Cost Estimating & Time 7A River Water Intake Unit 60

Scheduling Section 3D Model Progress Report


16-May-19

1- Above Ground Work


A B C D
D
A Water Collection Pond
PIB'SS
Building Cumu. Actual
Cumu. Plan %
%
Cumu.
Cumu. Plan % 0% 0%
Actual %
65% 45%
Pump Station (Inside)

Diesel unloading Cumu. Actual


Cumu. Plan %
%
Cumu.
Cumu. Plan % 90% 68%
Actual %
100% 86%
Pump Station (Outside)

B7A-02 Cumu. Actual


Cumu. Plan %
%
Cumu.
Cumu. Plan % 66% 15%
Actual %
100% 75%
Raw Water Transfer Pumps
B7A-09
A/B/C
Cumu. Cumu. Actual
Cumu. Plan % Cumu. Plan %
Actual % %
100% 80% 100% 95%

Air Compressors

Cumu. Actual
Cumu. Plan %
%

B C 60% 80%

Sludge Storage System Plant & Instrument Air Coarse Strainer &
Recycle Water Basin. Thickening Basins Sludge Filter press Packag Break Tank A/ B. Potable Water Tank Sodium Hypochlorite Dosing Sludge Basin
Package Receiver Hydrocyclone
Cumu. Plan Cumu. Actual Cumu. Actual Cumu. Actual Cumu. Actual Cumu. Actual Cumu. Actual Cumu. Actual Cumu. Actual
Cumu. Plan % Cumu. Actual % Cumu. Plan % Cumu. Plan % Cumu. Plan % Cumu. Plan % Cumu. Plan % Cumu. Actual % Cumu. Plan % Cumu. Plan % Cumu. Plan %
% % % % % % % % %
100% 100% 100% 100% 90% 75% 100% 95% 95% 79% 100% 90% 80% 75% 100% 100% 100% 95% 100% 90%

2- Under Ground Work


Area A Work Under Ground Area B Work Under Ground Area C Work Under Ground Area D Work Under Ground Remark
Cumu. Cumu. Cumu. Plan Cumu. Cumu. Cumu. Cumu. Cumu.
Name of Work Package Name of Work Package Name of Work Package Name of Work Package
Plan % Actual % % Actual % Plan % Actual % Plan % Actual %
Almost finished around
Piping Works (U/G) 5% 100.0% 95.0% Piping Works (U/G A/G) 25% 85% 40% Piping Works (U/G A/G) 40% 80% 40% Piping Works (U/G A/G) 30% 10% 0% 48% from Piping at the
Shop
Electrical Works 40% 70.0% 10.0% Electrical Works 20% 71% 5% Electrical Works 20% 70% 2% Electrical Works 20% 69% 0%
Instrument Works 50% 4.3% 0.1% Instrument Works 15% 1% 0% Instrument Works 15% 1% 0% Instrument Works 20% 2% 0%
Drainage System 11% 100.0% 95.0% Drainage System 20% 100% 90% Drainage System 45% 100% 95% Drainage System 24% 85% 0%
Concrete Sleeprs Work 0% Concrete Sleeprs Work 24% 100% 95% Concrete Sleeprs Work 52% 100% 92% Concrete Sleeprs Work 24% 84% 0%
Cable Trenches Works 20% 100.0% 80.0% Cable Trenches Works 35% 100% 80% Cable Trenches Works 40% 90% 85% Cable Trenches Works 5% 4% 0%

Ali Hadi Khudhair


Project Planner & Scheduler