Sei sulla pagina 1di 8

STANDARD OPERATING PROCEDURE

Jaypee Nigrie Super Thermal Power Plant


2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 1 of 8
Revision Date:

STANDARD OPERATING
PROCEDURE
FOR

SHOOT BLOWING SYSTEM

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 2 of 8
Revision Date:

List of Contents

1. Objective
2. Scope
3. Introduction
4. Sealing Fan’s Technical Data
5. Responsibility
6. Safety Ppe’s
7. Special Tools/ Equipments
8. Safety Precaution During operation
9. Pre checklist by Field engineer
10. Operating Procedure
11. Abbreviations / Notations
References

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 3 of 8
Revision Date:

1. Objective
For Smooth Operation of Shoot Blowing system.

2. Scope
This SOP is applicable for all type of Soot Blower.

3. Introduction
Soot Blowers are used to remove the soot deposited in tubes of Boiler
and also used to remove soot from APH by using steam as a blowing
medium. Soot blowing cycle should be determined based on the
accumulated ash of the heating surface; the coal fired boiler generally
soot blowing done once in a shift. If the soot blowing time interval is
too long, it can impact on the soot blowing effects, reduce the boiler
efficiency

4. Shoot blower Technical Data


Long Retractable soot blower
Quantity no. 38(1L-19L,1R-19R)
Type IK545(1L/R&2L/R) & IK555(3L/R &19L/R)

Blowing medium Steam


Steam consumption per unit 2052kg/hr-9720kg/hr
Head pressure 7.1kg/cm2
Travel speed 311sec (1L/R&2L/R),650sec (3L/R &19L/R)
Length of travel 13150mm (1L/R&2L/R),13750 (3L/R &19L/R)
Drive motor 1.5Kw,415v,3phase,1500rpm
Head Steam
Gas
Tag. No Blower Location pressure consumption per
Temperature
kg/cm2 unit(kg/hr)
1L/R,2L/R 2ry superheater 1470 15.9 9720
3,4,5L/R 3ry superheater 1100 10.4 4392
6,7,8L/R 2ry Reheater 1020 11.3 4320
9L/R 2ry Reheater outlet 880 8.6 3420

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 4 of 8
Revision Date:

10L/R 2ry Reheater Inlet 880 8.6 3420


12L/R- 3528
1ry Reheater 790 8.8
13L/R
15-16L/R 1ry Reheater 680 7.1 2052

18-19L/R 1ry Reheater 570 7.2 2124


1ry 3528
11L/R 800 8.8
Superheater(inlet)
14L/R 1ry Superheater 680 7.1 2052

17L/R 1ry Superheater 559 7.2 2124


Half Retractable soot blower

Quantity no. 14(20L-26L,20R-26R)


Type IK525-EL

Blowing medium Steam


Steam consumption per unit Approx 4320kg/hr
Head pressure 8.8kg/cm2
Travel speed 42.3mm/sec
Length of travel 6730mm
Drive motor 1.5Kw,415v,3Phase ,1500RPM
Head Steam
Gas
Tag. No Blower Location pressure consumption per
Temperature
kg/cm2 unit(kg/hr)
21L/R,22L 1ry Reheater/Eco. 460 8.8 4320
/R
24,25L/R Economizer outlet 460 8.8 4320
20L/R Economizer Inlet 460 8.8 4320
23L/R Economizer 460 8.8 4320
26L/R Economizer outlet 460 8.8 4320
Wall deslagger

Quantity no. 68(A1-A24,B1-B20,C1-C24)


Type IR2G

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 5 of 8
Revision Date:

Blowing medium Steam


Steam consumption per unit Approx 1260kg/hr
Blower location Furnace in three elevation A,B,C
Head pressure 8.8kg/cm2
Travel speed 5.3mm/sec
Length of travel 254mm
Drive motor 0.18Kw,415v,3Phase ,1500RPM
RAPH Soot Blower

Quantity no. 4set,2per RAPH(one each at cold and hot side)


Type Semi-retractable lance design

Blowing medium Steam supply 25bar(g),359c


Steam consumption per unit Approx 1260kg/hr
Blower location Furnace in three elevation A,B,C
Max. pressure 40bar(g)
Drive motor 0.55Kw,415v,3Phase ,1395RPM

5. Responsibility:
Unit Control Engineer, Field Engineer and Desk engineer

6. Safety Precautions:
Ensure No Permit To Work Is Pending On Regarding This
System By Checking With EE/MRSE.
7. SAFTEY PPE’s:
Ear Plugs, Safety Goggles, Hand Gloves, Etc.

8. Special Tools/ Equipments : Shoot Blower Handle.

9. Pre checklist by Field engineer:


Sl. Remarks
Description Ok Not Ok
No.
1 All permits and cross permits have been returned.
2 Area is clear of any other material
3 Confirm the soot blowing steam pipelines, hanger

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 6 of 8
Revision Date:

& support are in the good condition, good safety


valve appearance.
4 Oil level in the soot blower gear box is normal

Confirm the drain valves of the soot blowing


5 system and manually operated valve of soot blower
are OPEN

10. Operating Procedure


a) Pre startup check
1. No PTW is pending.
2. Power supply module on Boiler MCC-A is ON.
3. Power supply isolator on Soot blower MCC is ON (
Corresponding to Boiler MCC source )
4. Boiler operation is normal condition combustion conditions
are steady.
5. Soot blower steam line drain RTDs are showing normal.
6. Boiler load is > 70%. (Not applicable for APH).
7. Furnace pressure is normal.
8. All soot blowers are in remote condition.
9. Soot blowing steam main isolation valve is open.
10. Soot blowing steam line, Front, drains (manual, MOV) are
open.
11. Soot blowing steam line, Rear, drains (manual, MOV) are
open.
12. Soot blowing steam line, left, drains (manual, MOV) is
open.
13. Maintain pressure & temperature for SH-28
kg/cm2/300˚C & RAPH -15 kg/cm²

b) Sequence of Operation:

1. R APH
2. Wall deslagger (Wall blowers)
3. LRSB (Super heater& reheater)
4. HRSB(Reheater & economiser)

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 7 of 8
Revision Date:

RAPH
Manual mode (Main steam) for RAPH soot blower

1. Open Soot blower Steam MOV.


2. Open pressure control valve up to 30%, gradually.
3. Close all drain.
4. Select main steam for APH soot blowing.
5. Ensure blowers retracted completely.

Manual mode (Aux steam) for RAPH:

Prestart checks

1. Aux steam header is charged.


2. Aux steams to RAPH line drains are open.
3. APH soot blowing line, from Aux steam, manual valves
are open.
Procedure:

1. Open Aux steam to APH valve, on Aux steam header,


slightly and warm-up the line.
2. Close drain valves after condensate is drained. Keep
traps in service.
3. Maintain the aux steam pressure at 15Kg/cm² & temp.
>260˚C
4. Blowing stops automatically after 30min.
5. Ensure blowers retracted completely.

Manual soot blowing operation for the LRSB

1. Open all drain MOVS.


2. Open main steam soot blowing line
3. Open Soot blower Steam MOV.
4. Open pressure reduce valve up to 30%.
5. Close all drain MOVS
6. Set pressure reducer valve auto position
7. Give the extend command to required soot blower.
8. Check in local.
9. Check in DCS.
10. Check the motor current.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR SHOOT BLOWING SYSTEM
Revision No.: 00
Document No.: PMPL/SOP/00 Effective Date: Page 8 of 8
Revision Date:

Manual soot blowing operation for the HRSB

1. Open all drain MOVS.


2. Open main steam soot blowing line.
3. Open Soot blower Steam MOV.
4. Open pressure reduce valve up to 30%.
5. Close all drain MOVS
6. Give the extend command to required soot blower.
7. Check in local.
8. Check in DCS.
9. Check the motor current.
10. Check that soot blower retract in auto, If not give
the retract command.

11. Abbreviations / Notations

1. SOP: Standard Operating Procedure


2. UCE: Unit Control Engineer
3. DE: Desk Engineer
4. FE: Field Engineer
5. DCS: Distributed Control System
6. EE: Electrical Shift Engineer
7. MFT: Main Fuel Trip.
8. RB: Run Back

References
1. L&T O & M manual
2. Soot blower P & I Drawing

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (Jaypee): Approved by (Jaypee):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head

Potrebbero piacerti anche