USER MANUAL
CONTROLLING

PRESENTED BY: SAAD SARWAR


SIEMENS PAKISTAN ENGINEERING CO. LTD
ISLAMABAD
TABLE OF CONTENTS
CONTROLLING ............................................................................................................................................... 3
1. COST ELEMENT ACCOUNTING .............................................................................................................. 3
1.1. FS00- Create a Primary Cost Element ........................................................................................... 3
1.2. FS00 - Create a Secondary Cost Element ...................................................................................... 6
1.3. FS00 - Change, Display, Delete a Cost Element & display changes ............................................... 7
1.4. KAH1 - Cerate a Cost Element Group: ........................................................................................... 8
1.5. KAH2 - Change a Cost Element Group: ....................................................................................... 10
1.6. KAH3 - Display a Cost Element Group ......................................................................................... 11
2. COST CENTER ACCOUNTING ............................................................................................................... 12
2.1. OKEON – Create, Change or display the Cost Center Hierarchy ................................................. 12
2.2. KS01 - Create a Cost Center (not from the hierarchy)................................................................. 13
2.3. KS02 ETC - Change, display, delete a Cost Center & display changes ......................................... 16
2.4. KSH1 - Create Cost Center Group: ............................................................................................... 17
2.5. KSH2 - Change, display, delete a Cost Center Group................................................................... 19
2.6. KSV1, KSV2, KSV3 – Create, Change, Delete, Display Actual Distribution Cycle.......................... 20
2.6.1. KSV1 - Run Cost Distribution cycle .......................................................................................... 21
2.6.2. KSV5 - Execute Cost Distribution cycle ................................................................................ 24
2.6.3. KSB1 - Check cost distribution on Cost Centers .................................................................. 26
3. INTERNAL ORDERS .............................................................................................................................. 27
3.1. KO01 - Create an Internal Order.................................................................................................. 27
3.2. KOB1 - Run Order report ............................................................................................................. 29
3.3. KO02, KO03 – Change, Display an Internal Order ....................................................................... 30
4. PRODUCT COST CONTROLLING ........................................................................................................... 31
4.1. KP26 – Activity Price Entering ..................................................................................................... 31
4.2. KP97 – Copying plan activity prices to next period ..................................................................... 33
4.3. KP98 – Copying actual activity prices to next period .................................................................. 34
5. STANDARD COST ESTIMATE................................................................................................................. 38
5.1. CK11N – Standard Cost Estimate for One Material ..................................................................... 38
5.2. CK40N – Standard Cost Estimate Run for Multiple Materials ..................................................... 45
6. MONTH END TRANSACTIONS ............................................................................................................. 52
6.1. KSS2 - Run Actual Splitting .......................................................................................................... 52
6.2. KSII - Calculate Actual Activity Rate ............................................................................................ 53

CONFIDENTIAL Page 1 of 60
6.3. MFN1 - Revaluation at actual prices ........................................................................................... 55
6.4. KKS2 - Variance Calculation ......................................................................................................... 58
6.5. KO88 - Actual Settlement of Variance ......................................................................................... 59
7. CO PROFITABILITY ANALYSIS (CO-PA) REPORTS...................................... Error! Bookmark not defined.
7.1. CO-PA Organization Structure ........................................................ Error! Bookmark not defined.
7.2. Characteristics ................................................................................ Error! Bookmark not defined.
7.2.1. Fixed Characteristics:.............................................................. Error! Bookmark not defined.
7.2.2. Predefined Characteristics: .................................................... Error! Bookmark not defined.
7.3. Value Fields .................................................................................... Error! Bookmark not defined.
7.4. KE31 - Create CO-PA Report ........................................................... Error! Bookmark not defined.
7.4.1. Element definition: General data selection ........................... Error! Bookmark not defined.
7.4.2. Create Profitability Report: Initial Screen............................... Error! Bookmark not defined.
7.4.3. Create Profitability Report: Specify Profit. Segment .............. Error! Bookmark not defined.
7.5. Change Report: Settings ................................................................. Error! Bookmark not defined.
7.5.1. Change Profitability Report: Specify Profit. Segment ............ Error! Bookmark not defined.
7.5.2. Report: MONSALE2 -MONTHLY SALES 2 ................................ Error! Bookmark not defined.

CONFIDENTIAL Page 2 of 60
CONTROLLING
SAP Controlling (CO) is another important SAP module offered to an organization. The main purpose
of SAP controlling module is planning. It enables you to determine variances by comparing actual data
with plan data and thus enables you to control business flows in your organization.

1. COST ELEMENT ACCOUNTING

1.1. FS00- C REATE A P R IMARY C OST E LEMENT


Creating a Primary Cost Element can be achieved by using transaction FS00.
Using FS00:

Press “create” button from the tool bar or Press “Copy” button if you want to create from
reference of already created one.

One of the following screens will pop – up for new creation or creation from reference respectively

Or
Enter the Cost Element number you want to create and press enter.

CONFIDENTIAL Page 3 of 60
In “Type / Description” tab:
Select GL Account type: “P Primary Costs or Revenue”
Select Account Group: “5000 EXPENSE (PRIMARY COST ELEMENT)
Fill Short Text and G/L Acct Long Text with appropriate values

In “Control Data” Tab:


Fill the data as mention in screen shot below:

Account Currency: PKR


Tax Category: *

CONFIDENTIAL Page 4 of 60
Posting without tax allowed:
Sort Key: 002
Cost element category: 1
For an Expense account you must choose “1” for the Cost Element Category.

For a Revenue account you must choose “11” & for a Sales Deduction you must choose “12”.

After definition, press

CONFIDENTIAL Page 5 of 60
1.2. FS00 - C REATE A S ECONDARY C OST E LEMENT
For secondary cost elements, you have to use the same path as you have used for creation of Primary
cost elements. Secondary cost elements are only using at CO module purposes, they’re not related to
FI module.
For example, activity cost elements are created as secondary cost elements.
In “Type / Description” tab:
Select GL Account type: “S Secondary Costs”
Select Account Group: “5900 EXPENSE (SECONDARY COST ELEMENT)
Fill Short Text and G/L Acct Long Text with appropriate values

In “Control Data” Tab

Enter a meaningful Name & Description.


The Cost Element Category you select here should be 43 for Secondary Cost Elements which are going
to be used in internal activity allocation. Rest of the Procedure will be same.
After definition of cost elements category, press save.

CONFIDENTIAL Page 6 of 60
1.3. FS00 - C HANGE , D ISPLAY , D E LETE A C OST E LEMENT & DISPLAY CHANGES
Use transactions FS00 for all the activities, i.e. change, display or deletion of a cost element.
The transaction is simple & straight forward to use.
Open T- Code FS00

Double click on the cost element you want to work on from the hierarchy mentioned in left side of the
screen (5900000002).

Then click on “change” button for the tool bar

CONFIDENTIAL Page 7 of 60
1.4. KAH1 - C ERATE A C OST E LEMENT G ROUP :
Go to T-Code KAH1

A Cost Element Group can be given any name.

ENTER
Enter a description for the group.

To insert the cost elements, click on “Cost Element”.

Enter either cost elements one after the other or as a range.

CONFIDENTIAL Page 8 of 60
SAVE
Cost Element Groups are used in reporting & in assignment of cost elements to activity types etc.
where the requirement is to read the values from a number of Cost Elements.

There can be sub-groups within a group.

CONFIDENTIAL Page 9 of 60
1.5. KAH2 - C HANGE A C O ST E LEMENT G ROUP :

ENTER

Click on the cost element to remove from the group & then click on the icon .

Then click on the icon.

The cost element has been removed.


Press “SAVE”.

CONFIDENTIAL Page 10 of 60
1.6. KAH3 - D ISPLAY A C OST E LEMENT G ROUP
Open the T-Code KAH3 and fill the cost element field with cost element you want to change.

Press Enter

CONFIDENTIAL Page 11 of 60
2. COST CENTER ACCOUNTING
2.1. OKEON – C REATE , C HANGE OR DISPLAY THE C OST C ENTER H IERARC HY

From this transaction one can create, change or delete a cost center and also add, change or delete a
hierarchy level (called a node).
Transaction OKEON

Close the Basic Screen to simplify the screen.

CONFIDENTIAL Page 12 of 60
You can either do this from within the hierarchy transaction or use KS01.
From within the hierarchy:

Click on the “Create” icon .

Or you can create from the T-Code KS01. Creation procedure would be same from both the codes.

2.2. KS01 - C REATE A C OST C ENTER ( NOT FROM THE HIERARC HY )

Enter the cost center number (first 4 characters are equal to the Cost Center Group, next 2 for Sub-
group and last 4 shall represent Cost Center).
Date range – whatever is applicable.
Usually the end date is 31.12.9999

CONFIDENTIAL Page 13 of 60
ENTER
Fill in the required fields & optional fields for more info.

In “Address Tab” write down the brief address related to Cost Center

CONFIDENTIAL Page 14 of 60
Enter SAVE

CONFIDENTIAL Page 15 of 60
2.3. KS02 ETC - C HANG E , DISPLAY , DELETE A C OST C ENTER & DISPLAY
CHANGES

At KS02 transaction, you can change the settings for cost center. KS03 transaction is for displaying
settings for cost center.
If cost center doesn’t have any records, you can delete cost center master data at KS04 transaction.

First run the deletion in test run.

If it gives no error, run again after removing Test run to update the records.

CONFIDENTIAL Page 16 of 60
Select Yes.

Process completed.

2.4. KSH1 - C REATE C OST C ENTER G ROUP :

CONFIDENTIAL Page 17 of 60
ENTER

Enter a description.
ENTER
Click on “Cost Center”.
Capture the cost centers.

SAVE

CONFIDENTIAL Page 18 of 60
2.5. KSH2 - C HANGE , DISP LAY , DE LETE A C OST C ENTER G ROUP

ENTER

If you want to add another group in the structure, click on one of the two buttons

by placing the cursor where you want to enter the group.

Add in the additional Groups and cost centers & SAVE.

CONFIDENTIAL Page 19 of 60
2.6. KSV1, KSV2, KSV3 – C REATE , C HANGE , D E LETE , D ISPLAY A CTUAL
D ISTRIBUTION C YCLE

We have to book an expense document in the system and post the cost on a Cost Center. Then
distribute that cost to other cost centers. Document posted as under:

In above example, we have booked Fuel expense of 350,000 and allocated to cost center T018010001.
Document number for this Journal entry is 1900000063.
Now we run the cost centre report “KSB1”

CONFIDENTIAL Page 20 of 60
Fill in the required data i.e.
Cost Element: 5004005024 (Fuel)
Cost Center: T018010001 (we used in Journal Entry)

Press F8 or execute

The above report shows that cost center T018010001 has a value of 350,000 against cost element
5004005024 (Fuel).

2.6.1. KSV1 - R UN C OST D ISTRIBUTION CYCLE


Go to KSV1 transaction code and enter distribution cycle name and press enter.

Enter text, date information and go to “Attach segment.”

CONFIDENTIAL Page 21 of 60
Sender Rule: Select “Posted amounts”.
Share in %: Give percentage of the amount to be distributed. Select 100%.
Receiver Rule: Select “Fixed Amounts”.

At sender/receiver Tab, enter sender cost center, cost element and receiver cost center information.
Sender cost center: T018010001
Fuel Cost element: 5004005024 (Fuel)
Receiver Cost Center: T018010006

CONFIDENTIAL Page 22 of 60
At sender values tab, choose “000” for version.
Share %: select the percentage you want to allocate. We put 90% in example.

At receiver tracing factor tab, enter the amount to be distributed among the receiving cost centers. We
will distribute 200,000 and 115,000 in T018010006 and T018010007 respectively and save it.

CONFIDENTIAL Page 23 of 60
2.6.2. KSV5 - Execute Cost Distribution cycle
Enter Period: 5
Fiscal Year: 2019
Cycle: FUEL03
Start Date: 01.11.2018
Execute first in test run.

Test run shows that process completed without errors.

Press F9 or to check line items

CONFIDENTIAL Page 24 of 60
Press F9 or to check line items

Entry is correct. Go back, remove Test run and execute again.

CONFIDENTIAL Page 25 of 60
2.6.3. KSB1 - Check cost distribution on Cost Centers

Now run KSB1 to check the cost distribution on different cost centers.

Fill in the required and execute.

CONFIDENTIAL Page 26 of 60
3. INTERNAL ORDERS
3.1. KO01 - C REATE AN I N TERNAL O RDER

Enter controlling area: 1000


Order type: MT01
Press Enter

Enter Plant: 1100

CONFIDENTIAL Page 27 of 60
Enter Profit Center: 1001002
User responsible: SAAD
Cost Center: T007010002

Click Edit Release menu item .

Click button
Order Number 500003 is created in the system.
Now put an entry on the order.
Enter G/L Account Document: FB50

Fill all the required data and order field with the newly created Order (500003).

Click button
Document saved.

CONFIDENTIAL Page 28 of 60
3.2. KOB1 - R UN O RDER REPORT
Run T-Code KOB1 to check the Order report.

Controlling Area: 1000


Order : 500003

Click Execute button

CONFIDENTIAL Page 29 of 60
3.3. KO02, KO03 – C HAN GE , D ISPLAY AN I NTERNAL O RDER

Go to KO02 transaction and write order number.

Change the fields you want to change and save.

CONFIDENTIAL Page 30 of 60
4. PRODUCT COST CONTROLLING
4.1. KP26 – A CTIV ITY P R ICE E NTERING

For activity price entering, you should use KP26 transaction.


At this screen, you should enter cost center and activity type data.

Fill up all the data as below:


Version: 0
Posting Period and Fiscal Year
Cost Center s or Cost Center Group (T018)
Activity Types: FOH, Labour, Machine, Setup.

Press F5 or click overview button

CONFIDENTIAL Page 31 of 60
At this screen, you should check amount and plan unit price. For example, for ‘FOH’ activity, 1 Hour of
this activity is defined 10.00 PKR. You can change plan unit price here. Similarly you can assign activity
price to each activity type. For next cost center; press to toggle between the cost centers.
After entering activity prices, press save.

CONFIDENTIAL Page 32 of 60
4.2. KP97 – C OPY ING PLAN ACTIV ITY PRICES TO NEXT PERI OD

Go to KP97 transaction code. Enter values below


Template: reference values of current period for copy
Target: next period

CONFIDENTIAL Page 33 of 60
Enter values and execute for test run.

If there’s no error, unselect test run and execute.

4.3. KP98 – C OPY ING ACT UAL ACT IVI TY PRICES TO NEXT PE RIOD

After period end closing, you can copy actual activity prices to next period’s plan activity prices.

CONFIDENTIAL Page 34 of 60
CONFIDENTIAL Page 35 of 60
For reporting activity prices, you can use KSBT transaction code. Enter data and execute.

CONFIDENTIAL Page 36 of 60
CONFIDENTIAL Page 37 of 60
5. STANDARD COST ESTIMATE
For calculating standard cost estimate, activity prices, BOM and routing data should be entered for
related material.

5.1. CK11N – S TANDAR D C OST E STIMATE FOR O NE M ATERIAL


Go to CK11N transaction.

Enter material, plant and costing variant information and press enter.

Enter dates in the respective fields.

CONFIDENTIAL Page 38 of 60
Press Enter.
At calculation screen, status should be green.

For detailed analysis, press the button below. This button shows activity information.

This button shows detailed activity information as shown below.

CONFIDENTIAL Page 39 of 60
Press ‘SAVE’.
For marking /releasing process, you should go to CK24 transaction.
Marking: For allowing the price update marking, select “Marking Allowance”

Choose the company code, Plant and Material and execute in test run and click.
Then select costing variant and save.

CONFIDENTIAL Page 40 of 60
After allowance, go previous screen and execute marking at test run.

Go back,
If costing status will be “VO”, it means that marking is made successfully.

Go back at the main screen, unselect test run and execute.

CONFIDENTIAL Page 41 of 60
Releasing: For releasing, you should select the button below,

Execute release with Test Run

CONFIDENTIAL Page 42 of 60
Go back,
If costing status will be “FR”, it means that “release” is made successfully.

CONFIDENTIAL Page 43 of 60
Material price change document posted in the system. To check the Document goes to CKMPCD.

Enter Document number and press


The following screen will open.

Click on the button

Double click on Accounting Document

CONFIDENTIAL Page 44 of 60
The difference between old price and new price is 5.92 PKR. Available stock is 1,000 units for this
material. So, total amount posted to price difference is PKR 5,920.

Available quantity is 1,000 in Accounting 1 Tab of Material Master record.

5.2. CK40N – S TANDAR D C OST E STIMATE R UN FOR M ULTIPLE M ATERIALS

CONFIDENTIAL Page 45 of 60
Go to CK40N transaction. Write a name for costing run and enter costing run date (usually next period’s
beginning date) and press create.

Fill the Costing tab as follow,

Fill date fields,

Press ‘SAVE’
After saving, cost estimate tab will open.

CONFIDENTIAL Page 46 of 60
For selection, choose section. (You have to do it for every step.)

Press “SAVE”.

Go back and execute the first line, Press “RUN”.

CONFIDENTIAL Page 47 of 60
After running “analysis” steps, you can see the cost estimate analysis report at the screen below,

You can view Material Cost Estimate by double clicking each line as we get in case of single material
cost estimate.

CONFIDENTIAL Page 48 of 60
Press back button, and Run “Marking”

Press back

We have “VO” status for each material.


Go back and click on parameter Icon in “Marking” step.

CONFIDENTIAL Page 49 of 60
Remove Test run

Go back and execute Marking Step.

Press Log

Following pop up shows that there is no error in marking.

Go back and click on parameter Icon in “Release” step.

CONFIDENTIAL Page 50 of 60
Remove Test run and Save.

Execute “RELEASE”.

Execute Doc number 3000000022 in CKMPCD.

Click on accounting Documents.

CONFIDENTIAL Page 51 of 60
6. MONTH END TRANSACTIONS
At the month, in SAP CO Module users have to run some month end activities which are described
below

6.1. KSS2 - R UN A CTUAL S PLIT TING


Go to T-code KSS2 and fill the required data.

CONFIDENTIAL Page 52 of 60
Execute in Test Run.

This screen shows actual cost postings on the production cost centers and primary cost elements which
we have assigned to our Activity Types.
If there is no error message and actual cost which the users have posted are correct, go back, remove
test run and execute.

6.2. KSII - C ALCULATE A CTUAL A CTIV ITY R ATE

Go to T-code KSII and fill the required data.

CONFIDENTIAL Page 53 of 60
Execute in Test run.

If you multiply Activity quantity with total price and sum it. Total would be Rs. 1,000,000. The actual
expense incurred in this test case is 1,000,000 as shown in below document. Document number is
1900000066.

Go back and execute the same without test run.

CONFIDENTIAL Page 54 of 60
6.3. MFN1 - R E VALUATION AT ACTUAL PR ICES
Go to T-Code MFN1 and fill the required data.

CONFIDENTIAL Page 55 of 60
Execute in Test Run.

Click next level details.

CONFIDENTIAL Page 56 of 60
Here it the production order at actual price as per the actual costs booked on respective cost center
and cost elements assigned to the activity types.

CONFIDENTIAL Page 57 of 60
6.4. KKS2 - V ARIANCE C ALCULATION
In this step we will calculate variance between the target cost and actual cost. Go to T-Code KKS2 and
fill the required data.

Execute in test Run initially.


For this particular order “1000160”, the system will calculate the variance and show as below

Go back and execute again without test run.

CONFIDENTIAL Page 58 of 60
6.5. KO88 - A CTUAL S ET TLEMENT OF V ARIANCE
The last step in month end closing activities is to settle the variance calculated in the previous step. Go
to the T-Code KO88 and fill the data.

Execute in test run.

Click the highlighted Icon to get the detail list.

CONFIDENTIAL Page 59 of 60
The same value will come up; which was calculated earlier at the time of variance calculation. Go back
and run again without test run.

Click the ‘Accounting documents’ Tab to view the accounting entry.

Double click on accounting document

Above accounting entry posted in the system


Cost of goods Sold Dr
Variance Cr

CONFIDENTIAL Page 60 of 60