reduce, treatment processes
reuse, and recycle at
Specific of organic and Composition Standard : SNI 19-3694-1994
source and The inorganic. the biogas
schedule of waste Waste composition
reactor is no longer Organic solid waste
collection hasn’t in operation (% weit weight)
been done Water Content: 60.89 %(Wet Weight) others
There is no organized 5% B3
sorting process at the Volatile Content: 85.59% (Dry Weight) Glass
9%
2%
TPS Carbon: 58.2 %(Dry Weight) Metal
4%
Nitrogen: 2.1%(Dry Weight)
Organic waste
04 DESIGN CONCEPT C/N: 27.63
Plastic
40%
Mixed solid waste 17%
The waste processing facilities planned with service for 10
Water Content: 53.19% (Wet Weight)
years (2022-2031) Paper
Volatile Content: 92.2% (Dry Weight) Rubber/leather
Waste produced in 2018 = 3.13 l/p/d or 0.36 kg/p/d 2% Textile 13%
Wood
Carbon: 22.69%(Dry Weight) 4% 4%
Nitrogen: 1.8%(Dry Weight) Organic waste : 44%
C/N: 12.6 Recycleables waste : 36%
Others waste : 20%

Selested scenario :
Scenario 2

Capacity design :
6,42 ton/day

05 DESIGN RESULTS
The organic waste processing facilities divided in two way with anaerobic Gas roduced Maturation
system use biodigester and aerob system use windrow composting.
Wet organic Shredded Input Anaerobic Leachate and
solid waste solid waste feedstock digester solid digestate
Organic
solid waste
Dry organic Shredded Windrow
solid waste Maturation
solid waste composting

06 REFERENCES
Damanhuri, E and Tri Padmi .(2016). Intregated Solid Waste Management. Bandung
Institute of Technology : Bandung. Layout planning of organic solid
Ministry of Public Works and Public Housing .(2017). 3R TPS Technical Instructions. waste processing facilities at TPS
PUPR: Jakarta. 3R Cicadas Market, Bandung City
SNI 19-3964-1994 concerning Methods for Taking and Measuring
Example of Embossment.
Vogeli, Y dkk .(2014). Anaerobic Digestion of Biowaste in Developing Countries.
Binkert Buang AG: Switzerland.