Sei sulla pagina 1di 1

Installation Guide

CanusaWrap™
Two-piece protective bulk roll with separate closure

Product Description Storage & Safety Guidelines Equipment List


1 2 3
To ensure maximum performance, store
Canusa products in a dry, ventilated area. Keep
CAN

products sealed in original cartons and avoid


USA

exposure to direct sunlight, rain, snow, dust or


other adverse environmental elements. Avoid
-CP

prolonged storage at temperatures above 35°C


S

SOLVENT
(95°F) or below -20°C (-4°F). Product
installation should be done in accordance with
local health and safety regulations.
Bulk Roll Closure
CanusaWrapTM is typically shipped in bulk rolls. The These installation instructions are intended as a Propane tank, hose, torch & regulator Appropriate
adhesive is protected from contamination by an guide for standard products. Consult your Canusa tools for surface abrasion
inner liner. Closures are shipped either in bulk rolls representative for specific projects or unique Knife, roller, rags & Canusa approved solvent cleanser
or pre-cut. applications.
Digital thermometer with suitable probe
Standard safety equipment: gloves, goggles, hard hat,
etc.

Product Preparation Guidelines Surface Preparation


4 Bulk Roll Closure 5
overlap

SOLVENT
L
Corner Cuts
A <450mm Pipe O.D.
Pipe O.D.: B
A-50mm, B-25mm
Closure
<450mm (18")
Cut
Underlap

Overlap

100 mm overlap W
Sleeve
>450mm (18")
150 mm overlap
Sleeve >450mm Pipe O.D. width
A-100mm, B-50mm

As a guideline,cut the required lengths of Sleeve material (L)and Closure material (W) from the bulk roll as follows Ensure that the PE coating edges are beveled to 30°.
L = Coated Pipe circumference + overlap dimension W = Sleeve Width Clean exposed steel and adjacent pipe coating with a
solvent cleanser to remove the presence of oil,
Ensure that the sleeve and closure are not damaged or contaminated. Trim corners as shown . grease, and other contaminants.
Please see “CanusaWrapTM Sleeve Cutting Guideline” for more information on alternative cutting methods.

Surface Preparation and Pre-Heat Chart Flame Intensity & Torch Size
6 Standard Sleeves Surface Preparation Min. Pre-Heat Temp. 7
SIS Standard SSPC Standard °C (°F) Pipe O.D. Pipe O.D.
Minimum Preferred Minimum Preferred <450mm >450mm
WLG WTG St2 Sa2 SP2 SP6 50 (122) (18") (18")
WLC WTC St2 Sa2 SP2 SP6 60 (140)
Mastic

WLS WTS St2 Sa2 SP2 SP6 65 (150)


WLO WTO St2 Sa2 SP2 SP6 75 (167)
WLON WTON St2 Sa2 SP2 SP6 75 (167)
WLNN WTNN St3 Sa2½ SP3 SP10 90 (195) Use moderate flame Use moderate to high
WLA St3 Sa2½ SP3 SP10 60 (140) intensity for pre-heating flame intensity for pre-
Melt
Hot

SP10 and shrinking. heating and shrinking.


WLAS St3 Sa2½ SP3 90 (195)
Minimum Torch Size: Minimum Torch Size:
150,000 BTU/hr. 300,000 BTU/hr.

Surface Preparation Pre-Heat


8 h
9 10
idt 0mm
v e W e+5
e
Sle Sleev
m +
50m

Ensure that the pipe is dry before cleaning. Wipe clean or air blast the steel and pipe coating to Pre-heat the joint area to the minimum required
Prepare the steel joint area using the Surface remove foreign contaminants. temperature (see Surface Preparation & Pre-Heat
Preparation and Pre-Heat as a guideline. Lightly Chart). Using a temperature measuring device,
abrade the pipe coating adjacent to the cutback ensure that the correct temperature is reached on
area to a distance of 50mm (2") beyond each end the steel and at least 50mm (2") on each side of the
of the sleeve width. sleeve.

CANUSA-CPS is registered to ISO 9001:2008. Part No. 99060-022

Potrebbero piacerti anche