Sei sulla pagina 1di 19

We alleviate landfills.

Apalit, Philippines. August 2018.

res torin g na t ure

res torin g na t ure

Apalit, Philippines. March 2019.


MILLENIUM E & C (M) Sdn Bhd
Incubating & commercializing GREEN TECHNOLOGY since 1999.
 20 years in the green industry Infrastructure
 Cutting-edge solutions such as: water treatment systems & components, water-
sourcing technology & solar-power systems.
 Global network of technical, industrial and commercial expertise.
 Clients include Petronas, Technip, Exon, MMC among others.
Oil & Gas

Power
Desalination Plant in
Water-sourcing in Spain Rural Water in Sabah
Turkmenistan
SOLID WASTE MANAGEMENET

res torin g na t ure


The world generates 1.3 billion TON of waste per year.
3 major environmental
By 2050, this amount will reach 3.5 billion TON per year. crises:
4 billion
1. Global warming
3.5 3.4
2. Depletion of
3 resources
2.6
2.5 3. Destruction of our
ecosystem
2

1.5 1.3 These crises are


1
interrelated, and
are all connected
0.5
to WASTE &
0 WASTE
2019 2025 2050
MANAGEMENT.

A household of 2 childrenOperating cost of integrated waste management


generates between 0.11kgsystems: $35 / ton - $100 / ton
– 4.54kg per day 20-50% of the municipal
budget
World Waste
67% of the world’s waste is not treated.
33% of waste is disposed at landfills and incineration plants.

Collection & Sorting &


Generation Handling Disposal
Transportation Segregation
Waste consisting Depending on the Waste is picked up Waste is sorted and Disposal of waste at
various categories arrangement by the periodically and segregated. Recyclable landfills, incinerators,
depending at source. municipality. Waste is delivered to waste materials are salvaged, composting sites,
Residential, delivered and/or transfer stations. toxic and hazardous concreate burial,
commercial, industrial, stored at collection materials are treated biodegraded to
etc. point. before being stored. alternative fuels, etc.

LANDFILL INCINERATION PLANT

• Ground water contamination • Negative Public Perception


• Far from city • Expensive to Build
• Requires large piece of land • Requires big space
• High maintenance & logistics cost • High operation cost
• Methane gas emissions • High maintenance cost
• Fire hazard • Situated in near urban area
• Banned in many countries
BOTH THESE SOLUTIONS REQUIRE THE CONVENTIONAL HANDLING TO DISPOSAL SUPPLY CHAIN
The waste situation in (country/ territory)
The Solution: ClearWaste
A GREENER and CLEANER alternative to the conventional
waste management system.

INDUSTRIAL DOMESTIC
WASTE WASTE FERTILISER

CONSTRUCTION
MATERIALS
MEDICAL ELECTRONIC
WASTE WASTE

The byproducts are applicable across


various industries – from agriculture,
to urban development and more…
Key characteristics

LOW RUNNING &


RUNS ON
MAINTENANCE COST
RENEWABLES

MODULAR & ZERO HARMFUL


MOBILE EMISSIONS

SELF-SUSTAINABLE SAFE & USER-


FRIENDLY
The ClearWaste units are robust, durable & uniquely designed.

BARE CONTAINERISED TRAILER-MOUNTED

Model Input Capacity Output (byproduct) Emissions Power source

2 TON per day 85kg/h 80kg/day (4%) Non-toxic smoke Solar & Electric

2.5 TON per day 105kg/h 100kg/day (4%) Water vapour Electric

4 TON per day 160kg/h 160kg/day (4%) Water vapour Electric


How it works: from waste to useable by-products
TESTING & CERTIFICATION
Cle ar OP Te st ing Parame t e rs
Testing Parameters
No. Paramet e r Unit
EMISSION TEST
1 Particulate Matter mg/ m3
2 NMVOC as total organic carbon mg/ m3
3 Hydrogen Chloride (HCl) mg/ m3
4 Hydrogen Fluoride (HF) mg/ m3
5 Sum of SO2 and SO3 expressed as mg/ m3
SO2
6 Sum of NO and NO2 expressed as mg/ m3
NO2
7 Cd & Tl mg/ m3
8 Sb, As, Pb, Cr, Co, Cu, Mn, Ni, V mg/ m3
9 PCDD / PCDF ng
TEQ/ m3
10 Mercury mg/ Nm3
11 Carbon Monoxide mg/ Nm3
WATER TEST
1 BOD-5 @20 °C mg/ L
2 COD mg/ L
3 Oil and Grease mg/ L
ASH TEST
1 Arsenic (As) mg/ kg
2 Cadmium (Cd) mg/ kg
3 Chromium (Cr) mg/ kg
4 Copper (Cu) mg/ kg
5 Lead (Pb) mg/ kg
6 Mercury (Hg) mg/ kg
7 Molybdenum (Mo) mg/ kg
8 Nicke l (Ni) mg/ kg
9 Selenium (Se) mg/ kg
10 Zinc (Zn) mg/ kg
11 Sulphur mg/ kg

• Green and eco friendly – passes all tests and standards as


per US EPA and Country Specific Standards

We provide Emission and Ash Testing @ site through world renowned agencies
- SGS / Exova / MyCO2 / SUCOFINDO
Applications

Rivers Cities Ports Farms

Slums Religious Sites Schools Hotels & Malls

Industrial Waste Medical Waste Electronic waste Domestic waste


Portfolio

 Landfill in the Philippines


 Township in Malaysia
 Shoe factory in China
 Remote Island Community in the Carribean
Landfill in the Philippines

Apalit, Philippines

- LANDFILL

- The landfill covered 5 ACRES

- The CW 2.00S unit was deployed AUGUST 2018

- 10 TONS of waste was cleared per day

- Entire landfill was cleared in less than a


year

MARCH 2019
Township in Malaysia

Samporna, Sabah

- COMMUNITY TOWNSHIP

- The CW 2.500E unit was deployed

- 5 TONS of waste was cleared per day


Plastic Waste Factory in China

Guangzhou, China

- SHOE-MANUFACTURING FACTORY

- PLASTIC WASTE

- The CW 4.00E unit was deployed

- 4 TONS of waste was cleared per day

- Now, the factory manages its own waste

- 160kg of byproduct is produced every day


Remote Island Community in The Carribbean

St Lucia

- ISLANDS

- The CW 2.500E & CW 4.00E unit was


deployed

- 66 units deployed all over the island

- Entire island is waste-free


res torin g na t ure

Potrebbero piacerti anche