Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2. Land
In government approval we need to find out what are the approvals required such as
-Taxes
-Pollution
-Forest
-Employment law
a. State DI
procedure, operation, action, activity, exercise, affair, business, job, task, undertaking, proceeding
Setting up meaning
Build , arrange , install , initiate , begin , create
Manufacturing meaning
make, produce, mass produce, build, construct, assemble, put
together, create, fabricate, prefabricate, turn
out, process, form, fashion, model, mould, shape, forge, engineer
Company Formation
START
Obtaining approval for the proposed name of the Company from the ROC
Drawing up the Memorandum of Association
Drawing up the Articles of Association
Getting the appropriate persons to subscribe to the Memorandum (a minimum of 7 for a
public company and 2 for a private company
Payment of Registration Fee to the ROC
Receipt of Certificate of Incorporation
Obtain a certificate of commencement of business from the ROC in case of a public company
STEP 1-Every business registered in India is provided certain benefits by the
government based on its type of entity - small, medium or micro. On registration
of the micro/small/medium enterprise, one shall receive a MSME certificate.
The factory owners are required to notify and also register their premises with
the local governing authority before the beginning of operations. This helps in
facilitating the risk management at workplace and the total implementation of
Safety and Health Management Systems in factory premises
STEP 4- next he should take certificate from Pollution Control Board of state
and Central for forest and water pollution.
STEP 5- and he should make a Latest analysis report of effluent, fuel gases,
solid waste and hazardous wastes and Details of water pollution control/air
pollution control devices provided and also Ambient air quality report and should
submit the report
STEP 6-At the time of applying for the license it is required to mention other
information like the lists of equipment, manufacturing facility details with
minimum area required for manufacturing, Technical Competent personnel
details, etc. so that the licensing authorities have proper knowledge
regarding the background of the person
STEP 7– After that when the authority is satisfied with the report and the
standards of your premises it grants the license .after that we can start the
work .
And we need to list the required machinery and all raw material for setting
up manufacturing unit and should purchase the same
• Production of Contract
• Placing of order