CORNELL TECH

COMMUNITY
AND
CONSTRUCTION TASK
FORCE MEETING
9/9/2019
The House (residential)

TATA
Innovation Center
Bloomberg
Center

Aerial view of campus looking north


North
Graduate
Hotel
18 Stories
150,000 sq ft
• 224 room keys
• Meeting Rms
• Restaurant
• Rooftop lounge

Verizon Executive Education Center


4 Stories
40,000 sq ft
• Ground fl meeting rm.
• 4 Classrooms
• 4 med. conf rms & 12 small break out rooms
• All loop roads remain open to vehicles, RIOC & MTA buses
• All 3 bus stops are maintained
• Daily & 3-week “look-a-heads” sent to RIOC / PSD
• PSD helix coordination & escorted wide load deliveries North
• 8’ high plywood / conc. barrier fence around entire site

Logistics Site Plan developed with and approved by:


FDNY, Dept. of Buildings (BEST Squad) RIOC / PSD
North West Corner

View of construction site truck


gates & overhead protection

North Loop Rd looking east


at protective vehicular
concrete & wood
barrier fence
North Loop Road

Construction lanes for 12’ vehicular


cueing & deliveries through traffic lane

North Loop Road traffic division

View looking east of 12’


through traffic lane
Construction Milestone Schedule
Activity VEEC Hotel
Construction Manager Barr & Barr Hunter Roberts

Site Mobilization Nov 2017 Nov 2017 (Fence only)

Ground breaking Nov. 30, 2017 March 12, 2018

Excavation / Foundation Nov 2018 – April 2018 March 2018 – Oct 2018

Crane arrival & set up n/a Nov 2018

Superstructure July 2018- Sept 2018 November 2018 – April 2019

Mech, Elect, Plumb on going on going

Building Façade March 2019 – Fall 2019 May 2019- Fall 2019
Interior framing & finishes on going on going

Building Completion Winter 2020 Spring 2020

Construction Duration 27 months 24 months


Hotel
Façade Enclosure VEEC Façade
Enclosure

Hotel & VEEC Construction Progress


(looking East)
Photo taken 9/4/2019
Hotel

VEEC

View from campus center


Photo taken 9/4/2019
Hotel (Restaurant area)

Hotel
(Lobby area)

Hotel (Lobby area)

HOTEL & VEEC


COURTYARD
Photos taken 9/9/2019
Lobby Area (looking south)

Lobby Area (looking west)


VEEC Ground Floor
Photos taken 9/9/2019

May Lobby Area (looking north at entry)


Meeting Room

VEEC Ground Floor


Photos taken 5/21/2019

Meeting Room
Classroom

VEEC 2nd & 3rd Fl.


Photos taken 9/9/2019

Breakout Spaces
(Photo taken May 2019) (Photo taken Sept. 2019)

Hotel Construction Progress


(Photo taken May 2019)
(Photo taken Feb 2019)

Hotel Construction Progress

Photo taken 9/9/2019


Hotel Façade Progress
(Photo taken 7/2019)
Hotel Interior Spaces
(photos taken Sept 2019)
(Photo taken May 2019)

Hotel 18th Floor

(Photo taken Sept 2019)