lG-E-0: CEME N
T PLUG DRILLING AND WEU CLEANUP-TD
l
. oom· Plug Length: 100m
,tcement Plug To p expe cte d · 2 '
1
ct d· 357m· Plug length: 100m
2nd Cement Plug Top expe e . ,
. l147m · Plug Length : 100m
T p expect e d · '
3rd Cement Plug 0
N· 332 M lAS PER WIRELINE LOGGING DEPTH)
PARTED CASING SECTIO .
392 4385m , 4384m , 4402m , 4401m, 4418m, 4417m, 4429m ,
PERFORATION: 4393m , 4 m,

4430m, 4456m, 4462m, 4466m

MUD MOTOR DETAILS


. I No . SLZ60X3 S· Motor OD: 2-3/8", CONNECTION : 1-1/2" AMMT
Make: ULIN MOTOR; Sena ·· · '

MILLING BIT DETAILS

Make: Great Bit China; Bit OD : 3.5"

FLUID TO BE USED FOR CEMENT PLUG DRILLING

For i5t and 2nd Plug drilling we will start with fresh water
However after every 5-10 Ft we will use high viscous pill (10-20 cP) to lift the cutting on

Surface
For 3rd Plug drilling we will start with gel fluid 5 cP and will send pill after every 5-10 Ft
TD: 4445m

JOB EXECUTION PROCEDURE


l . Rig up the BHA and function test on surface at max circulating rate of 1.5 BPM, note down the rate and
pressure with water
2_ Put high pressure water filter in the pumping line to coil to avoid any debris getting to the motor
3. we will pressure test the coil stack at 5000 psi
4_ Rig up Trican Cement Unit and also keep one Frac pump as back up, both units rigged up and primed .
5_ once the surface function test and pressure test is confirmed we open the swab valve & master valve
and start lower the coil at 5FPM to pass the wellhead and then keep 15 FPM rate, till we tag the first
cement top.
6 During running in hole keep pump running a~
_ bpm r~ e and confirm the return on surface.
. Tag the cement top slowly and note down the depth , increase the pump rate to 0.9 bpm and start the
7
milling process.
After everv 5-Ft pickup CTU and then pump a high vis pill, monitor the return and confirm the cement
8.
cuttings. .
nduct the milling operation of every cement plug as we need to keep the motor working till
9. slowycoI ,
we clean everything. . .
must note down the ctrculation pressure, off bottom pressure and on bottom pressure
10. The operator
with pumP rate.
Page 1 of 2
FLUID/ CHEM ICAL TO BE USED FOR THIS JOB

RO Water

HVFR : EM 533F (Make : SNF)

PERSONN EL

Coil tubing team

Supervisor: Henry Berty Roeroe

Day shift

Operator : Budi Bako

Asstt Opt: Surender

Mahto, Ramesh, Anwa r

Night Shift

Operator: Jantua

Asstt Opt: Amit

Magesh, Sumit, Mukesh

Trican pumping team

Operator: Manoj Yadav

Hussain, DebuRam

Frac pump supervisor: Sandira Kumar

Operation : Monirul

Ground : Satish, Rajesh

Chemist: Arvind Mangal & Prashant

E-tech : Ayush / Abhishek